Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost Barisal Zone Barguna Division R880 Patuakhali-Kacchira Road Km 047.88-047.98 S 0.10 1443 Regional DBST 25mm Traff 2014 0.147 1.79 R880 Patuakhali-Kacchira Road Km 047.98-048.28 S 0.30 1443 Regional DBST 25mm Traff 2014 0.441 0.45 R880 Patuakhali-Kacchira Road Km 029.04-030.44 S 1.40 5170 Regional DBST 25mm Traff 4000-600 2014 3.479 5.12 R880 Patuakhali-Kacchira Road Km 045.68-045.78 S 0.10 1443 Regional DBST 25mm Traff All 2014 0.147 0.66 R880 Patuakhali-Kacchira Road Km 047.08-047.88 S 0.80 1443 Regional DBST 25mm Traff All 2014 1.176 0.39 R880 Patuakhali-Kacchira Road Km 046.78-046.98 L 0.20 1443 Regional DBST 25mm Traff All 2014 0.504 0.04 R880 Patuakhali-Kacchira Road Km 046.78-046.98 R 0.20 1443 Regional DBST 25mm Traff All 2014 0.504 0.04 R880 Patuakhali-Kacchira Road Km 036.03-036.83 S 0.80 1929 Regional Overlay 50mm @ IRI 7-9 2014 2.472 2.35 Sub-total Barguna Division 8.871

Barisal Division N8 -Patuakhali Road Km 133.28-133.68 S 0.40 2933 National DBST 25mm Traff 2000-400 2014 0.924 3.12 N8 Dhaka -Patuakhali Road Km 130.08-133.08 S 3.00 2933 National DBST 25mm Traff 2000-400 2014 6.930 3.09 N8 Dhaka -Patuakhali Road Km 133.08-133.28 S 0.20 2933 National Overlay 50mm @ IRI 4-9 2014 0.971 4.56 N8 Dhaka -Patuakhali Road Km 126.88-130.08 S 3.20 2933 National Overlay 50mm @ IRI 4-9 2014 15.541 4.25 N8 Dhaka -Patuakhali Road Km 136.18-136.38 S 0.20 2933 National Overlay 50mm @ IRI 4-9 2014 1.325 2.81 N8 Dhaka -Patuakhali Road Km 133.68-136.08 S 2.40 2933 National Overlay 50mm @ IRI 4-9 2014 15.173 2.78 N8 Dhaka -Patuakhali Road Km 136.38-139.38 S 3.00 2933 National Overlay 50mm @ IRI 4-9 2014 19.868 2.67 N8 Dhaka -Patuakhali Road Km 165.94-174.98 S 9.05 3147 National Overlay 50mm @ IRI 4-9 2014 43.937 2.45 N8 Dhaka -Patuakhali Road Km 176.09-177.30 S 1.21 1401 National Overlay 50mm @ IRI 4-9 2014 5.342 1.40 N8 Dhaka -Patuakhali Road Km 161.91-164.84 S 2.93 9090 National Overlay 60mm @ IRI 7-9 2014 16.903 7.36 N8 Dhaka -Patuakhali Road Km 152.44-161.80 S 9.36 9090 National Overlay 60mm @ IRI 7-9 2014 54.071 7.35 N8 Dhaka -Patuakhali Road Km 115.08-117.68 S 2.60 9090 National Overlay 60mm @ IRI 7-9 2014 15.015 7.31 N8 Dhaka -Patuakhali Road Km 146.58-151.94 S 5.36 12114 National Overlay 80mm @ IRI 4-9 2014 44.995 10.21 N809 Barishal-Lakshmipur Road Km 005.28-008.38 S 3.10 753 National DBST 25mm Traff All 2014 7.552 0.17 N809 Barishal-Lakshmipur Road Km 011.98-015.08 S 3.10 753 National DBST 25mm Traff All 2014 7.552 0.17 N809 Barishal-Lakshmipur Road Km 015.28-015.66 S 0.38 753 National DBST 25mm Traff All 2014 0.931 0.02 N809 Barishal-Lakshmipur Road Km 015.08-015.18 S 0.10 753 National DBST 25mm Traff All 2014 0.244 0.01 N809 Barishal-Lakshmipur Road Km 008.48-011.98 S 3.50 753 National DBST 25mm Traff All 2014 8.526 0.00 N809 Barishal-Lakshmipur Road Km 015.18-015.28 S 0.10 753 National Overlay 50mm @ IRI 5-9 2014 0.512 0.17 N809 Barishal-Lakshmipur Road Km 008.38-008.48 S 0.10 753 National Overlay 50mm @ IRI 5-9 2014 0.512 0.17 Sub-total Barisal Division 266.823

Appendix-B Page: 1 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost Bhola Division R890 Bhola -Char Manika Road Km 035.37-046.87 S 11.50 1419 Regional DBST 25mm @ 25% Crk 2014 26.565 0.36 R890 Bhola -Char Manika Road Km 028.27-035.17 S 6.90 1548 Regional DBST 25mm @ 25% Crk 2014 15.939 0.20 R890 Bhola -Char Manika Road Km 019.70-022.80 S 3.10 1548 Regional DBST 25mm Traff 2014 7.161 0.91 R890 Bhola -Char Manika Road Km 009.10-010.90 S 1.80 5170 Regional DBST 25mm Traff 4000-600 2014 4.158 4.75 R890 Bhola -Char Manika Road Km 022.80-023.20 S 0.40 1548 Regional DBST 25mm Traff All 2014 0.924 0.30 R890 Bhola -Char Manika Road Km 025.67-028.27 S 2.60 1548 Regional DBST 25mm Traff All 2014 6.006 0.25 R890 Bhola -Char Manika Road Km 023.20-025.67 S 2.47 1548 Regional Overlay 50mm @ IRI 7-9 2014 11.976 0.71 R890 Bhola -Char Manika Road Km 016.70-019.70 S 3.00 1548 Regional Overlay 50mm @ IRI 7-9 2014 14.570 0.69 R890 Bhola -Char Manika Road Km 004.70-004.80 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.94 R890 Bhola -Char Manika Road Km 035.17-035.37 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.67 R890 Bhola -Char Manika Road Km 052.50-073.40 S 20.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 120.698 6.19 R890 Bhola -Char Manika Road Km 074.10-080.86 S 6.76 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 39.022 6.07 R890 Bhola -Char Manika Road Km 080.86-084.06 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.480 5.47 R891 Bhola-Illisha Road Km 000.00-000.65 S 0.65 1092 Regional Overlay 50mm @ IRI 7-9 2014 3.157 0.88 Sub-total Bhola Division 270.387

Jhalokati Division R870 Barisal-Pirojpur Road Km 042.54-043.74 S 1.20 1253 Regional DBST 25mm Traff 2014 1.971 1.65 R870 Barisal-Pirojpur Road Km 043.74-044.04 S 0.30 1253 Regional Overlay 50mm @ IRI 5-7 2014 1.536 0.57 R870 Barisal-Pirojpur Road Km 044.04-044.05 S 0.01 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.079 12.12 Sub-total Jhalokati Division 3.586

Patuakhali Division N8 Dhaka -Patuakhali Road Km 180.88-181.88 S 1.00 1401 National DBST 25mm Traff 2014 2.310 0.88 N8 Dhaka -Patuakhali Road Km 177.30-180.38 S 3.08 1401 National Overlay 50mm @ IRI 4-9 2014 14.106 1.10 N8 Dhaka -Patuakhali Road Km 182.68-183.08 S 0.40 1401 National Overlay 50mm @ IRI 4-9 2014 1.943 0.89 N8 Dhaka -Patuakhali Road Km 185.08-185.78 S 0.70 1401 National Overlay 50mm @ IRI 4-9 2014 3.400 0.81 N8 Dhaka -Patuakhali Road Km 183.88-185.08 S 1.20 1401 National Overlay 50mm @ IRI 4-9 2014 5.828 0.76 N8 Dhaka -Patuakhali Road Km 180.38-180.88 S 0.50 1401 National Overlay 50mm @ IRI 4-9 2014 2.428 0.76 N8 Dhaka -Patuakhali Road Km 183.08-183.38 S 0.30 1401 National Overlay 50mm @ IRI 4-9 2014 1.457 0.73 N8 Dhaka -Patuakhali Road Km 191.98-192.38 S 0.40 1401 National Overlay 50mm @ IRI 4-9 2014 1.943 0.69 N8 Dhaka -Patuakhali Road Km 181.88-182.68 S 0.80 1401 National Overlay 50mm @ IRI 4-9 2014 3.885 0.66 N8 Dhaka -Patuakhali Road Km 185.78-188.88 S 3.10 1401 National Overlay 50mm @ IRI 4-9 2014 15.055 0.65 N8 Dhaka -Patuakhali Road Km 192.58-194.47 S 1.88 1401 National Overlay 50mm @ IRI 4-9 2014 9.135 0.64 R880 Patuakhali-Kacchira Road Km 009.60-029.04 S 19.44 5170 Regional DBST 25mm @ 25% Crk 2014 65.318 3.28

Appendix-B Page: 2 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R880 Patuakhali-Kacchira Road Km 000.00-009.40 S 9.40 5170 Regional DBST 25mm Traff 4000-600 2014 31.584 3.33 R880 Patuakhali-Kacchira Road Km 009.40-009.60 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.680 4.45 R881 Amtali-Kuakata Road Km 023.81-025.31 S 1.50 1333 Regional DBST 25mm Traff 2014 3.528 0.27 R881 Amtali-Kuakata Road Km 025.31-031.22 S 5.91 1333 Regional DBST 25mm Traff 2014 13.889 0.26 R881 Amtali-Kuakata Road Km 035.52-038.71 S 3.19 5170 Regional DBST 25mm Traff 4000-600 2014 7.510 6.47 R881 Amtali-Kuakata Road Km 039.81-040.65 S 0.84 5170 Regional DBST 25mm Traff 4000-600 2014 1.969 5.17 R881 Amtali-Kuakata Road Km 038.81-039.31 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 6.83 R881 Amtali-Kuakata Road Km 031.22-035.32 S 4.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.108 6.62 Sub-total Patuakhali Division 214.015

Pirojpur Division R770 Noapara-Pirojpur Road Km 020.51-023.91 S 3.40 1851 Regional Overlay 50mm @ IRI 5-7 2014 16.512 1.12 R770 Noapara-Pirojpur Road Km 026.51-033.81 S 7.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 42.158 5.46 R770 Noapara-Pirojpur Road Km 034.01-042.78 S 8.77 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 54.035 5.19 R770 Noapara-Pirojpur Road Km 011.40-014.60 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 25.200 4.93 R770 Noapara-Pirojpur Road Km 003.40-006.50 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.413 4.78 R770 Noapara-Pirojpur Road Km 000.00-003.40 S 3.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 26.775 4.25 R770 Noapara-Pirojpur Road Km 016.10-017.40 S 1.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.238 4.14 R870 Barisal-Pirojpur Road Km 058.20-059.90 S 1.70 1265 Regional DBST 25mm Traff 2014 4.141 0.46 R870 Barisal-Pirojpur Road Km 047.34-050.54 S 3.20 5170 Regional DBST 25mm Traff 4000-600 2014 7.795 5.08 R870 Barisal-Pirojpur Road Km 060.20-060.30 S 0.10 1265 Regional DBST 25mm Traff All 2014 0.244 0.06 R870 Barisal-Pirojpur Road Km 056.90-057.80 S 0.90 1265 Regional Overlay 50mm @ IRI 7-9 2014 4.609 0.53 R870 Barisal-Pirojpur Road Km 053.57-053.60 S 0.03 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.177 9.86 R870 Barisal-Pirojpur Road Km 050.54-053.57 S 3.03 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.459 5.84 R870 Barisal-Pirojpur Road Km 044.05-047.14 S 3.09 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.800 5.64 Sub-total Pirojpur Division 253.554 Total Barisal Zone 1,017.24

Chittagong Zone Bandarban Division N108 Keranirhat-Bandarban Road Km 001.90-002.00 S 0.10 2240 National DBST 25mm Traff 2000-400 2014 0.231 2.15 N108 Keranirhat-Bandarban Road Km 005.20-005.40 S 0.20 2240 National DBST 25mm Traff 2000-400 2014 0.462 1.87 N108 Keranirhat-Bandarban Road Km 002.00-002.10 S 0.10 2240 National DBST 25mm Traff 2000-400 2014 0.231 1.09 N108 Keranirhat-Bandarban Road Km 005.40-006.10 S 0.70 2240 National DBST 25mm Traff 2000-400 2014 1.617 0.82 N108 Keranirhat-Bandarban Road Km 003.30-005.20 S 1.90 2240 National DBST 25mm Traff 2000-400 2014 4.389 0.71

Appendix-B Page: 3 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N108 Keranirhat-Bandarban Road Km 002.50-003.30 S 0.80 2240 National Overlay 50mm @ IRI 5-9 2014 3.885 1.88 N108 Keranirhat-Bandarban Road Km 002.20-002.50 S 0.30 2240 National Overlay 50mm @ IRI 5-9 2014 1.457 1.38 N108 Keranirhat-Bandarban Road Km 019.40-022.64 S 3.24 2240 National Overlay 50mm @ IRI 5-9 2014 15.754 1.09 N108 Keranirhat-Bandarban Road Km 006.30-019.40 S 13.10 2240 National Overlay 50mm @ IRI 5-9 2014 71.486 1.00 R161 Rangamati -Bandarban Road Km 031.87-032.37 S 0.50 5170 Regional DBST 25mm @ 25% Crk 2014 0.848 5.61 R161 Rangamati -Bandarban Road Km 035.07-035.57 S 0.50 830 Regional DBST 25mm Traff 2014 0.861 0.48 R161 Rangamati -Bandarban Road Km 032.37-035.07 S 2.70 830 Regional DBST 25mm Traff All 2014 4.649 0.65 R161 Rangamati -Bandarban Road Km 027.37-027.47 S 0.10 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.353 5.60 R161 Rangamati -Bandarban Road Km 058.57-058.67 S 0.10 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.353 5.16 R161 Rangamati -Bandarban Road Km 048.67-048.97 S 0.30 3029 Regional Overlay 50mm @ IRI 5-7 2014 1.060 4.72 R161 Rangamati -Bandarban Road Km 050.97-051.37 S 0.40 3029 Regional Overlay 50mm @ IRI 5-7 2014 1.413 4.61 R161 Rangamati -Bandarban Road Km 017.29-020.47 S 3.18 3029 Regional Overlay 50mm @ IRI 5-7 2014 11.239 4.39 R161 Rangamati -Bandarban Road Km 058.37-058.47 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.353 5.16 R161 Rangamati -Bandarban Road Km 025.77-026.27 S 0.50 3029 Regional Overlay 50mm @ IRI 7-9 2014 1.766 4.19 R161 Rangamati -Bandarban Road Km 021.67-022.27 S 0.60 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.119 4.14 R161 Rangamati -Bandarban Road Km 057.47-058.07 S 0.60 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.119 3.55 R161 Rangamati -Bandarban Road Km 014.00-017.29 S 3.29 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.155 6.99 Sub-total Bandarban Division 140.801

Chittagong Division Baraiyerhat-Fatikchhari Road Km 023.60-026.91 S 3.31 916 Regional DBST 25mm Traff 2014 5.141 1.34 R151 Baraiyerhat-Fatikchhari Road Km 027.41-027.91 S 0.50 916 Regional DBST 25mm Traff 2014 0.796 1.33 R151 Baraiyerhat-Fatikchhari Road Km 027.91-028.01 S 0.10 916 Regional DBST 25mm Traff 2014 0.160 1.16 R151 Baraiyerhat-Fatikchhari Road Km 026.91-027.41 S 0.50 916 Regional DBST 25mm Traff 2014 0.777 0.85 R151 Baraiyerhat-Fatikchhari Road Km 011.10-011.70 S 0.60 1547 Regional DBST 25mm Traff All 2014 1.336 0.41 R151 Baraiyerhat-Fatikchhari Road Km 023.50-023.60 S 0.10 916 Regional DBST 25mm Traff All 2014 0.155 0.33 R151 Baraiyerhat-Fatikchhari Road Km 020.50-020.70 S 0.20 916 Regional DBST 25mm Traff All 2014 0.437 0.05 R151 Baraiyerhat-Fatikchhari Road Km 015.60-016.00 S 0.40 1547 Regional Overlay 50mm @ IRI 5-7 2014 1.837 2.28 R151 Baraiyerhat-Fatikchhari Road Km 018.00-020.50 S 2.50 1490 Regional Overlay 50mm @ IRI 5-7 2014 11.479 1.65 R151 Baraiyerhat-Fatikchhari Road Km 016.00-016.20 S 0.20 1547 Regional Overlay 50mm @ IRI 7-9 2014 0.918 2.34 R151 Baraiyerhat-Fatikchhari Road Km 015.30-015.60 S 0.30 1547 Regional Overlay 50mm @ IRI 7-9 2014 1.377 2.31 R151 Baraiyerhat-Fatikchhari Road Km 016.20-017.00 S 0.80 1547 Regional Overlay 50mm @ IRI 7-9 2014 3.673 2.28 R151 Baraiyerhat-Fatikchhari Road Km 005.10-011.10 S 6.00 1547 Regional Overlay 50mm @ IRI 7-9 2014 27.973 2.19 R151 Baraiyerhat-Fatikchhari Road Km 017.00-018.00 S 1.00 1547 Regional Overlay 50mm @ IRI 7-9 2014 4.592 2.12 R151 Baraiyerhat-Fatikchhari Road Km 020.70-023.50 S 2.80 916 Regional Overlay 50mm @ IRI 7-9 2014 9.766 1.31 Heako-Ramgarh Road Km 017.50-017.53 S 0.03 827 Regional DBST 25mm @ 25% Crk 2014 0.066 0.53 R152 Heako-Ramgarh Road Km 010.50-010.70 S 0.20 827 Regional DBST 25mm Traff All 2014 0.445 0.15

Appendix-B Page: 4 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R152 Heako-Ramgarh Road Km 008.40-010.40 S 2.00 827 Regional DBST 25mm Traff All 2014 4.452 0.06 R152 Heako-Ramgarh Road Km 002.30-005.30 S 3.00 827 Regional Overlay 50mm @ IRI 7-9 2014 13.775 0.90 R152 Heako-Ramgarh Road Km 013.70-014.80 S 1.10 827 Regional Overlay 50mm @ IRI 7-9 2014 5.051 0.87 Hathazari-Khagrachhari Road Km 018.30-018.50 S 0.20 2967 Regional DBST 25mm Traff 2000-400 2014 0.454 3.73 R160 Hathazari-Khagrachhari Road Km 016.00-016.70 S 0.70 2967 Regional DBST 25mm Traff 2000-400 2014 1.588 3.44 R160 Hathazari-Khagrachhari Road Km 014.20-014.30 S 0.10 2967 Regional DBST 25mm Traff All 2014 0.227 0.92 R160 Hathazari-Khagrachhari Road Km 018.50-019.70 S 1.20 2967 Regional Overlay 50mm @ IRI 5-7 2014 5.722 3.54 R160 Hathazari-Khagrachhari Road Km 016.70-018.30 S 1.60 2967 Regional Overlay 50mm @ IRI 5-7 2014 7.629 3.48 R160 Hathazari-Khagrachhari Road Km 020.60-022.30 S 1.70 2967 Regional Overlay 50mm @ IRI 5-7 2014 8.106 2.91 R160 Hathazari-Khagrachhari Road Km 014.30-016.00 S 1.70 2967 Regional Overlay 50mm @ IRI 5-7 2014 8.106 2.84 R160 Hathazari-Khagrachhari Road Km 013.30-013.60 S 0.30 2967 Regional Overlay 50mm @ IRI 7-9 2014 1.457 3.96 R160 Hathazari-Khagrachhari Road Km 019.70-020.60 S 0.90 2967 Regional Overlay 50mm @ IRI 7-9 2014 4.291 3.86 R160 Hathazari-Khagrachhari Road Km 011.80-012.90 S 1.10 2967 Regional Overlay 50mm @ IRI 7-9 2014 5.342 3.67 R160 Hathazari-Khagrachhari Road Km 025.78-025.98 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.77 R160 Hathazari-Khagrachhari Road Km 009.70-010.20 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.68 R160 Hathazari-Khagrachhari Road Km 001.80-002.70 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.387 6.34 R160 Hathazari-Khagrachhari Road Km 002.80-005.40 S 2.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 15.561 6.15 R160 Hathazari-Khagrachhari Road Km 005.50-009.70 S 4.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.387 6.09 R160 Hathazari-Khagrachhari Road Km 010.30-011.40 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.353 6.03 R160 Hathazari-Khagrachhari Road Km 022.30-024.10 S 1.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.338 5.87 R161 Rangamati -Bandarban Road Km 000.00-002.10 S 2.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.261 6.78 R163 Chittagong -Chandragona Road Km 033.03-033.44 S 0.41 5170 Regional DBST 25mm @ 25% Crk 2014 0.921 4.98 R163 Chittagong -Chandragona Road Km 015.60-016.33 S 0.73 3303 Regional DBST 25mm @ 25% Crk 2014 1.594 0.80 R163 Chittagong -Chandragona Road Km 016.33-016.73 S 0.40 3303 Regional DBST 25mm Traff 2000-400 2014 0.874 1.97 R163 Chittagong -Chandragona Road Km 023.73-026.93 S 3.20 3303 Regional DBST 25mm Traff 2000-400 2014 7.190 0.83 R163 Chittagong -Chandragona Road Km 016.73-019.83 S 3.10 3303 Regional DBST 25mm Traff 2000-400 2014 6.901 0.72 R163 Chittagong -Chandragona Road Km 026.93-027.93 S 1.00 3303 Regional Overlay 50mm @ IRI 5-7 2014 4.768 1.66 R163 Chittagong -Chandragona Road Km 020.53-023.73 S 3.20 3303 Regional Overlay 50mm @ IRI 5-7 2014 14.976 1.05 R163 Chittagong -Chandragona Road Km 019.83-020.53 S 0.70 3303 Regional Overlay 50mm @ IRI 7-9 2014 3.276 1.77 R163 Chittagong -Chandragona Road Km 004.10-013.50 S 9.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 52.015 5.75 R163 Chittagong -Chandragona Road Km 000.00-003.70 S 3.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.979 5.35 R164 Baraichhari-Kaptai Road Km 000.30-000.50 S 0.20 1007 Regional Overlay 50mm @ IRI 7-9 2014 1.060 0.41 Sub-total Chittagong Division 327.009

Cox's Bazar Division Dhaka - Chittagong - Teknaf Road Km 461.98-464.04 S 2.06 12114 National Overlay 80mm @ IRI 4-9 2014 15.970 13.00 N110 Link Road-Cox's Bazar Road Km 006.20-006.42 S 0.22 12114 National Overlay 80mm @ IRI 5-9 2014 1.737 11.23

Appendix-B Page: 5 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R170 Patiya-Chokoria Road Km 066.14-066.24 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.235 6.14 R170 Patiya-Chokoria Road Km 071.94-072.14 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.470 5.65 R170 Patiya-Chokoria Road Km 066.24-067.14 S 0.90 5170 Regional DBST 25mm Traff 4000-600 2014 2.117 5.54 R170 Patiya-Chokoria Road Km 068.24-068.84 S 0.60 5170 Regional DBST 25mm Traff 4000-600 2014 1.411 4.85 R170 Patiya-Chokoria Road Km 062.14-063.14 S 1.00 1649 Regional Overlay 50mm @ IRI 5-7 2014 4.837 1.21 R170 Patiya-Chokoria Road Km 068.84-069.04 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 7.14 R170 Patiya-Chokoria Road Km 069.54-069.74 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.64 R170 Patiya-Chokoria Road Km 071.34-071.84 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 6.52 R170 Patiya-Chokoria Road Km 063.14-066.14 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.451 6.29 R170 Patiya-Chokoria Road Km 070.34-070.74 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.352 6.07 R172 Chokoria-Baderkhali Road Km 008.20-017.00 S 8.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 49.896 5.79 R180 Laharpur-Laboni More Road Km 000.00-006.00 S 6.00 3036 Regional Overlay 50mm @ IRI 7-9 2014 34.384 1.11 Sub-total Cox's Bazar Division 136.152

Dohazari Division N1 Dhaka - Chittagong - Teknaf Road Km 246.17-249.54 S 3.37 12114 National Overlay 80mm @ IRI 4-9 2014 30.347 11.05 N107 Kalurghat-Maneswartek Road Km 002.90-006.70 S 3.80 2590 National DBST 25mm @ 25% Crk 2014 6.065 1.84 N107 Kalurghat-Maneswartek Road Km 000.00-002.90 S 2.90 3030 National Overlay 50mm @ IRI 5-9 2014 9.731 4.63 N107 Kalurghat-Maneswartek Road Km 006.70-010.51 S 3.81 3030 National Overlay 50mm @ IRI 5-9 2014 12.771 4.28 R170 Patiya-Chokoria Road Km 053.94-054.04 S 0.10 1649 Regional DBST 25mm Traff 2014 0.235 1.73 R170 Patiya-Chokoria Road Km 055.34-055.54 S 0.20 1649 Regional DBST 25mm Traff 2014 0.470 1.64 R170 Patiya-Chokoria Road Km 014.30-016.20 S 1.90 5170 Regional DBST 25mm Traff 4000-600 2014 4.317 4.63 R170 Patiya-Chokoria Road Km 010.46-014.30 S 3.84 3029 Regional Overlay 50mm @ IRI 5-7 2014 14.497 4.11 R170 Patiya-Chokoria Road Km 016.20-016.40 S 0.20 3119 Regional Overlay 50mm @ IRI 5-7 2014 0.989 1.46 R170 Patiya-Chokoria Road Km 017.10-020.20 S 3.10 3119 Regional Overlay 50mm @ IRI 5-7 2014 15.329 0.85 R170 Patiya-Chokoria Road Km 061.44-061.64 S 0.20 1649 Regional Overlay 50mm @ IRI 7-9 2014 0.971 2.22 R170 Patiya-Chokoria Road Km 058.24-058.44 S 0.20 1649 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.85 R170 Patiya-Chokoria Road Km 020.80-021.20 S 0.40 3119 Regional Overlay 50mm @ IRI 7-9 2014 1.978 1.79 R170 Patiya-Chokoria Road Km 055.94-056.24 S 0.30 1649 Regional Overlay 50mm @ IRI 7-9 2014 1.483 1.72 R170 Patiya-Chokoria Road Km 056.74-056.94 S 0.20 1649 Regional Overlay 50mm @ IRI 7-9 2014 0.984 1.70 R170 Patiya-Chokoria Road Km 005.60-006.30 S 0.70 1609 Regional Overlay 50mm @ IRI 7-9 2014 2.225 1.55 R170 Patiya-Chokoria Road Km 039.80-040.00 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.98 R170 Patiya-Chokoria Road Km 041.20-042.70 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.820 6.93 R170 Patiya-Chokoria Road Km 033.74-039.80 S 6.06 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 34.997 5.48 R171 Banshkhali -Chunti Road Km 000.00-006.89 S 6.89 3029 Regional Overlay 50mm @ IRI 7-9 2014 23.102 4.11 Sub-total Dohazari Division 171.438

Appendix-B Page: 6 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost

Khagrachari Division R160 Hathazari-Khagrachhari Road Km 077.23-078.03 S 0.80 5170 Regional DBST 25mm Traff 4000-600 2014 1.882 5.76 R160 Hathazari-Khagrachhari Road Km 041.28-042.48 S 1.20 5170 Regional DBST 25mm Traff 4000-600 2014 2.807 5.73 R160 Hathazari-Khagrachhari Road Km 037.88-038.88 S 1.00 5170 Regional DBST 25mm Traff 4000-600 2014 2.352 5.68 R160 Hathazari-Khagrachhari Road Km 057.51-060.01 S 2.50 5170 Regional DBST 25mm Traff 4000-600 2014 5.912 5.57 R160 Hathazari-Khagrachhari Road Km 046.91-047.51 S 0.60 680 Regional DBST 25mm Traff All 2014 1.386 0.14 R160 Hathazari-Khagrachhari Road Km 046.41-046.81 S 0.40 680 Regional DBST 25mm Traff All 2014 0.924 0.03 R160 Hathazari-Khagrachhari Road Km 048.21-051.41 S 3.20 680 Regional Overlay 50mm @ IRI 7-9 2014 15.597 0.75 R160 Hathazari-Khagrachhari Road Km 078.63-078.73 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.79 R160 Hathazari-Khagrachhari Road Km 084.03-084.13 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.599 7.44 R160 Hathazari-Khagrachhari Road Km 087.93-088.23 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.796 6.87 R160 Hathazari-Khagrachhari Road Km 065.61-065.81 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.197 6.60 R160 Hathazari-Khagrachhari Road Km 060.81-061.21 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.394 6.43 R160 Hathazari-Khagrachhari Road Km 064.31-065.41 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.584 6.21 Sub-total Khagrachari Division 44.016 Total Chittagong Zone 819.42

Comilla Zone Brahmanbaria Division Comilla-Brahmanbaria Road Km 072.39-072.49 S 0.10 5776 National DBST 25mm @ 25% Crk 2014 0.248 4.97 N102 Comilla-Brahmanbaria Road Km 072.79-073.49 S 0.70 5776 National DBST 25mm Traff 4000-600 2014 1.735 4.04 N102 Comilla-Brahmanbaria Road Km 076.61-077.21 S 0.60 5776 National DBST 25mm Traff 4000-600 2014 1.487 3.93 N102 Comilla-Brahmanbaria Road Km 074.11-074.61 S 0.50 5776 National DBST 25mm Traff 4000-600 2014 1.239 3.67 N102 Comilla-Brahmanbaria Road Km 073.81-073.91 S 0.10 5776 National Overlay 50mm @ IRI 5-9 2014 0.521 5.42 N102 Comilla-Brahmanbaria Road Km 077.31-077.41 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.817 15.64 N102 Comilla-Brahmanbaria Road Km 068.28-068.38 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.831 15.52 N102 Comilla-Brahmanbaria Road Km 079.11-083.38 S 4.27 12114 National Overlay 80mm @ IRI 5-9 2014 34.892 13.01 N103 Brahmanbaria Town Portion Km 000.00-004.78 S 4.78 6488 National Overlay 50mm @ IRI 5-7 2014 25.319 1.51 Dhaka-Sylhet-Jaflong Road Km 085.71-088.30 S 2.59 5095 National Overlay 50mm @ IRI 4-9 2014 18.572 3.52 N2 Dhaka-Sylhet-Jaflong Road Km 108.17-108.75 S 0.58 12114 National Overlay 80mm @ IRI 4-9 2014 5.985 10.77 N2 Dhaka-Sylhet-Jaflong Road Km 088.30-107.71 S 19.41 12114 National Overlay 80mm @ IRI 4-9 2014 209.105 9.30 N2 Dhaka-Sylhet-Jaflong Road Km 074.18-085.71 S 11.53 12114 National Overlay 80mm @ IRI 4-9 2014 118.202 9.18 N2 Dhaka-Sylhet-Jaflong Road Km 107.80-108.17 R 0.37 12114 National Overlay 80mm @ IRI 4-9 2014 4.562 8.58 N2 Dhaka-Sylhet-Jaflong Road Km 107.80-108.17 L 0.37 12114 National Overlay 80mm @ IRI 4-9 2014 6.083 4.95

Appendix-B Page: 7 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R203 Bhulta-Radhika Road Km 036.57-036.64 S 0.06 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.351 8.12 R203 Bhulta-Radhika Road Km 031.77-031.97 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.113 6.88 R203 Bhulta-Radhika Road Km 029.57-030.07 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.783 6.80 R203 Bhulta-Radhika Road Km 029.17-029.37 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.134 6.66 R203 Bhulta-Radhika Road Km 031.07-031.27 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.113 6.46 R203 Bhulta-Radhika Road Km 032.27-032.47 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.113 6.09 R220 Sarail-Habiganj Road Km 000.00-019.00 S 19.00 2186 Regional Overlay 50mm @ IRI 7-9 2014 88.918 0.60 Sub-total Brahmanbaria Division 526.122

Chandpur Division R140 Comilla-Begumganj Road Km 082.77-082.99 S 0.22 2102 Regional DBST 25mm Traff 2000-400 2014 0.496 0.25 R140 Comilla-Begumganj Road Km 048.29-048.59 S 0.30 5170 Regional DBST 25mm Traff 4000-600 2014 0.703 5.83 R140 Comilla-Begumganj Road Km 085.59-085.61 S 0.02 2102 Regional DBST 25mm Traff All 2014 0.036 1.34 R140 Comilla-Begumganj Road Km 082.99-083.69 S 0.70 2102 Regional Overlay 50mm @ IRI 5-7 2014 3.276 1.23 R140 Comilla-Begumganj Road Km 084.49-085.59 S 1.10 2102 Regional Overlay 50mm @ IRI 5-7 2014 5.148 1.18 R140 Comilla-Begumganj Road Km 082.17-082.77 S 0.60 2102 Regional Overlay 50mm @ IRI 5-7 2014 2.808 1.11 R140 Comilla-Begumganj Road Km 083.89-083.99 S 0.10 2102 Regional Overlay 50mm @ IRI 7-9 2014 0.468 2.29 R140 Comilla-Begumganj Road Km 079.17-082.17 S 3.00 2102 Regional Overlay 50mm @ IRI 7-9 2014 14.040 1.60 R140 Comilla-Begumganj Road Km 067.37-067.47 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 7.93 R140 Comilla-Begumganj Road Km 053.09-053.49 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.268 6.51 R140 Comilla-Begumganj Road Km 052.59-052.79 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.134 6.46 R140 Comilla-Begumganj Road Km 067.57-068.17 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.402 6.36 R140 Comilla-Begumganj Road Km 053.69-054.69 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.670 6.25 R140 Comilla-Begumganj Road Km 051.19-051.39 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.134 6.15 R140 Comilla-Begumganj Road Km 051.69-052.49 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.536 6.15 R140 Comilla-Begumganj Road Km 057.69-058.59 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.103 6.14 R140 Comilla-Begumganj Road Km 048.69-049.49 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.536 6.02 R140 Comilla-Begumganj Road Km 049.99-051.09 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.237 5.91 Sub-total Chandpur Division 61.562

Comilla Division N102 Comilla-Brahmanbaria Road Km 018.40-019.20 S 0.80 5448 National DBST 25mm Traff 4000-600 2014 2.050 4.14 N102 Comilla-Brahmanbaria Road Km 018.30-018.40 S 0.10 5448 National Overlay 50mm @ IRI 5-9 2014 0.539 7.14 N102 Comilla-Brahmanbaria Road Km 019.60-019.70 S 0.10 5448 National Overlay 50mm @ IRI 5-9 2014 0.539 6.91 N102 Comilla-Brahmanbaria Road Km 019.20-019.30 S 0.10 5448 National Overlay 50mm @ IRI 5-9 2014 0.539 6.26 N102 Comilla-Brahmanbaria Road Km 011.70-012.00 S 0.30 5448 National Overlay 50mm @ IRI 5-9 2014 1.642 6.26

Appendix-B Page: 8 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N102 Comilla-Brahmanbaria Road Km 011.40-011.60 S 0.20 5448 National Overlay 50mm @ IRI 5-9 2014 1.095 5.80 N102 Comilla-Brahmanbaria Road Km 013.40-014.80 S 1.40 5448 National Overlay 50mm @ IRI 5-9 2014 7.664 5.53 N102 Comilla-Brahmanbaria Road Km 010.90-011.20 S 0.30 5448 National Overlay 50mm @ IRI 5-9 2014 1.642 5.23 N102 Comilla-Brahmanbaria Road Km 017.90-018.20 S 0.30 5448 National Overlay 50mm @ IRI 5-9 2014 1.616 4.80 N102 Comilla-Brahmanbaria Road Km 019.90-020.00 S 0.10 5448 National Overlay 50mm @ IRI 5-9 2014 0.539 4.63 N102 Comilla-Brahmanbaria Road Km 012.80-013.20 S 0.40 5448 National Overlay 50mm @ IRI 5-9 2014 2.190 4.59 N102 Comilla-Brahmanbaria Road Km 000.00-000.30 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.493 12.30 R140 Comilla-Begumganj Road Km 025.90-026.30 S 0.40 5170 Regional DBST 25mm @ 25% Crk 2014 0.941 5.46 R140 Comilla-Begumganj Road Km 017.70-018.30 S 0.60 5170 Regional DBST 25mm Traff 4000-600 2014 1.411 5.29 R140 Comilla-Begumganj Road Km 011.90-012.10 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.470 5.20 R140 Comilla-Begumganj Road Km 015.90-017.50 S 1.60 5170 Regional DBST 25mm Traff 4000-600 2014 3.763 5.13 R140 Comilla-Begumganj Road Km 012.70-012.80 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.12 R140 Comilla-Begumganj Road Km 012.30-012.60 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 6.44 R140 Comilla-Begumganj Road Km 014.90-015.70 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.704 6.37 R140 Comilla-Begumganj Road Km 020.30-020.90 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.528 6.27 R140 Comilla-Begumganj Road Km 028.80-029.40 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.528 6.25 R140 Comilla-Begumganj Road Km 027.50-028.50 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.880 6.09 R140 Comilla-Begumganj Road Km 026.40-027.10 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.116 6.07 R140 Comilla-Begumganj Road Km 029.50-029.90 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.352 5.96 R140 Comilla-Begumganj Road Km 021.60-023.00 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.232 5.93 R141 Lalmai-Sonaimuri Road Km 020.19-021.39 S 1.20 2895 Regional DBST 25mm Traff 2000-400 2014 3.578 2.32 R141 Lalmai-Sonaimuri Road Km 012.50-012.70 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.596 4.48 R141 Lalmai-Sonaimuri Road Km 009.60-011.10 S 1.50 5170 Regional DBST 25mm Traff 4000-600 2014 4.473 3.74 R141 Lalmai-Sonaimuri Road Km 026.29-026.49 S 0.20 2895 Regional DBST 25mm Traff All 2014 0.596 0.54 R141 Lalmai-Sonaimuri Road Km 018.10-019.39 S 1.29 2895 Regional Overlay 50mm @ IRI 5-7 2014 8.081 3.87 R141 Lalmai-Sonaimuri Road Km 019.49-020.19 S 0.70 2895 Regional Overlay 50mm @ IRI 5-7 2014 4.389 3.76 R141 Lalmai-Sonaimuri Road Km 014.70-014.80 S 0.10 2895 Regional Overlay 50mm @ IRI 5-7 2014 0.627 3.68 R141 Lalmai-Sonaimuri Road Km 026.49-027.59 S 1.10 2895 Regional Overlay 50mm @ IRI 5-7 2014 6.896 3.33 R141 Lalmai-Sonaimuri Road Km 008.60-009.20 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.473 5.06 R141 Lalmai-Sonaimuri Road Km 029.09-031.39 S 2.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.147 5.04 R141 Lalmai-Sonaimuri Road Km 002.50-005.50 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 22.365 5.02 R141 Lalmai-Sonaimuri Road Km 011.30-012.30 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.455 4.99 R141 Lalmai-Sonaimuri Road Km 001.20-001.80 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.473 4.87 R141 Lalmai-Sonaimuri Road Km 000.70-001.00 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.237 4.87 R141 Lalmai-Sonaimuri Road Km 031.49-031.72 S 0.23 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.722 4.69 R141 Lalmai-Sonaimuri Road Km 013.60-014.70 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.201 4.38 R141 Lalmai-Sonaimuri Road Km 012.80-013.10 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.237 4.29

Appendix-B Page: 9 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R144 Laksam Old Section Km 000.00-002.49 S 2.49 1866 Regional Overlay 50mm @ IRI 7-9 2014 8.365 1.56 Sub-total Comilla Division 171.735

Feni Division N104 Feni-Noakhali Road Km 016.70-018.70 S 2.00 4644 National Overlay 50mm @ IRI 5-9 2014 9.890 7.02 N104 Feni-Noakhali Road Km 016.20-016.70 S 0.50 12114 National Overlay 80mm @ IRI 5-9 2014 3.878 12.30 Sub-total Feni Division 13.768

Laxmipur Division R140 Comilla-Begumganj Road Km 085.99-087.19 S 1.20 2102 Regional DBST 25mm Traff 2000-400 2014 2.671 1.47 R140 Comilla-Begumganj Road Km 091.69-091.79 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.223 4.26 R140 Comilla-Begumganj Road Km 085.61-085.69 S 0.08 2102 Regional DBST 25mm Traff All 2014 0.187 0.31 R140 Comilla-Begumganj Road Km 088.49-088.78 S 0.29 2102 Regional DBST 25mm Traff All 2014 0.637 0.17 R140 Comilla-Begumganj Road Km 129.23-129.43 S 0.20 3876 Regional Overlay 50mm @ IRI 5-7 2014 0.962 4.39 R140 Comilla-Begumganj Road Km 087.19-088.49 S 1.30 2102 Regional Overlay 50mm @ IRI 5-7 2014 6.084 1.50 R140 Comilla-Begumganj Road Km 085.69-085.99 S 0.30 2102 Regional Overlay 50mm @ IRI 5-7 2014 1.404 1.45 R140 Comilla-Begumganj Road Km 112.23-112.33 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.60 R140 Comilla-Begumganj Road Km 112.63-113.13 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.64 R140 Comilla-Begumganj Road Km 111.73-112.13 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.40 R140 Comilla-Begumganj Road Km 113.23-113.33 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 6.34 R140 Comilla-Begumganj Road Km 111.13-111.53 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.331 5.85 R142 Begamganj-Ramganj Road Km 036.11-037.00 S 0.89 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.140 5.34 R143 Maijdi-Chandraganj Road Km 014.80-015.40 S 0.60 1766 Regional Overlay 50mm @ IRI 5-7 2014 1.854 1.27 R143 Maijdi-Chandraganj Road Km 013.00-014.70 S 1.70 1766 Regional Overlay 50mm @ IRI 5-7 2014 5.254 1.18 R145 Laksam Old Section Km 000.00-001.54 S 1.53 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.476 6.10 R147 Lakshmipur -Tero Baki Road Km 001.30-002.21 S 0.90 3029 Regional DBST 25mm Traff 2000-400 2014 1.330 4.95 R147 Lakshmipur -Tero Baki Road Km 000.00-000.90 S 0.90 3029 Regional DBST 25mm Traff 2000-400 2014 1.323 3.64 Sub-total Laxmipur Division 46.228

Noakhali Division N104 Feni-Noakhali Road Km 034.59-034.79 S 0.20 3865 National DBST 25mm Traff 2000-400 2014 0.454 3.66 N104 Feni-Noakhali Road Km 032.19-032.39 S 0.20 3865 National DBST 25mm Traff 2000-400 2014 0.454 3.64 N104 Feni-Noakhali Road Km 036.49-036.89 S 0.40 4090 National DBST 25mm Traff 4000-600 2014 0.941 4.22 N104 Feni-Noakhali Road Km 042.39-043.09 S 0.70 4090 National DBST 25mm Traff 4000-600 2014 1.646 4.15 N104 Feni-Noakhali Road Km 039.89-041.19 S 1.30 4090 National DBST 25mm Traff 4000-600 2014 3.058 3.62 N104 Feni-Noakhali Road Km 038.59-038.79 S 0.20 4090 National DBST 25mm Traff All 2014 0.470 0.92

Appendix-B Page: 10 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N104 Feni-Noakhali Road Km 041.19-041.59 S 0.40 4090 National DBST 25mm Traff All 2014 0.941 0.70 N104 Feni-Noakhali Road Km 032.39-034.59 S 2.20 3865 National DBST 25mm Traff All 2014 4.990 0.53 N104 Feni-Noakhali Road Km 047.46-049.70 S 2.24 9090 National Overlay 50mm @ IRI 5-7 2014 10.869 7.43 N104 Feni-Noakhali Road Km 041.59-042.29 S 0.70 4090 National Overlay 50mm @ IRI 5-9 2014 3.461 4.35 N104 Feni-Noakhali Road Km 039.49-039.79 S 0.30 4090 National Overlay 50mm @ IRI 5-9 2014 1.483 4.08 N104 Feni-Noakhali Road Km 037.29-038.59 S 1.30 4090 National Overlay 50mm @ IRI 5-9 2014 6.428 3.67 N104 Feni-Noakhali Road Km 038.79-039.29 S 0.50 4090 National Overlay 50mm @ IRI 5-9 2014 2.472 3.29 R140 Comilla-Begumganj Road Km 129.43-132.43 S 3.00 3876 Regional Overlay 50mm @ IRI 7-9 2014 14.579 3.70 R141 Lalmai-Sonaimuri Road Km 031.72-032.29 S 0.57 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.242 5.23 R141 Lalmai-Sonaimuri Road Km 036.19-036.49 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.237 4.55 R142 Begamganj-Ramganj Road Km 006.40-009.90 S 3.50 3490 Regional DBST 25mm @ 25% Crk 2014 10.290 1.28 R142 Begamganj-Ramganj Road Km 005.20-006.20 S 1.00 3490 Regional DBST 25mm @ 25% Crk 2014 2.940 1.23 R142 Begamganj-Ramganj Road Km 003.90-005.00 S 1.10 3490 Regional DBST 25mm Traff 2000-400 2014 3.234 1.25 R142 Begamganj-Ramganj Road Km 005.00-005.20 S 0.20 3490 Regional DBST 25mm Traff All 2014 0.588 0.36 R142 Begamganj-Ramganj Road Km 000.00-003.80 S 3.80 3490 Regional Overlay 50mm @ IRI 7-9 2014 22.481 2.71 R142 Begamganj-Ramganj Road Km 023.25-023.45 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.87 R142 Begamganj-Ramganj Road Km 022.75-023.15 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.47 R142 Begamganj-Ramganj Road Km 021.65-021.95 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.16 R142 Begamganj-Ramganj Road Km 020.15-021.35 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.82 R143 Maijdi-Chandraganj Road Km 003.50-003.60 S 0.10 1766 Regional DBST 25mm Traff All 2014 0.147 0.80 R143 Maijdi-Chandraganj Road Km 010.60-010.70 S 0.10 1766 Regional DBST 25mm Traff All 2014 0.143 0.53 R143 Maijdi-Chandraganj Road Km 005.90-006.10 S 0.20 1766 Regional DBST 25mm Traff All 2014 0.294 0.41 R143 Maijdi-Chandraganj Road Km 004.50-004.90 S 0.40 1766 Regional DBST 25mm Traff All 2014 0.588 0.33 R143 Maijdi-Chandraganj Road Km 011.00-011.20 S 0.20 1766 Regional Overlay 50mm @ IRI 5-7 2014 0.600 2.47 R143 Maijdi-Chandraganj Road Km 010.10-010.30 S 0.20 1766 Regional Overlay 50mm @ IRI 5-7 2014 0.600 2.36 R143 Maijdi-Chandraganj Road Km 001.30-001.60 S 0.30 1766 Regional Overlay 50mm @ IRI 5-7 2014 0.927 2.10 R143 Maijdi-Chandraganj Road Km 006.50-006.90 S 0.40 1766 Regional Overlay 50mm @ IRI 5-7 2014 1.236 1.44 R143 Maijdi-Chandraganj Road Km 003.60-004.10 S 0.50 1766 Regional Overlay 50mm @ IRI 7-9 2014 1.545 2.05 R143 Maijdi-Chandraganj Road Km 007.00-007.50 S 0.50 1766 Regional Overlay 50mm @ IRI 7-9 2014 1.545 1.96 R143 Maijdi-Chandraganj Road Km 011.40-012.20 S 0.80 1766 Regional Overlay 50mm @ IRI 7-9 2014 2.402 1.79 R143 Maijdi-Chandraganj Road Km 008.10-009.10 S 1.00 1766 Regional Overlay 50mm @ IRI 7-9 2014 3.002 1.78 Sub-total Noakhali Division 123.416 Total Comilla Zone 942.83

Dhaka Zone Dhaka Division

Appendix-B Page: 11 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N105 Madanpur-Joydevpur Km 020.20-027.40 S 7.20 4568 National Overlay 50mm @ IRI 5-9 2014 40.752 4.14 N105 Madanpur-Joydevpur Km 018.00-020.20 S 2.20 12114 National Overlay 80mm @ IRI 5-9 2014 19.806 11.56 N301 Progoti Sarani-Debogram Road Km 000.00-013.08 S 13.08 12114 National Overlay 80mm @ IRI 5-9 2014 101.448 13.04 Dhaka -Utholi-Banglabandh Road Km 000.00-000.10 R 0.10 8719 National Overlay 50mm @ IRI 4-7 2014 0.596 7.86 N5 Dhaka -Utholi-Banglabandh Road Km 000.20-000.60 R 0.40 8719 National Overlay 50mm @ IRI 4-7 2014 2.384 7.47 N5 Dhaka -Utholi-Banglabandh Road Km 004.20-006.90 L 2.70 8719 National Overlay 50mm @ IRI 4-7 2014 16.093 7.44 N5 Dhaka -Utholi-Banglabandh Road Km 000.00-000.10 L 0.10 8490 National Overlay 50mm @ IRI 4-7 2014 0.596 7.02 N5 Dhaka -Utholi-Banglabandh Road Km 000.90-001.80 L 0.90 8490 National Overlay 50mm @ IRI 4-7 2014 5.364 6.76 N5 Dhaka -Utholi-Banglabandh Road Km 000.20-000.60 L 0.40 8490 National Overlay 50mm @ IRI 4-7 2014 2.384 6.63 N5 Dhaka -Utholi-Banglabandh Road Km 001.90-004.00 L 2.10 8644 National Overlay 50mm @ IRI 4-7 2014 12.517 6.62 N5 Dhaka -Utholi-Banglabandh Road Km 001.90-002.59 R 0.69 8719 National Overlay 50mm @ IRI 4-7 2014 4.113 6.50 N5 Dhaka -Utholi-Banglabandh Road Km 000.90-001.80 R 0.90 8719 National Overlay 50mm @ IRI 4-7 2014 5.364 6.42 N5 Dhaka -Utholi-Banglabandh Road Km 021.00-022.14 S 1.14 6601 National Overlay 50mm @ IRI 4-7 2014 6.895 5.67 N5 Dhaka -Utholi-Banglabandh Road Km 020.87-021.00 L 0.14 6601 National Overlay 50mm @ IRI 4-7 2014 0.805 5.48 N5 Dhaka -Utholi-Banglabandh Road Km 020.87-021.00 R 0.14 6601 National Overlay 50mm @ IRI 4-7 2014 0.805 5.43 N5 Dhaka -Utholi-Banglabandh Road Km 002.59-004.00 R 1.41 15532 National Overlay 80mm @ IRI 4-9 2014 13.182 12.89 N5 Dhaka -Utholi-Banglabandh Road Km 008.50-011.10 L 2.60 15678 National Overlay 80mm @ IRI 4-9 2014 24.307 12.48 N5 Dhaka -Utholi-Banglabandh Road Km 004.20-006.90 R 2.70 15532 National Overlay 80mm @ IRI 4-9 2014 25.242 12.28 N5 Dhaka -Utholi-Banglabandh Road Km 008.50-011.10 R 2.60 14578 National Overlay 80mm @ IRI 4-9 2014 24.307 12.12 N5 Dhaka -Utholi-Banglabandh Road Km 008.10-008.40 L 0.30 15678 National Overlay 80mm @ IRI 4-9 2014 2.805 11.56 N5 Dhaka -Utholi-Banglabandh Road Km 007.00-008.00 L 1.00 15678 National Overlay 80mm @ IRI 4-9 2014 9.349 11.47 N5 Dhaka -Utholi-Banglabandh Road Km 008.10-008.40 R 0.30 14578 National Overlay 80mm @ IRI 4-9 2014 2.805 10.94 N5 Dhaka -Utholi-Banglabandh Road Km 007.00-008.00 R 1.00 14578 National Overlay 80mm @ IRI 4-9 2014 9.349 10.85 N5 Dhaka -Utholi-Banglabandh Road Km 011.40-020.87 L 9.47 15678 National Overlay 80mm @ IRI 4-9 2014 88.486 10.15 N5 Dhaka -Utholi-Banglabandh Road Km 011.40-020.87 R 9.47 14578 National Overlay 80mm @ IRI 4-9 2014 88.486 9.52 N8 Dhaka -Patuakhali Road Km 001.63-002.10 S 0.47 6845 National Overlay 50mm @ IRI 4-7 2014 3.071 3.92 N8 Dhaka -Patuakhali Road Km 000.00-001.33 S 1.33 11581 National Overlay 80mm @ IRI 4-9 2014 16.106 7.25 N802 Dhaka -Patuakhali Road Km 000.00-003.05 S 3.05 12114 National Overlay 80mm @ IRI 5-9 2014 27.035 12.13 R110 Jatrabari-Narayanganj Road Km 003.61-004.10 S 0.49 4103 Regional DBST 25mm Traff All 2014 1.309 0.64 R110 Jatrabari-Narayanganj Road Km 009.01-009.33 S 0.32 3941 Regional Overlay 50mm @ IRI 7-9 2014 1.808 4.79 R110 Jatrabari-Narayanganj Road Km 001.30-001.40 S 0.10 9849 Regional Overlay 60mm @ IRI 5.5-9 2014 0.672 9.64 R110 Jatrabari-Narayanganj Road Km 000.30-001.20 S 0.90 9849 Regional Overlay 60mm @ IRI 5.5-9 2014 6.048 8.44 R110 Jatrabari-Narayanganj Road Km 003.40-003.60 S 0.20 8344 Regional Overlay 60mm @ IRI 5.5-9 2014 1.344 8.40 R110 Jatrabari-Narayanganj Road Km 006.16-009.01 S 2.85 5728 Regional Overlay 60mm @ IRI 5.5-9 2014 19.152 6.99 R110 Jatrabari-Narayanganj Road Km 005.20-006.16 S 0.96 4103 Regional Overlay 60mm @ IRI 7-9 2014 6.451 5.60 R110 Jatrabari-Narayanganj Road Km 004.10-004.90 S 0.80 4103 Regional Overlay 60mm @ IRI 7-9 2014 5.376 5.12 R302 Kaliganj Bazr Road Km 005.20-005.30 S 0.10 2541 Regional DBST 25mm Traff All 2014 0.239 0.44

Appendix-B Page: 12 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R302 Kaliganj Bazr Road Km 003.10-004.50 S 1.40 2541 Regional DBST 25mm Traff All 2014 3.352 0.41 R302 Kaliganj Bazr Road Km 004.50-004.80 S 0.30 2541 Regional Overlay 50mm @ IRI 7-9 2014 1.510 3.54 R302 Kaliganj Bazr Road Km 000.50-003.10 S 2.60 2541 Regional Overlay 50mm @ IRI 7-9 2014 13.086 3.16 R504 Hemayetpur-Manikganj Road Km 003.00-003.80 S 0.80 1968 Regional Overlay 50mm @ IRI 5-7 2014 3.885 0.83 R810 Postagola-Chasara Road Km 008.10-008.40 S 0.30 6169 Regional DBST 25mm Traff > 6000 2014 1.008 4.52 R810 Postagola-Chasara Road Km 007.00-008.00 S 1.00 6169 Regional DBST 25mm Traff > 6000 2014 3.360 3.48 R810 Postagola-Chasara Road Km 008.50-010.62 S 2.12 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.786 4.65 R810 Postagola-Chasara Road Km 000.20-000.60 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.360 4.21 R810 Postagola-Chasara Road Km 001.90-004.00 S 2.10 6169 Regional Overlay 60mm @ IRI 5.5-9 2014 17.640 3.73 R810 Postagola-Chasara Road Km 004.20-006.90 S 2.70 6169 Regional Overlay 60mm @ IRI 5.5-9 2014 22.680 3.50 R810 Postagola-Chasara Road Km 000.90-001.80 S 0.90 5071 Regional Overlay 60mm @ IRI 5.5-9 2014 7.560 3.45 R812 Fatullah -Mawa Road Km 000.00-001.40 S 1.40 3971 Regional Overlay 50mm @ IRI 5-7 2014 6.799 5.77 R812 Fatullah -Mawa Road Km 001.40-001.80 S 0.40 3971 Regional Overlay 50mm @ IRI 7-9 2014 1.943 4.51 R820 Zinzira-Srinagar Road Km 009.30-010.47 S 1.17 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.511 6.50 R820 Zinzira-Srinagar Road Km 000.00-009.30 S 9.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 51.266 5.82 Sub-total Dhaka Division 758.595

Gazipur Division N105 Madanpur-Joydevpur Km 038.00-048.87 S 10.87 6072 National DBST 25mm Traff > 6000 2014 29.313 4.41 N105 Madanpur-Joydevpur Km 028.00-031.20 S 3.20 4518 National DBST 25mm Traff 4000-600 2014 8.467 3.81 N105 Madanpur-Joydevpur Km 031.20-031.30 S 0.10 4437 National Overlay 50mm @ IRI 5-9 2014 0.556 4.79 N105 Madanpur-Joydevpur Km 033.70-038.00 S 4.30 12114 National Overlay 80mm @ IRI 5-9 2014 37.937 10.87 N105 Madanpur-Joydevpur Km 031.30-033.50 S 2.20 12114 National Overlay 80mm @ IRI 5-9 2014 19.196 10.77 R301 Tongi-Pachdona Road Km 020.84-020.94 S 0.10 4363 Regional Overlay 50mm @ IRI 5-7 2014 0.468 7.19 R301 Tongi-Pachdona Road Km 019.94-020.14 S 0.20 4363 Regional Overlay 50mm @ IRI 5-7 2014 0.936 6.30 R301 Tongi-Pachdona Road Km 019.20-019.54 S 0.34 4363 Regional Overlay 50mm @ IRI 5-7 2014 1.572 6.11 R301 Tongi-Pachdona Road Km 015.80-016.10 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.142 5.36 R301 Tongi-Pachdona Road Km 016.30-016.50 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.428 5.32 R301 Tongi-Pachdona Road Km 007.20-013.30 S 6.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 43.746 4.61 R301 Tongi-Pachdona Road Km 017.90-018.00 S 0.10 4695 Regional Overlay 60mm @ IRI 7-9 2014 0.557 9.29 R301 Tongi-Pachdona Road Km 022.74-022.94 S 0.20 4363 Regional Overlay 60mm @ IRI 7-9 2014 1.113 5.17 R301 Tongi-Pachdona Road Km 020.94-021.94 S 1.00 4363 Regional Overlay 60mm @ IRI 7-9 2014 5.565 4.57 R301 Tongi-Pachdona Road Km 021.94-022.44 S 0.50 4363 Regional Overlay 60mm @ IRI 7-9 2014 2.783 4.55 R301 Tongi-Pachdona Road Km 018.10-019.10 S 1.00 4363 Regional Overlay 60mm @ IRI 7-9 2014 5.565 4.40 R311 Joydebpur -Ordinance Factory Km 003.10-004.50 S 1.40 2992 Regional DBST 25mm Traff All 2014 3.763 0.28 R311 Joydebpur -Ordinance Factory Km 000.50-003.10 S 2.60 2992 Regional Overlay 50mm @ IRI 7-9 2014 14.693 2.87 R312 Rajendrapur -Motkhola Road Km 016.10-017.40 S 1.30 2719 Regional DBST 25mm @ 25% Crk 2014 3.003 3.36

Appendix-B Page: 13 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R312 Rajendrapur -Motkhola Road Km 011.40-012.60 S 1.20 2719 Regional DBST 25mm @ 25% Crk 2014 2.772 3.15 R312 Rajendrapur -Motkhola Road Km 012.80-014.50 S 1.70 2719 Regional DBST 25mm @ 25% Crk 2014 3.927 2.90 R312 Rajendrapur -Motkhola Road Km 010.50-011.30 S 0.80 2719 Regional DBST 25mm @ 25% Crk 2014 1.865 2.54 R312 Rajendrapur -Motkhola Road Km 001.90-002.10 S 0.20 2719 Regional DBST 25mm @ 25% Crk 2014 0.470 1.63 R312 Rajendrapur -Motkhola Road Km 000.20-000.60 S 0.40 2719 Regional DBST 25mm @ 25% Crk 2014 0.953 1.49 R312 Rajendrapur -Motkhola Road Km 000.00-000.10 S 0.10 2719 Regional DBST 25mm @ 25% Crk 2014 0.315 1.21 R312 Rajendrapur -Motkhola Road Km 025.60-027.90 S 2.30 1266 Regional DBST 25mm @ 25% Crk 2014 5.120 0.77 R312 Rajendrapur -Motkhola Road Km 018.60-022.00 S 3.40 1266 Regional DBST 25mm @ 25% Crk 2014 7.854 0.55 R312 Rajendrapur -Motkhola Road Km 025.10-025.50 S 0.40 1266 Regional DBST 25mm @ 25% Crk 2014 0.890 0.48 R312 Rajendrapur -Motkhola Road Km 025.00-025.10 S 0.10 1266 Regional DBST 25mm Traff 2014 0.223 1.72 R312 Rajendrapur -Motkhola Road Km 035.90-036.00 S 0.10 1266 Regional DBST 25mm Traff 2014 0.223 1.70 R312 Rajendrapur -Motkhola Road Km 029.80-030.80 S 1.00 1266 Regional DBST 25mm Traff 2014 2.226 0.66 R312 Rajendrapur -Motkhola Road Km 028.10-029.70 S 1.60 1266 Regional DBST 25mm Traff 2014 3.562 0.62 R312 Rajendrapur -Motkhola Road Km 017.50-018.20 S 0.70 2719 Regional DBST 25mm Traff 2000-400 2014 1.617 3.45 R312 Rajendrapur -Motkhola Road Km 014.60-015.90 S 1.30 2719 Regional DBST 25mm Traff 2000-400 2014 3.003 3.40 R312 Rajendrapur -Motkhola Road Km 002.60-003.30 S 0.70 2719 Regional DBST 25mm Traff 2000-400 2014 1.646 2.59 R312 Rajendrapur -Motkhola Road Km 003.40-010.40 S 7.00 2719 Regional DBST 25mm Traff 2000-400 2014 16.464 2.37 R312 Rajendrapur -Motkhola Road Km 002.20-002.50 S 0.30 2719 Regional DBST 25mm Traff 2000-400 2014 0.706 1.58 R312 Rajendrapur -Motkhola Road Km 027.90-028.10 S 0.20 1266 Regional DBST 25mm Traff All 2014 0.445 0.36 R312 Rajendrapur -Motkhola Road Km 000.70-000.80 S 0.10 2719 Regional Overlay 50mm @ IRI 5-7 2014 0.494 4.21 R312 Rajendrapur -Motkhola Road Km 039.90-040.90 S 1.00 1266 Regional Overlay 50mm @ IRI 5-7 2014 2.561 3.50 R312 Rajendrapur -Motkhola Road Km 031.20-032.20 S 1.00 1266 Regional Overlay 50mm @ IRI 5-7 2014 4.680 1.04 R312 Rajendrapur -Motkhola Road Km 022.00-025.00 S 3.00 1266 Regional Overlay 50mm @ IRI 5-7 2014 14.517 0.97 R312 Rajendrapur -Motkhola Road Km 032.40-033.60 S 1.20 1266 Regional Overlay 50mm @ IRI 7-9 2014 5.616 1.41 R312 Rajendrapur -Motkhola Road Km 018.30-018.40 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.58 R313 Mawna-Monohardi Road Km 014.20-015.50 S 1.30 833 Regional DBST 25mm @ 25% Crk 2014 3.058 0.15 R313 Mawna-Monohardi Road Km 008.60-009.40 S 0.80 833 Regional DBST 25mm @ 25% Crk 2014 1.882 0.12 R313 Mawna-Monohardi Road Km 023.20-023.60 S 0.40 556 Regional DBST 25mm @ 25% Crk 2014 0.924 0.12 R313 Mawna-Monohardi Road Km 028.90-029.30 S 0.40 556 Regional DBST 25mm Traff 2014 0.907 0.46 R313 Mawna-Monohardi Road Km 009.50-010.70 S 1.20 833 Regional DBST 25mm Traff 2014 2.822 0.24 R313 Mawna-Monohardi Road Km 026.20-027.80 S 1.60 556 Regional DBST 25mm Traff 2014 3.629 0.23 R313 Mawna-Monohardi Road Km 027.90-028.90 S 1.00 556 Regional DBST 25mm Traff 2014 2.268 0.19 R313 Mawna-Monohardi Road Km 029.30-030.30 S 1.00 556 Regional DBST 25mm Traff 2014 2.268 0.17 R313 Mawna-Monohardi Road Km 023.10-023.20 S 0.10 556 Regional DBST 25mm Traff 2014 0.231 0.08 R313 Mawna-Monohardi Road Km 001.50-006.40 S 4.90 5170 Regional DBST 25mm Traff 4000-600 2014 11.525 5.24 R313 Mawna-Monohardi Road Km 027.80-027.90 S 0.10 556 Regional DBST 25mm Traff All 2014 0.227 1.26 R313 Mawna-Monohardi Road Km 026.00-026.20 S 0.20 556 Regional DBST 25mm Traff All 2014 0.454 0.92

Appendix-B Page: 14 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R313 Mawna-Monohardi Road Km 014.00-014.20 S 0.20 833 Regional DBST 25mm Traff All 2014 0.470 0.52 R313 Mawna-Monohardi Road Km 031.70-031.90 S 0.20 556 Regional DBST 25mm Traff All 2014 0.454 0.34 R313 Mawna-Monohardi Road Km 030.30-030.50 S 0.20 556 Regional DBST 25mm Traff All 2014 0.454 0.25 R313 Mawna-Monohardi Road Km 010.70-010.90 S 0.20 833 Regional DBST 25mm Traff All 2014 0.470 0.18 R313 Mawna-Monohardi Road Km 023.60-023.70 S 0.10 556 Regional DBST 25mm Traff All 2014 0.231 0.14 R313 Mawna-Monohardi Road Km 016.30-016.40 S 0.10 833 Regional DBST 25mm Traff All 2014 0.231 0.04 R313 Mawna-Monohardi Road Km 015.50-015.60 S 0.10 833 Regional DBST 25mm Traff All 2014 0.234 0.04 R313 Mawna-Monohardi Road Km 008.50-008.60 S 0.10 833 Regional DBST 25mm Traff All 2014 0.235 0.04 R313 Mawna-Monohardi Road Km 009.40-009.50 S 0.10 833 Regional DBST 25mm Traff All 2014 0.235 0.04 R313 Mawna-Monohardi Road Km 012.60-012.70 S 0.10 833 Regional DBST 25mm Traff All 2014 0.235 0.04 R313 Mawna-Monohardi Road Km 030.50-031.70 S 1.20 556 Regional Overlay 50mm @ IRI 7-9 2014 5.722 0.12 R313 Mawna-Monohardi Road Km 038.00-039.00 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.670 6.05 R313 Mawna-Monohardi Road Km 034.10-034.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.701 5.73 R314 Gafargaon-Mawna Road Km 000.00-000.10 S 0.10 916 Regional DBST 25mm Traff 2014 0.155 1.10 R314 Gafargaon-Mawna Road Km 018.00-018.10 S 0.10 916 Regional DBST 25mm Traff All 2014 0.151 0.36 R314 Gafargaon-Mawna Road Km 000.10-000.20 S 0.10 916 Regional DBST 25mm Traff All 2014 0.155 0.32 R314 Gafargaon-Mawna Road Km 002.10-005.90 S 3.80 916 Regional DBST 25mm Traff All 2014 5.905 0.25 R314 Gafargaon-Mawna Road Km 013.90-017.50 S 3.60 916 Regional Overlay 50mm @ IRI 7-9 2014 11.444 2.39 R314 Gafargaon-Mawna Road Km 018.10-018.71 S 0.61 916 Regional Overlay 50mm @ IRI 7-9 2014 1.945 1.57 R315 Mawna-Nabinagar Road Km 029.40-029.50 S 0.10 1064 Regional DBST 25mm @ 25% Crk 2014 0.147 1.02 R315 Mawna-Nabinagar Road Km 034.00-034.10 S 0.10 2402 Regional DBST 25mm Traff 2000-400 2014 0.160 3.39 R315 Mawna-Nabinagar Road Km 035.50-035.60 S 0.10 2402 Regional DBST 25mm Traff All 2014 0.160 1.61 R315 Mawna-Nabinagar Road Km 038.60-038.90 S 0.30 2402 Regional DBST 25mm Traff All 2014 0.479 0.80 R315 Mawna-Nabinagar Road Km 034.40-034.80 S 0.40 2402 Regional DBST 25mm Traff All 2014 0.638 0.75 R315 Mawna-Nabinagar Road Km 031.80-032.20 S 0.40 2402 Regional DBST 25mm Traff All 2014 0.638 0.63 R315 Mawna-Nabinagar Road Km 017.40-017.50 S 0.10 1064 Regional DBST 25mm Traff All 2014 0.151 0.37 R315 Mawna-Nabinagar Road Km 016.70-016.80 S 0.10 1064 Regional DBST 25mm Traff All 2014 0.151 0.36 R315 Mawna-Nabinagar Road Km 025.80-026.00 S 0.20 1064 Regional DBST 25mm Traff All 2014 0.294 0.31 R315 Mawna-Nabinagar Road Km 017.20-017.30 S 0.10 1064 Regional DBST 25mm Traff All 2014 0.151 0.29 R315 Mawna-Nabinagar Road Km 017.70-018.00 S 0.30 1064 Regional DBST 25mm Traff All 2014 0.454 0.29 R315 Mawna-Nabinagar Road Km 021.60-021.90 S 0.30 1064 Regional DBST 25mm Traff All 2014 0.454 0.29 R315 Mawna-Nabinagar Road Km 035.60-036.20 S 0.60 2402 Regional Overlay 50mm @ IRI 5-7 2014 2.013 1.90 R315 Mawna-Nabinagar Road Km 034.80-035.50 S 0.70 2402 Regional Overlay 50mm @ IRI 5-7 2014 2.349 1.84 R315 Mawna-Nabinagar Road Km 029.20-029.30 S 0.10 1064 Regional Overlay 50mm @ IRI 5-7 2014 0.309 1.81 R315 Mawna-Nabinagar Road Km 021.90-022.10 S 0.20 1064 Regional Overlay 50mm @ IRI 5-7 2014 0.636 1.48 R315 Mawna-Nabinagar Road Km 000.20-000.50 S 0.30 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.927 4.94 R315 Mawna-Nabinagar Road Km 010.20-010.40 S 0.20 1064 Regional Overlay 50mm @ IRI 7-9 2014 0.636 2.16

Appendix-B Page: 15 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost Sub-total Gazipur Division 342.566

Jamalpur Division Joydebpur-Jamalpur Road Km 127.19-128.36 S 1.17 2653 National Overlay 50mm @ IRI 4-9 2014 5.381 2.68 N4 Joydebpur-Jamalpur Road Km 128.66-129.56 S 0.90 9090 National Overlay 60mm @ IRI 7-9 2014 4.914 7.79 N4 Joydebpur-Jamalpur Road Km 136.96-139.96 S 3.00 9090 National Overlay 60mm @ IRI 7-9 2014 16.380 7.73 N4 Joydebpur-Jamalpur Road Km 129.86-136.96 S 7.10 9090 National Overlay 60mm @ IRI 7-9 2014 38.766 7.69 Sub-total Jamalpur Division 65.441

Kishoreganj Division N2 Dhaka-Sylhet-Jaflong Road Km 071.71-073.60 L 1.89 12114 National Overlay 80mm @ IRI 4-9 2014 22.226 9.01 N2 Dhaka-Sylhet-Jaflong Road Km 071.71-073.60 R 1.89 12114 National Overlay 80mm @ IRI 4-9 2014 22.226 8.55 N2 Dhaka-Sylhet-Jaflong Road Km 073.60-074.18 S 0.58 12114 National Overlay 80mm @ IRI 4-9 2014 10.148 4.55 R211 Itakhola-Kotiadi Road Km 034.50-035.70 S 1.20 3698 Regional DBST 25mm Traff 2000-400 2014 2.772 3.92 R211 Itakhola-Kotiadi Road Km 035.80-037.50 S 1.70 3698 Regional DBST 25mm Traff 2000-400 2014 3.920 3.80 R211 Itakhola-Kotiadi Road Km 039.90-040.20 S 0.30 3698 Regional Overlay 50mm @ IRI 5-7 2014 1.404 5.58 R211 Itakhola-Kotiadi Road Km 033.40-034.30 S 0.90 3698 Regional Overlay 50mm @ IRI 5-7 2014 4.371 4.93 R211 Itakhola-Kotiadi Road Km 037.60-038.70 S 1.10 3698 Regional Overlay 50mm @ IRI 5-7 2014 5.148 4.86 R211 Itakhola-Kotiadi Road Km 040.40-040.80 S 0.40 3698 Regional Overlay 50mm @ IRI 7-9 2014 1.872 5.12 R211 Itakhola-Kotiadi Road Km 038.90-039.70 S 0.80 3698 Regional Overlay 50mm @ IRI 7-9 2014 3.744 4.81 R211 Itakhola-Kotiadi Road Km 032.21-033.10 S 0.89 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.140 5.62 R212 Akdaria -Agarpur Road Km 017.79-023.42 S 5.63 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 30.213 6.77 R360 Mymensingh -Bhairab Road Km 057.20-058.20 S 1.00 5170 Regional DBST 25mm @ 25% Crk 2014 2.478 6.16 R360 Mymensingh -Bhairab Road Km 048.50-052.90 S 4.40 5170 Regional DBST 25mm @ 25% Crk 2014 10.903 6.12 R360 Mymensingh -Bhairab Road Km 113.00-113.20 S 0.20 5170 Regional DBST 25mm @ 25% Crk 2014 0.454 4.96 R360 Mymensingh -Bhairab Road Km 053.60-057.00 S 3.40 5170 Regional DBST 25mm Traff 4000-600 2014 8.425 6.56 R360 Mymensingh -Bhairab Road Km 004.80-005.20 S 0.40 3748 Regional DBST 25mm Traff All 2014 1.008 0.60 R360 Mymensingh -Bhairab Road Km 005.50-005.60 S 0.10 3748 Regional Overlay 50mm @ IRI 5-7 2014 0.530 4.41 R360 Mymensingh -Bhairab Road Km 003.60-004.00 S 0.40 3748 Regional Overlay 50mm @ IRI 5-7 2014 2.119 3.33 R360 Mymensingh -Bhairab Road Km 004.20-004.80 S 0.60 3748 Regional Overlay 50mm @ IRI 5-7 2014 3.179 3.22 R360 Mymensingh -Bhairab Road Km 005.80-006.84 S 1.04 3748 Regional Overlay 50mm @ IRI 5-7 2014 5.515 3.21 R360 Mymensingh -Bhairab Road Km 000.00-003.00 S 3.00 3748 Regional Overlay 50mm @ IRI 7-9 2014 15.894 4.71 R360 Mymensingh -Bhairab Road Km 110.60-110.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 8.27 R360 Mymensingh -Bhairab Road Km 112.80-112.90 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 8.25 R360 Mymensingh -Bhairab Road Km 025.40-025.50 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.609 7.71 R360 Mymensingh -Bhairab Road Km 064.80-065.20 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.268 7.13

Appendix-B Page: 16 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R360 Mymensingh -Bhairab Road Km 078.20-078.40 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.84 R360 Mymensingh -Bhairab Road Km 079.00-080.90 S 1.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 11.132 6.78 R360 Mymensingh -Bhairab Road Km 099.00-100.50 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.820 6.72 R360 Mymensingh -Bhairab Road Km 024.70-025.20 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.045 6.66 R360 Mymensingh -Bhairab Road Km 074.80-075.40 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 6.60 R360 Mymensingh -Bhairab Road Km 059.90-061.10 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.804 6.53 R360 Mymensingh -Bhairab Road Km 077.10-078.10 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.880 6.45 R360 Mymensingh -Bhairab Road Km 061.30-063.10 S 1.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.206 6.43 R360 Mymensingh -Bhairab Road Km 107.80-108.80 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.670 6.27 R360 Mymensingh -Bhairab Road Km 100.70-103.90 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.278 6.25 R360 Mymensingh -Bhairab Road Km 095.00-095.30 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 6.22 R360 Mymensingh -Bhairab Road Km 006.90-007.20 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.890 6.17 R360 Mymensingh -Bhairab Road Km 081.70-088.40 S 6.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 38.693 5.98 R360 Mymensingh -Bhairab Road Km 048.10-048.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.859 5.97 R360 Mymensingh -Bhairab Road Km 115.40-116.64 S 1.24 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.025 5.97 R360 Mymensingh -Bhairab Road Km 113.30-115.10 S 1.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.206 5.94 R360 Mymensingh -Bhairab Road Km 014.80-014.90 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.609 5.85 R360 Mymensingh -Bhairab Road Km 065.40-065.90 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.835 5.85 R360 Mymensingh -Bhairab Road Km 095.50-099.00 S 3.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.580 5.78 R360 Mymensingh -Bhairab Road Km 091.80-094.90 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.228 5.77 R360 Mymensingh -Bhairab Road Km 028.70-028.80 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.620 5.72 R360 Mymensingh -Bhairab Road Km 063.40-064.60 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.804 5.70 R360 Mymensingh -Bhairab Road Km 052.90-053.30 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.478 5.53 R360 Mymensingh -Bhairab Road Km 021.40-022.20 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.872 5.38 Sub-total Kishoreganj Division 360.639

Manikganj Division N5 Dhaka -Utholi-Banglabandh Road Km 058.96-059.26 S 0.30 12114 National DBST 25mm Traff > 6000 2014 0.863 6.99 N5 Dhaka -Utholi-Banglabandh Road Km 066.85-069.55 S 2.70 8380 National DBST 25mm Traff > 6000 2014 7.768 6.49 N5 Dhaka -Utholi-Banglabandh Road Km 069.65-070.65 S 1.00 8380 National DBST 25mm Traff > 6000 2014 2.877 6.32 N5 Dhaka -Utholi-Banglabandh Road Km 022.14-022.49 S 0.35 6601 National Overlay 50mm @ IRI 4-7 2014 2.099 5.99 N5 Dhaka -Utholi-Banglabandh Road Km 025.99-027.08 S 1.09 6601 National Overlay 50mm @ IRI 4-7 2014 6.581 5.48 N5 Dhaka -Utholi-Banglabandh Road Km 025.69-025.79 S 0.10 6601 National Overlay 50mm @ IRI 4-7 2014 0.605 5.44 N5 Dhaka -Utholi-Banglabandh Road Km 022.69-025.69 S 3.00 6601 National Overlay 50mm @ IRI 4-7 2014 18.146 5.39 N5 Dhaka -Utholi-Banglabandh Road Km 031.89-033.59 S 1.70 5117 National Overlay 50mm @ IRI 4-9 2014 10.283 6.07 N5 Dhaka -Utholi-Banglabandh Road Km 028.19-028.29 S 0.10 5117 National Overlay 50mm @ IRI 4-9 2014 0.605 5.93 N5 Dhaka -Utholi-Banglabandh Road Km 052.76-054.86 S 2.10 4499 National Overlay 50mm @ IRI 4-9 2014 12.702 5.52

Appendix-B Page: 17 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 028.49-031.89 S 3.40 5117 National Overlay 50mm @ IRI 4-9 2014 20.565 5.41 N5 Dhaka -Utholi-Banglabandh Road Km 051.76-052.66 S 0.90 4499 National Overlay 50mm @ IRI 4-9 2014 5.444 5.38 N5 Dhaka -Utholi-Banglabandh Road Km 055.06-057.38 S 2.32 4499 National Overlay 50mm @ IRI 4-9 2014 14.002 5.27 N5 Dhaka -Utholi-Banglabandh Road Km 051.06-051.46 S 0.40 4499 National Overlay 50mm @ IRI 4-9 2014 2.419 5.26 N5 Dhaka -Utholi-Banglabandh Road Km 027.39-028.09 S 0.70 5117 National Overlay 50mm @ IRI 4-9 2014 4.234 5.17 N5 Dhaka -Utholi-Banglabandh Road Km 072.10-073.75 S 1.65 4263 National Overlay 50mm @ IRI 4-9 2014 9.992 4.66 N5 Dhaka -Utholi-Banglabandh Road Km 065.75-066.65 S 0.90 8380 National Overlay 60mm @ IRI 7-9 2014 6.473 8.12 N5 Dhaka -Utholi-Banglabandh Road Km 071.15-072.10 S 0.95 8380 National Overlay 60mm @ IRI 7-9 2014 6.818 7.97 N5 Dhaka -Utholi-Banglabandh Road Km 041.09-042.09 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.487 11.57 N5 Dhaka -Utholi-Banglabandh Road Km 059.36-061.96 S 2.60 12114 National Overlay 80mm @ IRI 4-9 2014 24.667 11.47 N5 Dhaka -Utholi-Banglabandh Road Km 064.55-065.75 S 1.20 12114 National Overlay 80mm @ IRI 4-9 2014 11.385 11.43 N5 Dhaka -Utholi-Banglabandh Road Km 049.79-050.79 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.487 11.34 N5 Dhaka -Utholi-Banglabandh Road Km 063.55-064.45 S 0.90 12114 National Overlay 80mm @ IRI 4-9 2014 8.539 11.26 N5 Dhaka -Utholi-Banglabandh Road Km 062.85-063.25 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.795 11.11 N5 Dhaka -Utholi-Banglabandh Road Km 057.38-057.76 S 0.38 12114 National Overlay 80mm @ IRI 4-9 2014 3.653 11.03 N5 Dhaka -Utholi-Banglabandh Road Km 039.69-040.69 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.487 10.73 N5 Dhaka -Utholi-Banglabandh Road Km 057.86-058.86 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.487 10.73 N5 Dhaka -Utholi-Banglabandh Road Km 045.89-046.19 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 2.846 10.70 N5 Dhaka -Utholi-Banglabandh Road Km 043.69-043.89 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 1.897 10.57 N5 Dhaka -Utholi-Banglabandh Road Km 037.99-039.59 S 1.60 12114 National Overlay 80mm @ IRI 4-9 2014 15.180 10.46 N5 Dhaka -Utholi-Banglabandh Road Km 033.79-034.89 S 1.10 12114 National Overlay 80mm @ IRI 4-9 2014 10.436 10.26 N5 Dhaka -Utholi-Banglabandh Road Km 044.09-045.79 S 1.70 12114 National Overlay 80mm @ IRI 4-9 2014 16.128 10.23 N5 Dhaka -Utholi-Banglabandh Road Km 046.29-049.79 S 3.50 12114 National Overlay 80mm @ IRI 4-9 2014 33.205 10.17 N5 Dhaka -Utholi-Banglabandh Road Km 035.49-037.79 S 2.30 12114 National Overlay 80mm @ IRI 4-9 2014 21.821 10.03 N5 Dhaka -Utholi-Banglabandh Road Km 034.99-035.39 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.795 9.87 R315 Mawna-Nabinagar Road Km 044.90-045.00 S 0.10 2402 Regional DBST 25mm Traff 2000-400 2014 0.155 4.08 R315 Mawna-Nabinagar Road Km 042.70-042.80 S 0.10 2402 Regional DBST 25mm Traff 2000-400 2014 0.155 3.45 R315 Mawna-Nabinagar Road Km 044.30-044.50 S 0.20 2402 Regional DBST 25mm Traff 2000-400 2014 0.311 2.35 R315 Mawna-Nabinagar Road Km 049.10-049.20 S 0.10 2402 Regional DBST 25mm Traff All 2014 0.155 1.65 R315 Mawna-Nabinagar Road Km 044.50-044.70 S 0.20 2402 Regional DBST 25mm Traff All 2014 0.311 0.97 R315 Mawna-Nabinagar Road Km 040.70-041.10 S 0.40 2402 Regional DBST 25mm Traff All 2014 0.638 0.66 R315 Mawna-Nabinagar Road Km 051.20-051.99 S 0.79 2402 Regional DBST 25mm Traff All 2014 1.220 0.57 R315 Mawna-Nabinagar Road Km 043.90-044.20 S 0.30 2402 Regional Overlay 50mm @ IRI 5-7 2014 0.980 2.72 R315 Mawna-Nabinagar Road Km 043.50-043.80 S 0.30 2402 Regional Overlay 50mm @ IRI 5-7 2014 0.980 2.68 R504 Hemayetpur-Manikganj Road Km 026.40-026.50 S 0.10 1968 Regional DBST 25mm Traff All 2014 0.231 0.18 R504 Hemayetpur-Manikganj Road Km 008.70-008.80 S 0.10 1968 Regional DBST 25mm Traff All 2014 0.231 0.12 R504 Hemayetpur-Manikganj Road Km 026.50-029.80 S 3.30 1968 Regional Overlay 50mm @ IRI 5-7 2014 14.744 0.92

Appendix-B Page: 18 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R504 Hemayetpur-Manikganj Road Km 004.00-004.70 S 0.70 1968 Regional Overlay 50mm @ IRI 5-7 2014 3.400 0.79 R504 Hemayetpur-Manikganj Road Km 019.90-022.70 S 2.80 1968 Regional Overlay 50mm @ IRI 7-9 2014 13.598 1.30 R504 Hemayetpur-Manikganj Road Km 032.91-033.91 S 1.00 1968 Regional Overlay 50mm @ IRI 7-9 2014 4.857 1.28 R504 Hemayetpur-Manikganj Road Km 005.00-005.90 S 0.90 1968 Regional Overlay 50mm @ IRI 7-9 2014 4.371 1.21 R506 Aricha -Daulatpur-Tangail Road Km 000.00-018.50 S 18.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 99.068 6.12 Sub-total Manikganj Division 473.176

Munshiganj Division N207 Mirpur-Sherpur Road Km 017.50-017.70 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.662 12.68 N207 Mirpur-Sherpur Road Km 018.00-021.60 S 3.60 12114 National Overlay 80mm @ IRI 5-9 2014 29.916 11.83 N207 Mirpur-Sherpur Road Km 015.88-016.70 S 0.82 12114 National Overlay 80mm @ IRI 5-9 2014 6.814 11.14 N8 Dhaka -Patuakhali Road Km 011.17-015.80 S 4.64 3755 National Overlay 50mm @ IRI 4-9 2014 29.058 2.86 N8 Dhaka -Patuakhali Road Km 019.60-021.00 S 1.40 2825 National Overlay 50mm @ IRI 4-9 2014 8.796 2.65 N8 Dhaka -Patuakhali Road Km 021.00-025.60 S 4.60 12114 National Overlay 80mm @ IRI 4-9 2014 45.234 9.45 R812 Fatullah -Mawa Road Km 008.83-009.48 S 0.65 3971 Regional DBST 25mm @ 25% Crk 2014 1.506 4.50 R813 Muktarpur - Munshiganj Road Km 000.00-004.01 S 4.01 2533 Regional Overlay 50mm @ IRI 7-9 2014 15.560 2.19 R820 Zinzira-Srinagar Road Km 010.47-011.60 S 1.13 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.288 6.68 R820 Zinzira-Srinagar Road Km 014.35-016.10 S 1.75 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.555 5.85 Sub-total Munshiganj Division 154.390

Mymensingh Division N401 Madhupur-Mymensingh Road Km 044.00-044.20 S 0.20 9090 National DBST 25mm Traff > 6000 2014 0.462 5.49 N401 Madhupur-Mymensingh Road Km 019.60-019.80 S 0.20 2014 National DBST 25mm Traff All 2014 0.470 0.37 N401 Madhupur-Mymensingh Road Km 019.90-020.10 S 0.20 2014 National DBST 25mm Traff All 2014 0.470 0.32 N401 Madhupur-Mymensingh Road Km 043.80-043.90 S 0.10 9090 National Overlay 50mm @ IRI 5-7 2014 0.486 8.64 N401 Madhupur-Mymensingh Road Km 030.10-030.20 S 0.10 9090 National Overlay 50mm @ IRI 5-7 2014 0.486 8.55 N401 Madhupur-Mymensingh Road Km 029.80-030.00 S 0.20 9090 National Overlay 50mm @ IRI 5-7 2014 0.971 7.91 N401 Madhupur-Mymensingh Road Km 034.80-035.10 S 0.30 9090 National Overlay 50mm @ IRI 5-7 2014 1.430 7.76 N401 Madhupur-Mymensingh Road Km 031.50-031.90 S 0.40 9090 National Overlay 50mm @ IRI 5-7 2014 1.907 7.64 N401 Madhupur-Mymensingh Road Km 033.90-034.50 S 0.60 9090 National Overlay 50mm @ IRI 5-7 2014 2.861 7.64 N401 Madhupur-Mymensingh Road Km 035.20-035.70 S 0.50 9090 National Overlay 50mm @ IRI 5-7 2014 2.384 7.59 N401 Madhupur-Mymensingh Road Km 046.20-046.93 S 0.73 9090 National Overlay 50mm @ IRI 5-7 2014 3.521 7.53 N401 Madhupur-Mymensingh Road Km 022.00-022.20 S 0.20 2014 National Overlay 50mm @ IRI 5-9 2014 0.989 2.70 N401 Madhupur-Mymensingh Road Km 017.00-017.30 S 0.30 2014 National Overlay 50mm @ IRI 5-9 2014 1.483 2.58 N401 Madhupur-Mymensingh Road Km 040.50-040.60 S 0.10 9090 National Overlay 60mm @ IRI 7-9 2014 0.578 9.31 N401 Madhupur-Mymensingh Road Km 045.90-046.00 S 0.10 9090 National Overlay 60mm @ IRI 7-9 2014 0.578 9.26

Appendix-B Page: 19 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N401 Madhupur-Mymensingh Road Km 030.80-031.30 S 0.50 9090 National Overlay 60mm @ IRI 7-9 2014 2.856 8.27 N401 Madhupur-Mymensingh Road Km 038.40-039.30 S 0.90 9090 National Overlay 60mm @ IRI 7-9 2014 5.103 8.22 N401 Madhupur-Mymensingh Road Km 039.60-040.10 S 0.50 9090 National Overlay 60mm @ IRI 7-9 2014 2.888 8.21 N401 Madhupur-Mymensingh Road Km 035.90-036.80 S 0.90 9090 National Overlay 60mm @ IRI 7-9 2014 5.103 8.20 N401 Madhupur-Mymensingh Road Km 037.00-038.10 S 1.10 9090 National Overlay 60mm @ IRI 7-9 2014 6.237 8.17 N401 Madhupur-Mymensingh Road Km 028.80-029.60 S 0.80 9090 National Overlay 60mm @ IRI 7-9 2014 4.620 8.12 N401 Madhupur-Mymensingh Road Km 032.30-033.80 S 1.50 9090 National Overlay 60mm @ IRI 7-9 2014 8.505 8.04 R314 Gafargaon-Mawna Road Km 023.80-023.90 S 0.10 916 Regional DBST 25mm Traff All 2014 0.151 0.37 R314 Gafargaon-Mawna Road Km 031.30-031.40 S 0.10 916 Regional DBST 25mm Traff All 2014 0.155 0.31 R314 Gafargaon-Mawna Road Km 031.50-031.60 S 0.10 916 Regional DBST 25mm Traff All 2014 0.155 0.31 R314 Gafargaon-Mawna Road Km 032.60-032.70 S 0.10 916 Regional DBST 25mm Traff All 2014 0.155 0.31 R314 Gafargaon-Mawna Road Km 027.60-028.00 S 0.40 916 Regional DBST 25mm Traff All 2014 0.605 0.31 R314 Gafargaon-Mawna Road Km 025.90-026.00 S 0.10 916 Regional DBST 25mm Traff All 2014 0.151 0.30 R314 Gafargaon-Mawna Road Km 028.80-029.30 S 0.50 916 Regional DBST 25mm Traff All 2014 0.756 0.27 R314 Gafargaon-Mawna Road Km 038.04-038.24 S 0.20 916 Regional Overlay 50mm @ IRI 5-7 2014 0.653 2.81 R314 Gafargaon-Mawna Road Km 032.70-033.24 S 0.54 916 Regional Overlay 50mm @ IRI 5-7 2014 1.751 2.34 R314 Gafargaon-Mawna Road Km 036.24-036.74 S 0.50 916 Regional Overlay 50mm @ IRI 5-7 2014 1.634 1.77 R314 Gafargaon-Mawna Road Km 023.90-025.90 S 2.00 916 Regional Overlay 50mm @ IRI 5-7 2014 6.358 1.27 R314 Gafargaon-Mawna Road Km 029.30-029.60 S 0.30 916 Regional Overlay 50mm @ IRI 7-9 2014 0.954 2.50 R314 Gafargaon-Mawna Road Km 026.00-027.60 S 1.60 916 Regional Overlay 50mm @ IRI 7-9 2014 5.086 2.33 R314 Gafargaon-Mawna Road Km 041.34-043.41 S 2.07 916 Regional Overlay 50mm @ IRI 7-9 2014 6.776 1.95 R314 Gafargaon-Mawna Road Km 038.24-041.34 S 3.10 916 Regional Overlay 50mm @ IRI 7-9 2014 10.128 1.72 R314 Gafargaon-Mawna Road Km 028.00-028.80 S 0.80 916 Regional Overlay 50mm @ IRI 7-9 2014 2.543 1.65 R314 Gafargaon-Mawna Road Km 018.71-023.80 S 5.09 916 Regional Overlay 50mm @ IRI 7-9 2014 16.174 1.54 R370 Mymensingh -Sunamganj Road Km 011.80-013.10 S 1.30 5170 Regional DBST 25mm Traff 4000-600 2014 3.058 5.53 R370 Mymensingh -Sunamganj Road Km 000.30-000.50 S 0.20 5629 Regional DBST 25mm Traff 4000-600 2014 0.479 3.95 R370 Mymensingh -Sunamganj Road Km 001.60-001.90 S 0.30 1474 Regional DBST 25mm Traff All 2014 0.718 0.38 R370 Mymensingh -Sunamganj Road Km 013.20-013.30 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.57 R370 Mymensingh -Sunamganj Road Km 014.40-015.43 S 1.03 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.155 6.71 R370 Mymensingh -Sunamganj Road Km 015.53-015.73 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.197 6.70 R370 Mymensingh -Sunamganj Road Km 013.40-014.00 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.528 6.66 R370 Mymensingh -Sunamganj Road Km 017.13-018.53 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.379 6.64 R370 Mymensingh -Sunamganj Road Km 003.60-005.30 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.175 6.47 R370 Mymensingh -Sunamganj Road Km 010.10-010.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 6.26 R370 Mymensingh -Sunamganj Road Km 005.50-006.20 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.190 6.18 R370 Mymensingh -Sunamganj Road Km 016.63-016.83 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.197 6.14 R370 Mymensingh -Sunamganj Road Km 008.80-009.80 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.880 5.88

Appendix-B Page: 20 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R370 Mymensingh -Sunamganj Road Km 001.90-003.30 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.379 5.85 R370 Mymensingh -Sunamganj Road Km 018.83-020.53 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.175 5.54 R371 Sherpur-Nakla-Mymensingh Km 005.10-005.20 S 0.10 2919 Regional DBST 25mm Traff 2000-400 2014 0.235 1.93 R371 Sherpur-Nakla-Mymensingh Km 025.50-028.30 S 2.80 5170 Regional DBST 25mm Traff 4000-600 2014 6.527 5.14 R371 Sherpur-Nakla-Mymensingh Km 015.10-015.40 S 0.30 2919 Regional DBST 25mm Traff All 2014 0.706 0.59 R371 Sherpur-Nakla-Mymensingh Km 003.70-004.00 S 0.30 2919 Regional DBST 25mm Traff All 2014 0.706 0.55 R371 Sherpur-Nakla-Mymensingh Km 000.00-000.30 S 0.30 2919 Regional Overlay 50mm @ IRI 5-7 2014 1.483 2.81 R371 Sherpur-Nakla-Mymensingh Km 004.60-005.10 S 0.50 2919 Regional Overlay 50mm @ IRI 7-9 2014 2.472 2.99 R371 Sherpur-Nakla-Mymensingh Km 033.00-034.77 S 1.77 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.222 5.73 R371 Sherpur-Nakla-Mymensingh Km 028.50-030.80 S 2.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 13.283 5.69 R371 Sherpur-Nakla-Mymensingh Km 032.00-032.90 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 5.66 R371 Sherpur-Nakla-Mymensingh Km 030.90-031.80 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 5.62 Sub-total Mymensingh Division 220.462

Narayanganj Division N1 Dhaka - Chittagong - Teknaf Road Km 006.20-011.94 L 5.74 8321 National Overlay 50mm @ IRI 4-7 2014 28.363 8.10 N1 Dhaka - Chittagong - Teknaf Road Km 004.18-005.90 L 1.73 7916 National Overlay 50mm @ IRI 4-7 2014 8.530 7.69 N1 Dhaka - Chittagong - Teknaf Road Km 000.00-001.00 L 1.00 20844 National Overlay 80mm @ IRI 4-9 2014 7.756 16.46 N1 Dhaka - Chittagong - Teknaf Road Km 001.10-004.18 L 3.08 15093 National Overlay 80mm @ IRI 4-9 2014 23.850 10.04 N105 Madanpur-Joydevpur Km 006.30-007.30 S 1.00 5673 National DBST 25mm Traff 4000-600 2014 2.730 3.76 N105 Madanpur-Joydevpur Km 000.00-000.10 S 0.10 6952 National Overlay 50mm @ IRI 5-7 2014 0.574 5.37 N105 Madanpur-Joydevpur Km 000.30-004.54 S 4.24 6952 National Overlay 50mm @ IRI 5-7 2014 24.307 5.19 N105 Madanpur-Joydevpur Km 007.30-008.60 S 1.30 6230 National Overlay 60mm @ IRI 7-9 2014 8.695 5.58 N105 Madanpur-Joydevpur Km 008.60-011.60 S 3.00 12114 National Overlay 80mm @ IRI 5-9 2014 26.177 12.30 N105 Madanpur-Joydevpur Km 011.60-015.30 S 3.70 12114 National Overlay 80mm @ IRI 5-9 2014 32.438 12.21 N105 Madanpur-Joydevpur Km 004.54-006.30 S 1.76 12114 National Overlay 80mm @ IRI 5-9 2014 15.889 11.94 N105 Madanpur-Joydevpur Km 016.00-018.00 S 2.00 12114 National Overlay 80mm @ IRI 5-9 2014 18.005 11.00 N2 Dhaka-Sylhet-Jaflong Road Km 011.00-011.20 L 0.20 8097 National Overlay 50mm @ IRI 4-7 2014 1.236 6.92 N2 Dhaka-Sylhet-Jaflong Road Km 011.00-011.20 R 0.20 8097 National Overlay 50mm @ IRI 4-7 2014 1.236 6.92 N2 Dhaka-Sylhet-Jaflong Road Km 002.31-011.00 S 8.68 8415 National Overlay 50mm @ IRI 4-7 2014 55.740 5.75 N2 Dhaka-Sylhet-Jaflong Road Km 011.28-011.49 S 0.21 3232 National Overlay 50mm @ IRI 4-9 2014 0.278 8.74 N2 Dhaka-Sylhet-Jaflong Road Km 011.49-014.50 S 3.01 8829 National Overlay 60mm @ IRI 7-9 2014 23.134 6.92 N2 Dhaka-Sylhet-Jaflong Road Km 011.20-011.28 L 0.08 12114 National Overlay 80mm @ IRI 4-9 2014 0.737 11.54 N2 Dhaka-Sylhet-Jaflong Road Km 011.20-011.28 R 0.08 12114 National Overlay 80mm @ IRI 4-9 2014 0.737 11.54 N2 Dhaka-Sylhet-Jaflong Road Km 014.50-017.00 S 2.50 12114 National Overlay 80mm @ IRI 4-9 2014 25.276 10.22 N2 Dhaka-Sylhet-Jaflong Road Km 000.13-002.31 S 2.18 20213 National Overlay 80mm @ IRI 4-9 2014 30.930 9.81 R110 Jatrabari-Narayanganj Road Km 017.60-018.10 S 0.50 3941 Regional DBST 25mm Traff 2000-400 2014 1.344 4.36

Appendix-B Page: 21 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R110 Jatrabari-Narayanganj Road Km 018.10-018.76 S 0.66 3941 Regional Overlay 50mm @ IRI 5-7 2014 3.730 4.33 R110 Jatrabari-Narayanganj Road Km 014.80-017.10 S 2.30 3941 Regional Overlay 50mm @ IRI 7-9 2014 12.998 5.07 R110 Jatrabari-Narayanganj Road Km 009.33-014.70 S 5.37 3941 Regional Overlay 50mm @ IRI 7-9 2014 30.347 5.03 R110 Jatrabari-Narayanganj Road Km 017.10-017.50 S 0.40 3941 Regional Overlay 50mm @ IRI 7-9 2014 2.260 4.55 R113 Madanpur-Sayedpur Road Km 008.10-008.20 S 0.10 8344 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 8.58 R113 Madanpur-Sayedpur Road Km 010.20-010.30 S 0.10 8344 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 8.56 R113 Madanpur-Sayedpur Road Km 007.70-007.90 S 0.20 8344 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 7.79 R113 Madanpur-Sayedpur Road Km 001.30-001.40 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.38 R113 Madanpur-Sayedpur Road Km 000.40-000.60 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.69 R114 Nayapur-Raipura Road Km 007.70-008.90 S 1.20 1719 Regional DBST 25mm @ 25% Crk 2014 2.873 0.66 R114 Nayapur-Raipura Road Km 001.70-002.80 S 1.10 1719 Regional DBST 25mm Traff 2014 2.633 1.59 R114 Nayapur-Raipura Road Km 003.00-003.40 S 0.40 1719 Regional DBST 25mm Traff 2014 0.958 1.52 R114 Nayapur-Raipura Road Km 006.80-007.00 S 0.20 1719 Regional DBST 25mm Traff All 2014 0.479 0.29 R114 Nayapur-Raipura Road Km 003.60-004.10 S 0.50 1719 Regional DBST 25mm Traff All 2014 1.197 0.29 R114 Nayapur-Raipura Road Km 000.10-000.30 S 0.20 2603 Regional DBST 25mm Traff All 2014 0.479 0.19 R114 Nayapur-Raipura Road Km 014.70-014.80 S 0.10 533 Regional DBST 25mm Traff All 2014 0.239 0.06 R114 Nayapur-Raipura Road Km 001.30-001.40 S 0.10 1719 Regional Overlay 50mm @ IRI 5-7 2014 0.503 1.55 R114 Nayapur-Raipura Road Km 007.30-007.50 S 0.20 1719 Regional Overlay 50mm @ IRI 5-7 2014 1.007 1.29 R114 Nayapur-Raipura Road Km 007.50-007.70 S 0.20 1719 Regional Overlay 50mm @ IRI 7-9 2014 1.007 2.27 R114 Nayapur-Raipura Road Km 004.10-004.90 S 0.80 1719 Regional Overlay 50mm @ IRI 7-9 2014 4.026 2.14 R114 Nayapur-Raipura Road Km 005.20-006.80 S 1.60 1719 Regional Overlay 50mm @ IRI 7-9 2014 8.053 1.96 R114 Nayapur-Raipura Road Km 009.10-009.30 S 0.20 1719 Regional Overlay 50mm @ IRI 7-9 2014 1.007 1.79 R114 Nayapur-Raipura Road Km 003.40-003.60 S 0.20 1719 Regional Overlay 50mm @ IRI 7-9 2014 1.007 1.42 R114 Nayapur-Raipura Road Km 017.60-018.10 S 0.50 533 Regional Overlay 50mm @ IRI 7-9 2014 2.517 0.06 R201 Tarabo-Demraghat Road Km 000.00-002.16 S 2.16 7657 Regional Overlay 60mm @ IRI 5.5-9 2014 12.946 8.22 R202 Bhulta-Rampura Road Km 000.00-008.84 S 8.84 2105 Regional Overlay 50mm @ IRI 7-9 2014 28.891 1.55 R203 Bhulta-Radhika Road Km 000.00-020.48 S 20.48 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 118.917 6.28 Sub-total Narayanganj Division 580.108

Narsingdi Division N2 Dhaka-Sylhet-Jaflong Road Km 028.40-028.50 S 0.10 5809 National DBST 25mm @ 25% Crk 2014 0.383 2.62 N2 Dhaka-Sylhet-Jaflong Road Km 031.90-033.44 S 1.54 6480 National Overlay 50mm @ IRI 4-7 2014 10.037 5.10 N2 Dhaka-Sylhet-Jaflong Road Km 059.13-061.60 S 2.47 5992 National Overlay 50mm @ IRI 4-9 2014 16.384 5.16 N2 Dhaka-Sylhet-Jaflong Road Km 064.05-069.40 S 5.35 5992 National Overlay 50mm @ IRI 4-9 2014 35.822 5.10 N2 Dhaka-Sylhet-Jaflong Road Km 049.70-050.17 S 0.47 5123 National Overlay 50mm @ IRI 4-9 2014 3.119 5.00 N2 Dhaka-Sylhet-Jaflong Road Km 028.70-029.83 S 1.13 5809 National Overlay 50mm @ IRI 4-9 2014 7.358 4.65 N2 Dhaka-Sylhet-Jaflong Road Km 043.40-046.60 S 3.20 5123 National Overlay 50mm @ IRI 4-9 2014 21.192 4.60

Appendix-B Page: 22 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N2 Dhaka-Sylhet-Jaflong Road Km 061.60-062.10 S 0.50 5992 National Overlay 50mm @ IRI 4-9 2014 3.311 4.51 N2 Dhaka-Sylhet-Jaflong Road Km 052.82-054.44 S 1.62 5123 National Overlay 50mm @ IRI 4-9 2014 10.695 4.46 N2 Dhaka-Sylhet-Jaflong Road Km 029.90-030.08 L 0.18 5809 National Overlay 50mm @ IRI 4-9 2014 1.041 4.38 N2 Dhaka-Sylhet-Jaflong Road Km 029.90-030.08 R 0.18 5809 National Overlay 50mm @ IRI 4-9 2014 1.041 4.35 N2 Dhaka-Sylhet-Jaflong Road Km 046.60-049.70 S 3.10 5123 National Overlay 50mm @ IRI 4-9 2014 20.530 4.33 N2 Dhaka-Sylhet-Jaflong Road Km 051.87-052.67 S 0.80 5123 National Overlay 50mm @ IRI 4-9 2014 5.298 4.20 N2 Dhaka-Sylhet-Jaflong Road Km 062.10-063.85 S 1.75 5992 National Overlay 50mm @ IRI 4-9 2014 11.576 4.20 N2 Dhaka-Sylhet-Jaflong Road Km 050.39-051.67 S 1.28 5123 National Overlay 50mm @ IRI 4-9 2014 8.477 4.20 N2 Dhaka-Sylhet-Jaflong Road Km 063.90-064.05 L 0.15 5992 National Overlay 50mm @ IRI 4-9 2014 1.045 4.06 N2 Dhaka-Sylhet-Jaflong Road Km 063.90-064.05 R 0.15 5992 National Overlay 50mm @ IRI 4-9 2014 1.045 4.06 N2 Dhaka-Sylhet-Jaflong Road Km 069.70-070.10 S 0.40 5992 National Overlay 50mm @ IRI 4-9 2014 2.811 4.01 N2 Dhaka-Sylhet-Jaflong Road Km 050.20-050.39 L 0.19 5123 National Overlay 50mm @ IRI 4-9 2014 1.434 4.00 N2 Dhaka-Sylhet-Jaflong Road Km 050.20-050.39 R 0.19 5123 National Overlay 50mm @ IRI 4-9 2014 1.434 4.00 N2 Dhaka-Sylhet-Jaflong Road Km 058.90-059.13 R 0.23 5992 National Overlay 50mm @ IRI 4-9 2014 1.596 3.92 N2 Dhaka-Sylhet-Jaflong Road Km 051.70-051.87 L 0.17 5123 National Overlay 50mm @ IRI 4-9 2014 1.208 3.89 N2 Dhaka-Sylhet-Jaflong Road Km 051.70-051.87 R 0.17 5123 National Overlay 50mm @ IRI 4-9 2014 1.208 3.89 N2 Dhaka-Sylhet-Jaflong Road Km 058.90-059.13 L 0.23 5992 National Overlay 50mm @ IRI 4-9 2014 1.596 3.87 N2 Dhaka-Sylhet-Jaflong Road Km 052.70-052.82 L 0.12 5123 National Overlay 50mm @ IRI 4-9 2014 0.855 3.85 N2 Dhaka-Sylhet-Jaflong Road Km 052.70-052.82 R 0.12 5123 National Overlay 50mm @ IRI 4-9 2014 0.855 3.85 N2 Dhaka-Sylhet-Jaflong Road Km 030.08-031.80 S 1.72 6422 National Overlay 60mm @ IRI 7-9 2014 62.126 1.86 N2 Dhaka-Sylhet-Jaflong Road Km 025.50-025.90 L 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.712 12.30 N2 Dhaka-Sylhet-Jaflong Road Km 025.50-025.90 R 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.712 12.30 N2 Dhaka-Sylhet-Jaflong Road Km 070.60-070.85 L 0.25 12114 National Overlay 80mm @ IRI 4-9 2014 2.748 10.82 N2 Dhaka-Sylhet-Jaflong Road Km 070.60-070.85 R 0.25 12114 National Overlay 80mm @ IRI 4-9 2014 2.748 10.82 N2 Dhaka-Sylhet-Jaflong Road Km 054.73-055.00 S 0.27 12114 National Overlay 80mm @ IRI 4-9 2014 2.846 10.63 N2 Dhaka-Sylhet-Jaflong Road Km 033.61-034.50 S 0.89 12114 National Overlay 80mm @ IRI 4-9 2014 9.163 10.09 N2 Dhaka-Sylhet-Jaflong Road Km 017.00-025.42 S 8.42 12114 National Overlay 80mm @ IRI 4-9 2014 85.090 9.88 N2 Dhaka-Sylhet-Jaflong Road Km 037.37-042.53 S 5.16 12114 National Overlay 80mm @ IRI 4-9 2014 53.457 9.84 N2 Dhaka-Sylhet-Jaflong Road Km 042.60-042.77 L 0.17 12114 National Overlay 80mm @ IRI 4-9 2014 1.954 9.76 N2 Dhaka-Sylhet-Jaflong Road Km 042.60-042.77 R 0.17 12114 National Overlay 80mm @ IRI 4-9 2014 1.954 9.76 N2 Dhaka-Sylhet-Jaflong Road Km 033.54-033.61 L 0.07 12114 National Overlay 80mm @ IRI 4-9 2014 0.873 9.39 N2 Dhaka-Sylhet-Jaflong Road Km 033.54-033.61 R 0.07 12114 National Overlay 80mm @ IRI 4-9 2014 0.873 9.39 N2 Dhaka-Sylhet-Jaflong Road Km 035.00-036.40 S 1.40 12114 National Overlay 80mm @ IRI 4-9 2014 16.268 9.35 N2 Dhaka-Sylhet-Jaflong Road Km 055.50-058.88 S 3.38 12114 National Overlay 80mm @ IRI 4-9 2014 35.068 9.16 N2 Dhaka-Sylhet-Jaflong Road Km 054.61-054.73 L 0.12 12114 National Overlay 80mm @ IRI 4-9 2014 1.363 9.04 N2 Dhaka-Sylhet-Jaflong Road Km 054.61-054.73 R 0.12 12114 National Overlay 80mm @ IRI 4-9 2014 1.363 9.04 N2 Dhaka-Sylhet-Jaflong Road Km 071.20-071.71 L 0.51 12114 National Overlay 80mm @ IRI 4-9 2014 6.004 8.99

Appendix-B Page: 23 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N2 Dhaka-Sylhet-Jaflong Road Km 071.20-071.71 R 0.51 12114 National Overlay 80mm @ IRI 4-9 2014 6.004 8.55 N2 Dhaka-Sylhet-Jaflong Road Km 036.90-037.37 L 0.47 12114 National Overlay 80mm @ IRI 4-9 2014 6.454 7.23 N2 Dhaka-Sylhet-Jaflong Road Km 036.90-037.37 R 0.47 12114 National Overlay 80mm @ IRI 4-9 2014 6.454 7.23 N2 Dhaka-Sylhet-Jaflong Road Km 042.77-043.40 S 0.63 12114 National Overlay 80mm @ IRI 4-9 2014 7.938 6.78 N2 Dhaka-Sylhet-Jaflong Road Km 070.85-071.11 S 0.26 12114 National Overlay 80mm @ IRI 4-9 2014 4.321 5.50 R114 Nayapur-Raipura Road Km 024.30-024.50 S 0.20 533 Regional DBST 25mm Traff 2014 0.470 0.12 R114 Nayapur-Raipura Road Km 024.50-025.80 S 1.30 533 Regional DBST 25mm Traff 2014 3.058 0.08 R114 Nayapur-Raipura Road Km 025.80-029.18 S 3.38 5170 Regional DBST 25mm Traff 4000-600 2014 7.954 4.87 R210 Shahepratap-Narsingdi Road Km 000.00-004.75 S 4.75 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 39.883 4.33 R211 Itakhola-Kotiadi Road Km 015.70-016.20 S 0.50 5170 Regional DBST 25mm @ 25% Crk 2014 1.155 4.67 R211 Itakhola-Kotiadi Road Km 021.30-022.70 S 1.40 1823 Regional DBST 25mm @ 25% Crk 2014 3.234 0.94 R211 Itakhola-Kotiadi Road Km 020.50-020.60 S 0.10 1823 Regional DBST 25mm @ 25% Crk 2014 0.231 0.79 R211 Itakhola-Kotiadi Road Km 020.70-021.20 S 0.50 1823 Regional DBST 25mm Traff 2014 1.155 1.04 R211 Itakhola-Kotiadi Road Km 014.30-014.70 S 0.40 5170 Regional DBST 25mm Traff 4000-600 2014 0.924 5.02 R211 Itakhola-Kotiadi Road Km 020.30-020.40 S 0.10 1823 Regional Overlay 50mm @ IRI 7-9 2014 0.486 2.20 R211 Itakhola-Kotiadi Road Km 019.60-019.80 S 0.20 1823 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.92 R211 Itakhola-Kotiadi Road Km 003.70-006.80 S 3.10 1887 Regional Overlay 50mm @ IRI 7-9 2014 15.329 1.81 R211 Itakhola-Kotiadi Road Km 025.90-026.00 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.34 R211 Itakhola-Kotiadi Road Km 003.20-003.70 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 6.52 R211 Itakhola-Kotiadi Road Km 026.10-027.20 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.353 6.04 R211 Itakhola-Kotiadi Road Km 006.80-012.50 S 5.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 32.977 5.63 R212 Akdaria -Agarpur Road Km 000.00-017.79 S 17.79 865 Regional Overlay 50mm @ IRI 7-9 2014 87.183 0.24 Sub-total Narsingdi Division 698.724

Netrokona Division R370 Mymensingh -Sunamganj Road Km 068.43-068.53 S 0.10 3029 Regional DBST 25mm Traff 2000-400 2014 0.155 3.32 R370 Mymensingh -Sunamganj Road Km 039.22-039.32 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.235 7.80 R370 Mymensingh -Sunamganj Road Km 021.33-021.43 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.239 6.24 R370 Mymensingh -Sunamganj Road Km 069.33-069.43 S 0.10 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.327 5.25 R370 Mymensingh -Sunamganj Road Km 061.72-061.82 S 0.10 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.336 5.01 R370 Mymensingh -Sunamganj Road Km 042.12-042.22 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.327 4.85 R370 Mymensingh -Sunamganj Road Km 043.52-043.62 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.327 4.84 R370 Mymensingh -Sunamganj Road Km 070.73-070.83 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.327 4.82 R370 Mymensingh -Sunamganj Road Km 061.12-061.42 S 0.30 3029 Regional Overlay 50mm @ IRI 7-9 2014 1.007 4.52 R370 Mymensingh -Sunamganj Road Km 066.43-066.73 S 0.30 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.980 4.52 R370 Mymensingh -Sunamganj Road Km 067.33-067.83 S 0.50 3029 Regional Overlay 50mm @ IRI 7-9 2014 1.634 4.32 R370 Mymensingh -Sunamganj Road Km 028.43-028.53 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.609 7.43

Appendix-B Page: 24 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R370 Mymensingh -Sunamganj Road Km 040.82-041.02 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.97 R370 Mymensingh -Sunamganj Road Km 040.12-040.62 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 6.75 R370 Mymensingh -Sunamganj Road Km 033.12-036.62 S 3.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.654 6.26 R370 Mymensingh -Sunamganj Road Km 029.63-029.93 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.827 6.11 R370 Mymensingh -Sunamganj Road Km 022.43-023.93 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.119 5.63 R370 Mymensingh -Sunamganj Road Km 028.63-029.23 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.654 5.60 R370 Mymensingh -Sunamganj Road Km 025.33-025.63 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.827 5.59 R370 Mymensingh -Sunamganj Road Km 036.62-038.82 S 2.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 12.936 5.47 R370 Mymensingh -Sunamganj Road Km 024.03-025.03 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.090 5.38 Sub-total Netrokona Division 66.724

Sherpur Division R371 Sherpur-Nakla-Mymensingh Km 063.78-063.88 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.231 5.35 R371 Sherpur-Nakla-Mymensingh Km 034.77-035.00 S 0.23 5170 Regional DBST 25mm Traff 4000-600 2014 0.531 5.00 R371 Sherpur-Nakla-Mymensingh Km 063.98-064.28 S 0.30 5170 Regional DBST 25mm Traff 4000-600 2014 0.693 4.96 R371 Sherpur-Nakla-Mymensingh Km 045.98-048.48 S 2.50 5170 Regional DBST 25mm Traff 4000-600 2014 5.670 4.76 R371 Sherpur-Nakla-Mymensingh Km 055.68-055.78 S 0.10 1863 Regional DBST 25mm Traff All 2014 0.231 0.33 R371 Sherpur-Nakla-Mymensingh Km 055.38-055.48 S 0.10 1863 Regional DBST 25mm Traff All 2014 0.231 0.29 R371 Sherpur-Nakla-Mymensingh Km 055.48-055.68 S 0.20 1863 Regional Overlay 50mm @ IRI 5-7 2014 0.971 1.68 R371 Sherpur-Nakla-Mymensingh Km 054.88-055.38 S 0.50 1863 Regional Overlay 50mm @ IRI 5-7 2014 2.424 1.47 R371 Sherpur-Nakla-Mymensingh Km 044.38-044.68 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.676 6.52 R371 Sherpur-Nakla-Mymensingh Km 042.58-044.28 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.461 6.48 R371 Sherpur-Nakla-Mymensingh Km 048.78-049.78 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.670 6.44 R371 Sherpur-Nakla-Mymensingh Km 035.20-038.70 S 3.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 19.661 6.28 R371 Sherpur-Nakla-Mymensingh Km 040.78-041.78 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.565 6.12 R371 Sherpur-Nakla-Mymensingh Km 039.68-040.68 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.565 6.06 R371 Sherpur-Nakla-Mymensingh Km 038.88-039.48 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.339 6.03 R371 Sherpur-Nakla-Mymensingh Km 044.98-045.78 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.536 5.76 R371 Sherpur-Nakla-Mymensingh Km 050.78-051.38 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.402 5.66 R371 Sherpur-Nakla-Mymensingh Km 062.48-063.38 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 5.65 R371 Sherpur-Nakla-Mymensingh Km 059.18-062.18 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.325 5.59 R460 Jamalpur-Sherpur-Bangaon Road Km 001.40-001.60 S 0.20 2530 Regional DBST 25mm Traff 2000-400 2014 0.462 1.09 R460 Jamalpur-Sherpur-Bangaon Road Km 002.60-003.20 S 0.60 2530 Regional DBST 25mm Traff 2000-400 2014 1.386 0.83 R460 Jamalpur-Sherpur-Bangaon Road Km 010.70-013.00 S 2.30 5170 Regional DBST 25mm Traff 4000-600 2014 5.410 5.22 R460 Jamalpur-Sherpur-Bangaon Road Km 001.60-001.80 S 0.20 2530 Regional DBST 25mm Traff All 2014 0.462 0.34 R460 Jamalpur-Sherpur-Bangaon Road Km 024.14-024.24 S 0.10 2034 Regional DBST 25mm Traff All 2014 0.227 0.31 R460 Jamalpur-Sherpur-Bangaon Road Km 004.00-004.20 S 0.20 2530 Regional DBST 25mm Traff All 2014 0.462 0.27

Appendix-B Page: 25 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R460 Jamalpur-Sherpur-Bangaon Road Km 016.80-016.90 S 0.10 2034 Regional DBST 25mm Traff All 2014 0.231 0.27 R460 Jamalpur-Sherpur-Bangaon Road Km 018.24-018.34 S 0.10 2034 Regional DBST 25mm Traff All 2014 0.231 0.27 R460 Jamalpur-Sherpur-Bangaon Road Km 003.20-003.40 S 0.20 2530 Regional DBST 25mm Traff All 2014 0.462 0.27 R460 Jamalpur-Sherpur-Bangaon Road Km 023.74-023.84 S 0.10 2034 Regional DBST 25mm Traff All 2014 0.227 0.24 R460 Jamalpur-Sherpur-Bangaon Road Km 001.10-001.40 S 0.30 2530 Regional DBST 25mm Traff All 2014 0.693 0.21 R460 Jamalpur-Sherpur-Bangaon Road Km 022.84-023.04 S 0.20 2034 Regional DBST 25mm Traff All 2014 0.454 0.18 R460 Jamalpur-Sherpur-Bangaon Road Km 019.24-019.44 S 0.20 2034 Regional DBST 25mm Traff All 2014 0.462 0.16 R460 Jamalpur-Sherpur-Bangaon Road Km 017.10-017.44 S 0.34 2034 Regional DBST 25mm Traff All 2014 0.776 0.12 R460 Jamalpur-Sherpur-Bangaon Road Km 001.80-002.10 S 0.30 2530 Regional Overlay 50mm @ IRI 5-7 2014 1.457 1.54 R460 Jamalpur-Sherpur-Bangaon Road Km 002.20-002.50 S 0.30 2530 Regional Overlay 50mm @ IRI 5-7 2014 1.457 1.38 R460 Jamalpur-Sherpur-Bangaon Road Km 023.04-023.74 S 0.70 2034 Regional Overlay 50mm @ IRI 5-7 2014 3.338 1.08 R460 Jamalpur-Sherpur-Bangaon Road Km 000.70-001.10 S 0.40 2530 Regional Overlay 50mm @ IRI 7-9 2014 1.943 1.78 R460 Jamalpur-Sherpur-Bangaon Road Km 017.54-017.74 S 0.20 2034 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.78 R460 Jamalpur-Sherpur-Bangaon Road Km 009.60-009.80 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 7.26 R460 Jamalpur-Sherpur-Bangaon Road Km 007.50-008.00 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 7.01 R460 Jamalpur-Sherpur-Bangaon Road Km 006.71-007.00 S 0.29 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.685 6.80 R460 Jamalpur-Sherpur-Bangaon Road Km 007.10-007.30 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.80 R460 Jamalpur-Sherpur-Bangaon Road Km 008.20-008.90 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.116 6.53 R460 Jamalpur-Sherpur-Bangaon Road Km 014.50-014.70 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.41 R460 Jamalpur-Sherpur-Bangaon Road Km 013.60-014.00 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.348 6.34 R460 Jamalpur-Sherpur-Bangaon Road Km 013.10-013.50 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.352 6.06 R460 Jamalpur-Sherpur-Bangaon Road Km 009.00-009.30 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 6.02 R460 Jamalpur-Sherpur-Bangaon Road Km 025.84-030.05 S 4.21 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 23.876 5.92 Sub-total Sherpur Division 156.077

Tangail Division N4 Joydebpur-Jamalpur Road Km 085.22-087.72 S 2.50 9090 National DBST 25mm Traff > 6000 2014 5.460 6.42 N4 Joydebpur-Jamalpur Road Km 122.86-123.66 S 0.80 2653 National DBST 25mm Traff 2000-400 2014 1.747 3.07 N4 Joydebpur-Jamalpur Road Km 106.05-107.06 S 1.01 2653 National DBST 25mm Traff 2000-400 2014 2.206 3.02 N4 Joydebpur-Jamalpur Road Km 121.26-121.36 S 0.10 2653 National DBST 25mm Traff 2000-400 2014 0.218 2.66 N4 Joydebpur-Jamalpur Road Km 076.82-077.92 S 1.10 4212 National DBST 25mm Traff 4000-600 2014 2.402 4.06 N4 Joydebpur-Jamalpur Road Km 079.02-079.32 S 0.30 4212 National DBST 25mm Traff 4000-600 2014 0.655 3.69 N4 Joydebpur-Jamalpur Road Km 076.62-076.72 S 0.10 4212 National Overlay 50mm @ IRI 4-9 2014 0.459 7.16 N4 Joydebpur-Jamalpur Road Km 079.62-079.70 S 0.09 4212 National Overlay 50mm @ IRI 4-9 2014 0.404 6.89 N4 Joydebpur-Jamalpur Road Km 075.92-076.42 S 0.50 4212 National Overlay 50mm @ IRI 4-9 2014 2.296 5.89 N4 Joydebpur-Jamalpur Road Km 078.22-078.62 S 0.40 4212 National Overlay 50mm @ IRI 4-9 2014 1.837 5.62 N4 Joydebpur-Jamalpur Road Km 105.66-105.76 S 0.10 4741 National Overlay 50mm @ IRI 4-9 2014 0.459 5.47

Appendix-B Page: 26 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N4 Joydebpur-Jamalpur Road Km 072.72-075.92 S 3.20 4212 National Overlay 50mm @ IRI 4-9 2014 14.693 5.46 N4 Joydebpur-Jamalpur Road Km 103.82-104.12 S 0.30 4741 National Overlay 50mm @ IRI 4-9 2014 1.377 5.42 N4 Joydebpur-Jamalpur Road Km 098.42-102.62 S 4.20 4741 National Overlay 50mm @ IRI 4-9 2014 19.285 5.14 N4 Joydebpur-Jamalpur Road Km 093.82-095.92 S 2.10 4741 National Overlay 50mm @ IRI 4-9 2014 9.642 5.11 N4 Joydebpur-Jamalpur Road Km 104.32-104.72 S 0.40 4741 National Overlay 50mm @ IRI 4-9 2014 1.837 5.00 N4 Joydebpur-Jamalpur Road Km 104.86-105.26 S 0.40 4741 National Overlay 50mm @ IRI 4-9 2014 1.837 4.95 N4 Joydebpur-Jamalpur Road Km 102.82-103.62 S 0.80 4741 National Overlay 50mm @ IRI 4-9 2014 3.673 4.78 N4 Joydebpur-Jamalpur Road Km 097.32-098.22 S 0.90 4741 National Overlay 50mm @ IRI 4-9 2014 4.132 4.73 N4 Joydebpur-Jamalpur Road Km 096.02-097.02 S 1.00 4741 National Overlay 50mm @ IRI 4-9 2014 4.592 4.59 N4 Joydebpur-Jamalpur Road Km 120.36-121.26 S 0.90 2653 National Overlay 50mm @ IRI 4-9 2014 4.132 3.25 N4 Joydebpur-Jamalpur Road Km 107.86-108.76 S 0.90 2653 National Overlay 50mm @ IRI 4-9 2014 4.132 3.09 N4 Joydebpur-Jamalpur Road Km 122.66-122.86 S 0.20 2653 National Overlay 50mm @ IRI 4-9 2014 0.918 3.08 N4 Joydebpur-Jamalpur Road Km 124.96-125.16 S 0.20 2653 National Overlay 50mm @ IRI 4-9 2014 0.918 3.05 N4 Joydebpur-Jamalpur Road Km 108.76-109.06 S 0.30 2653 National Overlay 50mm @ IRI 4-9 2014 1.377 2.91 N4 Joydebpur-Jamalpur Road Km 123.66-124.36 S 0.70 2653 National Overlay 50mm @ IRI 4-9 2014 3.214 2.88 N4 Joydebpur-Jamalpur Road Km 109.36-112.96 S 3.60 2653 National Overlay 50mm @ IRI 4-9 2014 16.530 2.82 N4 Joydebpur-Jamalpur Road Km 124.46-124.76 S 0.30 2653 National Overlay 50mm @ IRI 4-9 2014 1.377 2.68 N4 Joydebpur-Jamalpur Road Km 121.46-122.26 S 0.80 2653 National Overlay 50mm @ IRI 4-9 2014 3.673 2.48 N4 Joydebpur-Jamalpur Road Km 125.86-127.19 S 1.33 2653 National Overlay 50mm @ IRI 4-9 2014 6.098 2.47 N4 Joydebpur-Jamalpur Road Km 107.06-107.86 S 0.80 2653 National Overlay 50mm @ IRI 4-9 2014 3.673 2.43 N4 Joydebpur-Jamalpur Road Km 114.06-120.36 S 6.30 2653 National Overlay 50mm @ IRI 4-9 2014 28.927 2.42 N4 Joydebpur-Jamalpur Road Km 081.02-081.12 S 0.10 9090 National Overlay 60mm @ IRI 7-9 2014 0.546 8.65 N4 Joydebpur-Jamalpur Road Km 092.52-092.82 S 0.30 9090 National Overlay 60mm @ IRI 7-9 2014 1.638 8.12 N4 Joydebpur-Jamalpur Road Km 079.70-080.12 S 0.41 9090 National Overlay 60mm @ IRI 7-9 2014 2.250 7.95 N4 Joydebpur-Jamalpur Road Km 084.62-085.12 S 0.50 9090 National Overlay 60mm @ IRI 7-9 2014 2.730 7.94 N4 Joydebpur-Jamalpur Road Km 093.02-093.82 S 0.80 9090 National Overlay 60mm @ IRI 7-9 2014 4.368 7.90 N4 Joydebpur-Jamalpur Road Km 090.02-091.12 S 1.10 9090 National Overlay 60mm @ IRI 7-9 2014 6.006 7.77 N401 Madhupur-Mymensingh Road Km 013.80-014.00 S 0.20 2014 National DBST 25mm Traff All 2014 0.462 0.48 N401 Madhupur-Mymensingh Road Km 015.10-015.20 S 0.10 2014 National DBST 25mm Traff All 2014 0.235 0.43 N401 Madhupur-Mymensingh Road Km 005.70-005.80 S 0.10 2014 National DBST 25mm Traff All 2014 0.235 0.38 N401 Madhupur-Mymensingh Road Km 000.00-000.10 S 0.10 2014 National Overlay 50mm @ IRI 5-9 2014 0.494 2.94 N401 Madhupur-Mymensingh Road Km 001.50-001.70 S 0.20 2014 National Overlay 50mm @ IRI 5-9 2014 0.989 2.89 N401 Madhupur-Mymensingh Road Km 003.60-003.80 S 0.20 2014 National Overlay 50mm @ IRI 5-9 2014 0.989 2.88 N401 Madhupur-Mymensingh Road Km 006.50-007.00 S 0.50 2014 National Overlay 50mm @ IRI 5-9 2014 2.472 2.83 N401 Madhupur-Mymensingh Road Km 000.90-001.10 S 0.20 2014 National Overlay 50mm @ IRI 5-9 2014 0.989 2.79 N401 Madhupur-Mymensingh Road Km 003.80-004.10 S 0.30 2014 National Overlay 50mm @ IRI 5-9 2014 1.483 2.71 N403 Mirzapur Town old Section Km 002.00-002.30 S 0.30 9090 National Overlay 60mm @ IRI 7-9 2014 1.670 8.73

Appendix-B Page: 27 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N403 Mirzapur Town old Section Km 000.00-000.60 S 0.60 9090 National Overlay 60mm @ IRI 7-9 2014 3.339 8.53 N404 Tangail Old Section Km 001.00-001.70 S 0.70 5892 National Overlay 50mm @ IRI 5-9 2014 4.450 3.79 N404 Tangail Old Section Km 002.00-002.30 S 0.30 5892 National Overlay 50mm @ IRI 5-9 2014 1.907 3.43 N404 Tangail Old Section Km 000.00-000.60 S 0.60 5892 National Overlay 50mm @ IRI 5-9 2014 3.815 3.33 N404 Tangail Old Section Km 002.50-002.70 S 0.20 5892 National Overlay 50mm @ IRI 5-9 2014 1.272 2.57 N404 Tangail Old Section Km 001.80-001.90 S 0.10 5892 National Overlay 50mm @ IRI 5-9 2014 0.636 2.43 N404 Tangail Old Section Km 006.30-006.49 S 0.19 12114 National Overlay 80mm @ IRI 5-9 2014 1.885 11.27 N405 Elenga-Hatikamrul Road Km 000.10-008.10 S 8.00 8509 National Overlay 50mm @ IRI 5-7 2014 50.154 7.71 N405 Elenga-Hatikamrul Road Km 012.70-012.98 S 0.28 12114 National Overlay 80mm @ IRI 5-9 2014 2.753 10.76 N405 Elenga-Hatikamrul Road Km 008.10-011.00 S 2.90 12114 National Overlay 80mm @ IRI 5-9 2014 28.517 9.99 N405 Elenga-Hatikamrul Road Km 011.20-012.60 S 1.40 12114 National Overlay 80mm @ IRI 5-9 2014 13.767 9.64 R480 Elanga-Bhuanpur Road Km 014.89-016.29 S 1.40 1608 Regional DBST 25mm Traff All 2014 3.234 0.26 R480 Elanga-Bhuanpur Road Km 001.80-001.90 S 0.10 1608 Regional DBST 25mm Traff All 2014 0.231 0.23 R480 Elanga-Bhuanpur Road Km 008.00-008.10 S 0.10 1608 Regional DBST 25mm Traff All 2014 0.231 0.23 R480 Elanga-Bhuanpur Road Km 000.60-000.90 S 0.30 1608 Regional DBST 25mm Traff All 2014 0.693 0.20 R480 Elanga-Bhuanpur Road Km 006.90-007.00 S 0.10 1608 Regional DBST 25mm Traff All 2014 0.231 0.18 R480 Elanga-Bhuanpur Road Km 000.00-000.20 S 0.20 1608 Regional DBST 25mm Traff All 2014 0.462 0.17 R480 Elanga-Bhuanpur Road Km 004.00-004.20 S 0.20 1608 Regional DBST 25mm Traff All 2014 0.462 0.17 R480 Elanga-Bhuanpur Road Km 011.10-011.40 S 0.30 1608 Regional DBST 25mm Traff All 2014 0.693 0.09 R480 Elanga-Bhuanpur Road Km 008.50-011.10 S 2.60 1608 Regional Overlay 50mm @ IRI 5-7 2014 12.627 0.78 R480 Elanga-Bhuanpur Road Km 001.90-004.00 S 2.10 1608 Regional Overlay 50mm @ IRI 5-7 2014 10.199 0.64 R480 Elanga-Bhuanpur Road Km 011.40-011.79 S 0.39 1608 Regional Overlay 50mm @ IRI 7-9 2014 1.879 1.35 R480 Elanga-Bhuanpur Road Km 016.29-016.86 S 0.58 1608 Regional Overlay 50mm @ IRI 7-9 2014 2.797 1.14 R480 Elanga-Bhuanpur Road Km 012.29-014.89 S 2.60 1608 Regional Overlay 50mm @ IRI 7-9 2014 12.627 1.13 Sub-total Tangail Division 340.602 Total Dhaka Zone 4,217.50

Gopalganj Zone Faridpur Division Dauladia-Mongla Road Km 052.53-062.40 S 9.87 3611 National Overlay 50mm @ IRI 4-9 2014 65.364 3.58 N7 Dauladia-Mongla Road Km 041.54-041.64 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.66 N7 Dauladia-Mongla Road Km 029.94-041.54 S 11.60 12114 National Overlay 80mm @ IRI 4-9 2014 120.495 9.14 N804 Bhanga-Faridpur Road Km 008.40-009.10 S 0.70 2106 National DBST 25mm Traff 2000-400 2014 1.576 2.20 N804 Bhanga-Faridpur Road Km 009.30-009.70 S 0.40 2106 National DBST 25mm Traff 2000-400 2014 1.260 1.58 N804 Bhanga-Faridpur Road Km 022.70-026.40 S 3.70 2678 National DBST 25mm Traff 2000-400 2014 9.386 1.16 N804 Bhanga-Faridpur Road Km 026.40-026.50 S 0.10 1295 National DBST 25mm Traff All 2014 0.231 0.02

Appendix-B Page: 28 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N804 Bhanga-Faridpur Road Km 006.80-008.40 S 1.60 2106 National Overlay 50mm @ IRI 5-9 2014 7.064 3.13 N804 Bhanga-Faridpur Road Km 009.70-017.80 S 8.10 2245 National Overlay 50mm @ IRI 5-9 2014 41.984 2.08 N804 Bhanga-Faridpur Road Km 017.90-019.90 S 2.00 3225 National Overlay 50mm @ IRI 5-9 2014 13.951 1.68 N804 Bhanga-Faridpur Road Km 005.80-006.80 S 1.00 2106 National Overlay 50mm @ IRI 5-9 2014 6.137 1.56 N804 Bhanga-Faridpur Road Km 009.10-009.30 S 0.20 2106 National Overlay 50mm @ IRI 5-9 2014 1.325 1.40 N804 Bhanga-Faridpur Road Km 019.90-022.70 S 2.80 3225 National Overlay 50mm @ IRI 5-9 2014 23.067 1.26 N804 Bhanga-Faridpur Road Km 026.50-027.40 S 0.90 1295 National Overlay 50mm @ IRI 5-9 2014 4.458 0.40 N804 Bhanga-Faridpur Road Km 000.07-003.10 S 3.03 12114 National Overlay 80mm @ IRI 5-9 2014 31.474 10.51 N804 Bhanga-Faridpur Road Km 030.90-032.08 S 1.17 12114 National Overlay 80mm @ IRI 5-9 2014 12.174 10.00 Sub-total Faridpur Division 340.986

Gopalganj Division N805 Bhanga-Mollahhat Road Km 065.32-066.82 S 1.50 12114 National Overlay 80mm @ IRI 5-9 2014 15.540 10.61 N805 Bhanga-Mollahhat Road Km 066.99-067.42 S 0.43 12114 National Overlay 80mm @ IRI 5-9 2014 4.487 10.18 N805 Bhanga-Mollahhat Road Km 000.05-004.60 S 4.55 12114 National Overlay 80mm @ IRI 5-9 2014 47.263 10.08 N805 Bhanga-Mollahhat Road Km 073.62-077.88 S 4.26 12114 National Overlay 80mm @ IRI 5-9 2014 44.209 9.76 N805 Bhanga-Mollahhat Road Km 077.93-079.92 S 1.99 12114 National Overlay 80mm @ IRI 5-9 2014 20.416 9.38 R850 Tekerhat-Mollahhat Road Km 008.50-010.30 S 1.80 1527 Regional Overlay 50mm @ IRI 5-7 2014 8.742 1.36 R850 Tekerhat-Mollahhat Road Km 019.00-025.30 S 6.30 1298 Regional Overlay 50mm @ IRI 5-7 2014 30.596 0.75 R850 Tekerhat-Mollahhat Road Km 028.60-032.50 S 3.90 1296 Regional Overlay 50mm @ IRI 5-7 2014 18.940 0.69 R850 Tekerhat-Mollahhat Road Km 032.50-032.70 S 0.20 1296 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.27 R850 Tekerhat-Mollahhat Road Km 034.10-035.00 S 0.90 1296 Regional Overlay 50mm @ IRI 7-9 2014 4.371 1.17 Sub-total Gopalganj Division 195.536

Madaripur Division N8 Dhaka -Patuakhali Road Km 068.40-068.91 S 0.51 12114 National Overlay 80mm @ IRI 4-9 2014 5.350 9.56 Sub-total Madaripur Division 5.350

Rajbari Division N7 Dauladia-Mongla Road Km 006.00-006.60 S 0.60 3088 National Overlay 50mm @ IRI 4-9 2014 3.974 3.73 N7 Dauladia-Mongla Road Km 010.90-017.00 S 6.10 3340 National Overlay 50mm @ IRI 4-9 2014 39.212 3.66 N7 Dauladia-Mongla Road Km 007.80-010.90 S 3.10 3242 National Overlay 50mm @ IRI 4-9 2014 20.530 3.14 N7 Dauladia-Mongla Road Km 003.00-006.00 S 3.00 3088 National Overlay 50mm @ IRI 4-9 2014 19.868 2.82 N7 Dauladia-Mongla Road Km 000.00-001.00 S 1.00 3088 National Overlay 50mm @ IRI 4-9 2014 8.389 1.51 R711 Rajbari -Joukura Ferryghat Road Km 000.00-000.50 S 0.50 1110 Regional DBST 25mm @ 25% Crk 2014 0.945 0.76 R711 Rajbari -Joukura Ferryghat Road Km 000.70-000.80 S 0.10 1110 Regional DBST 25mm Traff 2014 0.189 1.22

Appendix-B Page: 29 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R711 Rajbari -Joukura Ferryghat Road Km 003.60-004.30 S 0.70 1110 Regional DBST 25mm Traff All 2014 1.323 0.24 R711 Rajbari -Joukura Ferryghat Road Km 000.80-001.70 S 0.90 1110 Regional DBST 25mm Traff All 2014 1.701 0.24 R711 Rajbari -Joukura Ferryghat Road Km 001.70-002.00 S 0.30 1110 Regional Overlay 50mm @ IRI 5-7 2014 1.192 1.44 R712 Tottipur -Machpara Link Road Km 000.00-002.22 S 2.22 990 Regional Overlay 50mm @ IRI 7-9 2014 7.449 0.61 Sub-total Rajbari Division 104.771

Sariatpur Division R861 Monohar -Shariatpur Road Km 001.50-001.90 S 0.40 2322 Regional DBST 25mm Traff 2000-400 2014 0.941 0.71 R861 Monohar -Shariatpur Road Km 001.40-001.50 S 0.10 2322 Regional DBST 25mm Traff 2000-400 2014 0.235 0.17 R861 Monohar -Shariatpur Road Km 005.40-006.91 S 1.51 2344 Regional Overlay 50mm @ IRI 5-7 2014 7.477 0.73 R861 Monohar -Shariatpur Road Km 000.00-001.40 S 1.40 2322 Regional Overlay 50mm @ IRI 5-7 2014 6.923 0.68 R861 Monohar -Shariatpur Road Km 001.90-002.40 S 0.50 2322 Regional Overlay 50mm @ IRI 7-9 2014 2.472 1.41 Sub-total Sariatpur Division 18.048 Total Gopalganj Zone 664.69

Khulna Zone Bagerhat Division N7 Dauladia-Mongla Road Km 252.42-258.88 S 6.47 2296 National Overlay 50mm @ IRI 4-9 2014 48.181 0.92 R771 Rupsha-Bagerhat Road Km 013.40-013.50 S 0.10 975 Regional DBST 25mm Traff All 2014 0.231 0.05 Sub-total Bagerhat Division 48.412

Chuadanga Division R745 Kushtia -Jhenaidah Road Km 095.44-096.24 S 0.80 1380 Regional DBST 25mm Traff 2014 1.848 0.35 R745 Kushtia -Jhenaidah Road Km 092.04-092.14 S 0.10 1380 Regional DBST 25mm Traff 2014 0.231 0.03 R745 Kushtia -Jhenaidah Road Km 092.23-092.24 S 0.01 1380 Regional DBST 25mm Traff All 2014 0.023 1.04 R745 Kushtia -Jhenaidah Road Km 090.94-091.14 S 0.20 1380 Regional DBST 25mm Traff All 2014 0.462 0.22 R745 Kushtia -Jhenaidah Road Km 091.64-091.84 S 0.20 1380 Regional DBST 25mm Traff All 2014 0.462 0.12 R745 Kushtia -Jhenaidah Road Km 096.24-096.44 S 0.20 1380 Regional DBST 25mm Traff All 2014 0.462 0.12 R745 Kushtia -Jhenaidah Road Km 095.14-095.44 S 0.30 1380 Regional DBST 25mm Traff All 2014 0.693 0.07 R745 Kushtia -Jhenaidah Road Km 074.46-075.26 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.620 6.51 R745 Kushtia -Jhenaidah Road Km 071.02-071.96 S 0.94 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.400 6.16 R745 Kushtia -Jhenaidah Road Km 075.26-079.24 S 3.98 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 23.013 6.01 R745 Kushtia -Jhenaidah Road Km 072.96-074.16 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.75 R747 Kushtia -Chuadanga Road Km 014.10-014.20 S 0.10 1438 Regional DBST 25mm Traff All 2014 0.223 0.21 R747 Kushtia -Chuadanga Road Km 015.20-020.60 S 5.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 31.979 5.85

Appendix-B Page: 30 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R748 Chuadanga-Kaliganj Road Km 015.70-015.80 S 0.10 1528 Regional DBST 25mm Traff All 2014 0.273 0.19 R748 Chuadanga-Kaliganj Road Km 001.20-001.40 S 0.20 1528 Regional Overlay 50mm @ IRI 7-9 2014 1.148 1.22 R748 Chuadanga-Kaliganj Road Km 034.60-037.50 S 2.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 13.538 7.17 R748 Chuadanga-Kaliganj Road Km 025.20-032.70 S 7.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 42.289 6.78 R748 Chuadanga-Kaliganj Road Km 033.10-034.20 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.851 6.71 R748 Chuadanga-Kaliganj Road Km 018.80-022.10 S 3.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 22.523 5.27 R748 Chuadanga-Kaliganj Road Km 022.30-025.10 S 2.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 19.083 4.96 R749 Darsana-Mujibnagar Road Km 015.42-021.82 S 6.40 1660 Regional Overlay 50mm @ IRI 5-7 2014 22.548 0.74 R749 Darsana-Mujibnagar Road Km 021.82-022.52 S 0.70 1660 Regional Overlay 50mm @ IRI 7-9 2014 2.225 2.18 Sub-total Chuadanga Division 204.823

Jessore Division N7 Dauladia-Mongla Road Km 179.54-180.04 S 0.50 3242 National DBST 25mm Traff All 2014 1.575 0.70 N7 Dauladia-Mongla Road Km 178.04-178.74 S 0.70 3242 National DBST 25mm Traff All 2014 2.205 0.66 N7 Dauladia-Mongla Road Km 138.87-149.02 S 10.15 3606 National Overlay 50mm @ IRI 4-9 2014 49.313 4.34 N7 Dauladia-Mongla Road Km 180.04-181.74 S 1.70 3242 National Overlay 50mm @ IRI 4-9 2014 11.258 4.20 N7 Dauladia-Mongla Road Km 185.84-186.14 S 0.30 3242 National Overlay 50mm @ IRI 4-9 2014 1.987 3.85 N7 Dauladia-Mongla Road Km 178.74-179.54 S 0.80 3242 National Overlay 50mm @ IRI 4-9 2014 5.298 3.52 N7 Dauladia-Mongla Road Km 186.14-186.54 S 0.40 3242 National Overlay 50mm @ IRI 4-9 2014 2.649 3.35 N7 Dauladia-Mongla Road Km 181.84-181.94 S 0.10 3242 National Overlay 50mm @ IRI 4-9 2014 0.662 3.29 N7 Dauladia-Mongla Road Km 174.71-178.04 S 3.33 3242 National Overlay 50mm @ IRI 4-9 2014 23.376 3.16 N7 Dauladia-Mongla Road Km 182.24-185.24 S 3.00 3242 National Overlay 50mm @ IRI 4-9 2014 19.868 3.01 N7 Dauladia-Mongla Road Km 186.54-188.77 S 2.23 3242 National Overlay 50mm @ IRI 4-9 2014 15.122 2.74 N7 Dauladia-Mongla Road Km 167.31-167.51 S 0.20 9090 National Overlay 60mm @ IRI 7-9 2014 1.155 7.90 N7 Dauladia-Mongla Road Km 149.02-149.21 S 0.19 9090 National Overlay 60mm @ IRI 7-9 2014 1.091 7.87 N7 Dauladia-Mongla Road Km 171.11-171.91 S 0.80 9090 National Overlay 60mm @ IRI 7-9 2014 4.620 7.58 N7 Dauladia-Mongla Road Km 160.61-161.71 S 1.10 9090 National Overlay 60mm @ IRI 7-9 2014 6.353 7.50 N7 Dauladia-Mongla Road Km 161.81-164.21 S 2.40 9090 National Overlay 60mm @ IRI 7-9 2014 13.860 7.31 N702 Jessore -Magura Road Km 000.60-000.70 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.900 14.21 N702 Jessore -Magura Road Km 002.10-021.98 S 19.88 12114 National Overlay 80mm @ IRI 5-9 2014 178.970 12.01 N702 Jessore -Magura Road Km 001.40-001.60 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.801 11.89 N702 Jessore -Magura Road Km 000.00-000.50 S 0.50 12114 National Overlay 80mm @ IRI 5-9 2014 4.501 10.77 N707 Jessore Town Old Section Km 000.00-006.36 S 6.36 4643 National Overlay 50mm @ IRI 5-9 2014 35.947 5.11 N708 Jessore Town Old Section Km 002.00-003.40 S 1.40 1789 National DBST 25mm @ 25% Crk 2014 4.757 0.34 N708 Jessore Town Old Section Km 000.00-000.30 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.659 10.42 N711 Benapole Town Old Section Km 000.00-001.03 S 1.03 4732 National Overlay 50mm @ IRI 5-9 2014 6.379 3.33 R750 Jessore-Narail Road Km 016.20-019.72 S 3.52 5170 Regional DBST 25mm Traff 4000-600 2014 8.120 4.82

Appendix-B Page: 31 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R750 Jessore-Narail Road Km 003.00-006.00 S 3.00 1433 Regional Overlay 50mm @ IRI 5-7 2014 14.570 0.74 R750 Jessore-Narail Road Km 008.70-010.80 S 2.10 1433 Regional Overlay 50mm @ IRI 7-9 2014 10.199 1.16 R750 Jessore-Narail Road Km 021.02-021.42 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.95 R755 Jessore -Chuknagar Road Km 022.20-027.30 S 5.10 1734 Regional DBST 25mm @ 25% Crk 2014 11.781 0.83 R755 Jessore -Chuknagar Road Km 016.00-016.20 S 0.20 1734 Regional DBST 25mm Traff 2014 0.462 1.73 R755 Jessore -Chuknagar Road Km 016.20-019.20 S 3.00 1734 Regional Overlay 50mm @ IRI 5-7 2014 14.570 1.26 R755 Jessore -Chuknagar Road Km 019.20-022.20 S 3.00 1734 Regional Overlay 50mm @ IRI 5-7 2014 14.570 1.26 R755 Jessore -Chuknagar Road Km 012.80-016.00 S 3.20 1734 Regional Overlay 50mm @ IRI 5-7 2014 15.541 1.24 R755 Jessore -Chuknagar Road Km 038.00-038.14 S 0.14 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.791 7.36 R755 Jessore -Chuknagar Road Km 000.00-007.10 S 7.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 43.239 6.57 R755 Jessore -Chuknagar Road Km 011.70-012.80 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.353 6.35 R755 Jessore -Chuknagar Road Km 033.90-034.30 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.26 R755 Jessore -Chuknagar Road Km 034.90-035.20 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.25 R755 Jessore -Chuknagar Road Km 010.34-011.50 S 1.16 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.716 6.12 R755 Jessore -Chuknagar Road Km 031.70-032.00 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.08 R755 Jessore -Chuknagar Road Km 007.31-010.20 S 2.89 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 16.707 5.84 R755 Jessore -Chuknagar Road Km 035.50-036.20 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 5.82 R755 Jessore -Chuknagar Road Km 027.30-031.50 S 4.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.255 5.46 R765 Khulna-Satkhira Road Km 000.00-001.40 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.085 6.66 R765 Khulna-Satkhira Road Km 015.60-016.00 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.07 R765 Khulna-Satkhira Road Km 001.80-015.60 S 13.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 79.695 5.88 Sub-total Jessore Division 686.395

Jhenaidah Division N7 Dauladia-Mongla Road Km 108.66-123.61 S 14.95 3077 National Overlay 50mm @ IRI 4-9 2014 79.458 4.74 N7 Dauladia-Mongla Road Km 105.67-105.95 S 0.28 3698 National Overlay 50mm @ IRI 4-9 2014 1.365 3.98 N7 Dauladia-Mongla Road Km 126.77-138.87 S 12.10 3606 National Overlay 50mm @ IRI 4-9 2014 76.487 3.82 N7 Dauladia-Mongla Road Km 104.45-104.85 S 0.40 3698 National Overlay 50mm @ IRI 4-9 2014 2.649 3.18 N7 Dauladia-Mongla Road Km 106.85-108.66 S 1.81 12114 National Overlay 80mm @ IRI 4-9 2014 23.301 8.21 N7 Dauladia-Mongla Road Km 106.40-106.45 S 0.05 12114 National Overlay 80mm @ IRI 4-9 2014 0.657 8.01 N703 Jhenaidah Town Old Section Km 000.00-003.49 S 3.49 2198 National Overlay 50mm @ IRI 5-9 2014 20.031 0.84 N704 Jhenaidah-Dasuria Road Km 000.00-000.10 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.252 9.67 N704 Jhenaidah-Dasuria Road Km 001.02-003.90 S 2.88 12114 National Overlay 80mm @ IRI 5-9 2014 27.922 11.64 N704 Jhenaidah-Dasuria Road Km 010.92-012.90 S 1.98 12114 National Overlay 80mm @ IRI 5-9 2014 19.186 10.94 N704 Jhenaidah-Dasuria Road Km 012.92-015.80 S 2.88 12114 National Overlay 80mm @ IRI 5-9 2014 27.912 10.59 N704 Jhenaidah-Dasuria Road Km 015.90-017.95 S 2.05 12114 National Overlay 80mm @ IRI 5-9 2014 19.836 10.19 N704 Jhenaidah-Dasuria Road Km 004.00-006.90 S 2.90 12114 National Overlay 80mm @ IRI 5-9 2014 28.116 9.99

Appendix-B Page: 32 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N704 Jhenaidah-Dasuria Road Km 006.93-010.03 S 3.10 12114 National Overlay 80mm @ IRI 5-9 2014 30.055 9.96 N704 Jhenaidah-Dasuria Road Km 018.90-020.82 S 1.92 12114 National Overlay 80mm @ IRI 5-9 2014 18.624 9.92 N712 Benapole Town Old Section Km 000.00-003.00 S 3.00 12114 National Overlay 80mm @ IRI 5-9 2014 33.240 9.74 R745 Kushtia -Jhenaidah Road Km 111.93-112.03 S 0.10 5170 Regional DBST 25mm Traff 4000-600 2014 0.231 5.49 R745 Kushtia -Jhenaidah Road Km 105.13-105.43 S 0.30 5170 Regional DBST 25mm Traff 4000-600 2014 0.693 5.12 R745 Kushtia -Jhenaidah Road Km 099.44-100.24 S 0.80 1380 Regional DBST 25mm Traff All 2014 1.848 0.12 R745 Kushtia -Jhenaidah Road Km 097.74-098.14 S 0.40 1380 Regional DBST 25mm Traff All 2014 0.924 0.03 R745 Kushtia -Jhenaidah Road Km 101.84-105.13 S 3.29 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.977 6.43 R745 Kushtia -Jhenaidah Road Km 113.23-114.63 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.085 6.39 R745 Kushtia -Jhenaidah Road Km 115.73-116.73 L 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.787 6.30 R745 Kushtia -Jhenaidah Road Km 115.23-115.72 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.859 6.03 R745 Kushtia -Jhenaidah Road Km 112.13-113.03 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.01 R745 Kushtia -Jhenaidah Road Km 115.73-116.73 R 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.787 5.92 R745 Kushtia -Jhenaidah Road Km 105.53-109.33 S 3.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 21.945 5.73 R745 Kushtia -Jhenaidah Road Km 110.03-111.73 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.818 5.71 R748 Chuadanga-Kaliganj Road Km 037.50-044.00 S 6.50 5170 Regional DBST 25mm Traff 4000-600 2014 17.734 4.02 R748 Chuadanga-Kaliganj Road Km 058.60-065.98 S 7.38 1339 Regional Overlay 50mm @ IRI 5-7 2014 42.340 0.97 R748 Chuadanga-Kaliganj Road Km 050.60-051.90 S 1.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.873 5.88 R748 Chuadanga-Kaliganj Road Km 057.90-058.60 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.778 5.35 R748 Chuadanga-Kaliganj Road Km 044.15-050.60 S 6.46 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 44.076 5.27 R748 Chuadanga-Kaliganj Road Km 055.20-057.80 S 2.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.745 5.22 R748 Chuadanga-Kaliganj Road Km 052.08-055.20 S 3.13 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 21.349 5.08 Sub-total Jhenaidah Division 648.133

Khulna Division N7 Dauladia-Mongla Road Km 190.47-203.90 S 13.43 12114 National Overlay 80mm @ IRI 4-9 2014 167.380 7.70 N7 Dauladia-Mongla Road Km 205.90-210.90 S 5.00 12114 National Overlay 80mm @ IRI 4-9 2014 62.325 7.34 N7 Dauladia-Mongla Road Km 215.92-221.80 S 5.88 12114 National Overlay 80mm @ IRI 4-9 2014 104.241 4.54 Khulna City By-Pass Road Km 000.00-016.00 S 16.00 12114 National Overlay 80mm @ IRI 5-9 2014 159.552 9.69 R760 Khulna-Satkhira Road Km 001.00-001.60 S 0.60 5170 Regional DBST 25mm @ 25% Crk 2014 2.016 4.22 R760 Khulna-Satkhira Road Km 000.00-000.20 S 0.20 5170 Regional DBST 25mm @ 25% Crk 2014 0.672 3.38 R760 Khulna-Satkhira Road Km 012.90-016.30 S 3.40 5170 Regional DBST 25mm Traff 4000-600 2014 8.568 4.98 R760 Khulna-Satkhira Road Km 019.70-023.30 S 3.60 5170 Regional DBST 25mm Traff 4000-600 2014 9.072 4.41 R760 Khulna-Satkhira Road Km 001.70-004.80 S 3.10 5203 Regional DBST 25mm Traff 4000-600 2014 10.416 1.98 R760 Khulna-Satkhira Road Km 030.70-033.62 S 2.92 2410 Regional Overlay 50mm @ IRI 5-7 2014 15.470 2.49 R760 Khulna-Satkhira Road Km 030.60-030.70 S 0.10 2410 Regional Overlay 50mm @ IRI 7-9 2014 0.530 3.40 R760 Khulna-Satkhira Road Km 007.90-008.30 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.520 6.35

Appendix-B Page: 33 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R760 Khulna-Satkhira Road Km 006.90-007.60 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.410 6.27 R760 Khulna-Satkhira Road Km 033.62-034.87 S 1.25 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.875 6.16 R760 Khulna-Satkhira Road Km 026.40-029.40 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.900 6.07 R760 Khulna-Satkhira Road Km 009.70-012.90 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.160 6.02 R760 Khulna-Satkhira Road Km 018.00-019.70 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.710 6.02 R760 Khulna-Satkhira Road Km 016.30-017.80 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.450 6.01 R760 Khulna-Satkhira Road Km 008.80-009.50 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.410 5.72 R760 Khulna-Satkhira Road Km 008.40-008.70 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.890 5.58 R760 Khulna-Satkhira Road Km 023.40-026.40 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.900 5.27 R760 Khulna-Satkhira Road Km 000.40-000.60 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.680 4.53 R760 Khulna-Satkhira Road Km 004.80-005.60 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.720 4.44 R771 Rupsha-Bagerhat Road Km 006.00-006.40 S 0.40 975 Regional DBST 25mm Traff All 2014 0.638 0.21 R771 Rupsha-Bagerhat Road Km 003.20-003.50 S 0.30 975 Regional DBST 25mm Traff All 2014 0.479 0.09 R771 Rupsha-Bagerhat Road Km 003.60-005.90 S 2.30 975 Regional DBST 25mm Traff All 2014 3.671 0.02 Sub-total Khulna Division 652.655

Kushtia Division N704 Jhenaidah-Dasuria Road Km 069.07-070.40 L 1.33 12114 National DBST 25mm Traff > 6000 2014 3.347 9.47 N704 Jhenaidah-Dasuria Road Km 069.07-070.40 R 1.33 12114 National DBST 25mm Traff > 6000 2014 3.347 9.47 N704 Jhenaidah-Dasuria Road Km 055.07-058.07 S 3.00 4323 National DBST 25mm Traff 4000-600 2014 8.820 2.89 N704 Jhenaidah-Dasuria Road Km 051.77-055.07 S 3.30 4323 National Overlay 50mm @ IRI 5-9 2014 20.397 3.79 N704 Jhenaidah-Dasuria Road Km 048.47-048.67 S 0.20 4323 National Overlay 50mm @ IRI 5-9 2014 1.236 3.74 N704 Jhenaidah-Dasuria Road Km 048.76-051.77 S 3.01 4323 National Overlay 50mm @ IRI 5-9 2014 18.630 3.70 N704 Jhenaidah-Dasuria Road Km 059.57-060.47 S 0.90 4323 National Overlay 50mm @ IRI 5-9 2014 5.563 3.67 N704 Jhenaidah-Dasuria Road Km 045.47-048.47 S 3.00 4323 National Overlay 50mm @ IRI 5-9 2014 18.543 3.63 N704 Jhenaidah-Dasuria Road Km 061.47-064.57 S 3.10 4323 National Overlay 50mm @ IRI 5-9 2014 19.161 3.56 N704 Jhenaidah-Dasuria Road Km 021.90-025.90 S 4.01 12114 National Overlay 80mm @ IRI 5-9 2014 38.838 11.18 N704 Jhenaidah-Dasuria Road Km 042.04-045.47 S 3.43 12114 National Overlay 80mm @ IRI 5-9 2014 33.293 10.82 N704 Jhenaidah-Dasuria Road Km 026.89-030.87 S 3.98 12114 National Overlay 80mm @ IRI 5-9 2014 38.576 10.69 N704 Jhenaidah-Dasuria Road Km 030.88-040.88 S 10.00 12114 National Overlay 80mm @ IRI 5-9 2014 96.969 10.54 N704 Jhenaidah-Dasuria Road Km 020.82-021.00 S 0.17 12114 National Overlay 80mm @ IRI 5-9 2014 1.697 10.43 R710 Ahaladipur-Kushtia Road Km 069.39-073.11 S 3.72 2445 Regional DBST 25mm @ 25% Crk 2014 8.593 1.38 R710 Ahaladipur-Kushtia Road Km 063.07-069.39 S 6.32 2445 Regional Overlay 50mm @ IRI 5-7 2014 30.683 2.02 R710 Ahaladipur-Kushtia Road Km 049.07-050.27 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 6.39 R710 Ahaladipur-Kushtia Road Km 059.67-060.17 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.17 R710 Ahaladipur-Kushtia Road Km 046.47-048.97 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.438 5.93 R710 Ahaladipur-Kushtia Road Km 045.00-046.27 S 1.27 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.346 5.78

Appendix-B Page: 34 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R710 Ahaladipur-Kushtia Road Km 051.07-056.47 S 5.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 31.185 5.74 R745 Kushtia -Jhenaidah Road Km 010.30-010.40 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.11 R745 Kushtia -Jhenaidah Road Km 000.90-001.70 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.620 6.24 R745 Kushtia -Jhenaidah Road Km 000.04-000.70 S 0.67 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.840 6.22 R745 Kushtia -Jhenaidah Road Km 007.20-007.70 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.16 R745 Kushtia -Jhenaidah Road Km 010.00-010.20 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.02 R745 Kushtia -Jhenaidah Road Km 004.05-007.20 S 3.15 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.209 5.88 R745 Kushtia -Jhenaidah Road Km 018.58-025.68 S 7.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 41.003 5.80 R745 Kushtia -Jhenaidah Road Km 001.80-004.00 S 2.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 12.705 5.78 R745 Kushtia -Jhenaidah Road Km 007.74-009.40 S 1.66 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.610 5.68 R745 Kushtia -Jhenaidah Road Km 010.79-018.08 S 7.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 42.134 5.60 R747 Kushtia -Chuadanga Road Km 000.00-000.10 S 0.10 1438 Regional Overlay 50mm @ IRI 5-7 2014 0.468 0.80 R747 Kushtia -Chuadanga Road Km 012.40-012.90 S 0.50 1438 Regional Overlay 50mm @ IRI 5-7 2014 2.340 0.62 Sub-total Kushtia Division 550.027

Magura Division N7 Dauladia-Mongla Road Km 076.82-078.22 S 1.40 3571 National Overlay 50mm @ IRI 4-9 2014 9.272 3.96 N7 Dauladia-Mongla Road Km 062.40-064.65 S 2.25 3611 National Overlay 50mm @ IRI 4-9 2014 14.901 3.66 N7 Dauladia-Mongla Road Km 102.95-104.35 S 1.40 3698 National Overlay 50mm @ IRI 4-9 2014 9.272 3.50 N7 Dauladia-Mongla Road Km 066.65-067.02 S 0.37 3611 National Overlay 50mm @ IRI 4-9 2014 3.079 2.25 N7 Dauladia-Mongla Road Km 067.66-076.82 S 9.16 12114 National Overlay 80mm @ IRI 4-9 2014 95.118 9.59 N7 Dauladia-Mongla Road Km 078.22-102.95 S 24.73 12114 National Overlay 80mm @ IRI 4-9 2014 270.627 9.05 N7 Dauladia-Mongla Road Km 067.02-067.66 S 0.64 12114 National Overlay 80mm @ IRI 4-9 2014 8.460 6.88 N702 Jessore -Magura Road Km 034.29-035.09 S 0.80 1938 National DBST 25mm Traff 2014 2.184 1.49 N702 Jessore -Magura Road Km 030.69-033.69 S 3.00 1938 National Overlay 50mm @ IRI 5-9 2014 17.219 1.60 N702 Jessore -Magura Road Km 035.09-038.09 S 3.00 1938 National Overlay 50mm @ IRI 5-9 2014 17.219 1.58 N702 Jessore -Magura Road Km 033.69-034.29 S 0.60 1938 National Overlay 50mm @ IRI 5-9 2014 3.444 1.40 N702 Jessore -Magura Road Km 038.09-044.07 S 5.99 1938 National Overlay 50mm @ IRI 5-9 2014 34.351 1.30 N702 Jessore -Magura Road Km 021.98-024.39 S 2.41 12114 National Overlay 80mm @ IRI 5-9 2014 21.660 12.37 Sub-total Magura Division 506.803

Meherpur Division R745 Kushtia -Jhenaidah Road Km 029.88-031.76 S 1.88 5170 Regional DBST 25mm Traff 4000-600 2014 4.340 5.04 R745 Kushtia -Jhenaidah Road Km 055.36-058.56 S 3.19 2266 Regional Overlay 50mm @ IRI 5-7 2014 15.512 0.86 R745 Kushtia -Jhenaidah Road Km 064.86-066.26 S 1.40 2266 Regional Overlay 50mm @ IRI 5-7 2014 6.799 0.85 R745 Kushtia -Jhenaidah Road Km 053.66-054.86 S 1.20 2266 Regional Overlay 50mm @ IRI 7-9 2014 5.828 1.39

Appendix-B Page: 35 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R745 Kushtia -Jhenaidah Road Km 058.56-061.66 S 3.10 2266 Regional Overlay 50mm @ IRI 7-9 2014 15.055 1.34 R745 Kushtia -Jhenaidah Road Km 036.66-036.96 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.75 R745 Kushtia -Jhenaidah Road Km 041.86-043.56 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.818 6.29 R745 Kushtia -Jhenaidah Road Km 040.86-041.46 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 6.20 R745 Kushtia -Jhenaidah Road Km 066.26-071.02 S 4.76 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 27.518 6.01 R745 Kushtia -Jhenaidah Road Km 031.76-033.16 S 1.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.085 6.00 R745 Kushtia -Jhenaidah Road Km 050.26-053.66 S 3.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 19.635 5.99 R745 Kushtia -Jhenaidah Road Km 033.36-036.66 S 3.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 19.058 5.76 R745 Kushtia -Jhenaidah Road Km 043.56-048.36 S 4.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 27.720 5.75 R745 Kushtia -Jhenaidah Road Km 039.56-040.56 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.775 5.57 R746 Meherpur-Mujibnagar Road Km 004.10-005.70 S 1.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.240 5.94 R746 Meherpur-Mujibnagar Road Km 000.00-004.10 S 4.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.194 5.88 R746 Meherpur-Mujibnagar Road Km 007.20-010.40 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.480 5.86 R746 Meherpur-Mujibnagar Road Km 010.40-012.85 S 2.45 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.126 5.62 R749 Darsana-Mujibnagar Road Km 028.62-029.12 S 0.50 3029 Regional Overlay 50mm @ IRI 5-7 2014 1.766 4.46 R749 Darsana-Mujibnagar Road Km 023.00-026.42 S 3.42 1660 Regional Overlay 50mm @ IRI 5-7 2014 11.714 1.12 R749 Darsana-Mujibnagar Road Km 029.31-030.24 S 0.94 3029 Regional Overlay 50mm @ IRI 7-9 2014 3.306 4.06 R749 Darsana-Mujibnagar Road Km 026.42-028.42 S 2.00 1660 Regional Overlay 50mm @ IRI 7-9 2014 7.064 1.66 Sub-total Meherpur Division 260.229

Narail Division R750 Jessore-Narail Road Km 026.62-027.12 S 0.50 5170 Regional DBST 25mm Traff 4000-600 2014 1.155 4.95 R750 Jessore-Narail Road Km 022.42-023.12 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 6.48 R750 Jessore-Narail Road Km 029.02-029.32 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.48 R750 Jessore-Narail Road Km 023.32-023.72 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.24 R750 Jessore-Narail Road Km 024.02-024.72 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 5.94 R750 Jessore-Narail Road Km 028.32-028.82 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 5.68 R750 Jessore-Narail Road Km 030.32-032.16 S 1.84 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.638 5.55 Sub-total Narail Division 26.808

Satkhira Division R760 Khulna-Satkhira Road Km 054.71-056.01 S 1.30 5170 Regional DBST 25mm Traff 4000-600 2014 3.276 5.21 R760 Khulna-Satkhira Road Km 046.71-049.71 S 3.00 5170 Regional DBST 25mm Traff 4000-600 2014 7.560 4.98 R760 Khulna-Satkhira Road Km 036.92-037.42 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.150 6.21 R760 Khulna-Satkhira Road Km 034.87-036.92 S 2.05 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 12.915 5.98 R760 Khulna-Satkhira Road Km 049.71-050.71 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.300 5.76

Appendix-B Page: 36 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R760 Khulna-Satkhira Road Km 052.61-054.11 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.450 5.61 R760 Khulna-Satkhira Road Km 056.21-058.50 S 2.29 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.446 5.46 R765 Khulna-Satkhira Road Km 033.63-042.93 S 9.30 1951 Regional DBST 25mm Traff 2014 21.483 0.91 R765 Khulna-Satkhira Road Km 016.00-017.20 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.94 R765 Khulna-Satkhira Road Km 017.50-032.83 S 15.33 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 88.519 5.75 Sub-total Satkhira Division 174.029 Total Khulna Zone 3,758.31

Rajshahi Zone Naogaon Division N516 Naogaon Town By-Pass Road Km 000.10-000.40 S 0.30 2013 National Overlay 50mm @ IRI 5-9 2014 1.483 2.66 R544 Aricha -Daulatpur-Tangail Road Km 008.10-008.40 S 0.30 3029 Regional DBST 25mm Traff 2000-400 2014 0.479 4.66 R544 Aricha -Daulatpur-Tangail Road Km 008.50-011.10 S 2.60 3029 Regional Overlay 50mm @ IRI 7-9 2014 8.724 3.91 R544 Aricha -Daulatpur-Tangail Road Km 000.90-001.80 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.38 R544 Aricha -Daulatpur-Tangail Road Km 007.00-008.00 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.450 6.33 R544 Aricha -Daulatpur-Tangail Road Km 004.20-006.90 S 2.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 15.593 6.08 R544 Aricha -Daulatpur-Tangail Road Km 000.20-000.60 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.00 R544 Aricha -Daulatpur-Tangail Road Km 001.90-004.00 S 2.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 12.127 5.67 R545 Bogra-Joypurhat Road Km 083.48-083.88 S 0.40 1263 Regional DBST 25mm Traff 2014 0.924 1.94 R545 Bogra-Joypurhat Road Km 053.58-055.48 S 1.90 3058 Regional DBST 25mm Traff 2000-400 2014 4.389 2.64 R545 Bogra-Joypurhat Road Km 082.98-083.08 S 0.10 1263 Regional DBST 25mm Traff All 2014 0.231 0.31 R545 Bogra-Joypurhat Road Km 079.78-080.38 S 0.60 1263 Regional DBST 25mm Traff All 2014 1.386 0.28 R545 Bogra-Joypurhat Road Km 082.68-082.88 S 0.20 1263 Regional DBST 25mm Traff All 2014 0.462 0.25 R545 Bogra-Joypurhat Road Km 078.88-079.08 S 0.20 1263 Regional DBST 25mm Traff All 2014 0.462 0.24 R545 Bogra-Joypurhat Road Km 083.98-084.78 S 0.80 1280 Regional DBST 25mm Traff All 2014 1.848 0.16 R545 Bogra-Joypurhat Road Km 052.08-053.48 S 1.40 3058 Regional Overlay 50mm @ IRI 5-7 2014 6.799 4.04 R545 Bogra-Joypurhat Road Km 055.68-056.98 S 1.30 3058 Regional Overlay 50mm @ IRI 5-7 2014 6.313 3.76 R545 Bogra-Joypurhat Road Km 058.08-058.88 S 0.80 3058 Regional Overlay 50mm @ IRI 5-7 2014 3.885 3.32 R545 Bogra-Joypurhat Road Km 079.48-079.78 S 0.30 1263 Regional Overlay 50mm @ IRI 5-7 2014 1.457 2.10 R545 Bogra-Joypurhat Road Km 083.08-083.48 S 0.40 1263 Regional Overlay 50mm @ IRI 5-7 2014 1.943 1.74 R545 Bogra-Joypurhat Road Km 073.99-076.88 S 2.89 1263 Regional Overlay 50mm @ IRI 5-7 2014 14.050 1.32 R545 Bogra-Joypurhat Road Km 112.14-113.77 S 1.63 1289 Regional Overlay 50mm @ IRI 5-7 2014 7.916 0.46 R545 Bogra-Joypurhat Road Km 051.18-051.98 S 0.80 3058 Regional Overlay 50mm @ IRI 7-9 2014 3.885 3.17 R545 Bogra-Joypurhat Road Km 079.08-079.18 S 0.10 1263 Regional Overlay 50mm @ IRI 7-9 2014 0.486 2.38 R545 Bogra-Joypurhat Road Km 081.88-082.68 S 0.80 1263 Regional Overlay 50mm @ IRI 7-9 2014 3.885 2.33 R545 Bogra-Joypurhat Road Km 077.00-078.18 S 1.18 1263 Regional Overlay 50mm @ IRI 7-9 2014 5.721 2.23

Appendix-B Page: 37 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R545 Bogra-Joypurhat Road Km 080.88-081.78 S 0.90 1263 Regional Overlay 50mm @ IRI 7-9 2014 4.371 1.86 R545 Bogra-Joypurhat Road Km 059.28-059.48 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.98 R545 Bogra-Joypurhat Road Km 061.58-061.78 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.64 R545 Bogra-Joypurhat Road Km 061.08-061.38 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.55 R545 Bogra-Joypurhat Road Km 066.48-067.28 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.620 6.54 R545 Bogra-Joypurhat Road Km 050.68-051.18 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.54 R545 Bogra-Joypurhat Road Km 043.18-043.68 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.48 R545 Bogra-Joypurhat Road Km 045.98-049.58 S 3.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.790 6.46 R545 Bogra-Joypurhat Road Km 069.96-073.48 S 3.52 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.316 6.42 R545 Bogra-Joypurhat Road Km 045.38-045.68 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.39 R545 Bogra-Joypurhat Road Km 043.78-044.48 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 6.15 R545 Bogra-Joypurhat Road Km 065.28-066.18 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.11 R545 Bogra-Joypurhat Road Km 062.48-064.98 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.438 6.00 R545 Bogra-Joypurhat Road Km 060.28-060.98 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 5.99 R545 Bogra-Joypurhat Road Km 067.38-069.68 S 2.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 13.283 5.58 R547 Naogaon-Badalgachhi-Rohonpur Km 015.40-015.50 S 0.10 1227 Regional DBST 25mm @ 25% Crk 2014 0.147 1.54 R547 Naogaon-Badalgachhi-Rohonpur Km 041.96-042.86 S 0.90 1531 Regional DBST 25mm @ 25% Crk 2014 2.079 0.64 R547 Naogaon-Badalgachhi-Rohonpur Km 053.49-053.79 S 0.30 1531 Regional DBST 25mm @ 25% Crk 2014 0.693 0.45 R547 Naogaon-Badalgachhi-Rohonpur Km 010.40-010.50 S 0.10 1227 Regional DBST 25mm @ 25% Crk 2014 0.231 0.41 R547 Naogaon-Badalgachhi-Rohonpur Km 059.89-062.99 S 3.10 1531 Regional DBST 25mm Traff 2014 4.557 1.98 R547 Naogaon-Badalgachhi-Rohonpur Km 015.70-016.00 S 0.30 1227 Regional DBST 25mm Traff 2014 0.441 1.82 R547 Naogaon-Badalgachhi-Rohonpur Km 013.00-013.40 S 0.40 1227 Regional DBST 25mm Traff 2014 0.588 1.71 R547 Naogaon-Badalgachhi-Rohonpur Km 015.10-015.20 S 0.10 1227 Regional DBST 25mm Traff 2014 0.147 1.51 R547 Naogaon-Badalgachhi-Rohonpur Km 015.60-015.70 S 0.10 1227 Regional DBST 25mm Traff 2014 0.147 1.50 R547 Naogaon-Badalgachhi-Rohonpur Km 000.60-003.20 S 2.60 1227 Regional DBST 25mm Traff 2014 6.006 1.13 R547 Naogaon-Badalgachhi-Rohonpur Km 067.49-067.69 S 0.20 1531 Regional DBST 25mm Traff 2014 0.462 0.96 R547 Naogaon-Badalgachhi-Rohonpur Km 003.80-004.00 S 0.20 1227 Regional DBST 25mm Traff 2014 0.462 0.38 R547 Naogaon-Badalgachhi-Rohonpur Km 010.50-010.60 S 0.10 1227 Regional DBST 25mm Traff 2014 0.231 0.35 R547 Naogaon-Badalgachhi-Rohonpur Km 042.86-043.36 S 0.50 1531 Regional DBST 25mm Traff 2014 1.155 0.22 R547 Naogaon-Badalgachhi-Rohonpur Km 008.10-008.60 S 0.50 1227 Regional DBST 25mm Traff 2014 1.155 0.20 R547 Naogaon-Badalgachhi-Rohonpur Km 003.40-003.80 S 0.40 1227 Regional DBST 25mm Traff 2014 0.924 0.14 R547 Naogaon-Badalgachhi-Rohonpur Km 049.16-049.76 S 0.60 1531 Regional DBST 25mm Traff All 2014 0.882 0.57 R547 Naogaon-Badalgachhi-Rohonpur Km 038.96-039.16 S 0.20 1531 Regional DBST 25mm Traff All 2014 0.462 0.32 R547 Naogaon-Badalgachhi-Rohonpur Km 043.56-043.76 S 0.20 1531 Regional DBST 25mm Traff All 2014 0.462 0.31 R547 Naogaon-Badalgachhi-Rohonpur Km 067.69-068.69 S 1.00 1531 Regional DBST 25mm Traff All 2014 2.310 0.28 R547 Naogaon-Badalgachhi-Rohonpur Km 039.26-039.76 S 0.50 1531 Regional DBST 25mm Traff All 2014 1.155 0.25 R547 Naogaon-Badalgachhi-Rohonpur Km 015.20-015.40 S 0.20 1227 Regional DBST 25mm Traff All 2014 0.294 0.25

Appendix-B Page: 38 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R547 Naogaon-Badalgachhi-Rohonpur Km 009.30-009.40 S 0.10 1227 Regional DBST 25mm Traff All 2014 0.231 0.12 R547 Naogaon-Badalgachhi-Rohonpur Km 011.90-012.00 S 0.10 1227 Regional DBST 25mm Traff All 2014 0.231 0.11 R547 Naogaon-Badalgachhi-Rohonpur Km 005.80-005.90 S 0.10 1227 Regional DBST 25mm Traff All 2014 0.231 0.11 R547 Naogaon-Badalgachhi-Rohonpur Km 008.70-008.80 S 0.10 1227 Regional DBST 25mm Traff All 2014 0.231 0.11 R547 Naogaon-Badalgachhi-Rohonpur Km 010.10-010.40 S 0.30 1227 Regional DBST 25mm Traff All 2014 0.693 0.06 R547 Naogaon-Badalgachhi-Rohonpur Km 010.90-011.40 S 0.50 1227 Regional DBST 25mm Traff All 2014 1.155 0.04 R547 Naogaon-Badalgachhi-Rohonpur Km 016.00-016.60 S 0.60 3029 Regional Overlay 50mm @ IRI 5-7 2014 1.854 5.30 R547 Naogaon-Badalgachhi-Rohonpur Km 021.90-022.40 S 0.50 3029 Regional Overlay 50mm @ IRI 5-7 2014 1.545 5.02 R547 Naogaon-Badalgachhi-Rohonpur Km 056.69-059.89 S 3.20 1531 Regional Overlay 50mm @ IRI 5-7 2014 9.890 2.86 R547 Naogaon-Badalgachhi-Rohonpur Km 039.16-039.26 S 0.10 1531 Regional Overlay 50mm @ IRI 5-7 2014 0.486 1.68 R547 Naogaon-Badalgachhi-Rohonpur Km 038.86-038.96 S 0.10 1531 Regional Overlay 50mm @ IRI 5-7 2014 0.486 1.40 R547 Naogaon-Badalgachhi-Rohonpur Km 043.76-044.06 S 0.30 1531 Regional Overlay 50mm @ IRI 5-7 2014 1.457 1.16 R547 Naogaon-Badalgachhi-Rohonpur Km 039.76-040.76 S 1.00 1531 Regional Overlay 50mm @ IRI 5-7 2014 4.857 1.11 R547 Naogaon-Badalgachhi-Rohonpur Km 044.36-047.16 S 2.80 1531 Regional Overlay 50mm @ IRI 5-7 2014 13.598 1.08 R547 Naogaon-Badalgachhi-Rohonpur Km 008.60-008.70 S 0.10 1227 Regional Overlay 50mm @ IRI 5-7 2014 0.486 0.72 R547 Naogaon-Badalgachhi-Rohonpur Km 010.60-010.90 S 0.30 1227 Regional Overlay 50mm @ IRI 5-7 2014 1.457 0.62 R547 Naogaon-Badalgachhi-Rohonpur Km 011.40-011.90 S 0.50 1227 Regional Overlay 50mm @ IRI 5-7 2014 2.428 0.58 R547 Naogaon-Badalgachhi-Rohonpur Km 005.90-006.90 S 1.00 1227 Regional Overlay 50mm @ IRI 5-7 2014 4.857 0.56 R547 Naogaon-Badalgachhi-Rohonpur Km 005.30-005.80 S 0.50 1227 Regional Overlay 50mm @ IRI 5-7 2014 2.428 0.56 R547 Naogaon-Badalgachhi-Rohonpur Km 068.99-075.89 S 6.90 3029 Regional Overlay 50mm @ IRI 7-9 2014 21.324 4.40 R547 Naogaon-Badalgachhi-Rohonpur Km 078.39-079.23 S 0.84 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.590 4.26 R547 Naogaon-Badalgachhi-Rohonpur Km 028.20-028.50 S 0.30 3029 Regional Overlay 50mm @ IRI 7-9 2014 1.060 4.25 R547 Naogaon-Badalgachhi-Rohonpur Km 021.50-021.70 S 0.20 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.618 4.17 R547 Naogaon-Badalgachhi-Rohonpur Km 025.10-026.30 S 1.20 3029 Regional Overlay 50mm @ IRI 7-9 2014 4.238 3.52 R547 Naogaon-Badalgachhi-Rohonpur Km 062.99-063.39 S 0.40 1531 Regional Overlay 50mm @ IRI 7-9 2014 1.236 3.51 R547 Naogaon-Badalgachhi-Rohonpur Km 048.26-049.16 S 0.90 1531 Regional Overlay 50mm @ IRI 7-9 2014 2.781 3.26 R547 Naogaon-Badalgachhi-Rohonpur Km 063.59-064.39 S 0.80 1531 Regional Overlay 50mm @ IRI 7-9 2014 2.472 2.72 R547 Naogaon-Badalgachhi-Rohonpur Km 049.76-052.16 S 2.40 1531 Regional Overlay 50mm @ IRI 7-9 2014 9.452 2.19 R547 Naogaon-Badalgachhi-Rohonpur Km 047.36-048.16 S 0.80 1531 Regional Overlay 50mm @ IRI 7-9 2014 3.610 1.61 R547 Naogaon-Badalgachhi-Rohonpur Km 034.96-038.56 S 3.60 1531 Regional Overlay 50mm @ IRI 7-9 2014 17.483 1.57 R547 Naogaon-Badalgachhi-Rohonpur Km 043.36-043.56 S 0.20 1531 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.54 R547 Naogaon-Badalgachhi-Rohonpur Km 012.00-012.90 S 0.90 1227 Regional Overlay 50mm @ IRI 7-9 2014 2.797 1.53 R547 Naogaon-Badalgachhi-Rohonpur Km 053.79-056.69 S 2.90 1531 Regional Overlay 50mm @ IRI 7-9 2014 12.778 1.53 R547 Naogaon-Badalgachhi-Rohonpur Km 038.56-038.86 S 0.30 1531 Regional Overlay 50mm @ IRI 7-9 2014 1.457 1.49 R547 Naogaon-Badalgachhi-Rohonpur Km 009.40-010.10 S 0.70 1227 Regional Overlay 50mm @ IRI 7-9 2014 3.400 0.80 R547 Naogaon-Badalgachhi-Rohonpur Km 008.80-009.30 S 0.50 1227 Regional Overlay 50mm @ IRI 7-9 2014 2.428 0.76 R547 Naogaon-Badalgachhi-Rohonpur Km 000.00-000.10 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.31

Appendix-B Page: 39 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R549 Badalgachhi-Joypurhat Road Km 000.00-000.10 S 0.10 899 Regional DBST 25mm @ 25% Crk 2014 0.294 0.11 R549 Badalgachhi-Joypurhat Road Km 008.90-009.90 S 1.00 899 Regional DBST 25mm Traff 2014 1.882 0.41 R549 Badalgachhi-Joypurhat Road Km 010.80-013.90 S 3.10 899 Regional DBST 25mm Traff 2014 5.729 0.38 R549 Badalgachhi-Joypurhat Road Km 000.20-001.60 S 1.40 899 Regional DBST 25mm Traff 2014 3.381 0.21 R549 Badalgachhi-Joypurhat Road Km 006.20-006.70 S 0.50 899 Regional DBST 25mm Traff All 2014 0.945 1.06 R549 Badalgachhi-Joypurhat Road Km 013.90-014.90 S 1.00 899 Regional DBST 25mm Traff All 2014 1.848 0.72 R549 Badalgachhi-Joypurhat Road Km 009.90-010.50 S 0.60 899 Regional DBST 25mm Traff All 2014 1.109 0.39 R549 Badalgachhi-Joypurhat Road Km 003.40-003.50 S 0.10 899 Regional DBST 25mm Traff All 2014 0.189 0.14 R549 Badalgachhi-Joypurhat Road Km 017.20-017.80 S 0.60 899 Regional DBST 25mm Traff All 2014 1.109 0.13 R549 Badalgachhi-Joypurhat Road Km 008.70-008.90 S 0.20 899 Regional DBST 25mm Traff All 2014 0.378 0.08 R549 Badalgachhi-Joypurhat Road Km 015.30-015.40 S 0.10 899 Regional DBST 25mm Traff All 2014 0.185 0.06 R549 Badalgachhi-Joypurhat Road Km 000.10-000.20 S 0.10 899 Regional DBST 25mm Traff All 2014 0.294 0.04 R549 Badalgachhi-Joypurhat Road Km 010.50-010.80 S 0.30 899 Regional Overlay 50mm @ IRI 5-7 2014 1.166 0.42 R549 Badalgachhi-Joypurhat Road Km 014.90-015.30 S 0.40 899 Regional Overlay 50mm @ IRI 5-7 2014 1.554 0.40 R549 Badalgachhi-Joypurhat Road Km 006.70-008.70 S 2.00 899 Regional Overlay 50mm @ IRI 7-9 2014 7.947 0.49 R549 Badalgachhi-Joypurhat Road Km 003.50-006.20 S 2.70 899 Regional Overlay 50mm @ IRI 7-9 2014 10.728 0.42 R549 Badalgachhi-Joypurhat Road Km 015.40-017.20 S 1.80 899 Regional Overlay 50mm @ IRI 7-9 2014 6.993 0.35 R549 Badalgachhi-Joypurhat Road Km 001.90-003.40 S 1.50 899 Regional Overlay 50mm @ IRI 7-9 2014 5.960 0.33 R685 Rajshahi -Chowmasia Road Km 052.20-052.40 S 0.20 2077 Regional DBST 25mm Traff All 2014 0.462 0.33 R685 Rajshahi -Chowmasia Road Km 060.70-063.70 S 3.00 2077 Regional Overlay 50mm @ IRI 5-7 2014 14.570 3.31 R685 Rajshahi -Chowmasia Road Km 050.80-052.20 S 1.40 2077 Regional Overlay 50mm @ IRI 5-7 2014 6.799 3.30 R685 Rajshahi -Chowmasia Road Km 064.30-064.70 S 0.40 2077 Regional Overlay 50mm @ IRI 5-7 2014 1.943 2.75 R685 Rajshahi -Chowmasia Road Km 064.70-065.30 S 0.60 2077 Regional Overlay 50mm @ IRI 7-9 2014 2.914 3.21 R685 Rajshahi -Chowmasia Road Km 057.60-060.70 S 3.10 2077 Regional Overlay 50mm @ IRI 7-9 2014 15.055 3.10 R685 Rajshahi -Chowmasia Road Km 045.00-045.10 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.60 R685 Rajshahi -Chowmasia Road Km 037.70-038.10 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.87 R685 Rajshahi -Chowmasia Road Km 033.20-033.50 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.82 R685 Rajshahi -Chowmasia Road Km 033.60-033.80 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.72 R685 Rajshahi -Chowmasia Road Km 048.80-050.30 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.663 6.38 R685 Rajshahi -Chowmasia Road Km 045.30-045.70 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.01 R685 Rajshahi -Chowmasia Road Km 040.10-040.30 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 5.97 R685 Rajshahi -Chowmasia Road Km 045.80-048.50 S 2.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 15.593 5.60 R685 Rajshahi -Chowmasia Road Km 034.30-036.80 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.438 5.59 R685 Rajshahi -Chowmasia Road Km 041.90-045.00 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.903 5.46 R685 Rajshahi -Chowmasia Road Km 037.00-037.70 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.043 5.38 R685 Rajshahi -Chowmasia Road Km 038.10-039.80 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.818 5.36 R685 Rajshahi -Chowmasia Road Km 040.50-041.70 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.27

Appendix-B Page: 40 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost Sub-total Naogaon Division 564.977

Natore Division N502 Bogra -Natore Road Km 039.11-039.21 S 0.10 12114 National Overlay 50mm @ IRI 5 2014 0.530 11.76 N502 Bogra -Natore Road Km 039.41-040.01 S 0.60 12114 National Overlay 80mm @ IRI 5-9 2014 4.986 12.60 N502 Bogra -Natore Road Km 040.81-042.91 S 2.10 12114 National Overlay 80mm @ IRI 5-9 2014 17.451 12.27 N502 Bogra -Natore Road Km 038.41-038.61 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.662 12.22 N507 Hatikamrul-Banpara Road Km 027.02-027.40 S 0.38 12114 National Overlay 80mm @ IRI 5-9 2014 3.947 11.10 N507 Hatikamrul-Banpara Road Km 027.60-050.90 S 23.30 12114 National Overlay 80mm @ IRI 5-9 2014 242.029 10.03 Kashinathpur-Natore-Rajshahi Road Km 091.95-098.65 S 6.70 4380 National Overlay 50mm @ IRI 4-9 2014 41.413 3.52 N6 Kashinathpur-Natore-Rajshahi Road Km 098.85-100.35 S 1.50 4380 National Overlay 50mm @ IRI 4-9 2014 9.272 3.37 N6 Kashinathpur-Natore-Rajshahi Road Km 068.28-068.88 L 0.60 9090 National Overlay 60mm @ IRI 7-9 2014 3.465 7.61 N6 Kashinathpur-Natore-Rajshahi Road Km 068.28-068.88 R 0.60 9090 National Overlay 60mm @ IRI 7-9 2014 3.465 7.61 N6 Kashinathpur-Natore-Rajshahi Road Km 085.78-085.85 S 0.07 12114 National Overlay 80mm @ IRI 4-9 2014 0.650 13.04 N6 Kashinathpur-Natore-Rajshahi Road Km 110.25-113.60 S 3.35 12114 National Overlay 80mm @ IRI 4-9 2014 32.488 11.57 N6 Kashinathpur-Natore-Rajshahi Road Km 074.88-078.58 S 3.70 12114 National Overlay 80mm @ IRI 4-9 2014 35.872 11.07 N6 Kashinathpur-Natore-Rajshahi Road Km 085.18-085.58 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.878 10.67 N6 Kashinathpur-Natore-Rajshahi Road Km 070.18-074.78 S 4.60 12114 National Overlay 80mm @ IRI 4-9 2014 44.597 10.20 N6 Kashinathpur-Natore-Rajshahi Road Km 083.87-084.98 S 1.11 12114 National Overlay 80mm @ IRI 4-9 2014 10.752 10.00 N6 Kashinathpur-Natore-Rajshahi Road Km 091.25-091.65 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.878 9.83 N6 Kashinathpur-Natore-Rajshahi Road Km 085.95-090.95 S 5.00 12114 National Overlay 80mm @ IRI 4-9 2014 48.475 9.19 N602 Natore Town old Section Km 003.00-003.50 S 0.50 12114 National DBST 25mm Traff > 6000 2014 1.659 7.45 N602 Natore Town old Section Km 000.20-001.50 S 1.30 8972 National Overlay 50mm @ IRI 5-7 2014 9.068 2.52 R548 Naogaon-Atrai-Natore Road Km 029.58-053.32 S 23.74 1607 Regional Overlay 50mm @ IRI 7-9 2014 97.664 0.77 Sub-total Natore Division 617.199

Nawabganj Division R547 Naogaon-Badalgachhi-Rohonpur Km 097.55-097.85 S 0.30 3029 Regional DBST 25mm @ 25% Crk 2014 0.441 3.37 R547 Naogaon-Badalgachhi-Rohonpur Km 089.39-089.45 S 0.06 3029 Regional DBST 25mm Traff 2000-400 2014 0.091 1.57 R547 Naogaon-Badalgachhi-Rohonpur Km 096.45-097.45 S 1.00 3029 Regional Overlay 50mm @ IRI 5-7 2014 3.091 5.22 R547 Naogaon-Badalgachhi-Rohonpur Km 090.35-091.25 S 0.90 3029 Regional Overlay 50mm @ IRI 5-7 2014 2.781 4.16 R547 Naogaon-Badalgachhi-Rohonpur Km 087.49-087.69 S 0.20 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.618 4.72 R547 Naogaon-Badalgachhi-Rohonpur Km 089.65-090.05 S 0.40 3029 Regional Overlay 50mm @ IRI 7-9 2014 1.236 4.68 R547 Naogaon-Badalgachhi-Rohonpur Km 087.89-089.29 S 1.40 3029 Regional Overlay 50mm @ IRI 7-9 2014 4.327 4.44 R547 Naogaon-Badalgachhi-Rohonpur Km 083.19-083.29 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.309 4.39 R547 Naogaon-Badalgachhi-Rohonpur Km 097.95-100.36 S 2.41 3029 Regional Overlay 50mm @ IRI 7-9 2014 7.436 3.84

Appendix-B Page: 41 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R548 Naogaon-Atrai-Natore Road Km 028.00-029.58 S 1.58 5170 Regional DBST 25mm Traff 4000-600 2014 2.721 6.12 R548 Naogaon-Atrai-Natore Road Km 006.00-006.80 S 0.80 5170 Regional DBST 25mm Traff 4000-600 2014 1.848 4.96 R548 Naogaon-Atrai-Natore Road Km 007.80-009.00 S 1.20 5170 Regional DBST 25mm Traff 4000-600 2014 2.772 4.85 R548 Naogaon-Atrai-Natore Road Km 021.20-021.30 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.344 4.70 R548 Naogaon-Atrai-Natore Road Km 017.30-017.90 S 0.60 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.119 4.06 R548 Naogaon-Atrai-Natore Road Km 021.80-022.40 S 0.60 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.066 3.60 R548 Naogaon-Atrai-Natore Road Km 007.30-007.40 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.50 R548 Naogaon-Atrai-Natore Road Km 005.20-005.40 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.73 R548 Naogaon-Atrai-Natore Road Km 004.50-004.70 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.69 R548 Naogaon-Atrai-Natore Road Km 002.00-002.90 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.50 R680 Rajshahi-Nawabganj Road Km 038.60-038.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.662 5.64 Sub-total Nawabganj Division 40.947

Pabna Division N5 Dhaka -Utholi-Banglabandh Road Km 099.70-100.40 S 0.70 5917 National Overlay 50mm @ IRI 4-9 2014 4.636 3.96 N5 Dhaka -Utholi-Banglabandh Road Km 100.50-106.93 S 6.43 12114 National Overlay 80mm @ IRI 4-9 2014 66.792 8.87 N504 Nagarbari -Kashinathpur Road Km 000.40-000.50 S 0.10 1700 National DBST 25mm Traff All 2014 0.336 0.10 N504 Nagarbari -Kashinathpur Road Km 004.40-004.50 S 0.10 1700 National DBST 25mm Traff All 2014 0.336 0.03 N6 Kashinathpur-Natore-Rajshahi Road Km 025.70-026.00 S 0.30 2732 National DBST 25mm Traff All 2014 0.882 0.42 N6 Kashinathpur-Natore-Rajshahi Road Km 068.00-068.12 L 0.12 9090 National Overlay 50mm @ IRI 4-7 2014 0.602 7.89 N6 Kashinathpur-Natore-Rajshahi Road Km 068.00-068.12 R 0.12 9090 National Overlay 50mm @ IRI 4-7 2014 0.602 7.89 N6 Kashinathpur-Natore-Rajshahi Road Km 021.60-022.10 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 4.848 11.47 N6 Kashinathpur-Natore-Rajshahi Road Km 012.30-016.60 S 4.30 12114 National Overlay 80mm @ IRI 4-9 2014 41.689 10.33 N6 Kashinathpur-Natore-Rajshahi Road Km 006.80-009.80 S 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 29.085 10.14 N6 Kashinathpur-Natore-Rajshahi Road Km 016.70-021.60 S 4.90 12114 National Overlay 80mm @ IRI 4-9 2014 47.506 10.05 N6 Kashinathpur-Natore-Rajshahi Road Km 009.90-012.10 S 2.20 12114 National Overlay 80mm @ IRI 4-9 2014 21.329 9.66 N6 Kashinathpur-Natore-Rajshahi Road Km 022.40-025.40 S 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 29.085 9.23 N704 Jhenaidah-Dasuria Road Km 074.00-074.37 S 0.37 12114 National Overlay 80mm @ IRI 5-9 2014 3.607 11.34 N704 Jhenaidah-Dasuria Road Km 070.40-074.00 L 3.60 12114 National Overlay 80mm @ IRI 5-9 2014 29.916 10.68 N704 Jhenaidah-Dasuria Road Km 070.40-074.00 R 3.60 12114 National Overlay 80mm @ IRI 5-9 2014 29.916 10.68 N705 Paksey -Iswardi-Dasuria Km 005.00-005.20 S 0.20 1726 National DBST 25mm Traff 2014 0.504 0.37 N705 Paksey -Iswardi-Dasuria Km 000.00-003.00 S 3.00 1726 National DBST 25mm Traff All 2014 7.560 0.03 N705 Paksey -Iswardi-Dasuria Km 003.10-004.90 S 1.80 1726 National DBST 25mm Traff All 2014 4.536 0.03 N705 Paksey -Iswardi-Dasuria Km 004.90-005.00 S 0.10 1726 National Overlay 50mm @ IRI 5-9 2014 0.530 0.63 N705 Paksey -Iswardi-Dasuria Km 005.40-008.50 S 3.10 12114 National Overlay 80mm @ IRI 5-9 2014 30.012 11.90 R601 Pabna-Natakhola Ferry Ghat Road Km 002.00-002.30 S 0.30 1595 Regional DBST 25mm Traff All 2014 0.693 0.10 R601 Pabna-Natakhola Ferry Ghat Road Km 000.30-000.50 S 0.20 1595 Regional DBST 25mm Traff All 2014 0.462 0.08

Appendix-B Page: 42 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R601 Pabna-Natakhola Ferry Ghat Road Km 002.90-018.38 S 15.48 1595 Regional DBST 25mm Traff All 2014 35.768 0.06 R601 Pabna-Natakhola Ferry Ghat Road Km 002.30-002.90 S 0.60 1595 Regional Overlay 50mm @ IRI 5-7 2014 2.914 0.57 R601 Pabna-Natakhola Ferry Ghat Road Km 000.50-002.00 S 1.50 1595 Regional Overlay 50mm @ IRI 7-9 2014 7.285 0.76 R601 Pabna-Natakhola Ferry Ghat Road Km 018.38-052.47 S 34.09 4020 Regional Overlay 60mm @ IRI 7-9 2014 196.131 1.04 R602 Nazirganj -Ferry Ghat Road Km 000.00-001.40 S 1.40 584 Regional Overlay 50mm @ IRI 7-9 2014 5.579 0.10 Sub-total Pabna Division 603.138

Rajshahi Division N6 Kashinathpur-Natore-Rajshahi Road Km 144.25-144.35 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.315 7.20 N6 Kashinathpur-Natore-Rajshahi Road Km 134.55-134.65 S 0.10 3767 National DBST 25mm Traff All 2014 0.315 0.79 N6 Kashinathpur-Natore-Rajshahi Road Km 141.15-141.75 S 0.60 3767 National Overlay 50mm @ IRI 4-9 2014 3.974 4.22 N6 Kashinathpur-Natore-Rajshahi Road Km 132.05-132.65 S 0.60 3767 National Overlay 50mm @ IRI 4-9 2014 3.974 4.20 N6 Kashinathpur-Natore-Rajshahi Road Km 134.15-134.55 S 0.40 3767 National Overlay 50mm @ IRI 4-9 2014 2.649 4.16 N6 Kashinathpur-Natore-Rajshahi Road Km 141.75-142.25 S 0.50 3767 National Overlay 50mm @ IRI 4-9 2014 3.311 4.14 N6 Kashinathpur-Natore-Rajshahi Road Km 134.65-139.45 S 4.80 3767 National Overlay 50mm @ IRI 4-9 2014 31.788 3.98 N6 Kashinathpur-Natore-Rajshahi Road Km 132.85-133.85 S 1.00 3767 National Overlay 50mm @ IRI 4-9 2014 6.623 3.59 N6 Kashinathpur-Natore-Rajshahi Road Km 146.15-146.25 L 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.831 12.63 N6 Kashinathpur-Natore-Rajshahi Road Km 146.15-146.25 R 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.831 12.63 N6 Kashinathpur-Natore-Rajshahi Road Km 145.45-146.05 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 4.986 12.06 N6 Kashinathpur-Natore-Rajshahi Road Km 143.15-143.55 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 11.32 N6 Kashinathpur-Natore-Rajshahi Road Km 130.85-132.05 S 1.20 12114 National Overlay 80mm @ IRI 4-9 2014 12.465 10.66 N6 Kashinathpur-Natore-Rajshahi Road Km 113.60-114.15 S 0.55 12114 National Overlay 80mm @ IRI 4-9 2014 5.323 10.47 N6 Kashinathpur-Natore-Rajshahi Road Km 142.25-143.05 S 0.80 12114 National Overlay 80mm @ IRI 4-9 2014 8.310 10.45 N6 Kashinathpur-Natore-Rajshahi Road Km 125.65-128.05 S 2.40 12114 National Overlay 80mm @ IRI 4-9 2014 24.930 10.26 N6 Kashinathpur-Natore-Rajshahi Road Km 114.35-114.85 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 4.848 10.25 N6 Kashinathpur-Natore-Rajshahi Road Km 118.65-120.45 S 1.80 12114 National Overlay 80mm @ IRI 4-9 2014 17.451 10.21 N6 Kashinathpur-Natore-Rajshahi Road Km 115.15-118.15 S 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 29.085 10.04 N6 Kashinathpur-Natore-Rajshahi Road Km 128.25-130.45 S 2.20 12114 National Overlay 80mm @ IRI 4-9 2014 22.853 10.02 N6 Kashinathpur-Natore-Rajshahi Road Km 144.65-145.25 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 5.817 10.01 N6 Kashinathpur-Natore-Rajshahi Road Km 120.95-125.45 S 4.50 12114 National Overlay 80mm @ IRI 4-9 2014 45.747 9.08 N603 Rajshahi Town By-Pass Road Km 005.90-007.40 S 1.50 2449 National DBST 25mm Traff 2000-400 2014 4.391 1.59 N603 Rajshahi Town By-Pass Road Km 009.20-009.40 S 0.20 2449 National DBST 25mm Traff All 2014 0.571 0.34 N603 Rajshahi Town By-Pass Road Km 007.40-008.10 S 0.70 2449 National Overlay 50mm @ IRI 5-9 2014 4.203 2.56 N603 Rajshahi Town By-Pass Road Km 008.20-009.20 S 1.00 2449 National Overlay 50mm @ IRI 5-9 2014 6.004 2.53 N603 Rajshahi Town By-Pass Road Km 002.50-005.20 S 2.70 2449 National Overlay 50mm @ IRI 5-9 2014 16.689 2.45 N603 Rajshahi Town By-Pass Road Km 005.30-005.90 S 0.60 2449 National Overlay 50mm @ IRI 5-9 2014 3.709 2.43 N603 Rajshahi Town By-Pass Road Km 018.00-018.70 S 0.70 12114 National Overlay 80mm @ IRI 5-9 2014 6.690 11.17

Appendix-B Page: 43 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N603 Rajshahi Town By-Pass Road Km 009.40-010.80 S 1.40 12114 National Overlay 80mm @ IRI 5-9 2014 13.185 10.74 R680 Rajshahi-Nawabganj Road Km 000.50-000.70 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.588 3.86 R680 Rajshahi-Nawabganj Road Km 028.70-029.58 S 0.88 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.821 5.23 R680 Rajshahi-Nawabganj Road Km 002.60-002.80 S 0.20 5851 Regional Overlay 60mm @ IRI 5.5-9 2014 1.470 4.45 R685 Rajshahi -Chowmasia Road Km 013.40-013.60 S 0.20 2046 Regional DBST 25mm Traff 2000-400 2014 0.462 1.34 R685 Rajshahi -Chowmasia Road Km 012.60-013.00 S 0.40 2046 Regional DBST 25mm Traff 2000-400 2014 0.924 1.22 R685 Rajshahi -Chowmasia Road Km 004.50-004.60 S 0.10 2046 Regional DBST 25mm Traff 2000-400 2014 0.315 0.57 R685 Rajshahi -Chowmasia Road Km 003.92-004.10 S 0.19 2046 Regional DBST 25mm Traff 2000-400 2014 0.583 0.39 R685 Rajshahi -Chowmasia Road Km 012.00-012.10 S 0.10 2046 Regional DBST 25mm Traff 2000-400 2014 0.231 0.13 R685 Rajshahi -Chowmasia Road Km 003.50-003.92 S 0.41 5436 Regional DBST 25mm Traff 4000-600 2014 1.307 1.52 R685 Rajshahi -Chowmasia Road Km 020.20-020.30 S 0.10 2046 Regional DBST 25mm Traff All 2014 0.231 0.24 R685 Rajshahi -Chowmasia Road Km 005.90-006.10 S 0.20 2046 Regional DBST 25mm Traff All 2014 0.630 0.02 R685 Rajshahi -Chowmasia Road Km 016.90-017.30 S 0.40 2046 Regional Overlay 50mm @ IRI 5-7 2014 1.943 0.91 R685 Rajshahi -Chowmasia Road Km 013.00-013.40 S 0.40 2046 Regional Overlay 50mm @ IRI 5-7 2014 1.943 0.84 R685 Rajshahi -Chowmasia Road Km 012.10-012.60 S 0.50 2046 Regional Overlay 50mm @ IRI 5-7 2014 2.428 0.62 R685 Rajshahi -Chowmasia Road Km 008.10-008.80 S 0.70 2046 Regional Overlay 50mm @ IRI 5-7 2014 3.400 0.62 R685 Rajshahi -Chowmasia Road Km 016.60-016.90 S 0.30 2046 Regional Overlay 50mm @ IRI 7-9 2014 1.457 1.59 R685 Rajshahi -Chowmasia Road Km 007.90-008.10 S 0.20 2046 Regional Overlay 50mm @ IRI 7-9 2014 0.971 1.55 R685 Rajshahi -Chowmasia Road Km 020.90-021.20 S 0.30 2046 Regional Overlay 50mm @ IRI 7-9 2014 1.457 1.32 R685 Rajshahi -Chowmasia Road Km 008.85-012.00 S 3.15 2046 Regional Overlay 50mm @ IRI 7-9 2014 15.298 1.12 R685 Rajshahi -Chowmasia Road Km 004.10-004.40 S 0.30 2046 Regional Overlay 50mm @ IRI 7-9 2014 1.987 0.64 R685 Rajshahi -Chowmasia Road Km 026.90-027.50 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 6.71 R685 Rajshahi -Chowmasia Road Km 030.60-032.34 S 1.74 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.049 5.79 R685 Rajshahi -Chowmasia Road Km 021.20-024.40 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.480 5.64 R685 Rajshahi -Chowmasia Road Km 024.40-026.60 S 2.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 12.705 5.62 R685 Rajshahi -Chowmasia Road Km 027.60-030.60 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.325 5.35 Sub-total Rajshahi Division 401.488

Sirajganj Division N5 Dhaka -Utholi-Banglabandh Road Km 142.47-142.57 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.294 7.07 N5 Dhaka -Utholi-Banglabandh Road Km 146.07-146.17 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.315 6.83 N5 Dhaka -Utholi-Banglabandh Road Km 157.04-157.34 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 12.63 N5 Dhaka -Utholi-Banglabandh Road Km 141.57-141.87 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 2.909 12.30 N5 Dhaka -Utholi-Banglabandh Road Km 115.40-115.50 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.970 11.74 N5 Dhaka -Utholi-Banglabandh Road Km 119.10-122.10 S 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 29.085 11.56 N5 Dhaka -Utholi-Banglabandh Road Km 153.67-153.87 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 11.50 N5 Dhaka -Utholi-Banglabandh Road Km 128.30-129.30 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.695 11.36

Appendix-B Page: 44 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 126.90-127.90 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 9.695 11.16 N5 Dhaka -Utholi-Banglabandh Road Km 133.50-137.00 S 3.50 12114 National Overlay 80mm @ IRI 4-9 2014 33.933 11.12 N5 Dhaka -Utholi-Banglabandh Road Km 158.44-158.54 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.970 11.01 N5 Dhaka -Utholi-Banglabandh Road Km 153.17-153.47 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.86 N5 Dhaka -Utholi-Banglabandh Road Km 133.10-133.40 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 2.909 10.78 N5 Dhaka -Utholi-Banglabandh Road Km 125.20-126.80 S 1.60 12114 National Overlay 80mm @ IRI 4-9 2014 15.512 10.69 N5 Dhaka -Utholi-Banglabandh Road Km 108.50-109.70 S 1.20 12114 National Overlay 80mm @ IRI 4-9 2014 11.833 10.59 N5 Dhaka -Utholi-Banglabandh Road Km 154.17-154.44 S 0.27 12114 National Overlay 80mm @ IRI 4-9 2014 2.773 10.38 N5 Dhaka -Utholi-Banglabandh Road Km 114.60-115.30 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 6.787 10.32 N5 Dhaka -Utholi-Banglabandh Road Km 161.24-161.37 S 0.13 12114 National Overlay 80mm @ IRI 4-9 2014 1.260 10.27 N5 Dhaka -Utholi-Banglabandh Road Km 152.57-153.07 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.498 10.26 N5 Dhaka -Utholi-Banglabandh Road Km 111.70-113.00 S 1.30 12114 National Overlay 80mm @ IRI 4-9 2014 12.604 10.24 N5 Dhaka -Utholi-Banglabandh Road Km 113.20-114.50 S 1.30 12114 National Overlay 80mm @ IRI 4-9 2014 12.604 10.17 N5 Dhaka -Utholi-Banglabandh Road Km 130.90-131.10 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 1.939 10.11 N5 Dhaka -Utholi-Banglabandh Road Km 149.67-149.77 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.108 10.09 N5 Dhaka -Utholi-Banglabandh Road Km 131.30-133.00 S 1.70 12114 National Overlay 80mm @ IRI 4-9 2014 16.482 9.98 N5 Dhaka -Utholi-Banglabandh Road Km 148.67-149.57 S 0.90 12114 National Overlay 80mm @ IRI 4-9 2014 9.710 9.96 N5 Dhaka -Utholi-Banglabandh Road Km 109.90-111.60 S 1.70 12114 National Overlay 80mm @ IRI 4-9 2014 16.482 9.93 N5 Dhaka -Utholi-Banglabandh Road Km 122.70-125.00 S 2.30 12114 National Overlay 80mm @ IRI 4-9 2014 22.299 9.88 N5 Dhaka -Utholi-Banglabandh Road Km 115.70-119.10 S 3.40 12114 National Overlay 80mm @ IRI 4-9 2014 32.963 9.84 N5 Dhaka -Utholi-Banglabandh Road Km 122.20-122.60 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.878 9.68 N5 Dhaka -Utholi-Banglabandh Road Km 144.87-145.07 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 1.994 9.56 N5 Dhaka -Utholi-Banglabandh Road Km 149.87-150.37 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.540 9.44 N5 Dhaka -Utholi-Banglabandh Road Km 150.47-150.57 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.108 9.10 N5 Dhaka -Utholi-Banglabandh Road Km 107.60-108.40 S 0.80 12114 National Overlay 80mm @ IRI 4-9 2014 8.310 9.08 N5 Dhaka -Utholi-Banglabandh Road Km 150.87-151.07 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.216 8.67 N5 Dhaka -Utholi-Banglabandh Road Km 106.93-107.50 S 0.57 12114 National Overlay 80mm @ IRI 4-9 2014 5.921 8.49 N507 Hatikamrul-Banpara Road Km 007.40-010.60 S 3.20 2433 National Overlay 50mm @ IRI 5-9 2014 21.192 3.16 N507 Hatikamrul-Banpara Road Km 013.60-017.30 S 3.70 2433 National Overlay 50mm @ IRI 5-9 2014 24.503 3.05 N507 Hatikamrul-Banpara Road Km 010.60-013.60 S 3.00 2433 National Overlay 50mm @ IRI 5-9 2014 19.868 2.69 N507 Hatikamrul-Banpara Road Km 018.10-027.02 S 8.92 12114 National Overlay 80mm @ IRI 5-9 2014 92.656 11.05 R450 Jamuna Bridge -Sirajganj Road Km 000.70-001.20 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.85 R450 Jamuna Bridge -Sirajganj Road Km 001.40-002.70 S 1.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.507 6.16 R450 Jamuna Bridge -Sirajganj Road Km 003.10-006.10 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.325 5.70 R451 Nalka-Sirajganj Road Km 008.00-009.70 S 1.70 2935 Regional DBST 25mm Traff All 2014 2.856 0.50 R451 Nalka-Sirajganj Road Km 000.20-000.70 S 0.50 2935 Regional Overlay 50mm @ IRI 5-7 2014 1.766 4.67 R451 Nalka-Sirajganj Road Km 002.00-003.50 S 1.50 2935 Regional Overlay 50mm @ IRI 5-7 2014 5.298 3.59

Appendix-B Page: 45 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R451 Nalka-Sirajganj Road Km 005.40-006.00 S 0.60 2935 Regional Overlay 50mm @ IRI 7-9 2014 2.119 4.84 R451 Nalka-Sirajganj Road Km 004.00-005.30 S 1.30 2935 Regional Overlay 50mm @ IRI 7-9 2014 4.592 4.17 R451 Nalka-Sirajganj Road Km 007.20-008.00 S 0.80 2935 Regional Overlay 50mm @ IRI 7-9 2014 2.826 3.82 R451 Nalka-Sirajganj Road Km 001.10-001.70 S 0.60 2935 Regional Overlay 50mm @ IRI 7-9 2014 2.119 3.79 Sub-total Sirajganj Division 505.418 Total Rajshahi Zone 2,733.17

Rangpur Zone Bogra Division N5 Dhaka -Utholi-Banglabandh Road Km 161.37-161.44 S 0.07 12114 National Overlay 80mm @ IRI 4-9 2014 0.679 11.91 N5 Dhaka -Utholi-Banglabandh Road Km 196.81-198.00 L 1.19 12114 National Overlay 80mm @ IRI 4-9 2014 11.566 11.67 N5 Dhaka -Utholi-Banglabandh Road Km 196.81-198.00 R 1.19 12114 National Overlay 80mm @ IRI 4-9 2014 11.566 11.67 N5 Dhaka -Utholi-Banglabandh Road Km 236.31-239.61 S 3.30 12114 National Overlay 80mm @ IRI 4-9 2014 34.279 11.08 N5 Dhaka -Utholi-Banglabandh Road Km 213.61-214.11 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.99 N5 Dhaka -Utholi-Banglabandh Road Km 166.24-166.74 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.92 N5 Dhaka -Utholi-Banglabandh Road Km 171.41-181.01 S 9.60 12114 National Overlay 80mm @ IRI 4-9 2014 99.720 10.81 N5 Dhaka -Utholi-Banglabandh Road Km 222.31-222.61 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.79 N5 Dhaka -Utholi-Banglabandh Road Km 215.51-215.61 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.78 N5 Dhaka -Utholi-Banglabandh Road Km 216.11-216.91 S 0.80 12114 National Overlay 80mm @ IRI 4-9 2014 8.310 10.66 N5 Dhaka -Utholi-Banglabandh Road Km 196.01-196.61 L 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 5.817 10.56 N5 Dhaka -Utholi-Banglabandh Road Km 196.01-196.61 R 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 5.817 10.56 N5 Dhaka -Utholi-Banglabandh Road Km 215.11-215.31 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.52 N5 Dhaka -Utholi-Banglabandh Road Km 220.01-222.01 S 2.00 12114 National Overlay 80mm @ IRI 4-9 2014 20.775 10.44 N5 Dhaka -Utholi-Banglabandh Road Km 214.31-214.61 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.41 N5 Dhaka -Utholi-Banglabandh Road Km 167.24-167.44 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.37 N5 Dhaka -Utholi-Banglabandh Road Km 215.71-215.81 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.19 N5 Dhaka -Utholi-Banglabandh Road Km 222.71-223.81 S 1.10 12114 National Overlay 80mm @ IRI 4-9 2014 11.426 10.11 N5 Dhaka -Utholi-Banglabandh Road Km 232.81-236.21 S 3.40 12114 National Overlay 80mm @ IRI 4-9 2014 35.318 9.98 N5 Dhaka -Utholi-Banglabandh Road Km 240.01-243.21 S 3.20 12114 National Overlay 80mm @ IRI 4-9 2014 33.240 9.84 N5 Dhaka -Utholi-Banglabandh Road Km 217.11-219.91 S 2.80 12114 National Overlay 80mm @ IRI 4-9 2014 29.085 9.63 N5 Dhaka -Utholi-Banglabandh Road Km 211.91-213.51 S 1.60 12114 National Overlay 80mm @ IRI 4-9 2014 16.620 9.28 N502 Bogra -Natore Road Km 022.20-022.40 S 0.20 2970 National DBST 25mm Traff All 2014 0.462 0.75 N502 Bogra -Natore Road Km 017.50-017.70 S 0.20 2970 National DBST 25mm Traff All 2014 0.462 0.69 N502 Bogra -Natore Road Km 010.90-011.70 S 0.80 2970 National DBST 25mm Traff All 2014 1.848 0.57 N502 Bogra -Natore Road Km 000.00-000.20 S 0.20 2970 National DBST 25mm Traff All 2014 0.504 0.46 N502 Bogra -Natore Road Km 011.70-013.80 S 2.10 2970 National Overlay 50mm @ IRI 5-9 2014 10.199 4.39

Appendix-B Page: 46 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N502 Bogra -Natore Road Km 010.30-010.90 S 0.60 2970 National Overlay 50mm @ IRI 5-9 2014 2.914 4.30 N502 Bogra -Natore Road Km 016.00-017.50 S 1.50 2970 National Overlay 50mm @ IRI 5-9 2014 7.285 4.24 N502 Bogra -Natore Road Km 003.20-003.40 S 0.20 2970 National Overlay 50mm @ IRI 5-9 2014 0.971 4.20 N502 Bogra -Natore Road Km 000.20-001.40 S 1.20 2970 National Overlay 50mm @ IRI 5-9 2014 6.358 3.75 N502 Bogra -Natore Road Km 017.70-020.10 S 2.40 2970 National Overlay 50mm @ IRI 5-9 2014 11.656 3.37 N502 Bogra -Natore Road Km 003.40-010.00 S 6.60 2970 National Overlay 50mm @ IRI 5-9 2014 32.053 3.26 N502 Bogra -Natore Road Km 020.80-022.20 S 1.40 2970 National Overlay 50mm @ IRI 5-9 2014 6.799 3.05 N515 Bogra 2nd Town By-Pass Road Km 008.60-015.40 S 6.80 1526 National Overlay 50mm @ IRI 5-9 2014 44.793 0.52 N515 Bogra 2nd Town By-Pass Road Km 015.40-016.00 S 0.60 12114 National Overlay 80mm @ IRI 5-9 2014 6.233 13.37 N515 Bogra 2nd Town By-Pass Road Km 000.20-002.50 S 2.30 12114 National Overlay 80mm @ IRI 5-9 2014 23.891 11.71 N515 Bogra 2nd Town By-Pass Road Km 002.80-005.50 S 2.70 12114 National Overlay 80mm @ IRI 5-9 2014 28.009 10.36 N515 Bogra 2nd Town By-Pass Road Km 007.40-007.60 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 2.050 9.75 R545 Bogra-Joypurhat Road Km 022.30-022.50 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.462 5.15 R545 Bogra-Joypurhat Road Km 021.50-022.20 S 0.70 5170 Regional DBST 25mm Traff 4000-600 2014 1.617 4.98 R545 Bogra-Joypurhat Road Km 042.38-042.98 S 0.60 2339 Regional DBST 25mm Traff All 2014 1.386 0.36 R545 Bogra-Joypurhat Road Km 010.30-010.50 S 0.20 3220 Regional Overlay 50mm @ IRI 5-7 2014 0.713 4.81 R545 Bogra-Joypurhat Road Km 041.48-041.88 S 0.40 2339 Regional Overlay 50mm @ IRI 5-7 2014 1.943 2.58 R545 Bogra-Joypurhat Road Km 019.40-019.50 S 0.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 0.353 4.48 R545 Bogra-Joypurhat Road Km 007.50-009.20 S 1.70 3220 Regional Overlay 50mm @ IRI 7-9 2014 6.004 4.07 R545 Bogra-Joypurhat Road Km 013.00-014.10 S 1.10 3029 Regional Overlay 50mm @ IRI 7-9 2014 3.885 3.86 R545 Bogra-Joypurhat Road Km 000.30-001.80 S 1.50 3029 Regional Overlay 50mm @ IRI 7-9 2014 5.298 3.83 R545 Bogra-Joypurhat Road Km 014.40-016.30 S 1.90 3029 Regional Overlay 50mm @ IRI 7-9 2014 6.711 3.82 R545 Bogra-Joypurhat Road Km 002.00-004.20 S 2.20 3220 Regional Overlay 50mm @ IRI 7-9 2014 7.770 3.77 R545 Bogra-Joypurhat Road Km 010.50-011.20 S 0.70 3029 Regional Overlay 50mm @ IRI 7-9 2014 2.465 3.76 R545 Bogra-Joypurhat Road Km 011.60-012.80 S 1.20 3029 Regional Overlay 50mm @ IRI 7-9 2014 4.238 3.72 R545 Bogra-Joypurhat Road Km 009.60-010.20 S 0.60 3220 Regional Overlay 50mm @ IRI 7-9 2014 2.119 3.54 R545 Bogra-Joypurhat Road Km 004.30-006.90 S 2.60 3220 Regional Overlay 50mm @ IRI 7-9 2014 9.183 3.16 R545 Bogra-Joypurhat Road Km 023.20-023.30 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.81 R545 Bogra-Joypurhat Road Km 023.60-023.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.77 R545 Bogra-Joypurhat Road Km 023.40-023.50 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 6.83 R545 Bogra-Joypurhat Road Km 019.60-021.40 S 1.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.904 6.73 R545 Bogra-Joypurhat Road Km 040.80-041.00 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.71 R545 Bogra-Joypurhat Road Km 028.90-029.80 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.58 R545 Bogra-Joypurhat Road Km 030.00-030.50 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 6.50 R545 Bogra-Joypurhat Road Km 039.00-039.20 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.34 R545 Bogra-Joypurhat Road Km 036.40-038.90 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.438 6.14 R545 Bogra-Joypurhat Road Km 040.00-040.50 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 5.79

Appendix-B Page: 47 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R545 Bogra-Joypurhat Road Km 030.70-031.30 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 5.78 R545 Bogra-Joypurhat Road Km 032.80-036.20 S 3.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 19.635 5.76 R545 Bogra-Joypurhat Road Km 039.30-039.90 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 5.61 R545 Bogra-Joypurhat Road Km 027.10-028.30 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.60 R546 Railgate-Shantahar Road Km 000.00-003.00 S 3.00 2077 Regional Overlay 50mm @ IRI 7-9 2014 13.775 1.66 R550 Mokamtala-Joypurhat Road Km 008.50-008.70 S 0.20 2510 Regional DBST 25mm Traff All 2014 0.454 0.56 R550 Mokamtala-Joypurhat Road Km 009.90-010.20 S 0.30 2510 Regional Overlay 50mm @ IRI 5-7 2014 1.430 4.06 R550 Mokamtala-Joypurhat Road Km 006.40-008.30 S 1.90 2510 Regional Overlay 50mm @ IRI 5-7 2014 9.227 3.77 R550 Mokamtala-Joypurhat Road Km 008.70-009.70 S 1.00 2510 Regional Overlay 50mm @ IRI 5-7 2014 4.768 3.55 R550 Mokamtala-Joypurhat Road Km 014.10-016.00 S 1.90 2510 Regional Overlay 50mm @ IRI 5-7 2014 9.227 3.47 R550 Mokamtala-Joypurhat Road Km 010.60-011.40 S 0.80 2510 Regional Overlay 50mm @ IRI 5-7 2014 3.815 3.02 R550 Mokamtala-Joypurhat Road Km 011.60-013.40 S 1.80 2510 Regional Overlay 50mm @ IRI 5-7 2014 8.599 3.01 R550 Mokamtala-Joypurhat Road Km 005.40-005.50 S 0.10 2510 Regional Overlay 50mm @ IRI 7-9 2014 0.486 3.28 R550 Mokamtala-Joypurhat Road Km 013.40-014.10 S 0.70 2510 Regional Overlay 50mm @ IRI 7-9 2014 3.400 2.75 R550 Mokamtala-Joypurhat Road Km 000.00-005.40 S 5.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 31.185 6.05 Sub-total Bogra Division 746.920

Dinajpur Division N5 Dhaka -Utholi-Banglabandh Road Km 376.88-377.38 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 11.79 N5 Dhaka -Utholi-Banglabandh Road Km 388.68-393.00 S 4.32 12114 National Overlay 80mm @ IRI 4-9 2014 44.905 10.90 N5 Dhaka -Utholi-Banglabandh Road Km 394.00-397.08 S 3.08 12114 National Overlay 80mm @ IRI 4-9 2014 31.962 10.46 N5 Dhaka -Utholi-Banglabandh Road Km 377.58-377.78 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.39 N5 Dhaka -Utholi-Banglabandh Road Km 377.88-378.48 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 6.233 10.33 N5 Dhaka -Utholi-Banglabandh Road Km 378.58-388.58 S 10.00 12114 National Overlay 80mm @ IRI 4-9 2014 103.875 9.86 N5 Dhaka -Utholi-Banglabandh Road Km 371.06-376.78 S 5.72 12114 National Overlay 80mm @ IRI 4-9 2014 59.365 9.37 N5 Dhaka -Utholi-Banglabandh Road Km 393.00-394.00 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 20.498 4.61 N508 Dinajpur-Beldanga Road Km 002.80-003.50 S 0.70 2272 National Overlay 50mm @ IRI 5-9 2014 4.327 2.55 N508 Dinajpur-Beldanga Road Km 003.70-003.90 S 0.20 2272 National Overlay 50mm @ IRI 5-9 2014 1.236 2.48 N508 Dinajpur-Beldanga Road Km 005.50-006.70 S 1.20 2272 National Overlay 50mm @ IRI 5-9 2014 7.417 2.48 N508 Dinajpur-Beldanga Road Km 004.30-005.30 S 1.00 2272 National Overlay 50mm @ IRI 5-9 2014 6.181 2.36 N508 Dinajpur-Beldanga Road Km 003.90-004.30 S 0.40 2272 National Overlay 50mm @ IRI 5-9 2014 2.472 2.28 N508 Dinajpur-Beldanga Road Km 002.60-002.80 S 0.20 2272 National Overlay 50mm @ IRI 5-9 2014 1.236 2.16 R556 Mithapukur-Fulbaria Road Km 032.02-033.02 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.825 5.69 R556 Mithapukur-Fulbaria Road Km 026.92-029.02 S 2.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.332 5.10 R556 Mithapukur-Fulbaria Road Km 025.92-026.82 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.143 4.98 R556 Mithapukur-Fulbaria Road Km 033.52-035.10 S 1.58 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.790 4.97 R556 Mithapukur-Fulbaria Road Km 029.22-031.92 S 2.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.428 4.78

Appendix-B Page: 48 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R556 Mithapukur-Fulbaria Road Km 025.22-025.62 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.730 4.74 R557 Madhypara-Badarganj Road Km 009.90-010.00 S 0.10 1131 Regional DBST 25mm Traff All 2014 0.218 0.14 R557 Madhypara-Badarganj Road Km 012.60-012.90 S 0.30 1131 Regional DBST 25mm Traff All 2014 0.655 0.07 R558 Maheshpur - Barapukuria Road Km 003.10-004.50 S 1.40 669 Regional DBST 25mm Traff All 2014 3.522 0.15 R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.35-104.15 S 0.80 3423 Regional DBST 25mm Traff 2000-400 2014 1.848 0.07 R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.35-079.45 S 0.10 1779 Regional DBST 25mm Traff All 2014 0.231 0.57 R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.85-090.05 S 0.20 3423 Regional DBST 25mm Traff All 2014 0.462 0.49 R585 Gobindagnj-Fulbari-Dinajpur Road Km 090.35-090.65 S 0.30 3423 Regional DBST 25mm Traff All 2014 0.693 0.49 R585 Gobindagnj-Fulbari-Dinajpur Road Km 106.05-106.35 S 0.30 2542 Regional DBST 25mm Traff All 2014 0.756 0.06 R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.90-053.93 S 0.03 3081 Regional Overlay 50mm @ IRI 5-7 2014 0.141 7.49 R585 Gobindagnj-Fulbari-Dinajpur Road Km 054.13-057.33 S 3.20 3081 Regional Overlay 50mm @ IRI 5-7 2014 15.541 4.39 R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.45-080.85 S 1.40 1779 Regional Overlay 50mm @ IRI 5-7 2014 6.799 3.01 R585 Gobindagnj-Fulbari-Dinajpur Road Km 080.95-083.25 S 2.30 1779 Regional Overlay 50mm @ IRI 5-7 2014 11.170 2.74 R585 Gobindagnj-Fulbari-Dinajpur Road Km 075.75-076.55 S 0.80 1779 Regional Overlay 50mm @ IRI 5-7 2014 3.885 2.54 R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.65-070.85 S 0.20 1779 Regional Overlay 50mm @ IRI 5-7 2014 0.971 2.50 R585 Gobindagnj-Fulbari-Dinajpur Road Km 086.26-087.55 S 1.29 3423 Regional Overlay 50mm @ IRI 5-7 2014 6.279 1.70 R585 Gobindagnj-Fulbari-Dinajpur Road Km 095.35-096.05 S 0.70 3423 Regional Overlay 50mm @ IRI 5-7 2014 3.400 1.51 R585 Gobindagnj-Fulbari-Dinajpur Road Km 104.15-104.45 S 0.30 3423 Regional Overlay 50mm @ IRI 5-7 2014 1.457 1.20 R585 Gobindagnj-Fulbari-Dinajpur Road Km 096.85-100.15 S 3.30 3423 Regional Overlay 50mm @ IRI 5-7 2014 16.026 1.05 R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.60-053.70 S 0.10 3081 Regional Overlay 50mm @ IRI 7-9 2014 0.486 5.18 R585 Gobindagnj-Fulbari-Dinajpur Road Km 057.33-060.53 S 3.20 3081 Regional Overlay 50mm @ IRI 7-9 2014 15.541 3.88 R585 Gobindagnj-Fulbari-Dinajpur Road Km 060.53-062.63 S 2.10 3081 Regional Overlay 50mm @ IRI 7-9 2014 10.199 3.35 R585 Gobindagnj-Fulbari-Dinajpur Road Km 083.55-086.26 S 2.71 1779 Regional Overlay 50mm @ IRI 7-9 2014 13.147 2.73 R585 Gobindagnj-Fulbari-Dinajpur Road Km 076.65-079.35 S 2.70 1779 Regional Overlay 50mm @ IRI 7-9 2014 13.113 2.56 R585 Gobindagnj-Fulbari-Dinajpur Road Km 073.85-074.55 S 0.70 1779 Regional Overlay 50mm @ IRI 7-9 2014 3.400 2.51 R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.95-071.75 S 0.80 1779 Regional Overlay 50mm @ IRI 7-9 2014 3.885 2.30 R585 Gobindagnj-Fulbari-Dinajpur Road Km 090.05-090.35 S 0.30 3423 Regional Overlay 50mm @ IRI 7-9 2014 1.457 2.29 R585 Gobindagnj-Fulbari-Dinajpur Road Km 068.15-070.55 S 2.40 1779 Regional Overlay 50mm @ IRI 7-9 2014 11.656 2.23 R585 Gobindagnj-Fulbari-Dinajpur Road Km 074.75-075.55 S 0.80 1779 Regional Overlay 50mm @ IRI 7-9 2014 3.885 2.20 R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.35-089.85 S 0.50 3423 Regional Overlay 50mm @ IRI 7-9 2014 2.428 2.04 R585 Gobindagnj-Fulbari-Dinajpur Road Km 087.75-088.75 S 1.00 3423 Regional Overlay 50mm @ IRI 7-9 2014 4.857 1.84 R585 Gobindagnj-Fulbari-Dinajpur Road Km 100.15-103.35 S 3.20 3423 Regional Overlay 50mm @ IRI 7-9 2014 15.541 1.52 R585 Gobindagnj-Fulbari-Dinajpur Road Km 090.65-093.15 S 2.50 3423 Regional Overlay 50mm @ IRI 7-9 2014 12.141 1.36 R585 Gobindagnj-Fulbari-Dinajpur Road Km 065.83-065.93 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 8.23 R585 Gobindagnj-Fulbari-Dinajpur Road Km 065.42-065.73 S 0.31 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.802 6.98 R585 Gobindagnj-Fulbari-Dinajpur Road Km 066.13-066.73 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.465 6.16 R586 Fulbari Bus Stand-Dinajpur Road Km 002.00-002.20 S 0.20 3061 Regional DBST 25mm @ 25% Crk 2014 0.546 1.68

Appendix-B Page: 49 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R586 Fulbari Bus Stand-Dinajpur Road Km 002.90-003.10 S 0.20 3061 Regional DBST 25mm Traff All 2014 0.546 0.38 R586 Fulbari Bus Stand-Dinajpur Road Km 002.50-002.90 S 0.40 3061 Regional Overlay 50mm @ IRI 5-7 2014 2.296 3.25 R586 Fulbari Bus Stand-Dinajpur Road Km 001.40-001.90 S 0.50 3061 Regional Overlay 50mm @ IRI 5-7 2014 2.870 3.08 R586 Fulbari Bus Stand-Dinajpur Road Km 001.10-001.30 S 0.20 3061 Regional Overlay 50mm @ IRI 5-7 2014 1.148 2.83 R586 Fulbari Bus Stand-Dinajpur Road Km 002.20-002.50 S 0.30 3061 Regional Overlay 50mm @ IRI 7-9 2014 1.722 3.25 R586 Fulbari Bus Stand-Dinajpur Road Km 003.10-003.26 S 0.16 3061 Regional Overlay 50mm @ IRI 7-9 2014 0.918 3.03 R586 Fulbari Bus Stand-Dinajpur Road Km 000.60-001.10 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.413 4.94 R587 Thakurgaon Town Old Section Km 002.00-002.20 S 0.20 6145 Regional DBST 25mm Traff > 6000 2014 0.504 2.32 R587 Thakurgaon Town Old Section Km 002.50-002.70 S 0.20 6145 Regional DBST 25mm Traff All 2014 0.504 0.94 R587 Thakurgaon Town Old Section Km 005.50-005.70 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.260 7.28 R587 Thakurgaon Town Old Section Km 002.70-004.40 S 1.70 5569 Regional Overlay 60mm @ IRI 5.5-9 2014 10.710 6.12 R587 Thakurgaon Town Old Section Km 004.70-004.90 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.260 5.71 R587 Thakurgaon Town Old Section Km 000.40-001.40 S 1.00 6145 Regional Overlay 60mm @ IRI 5.5-9 2014 7.350 2.90 Sub-total Dinajpur Division 582.906

Gaibanda Division N5 Dhaka -Utholi-Banglabandh Road Km 278.61-278.91 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.69 N5 Dhaka -Utholi-Banglabandh Road Km 268.91-278.41 S 9.50 12114 National Overlay 80mm @ IRI 4-9 2014 98.681 10.59 N5 Dhaka -Utholi-Banglabandh Road Km 279.21-279.50 S 0.29 12114 National Overlay 80mm @ IRI 4-9 2014 3.002 10.32 N5 Dhaka -Utholi-Banglabandh Road Km 279.01-279.11 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.16 R555 Palashbari-Gaibandah Road Km 016.90-017.40 S 0.50 3080 Regional DBST 25mm Traff 2000-400 2014 1.155 1.83 R555 Palashbari-Gaibandah Road Km 007.40-008.90 S 1.50 3080 Regional DBST 25mm Traff 2000-400 2014 3.465 1.81 R555 Palashbari-Gaibandah Road Km 019.90-021.02 S 1.11 5170 Regional DBST 25mm Traff 4000-600 2014 2.566 4.92 R555 Palashbari-Gaibandah Road Km 017.50-017.80 S 0.30 3080 Regional Overlay 50mm @ IRI 5-7 2014 1.457 2.67 R555 Palashbari-Gaibandah Road Km 013.00-016.80 S 3.80 3080 Regional Overlay 50mm @ IRI 5-7 2014 18.455 2.12 R555 Palashbari-Gaibandah Road Km 018.80-019.80 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.775 6.12 R585 Gobindagnj-Fulbari-Dinajpur Road Km 052.70-053.54 S 0.84 3081 Regional DBST 25mm Traff All 2014 1.940 0.93 R585 Gobindagnj-Fulbari-Dinajpur Road Km 000.00-001.10 S 1.10 3271 Regional DBST 25mm Traff All 2014 2.587 0.69 R585 Gobindagnj-Fulbari-Dinajpur Road Km 016.20-016.30 S 0.10 1477 Regional Overlay 50mm @ IRI 5-7 2014 0.477 2.29 R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.10-001.60 S 0.50 3271 Regional Overlay 50mm @ IRI 7-9 2014 2.472 3.61 R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.70-003.00 S 1.30 3271 Regional Overlay 50mm @ IRI 7-9 2014 6.428 3.23 R585 Gobindagnj-Fulbari-Dinajpur Road Km 003.20-005.16 S 1.96 3271 Regional Overlay 50mm @ IRI 7-9 2014 9.657 3.13 R585 Gobindagnj-Fulbari-Dinajpur Road Km 026.00-026.06 S 0.06 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.340 8.62 R585 Gobindagnj-Fulbari-Dinajpur Road Km 052.60-052.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.87 R585 Gobindagnj-Fulbari-Dinajpur Road Km 025.20-025.30 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 7.58 R585 Gobindagnj-Fulbari-Dinajpur Road Km 050.40-050.70 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.92 R585 Gobindagnj-Fulbari-Dinajpur Road Km 031.30-031.50 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.92

Appendix-B Page: 50 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R585 Gobindagnj-Fulbari-Dinajpur Road Km 052.10-052.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.54 R585 Gobindagnj-Fulbari-Dinajpur Road Km 025.40-025.90 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.835 6.42 R585 Gobindagnj-Fulbari-Dinajpur Road Km 049.00-050.00 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.775 6.25 R585 Gobindagnj-Fulbari-Dinajpur Road Km 051.60-051.90 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.12 R585 Gobindagnj-Fulbari-Dinajpur Road Km 031.60-034.70 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.903 5.97 R585 Gobindagnj-Fulbari-Dinajpur Road Km 047.90-048.40 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.888 5.94 R585 Gobindagnj-Fulbari-Dinajpur Road Km 037.30-038.90 S 1.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.240 5.80 R585 Gobindagnj-Fulbari-Dinajpur Road Km 035.20-036.90 S 1.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.818 5.76 R585 Gobindagnj-Fulbari-Dinajpur Road Km 039.20-042.30 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.903 5.66 R585 Gobindagnj-Fulbari-Dinajpur Road Km 005.16-010.40 S 5.24 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 29.711 5.63 R585 Gobindagnj-Fulbari-Dinajpur Road Km 042.50-044.40 S 1.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.973 5.59 R585 Gobindagnj-Fulbari-Dinajpur Road Km 044.50-047.60 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.903 5.48 R585 Gobindagnj-Fulbari-Dinajpur Road Km 050.70-051.60 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 5.36 R585 Gobindagnj-Fulbari-Dinajpur Road Km 010.60-015.30 S 4.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 26.649 5.29 Sub-total Gaibanda Division 326.903

Joypurhat Division R545 Bogra-Joypurhat Road Km 117.38-118.18 S 0.80 1289 Regional Overlay 50mm @ IRI 7-9 2014 3.885 0.85 R550 Mokamtala-Joypurhat Road Km 023.90-024.00 S 0.10 2510 Regional Overlay 50mm @ IRI 5-7 2014 0.477 4.58 R550 Mokamtala-Joypurhat Road Km 022.30-023.80 S 1.50 2510 Regional Overlay 50mm @ IRI 5-7 2014 7.152 3.55 R550 Mokamtala-Joypurhat Road Km 016.00-019.00 S 3.00 2510 Regional Overlay 50mm @ IRI 5-7 2014 14.570 3.01 R550 Mokamtala-Joypurhat Road Km 019.10-020.20 S 1.10 2510 Regional Overlay 50mm @ IRI 5-7 2014 5.342 3.00 R550 Mokamtala-Joypurhat Road Km 020.30-022.20 S 1.90 2510 Regional Overlay 50mm @ IRI 5-7 2014 9.211 3.00 R550 Mokamtala-Joypurhat Road Km 029.10-029.30 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.97 R550 Mokamtala-Joypurhat Road Km 024.00-025.80 S 1.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 10.206 6.62 R550 Mokamtala-Joypurhat Road Km 031.50-031.70 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.21 R550 Mokamtala-Joypurhat Road Km 025.80-028.80 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.010 5.79 R550 Mokamtala-Joypurhat Road Km 034.10-035.00 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 5.42 R550 Mokamtala-Joypurhat Road Km 030.20-031.30 S 1.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.353 5.38 R550 Mokamtala-Joypurhat Road Km 031.80-033.80 S 2.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 11.550 5.33 R550 Mokamtala-Joypurhat Road Km 035.60-036.20 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.410 4.64 R550 Mokamtala-Joypurhat Road Km 035.40-035.50 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.735 4.57 Sub-total Joypurhat Division 98.408

Kurigram Division N506 Rangpur-Barobari-Kurigram Road Km 042.20-042.40 S 0.20 1457 National DBST 25mm Traff All 2014 0.588 0.07

Appendix-B Page: 51 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N506 Rangpur-Barobari-Kurigram Road Km 040.10-041.80 S 1.70 1457 National Overlay 50mm @ IRI 5-9 2014 8.256 1.29 N506 Rangpur-Barobari-Kurigram Road Km 036.00-038.00 S 2.00 1457 National Overlay 50mm @ IRI 5-9 2014 9.713 1.27 N506 Rangpur-Barobari-Kurigram Road Km 049.30-049.40 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.970 12.56 N506 Rangpur-Barobari-Kurigram Road Km 047.00-047.30 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.909 12.03 Sub-total Kurigram Division 22.435

Lalmonirhat Division N506 Rangpur-Barobari-Kurigram Road Km 032.30-032.60 S 0.30 9090 National DBST 25mm Traff > 6000 2014 0.693 6.14 N506 Rangpur-Barobari-Kurigram Road Km 021.00-022.94 S 1.94 3189 National Overlay 50mm @ IRI 5-9 2014 9.422 4.96 N506 Rangpur-Barobari-Kurigram Road Km 032.80-033.20 S 0.40 1457 National Overlay 50mm @ IRI 5-9 2014 1.943 1.39 N506 Rangpur-Barobari-Kurigram Road Km 034.00-034.80 S 0.80 1457 National Overlay 50mm @ IRI 5-9 2014 3.885 1.23 N506 Rangpur-Barobari-Kurigram Road Km 026.00-029.20 S 3.20 9090 National Overlay 60mm @ IRI 7-9 2014 18.480 7.88 N506 Rangpur-Barobari-Kurigram Road Km 029.20-032.20 S 3.00 9090 National Overlay 60mm @ IRI 7-9 2014 17.325 7.75 N509 Barabari-Burimary Road Km 047.90-053.60 S 5.70 9090 National DBST 25mm Traff > 6000 2014 13.167 6.14 N509 Barabari-Burimary Road Km 080.60-083.10 S 2.50 9090 National DBST 25mm Traff > 6000 2014 5.775 6.12 N509 Barabari-Burimary Road Km 086.40-093.10 S 6.70 9090 National DBST 25mm Traff > 6000 2014 15.477 6.12 N509 Barabari-Burimary Road Km 083.20-086.30 S 3.10 9090 National DBST 25mm Traff > 6000 2014 7.161 6.10 N509 Barabari-Burimary Road Km 062.70-073.50 S 10.80 9090 National DBST 25mm Traff > 6000 2014 24.948 6.09 N509 Barabari-Burimary Road Km 059.40-061.50 S 2.10 9090 National DBST 25mm Traff > 6000 2014 4.851 6.09 N509 Barabari-Burimary Road Km 077.10-080.40 S 3.30 9090 National DBST 25mm Traff > 6000 2014 7.623 6.09 N509 Barabari-Burimary Road Km 012.00-012.03 S 0.03 2155 National DBST 25mm Traff 2000-400 2014 0.069 2.19 N509 Barabari-Burimary Road Km 101.50-101.60 S 0.10 250 National DBST 25mm Traff All 2014 0.231 0.65 N509 Barabari-Burimary Road Km 102.70-102.80 S 0.10 250 National DBST 25mm Traff All 2014 0.231 0.09 N509 Barabari-Burimary Road Km 012.90-013.10 S 0.20 842 National DBST 25mm Traff All 2014 0.462 0.02 N509 Barabari-Burimary Road Km 020.50-020.60 S 0.10 9090 National Overlay 50mm @ IRI 5-7 2014 0.486 8.57 N509 Barabari-Burimary Road Km 046.30-046.40 S 0.10 9090 National Overlay 50mm @ IRI 5-7 2014 0.486 8.49 N509 Barabari-Burimary Road Km 076.60-076.80 S 0.20 9090 National Overlay 50mm @ IRI 5-7 2014 0.971 7.75 N509 Barabari-Burimary Road Km 046.50-047.00 S 0.50 9090 National Overlay 50mm @ IRI 5-7 2014 2.428 7.32 N509 Barabari-Burimary Road Km 073.60-076.50 S 2.90 9090 National Overlay 50mm @ IRI 5-7 2014 14.084 7.20 N509 Barabari-Burimary Road Km 024.00-025.60 S 1.60 9090 National Overlay 50mm @ IRI 5-7 2014 7.770 7.10 N509 Barabari-Burimary Road Km 015.10-015.40 S 0.30 2994 National Overlay 50mm @ IRI 5-9 2014 1.457 2.77 N509 Barabari-Burimary Road Km 000.10-003.50 S 3.40 2155 National Overlay 50mm @ IRI 5-9 2014 16.512 1.69 N509 Barabari-Burimary Road Km 026.80-027.00 S 0.20 9090 National Overlay 60mm @ IRI 7-9 2014 1.155 8.46 N509 Barabari-Burimary Road Km 045.90-046.20 S 0.30 9090 National Overlay 60mm @ IRI 7-9 2014 1.733 8.30 N509 Barabari-Burimary Road Km 047.50-047.80 S 0.30 9090 National Overlay 60mm @ IRI 7-9 2014 1.733 8.11 N509 Barabari-Burimary Road Km 016.23-016.70 S 0.47 9090 National Overlay 60mm @ IRI 7-9 2014 2.703 8.09 N509 Barabari-Burimary Road Km 025.70-026.60 S 0.90 9090 National Overlay 60mm @ IRI 7-9 2014 5.198 8.01

Appendix-B Page: 52 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N509 Barabari-Burimary Road Km 020.80-021.80 S 1.00 9090 National Overlay 60mm @ IRI 7-9 2014 5.775 8.00 N509 Barabari-Burimary Road Km 027.10-028.30 S 1.20 9090 National Overlay 60mm @ IRI 7-9 2014 6.930 7.96 N509 Barabari-Burimary Road Km 016.80-018.00 S 1.20 9090 National Overlay 60mm @ IRI 7-9 2014 6.930 7.95 N509 Barabari-Burimary Road Km 028.80-032.90 S 4.10 9090 National Overlay 60mm @ IRI 7-9 2014 23.678 7.90 N509 Barabari-Burimary Road Km 033.00-036.20 S 3.20 9090 National Overlay 60mm @ IRI 7-9 2014 18.480 7.89 N509 Barabari-Burimary Road Km 054.80-059.30 S 4.50 9090 National Overlay 60mm @ IRI 7-9 2014 25.988 7.86 N509 Barabari-Burimary Road Km 053.80-054.70 S 0.90 9090 National Overlay 60mm @ IRI 7-9 2014 5.198 7.84 N509 Barabari-Burimary Road Km 036.20-045.70 S 9.50 9090 National Overlay 60mm @ IRI 7-9 2014 54.863 7.74 Sub-total Lalmonirhat Division 336.297

Nilphamari Division N5 Dhaka -Utholi-Banglabandh Road Km 360.58-360.78 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 11.69 N5 Dhaka -Utholi-Banglabandh Road Km 364.68-367.88 S 3.20 12114 National Overlay 80mm @ IRI 4-9 2014 33.240 11.35 N5 Dhaka -Utholi-Banglabandh Road Km 361.18-361.88 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 11.17 N5 Dhaka -Utholi-Banglabandh Road Km 369.58-369.88 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 11.15 N5 Dhaka -Utholi-Banglabandh Road Km 367.88-368.58 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 10.94 N5 Dhaka -Utholi-Banglabandh Road Km 370.88-371.06 S 0.19 12114 National Overlay 80mm @ IRI 4-9 2014 1.922 10.90 N5 Dhaka -Utholi-Banglabandh Road Km 368.98-369.38 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 10.68 N5 Dhaka -Utholi-Banglabandh Road Km 368.68-368.88 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.43 N5 Dhaka -Utholi-Banglabandh Road Km 370.28-370.78 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.40 N5 Dhaka -Utholi-Banglabandh Road Km 358.07-360.48 S 2.41 12114 National Overlay 80mm @ IRI 4-9 2014 25.034 10.17 N5 Dhaka -Utholi-Banglabandh Road Km 360.88-360.98 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.14 N5 Dhaka -Utholi-Banglabandh Road Km 362.18-364.38 S 2.20 12114 National Overlay 80mm @ IRI 4-9 2014 26.844 8.83 N5 Dhaka -Utholi-Banglabandh Road Km 361.98-362.08 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.411 8.30 N518 Sayedpur Town Old Section Km 003.10-004.18 S 1.08 3739 National DBST 25mm Traff All 2014 3.856 0.12 N518 Sayedpur Town Old Section Km 000.50-003.10 S 2.60 3739 National Overlay 50mm @ IRI 5-9 2014 19.514 1.01 R570 Sayedpur-Nilphamari Road Km 005.80-006.00 S 0.20 2399 Regional DBST 25mm Traff All 2014 0.630 0.03 R570 Sayedpur-Nilphamari Road Km 007.60-007.80 S 0.20 2399 Regional DBST 25mm Traff All 2014 0.630 0.03 R570 Sayedpur-Nilphamari Road Km 000.30-000.50 S 0.20 2399 Regional Overlay 50mm @ IRI 7-9 2014 1.325 1.57 R570 Sayedpur-Nilphamari Road Km 010.20-013.20 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 23.027 4.68 R570 Sayedpur-Nilphamari Road Km 013.30-015.20 S 1.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.963 4.61 Sub-total Nilphamari Division 184.596

Panchgarh Division N5 Dhaka -Utholi-Banglabandh Road Km 456.68-466.68 S 10.00 9090 National DBST 25mm Traff > 6000 2014 24.360 5.66 N5 Dhaka -Utholi-Banglabandh Road Km 466.78-469.88 S 3.10 9090 National Overlay 60mm @ IRI 7-9 2014 19.270 7.00

Appendix-B Page: 53 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 440.08-440.18 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.900 12.73 N5 Dhaka -Utholi-Banglabandh Road Km 439.41-439.98 S 0.56 12114 National Overlay 80mm @ IRI 4-9 2014 5.086 11.98 N5 Dhaka -Utholi-Banglabandh Road Km 440.28-442.48 S 2.20 12114 National Overlay 80mm @ IRI 4-9 2014 19.806 11.97 N5 Dhaka -Utholi-Banglabandh Road Km 454.98-455.48 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 11.73 N5 Dhaka -Utholi-Banglabandh Road Km 482.98-488.98 S 6.00 12114 National Overlay 80mm @ IRI 4-9 2014 62.325 11.38 N5 Dhaka -Utholi-Banglabandh Road Km 442.78-445.98 S 3.20 12114 National Overlay 80mm @ IRI 4-9 2014 33.063 11.34 N5 Dhaka -Utholi-Banglabandh Road Km 521.47-524.07 S 2.60 12114 National Overlay 80mm @ IRI 4-9 2014 27.008 11.25 N5 Dhaka -Utholi-Banglabandh Road Km 514.87-516.97 S 2.10 12114 National Overlay 80mm @ IRI 4-9 2014 21.814 11.13 N5 Dhaka -Utholi-Banglabandh Road Km 447.68-447.98 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 11.09 N5 Dhaka -Utholi-Banglabandh Road Km 497.88-498.18 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 11.09 N5 Dhaka -Utholi-Banglabandh Road Km 493.28-495.18 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 11.05 N5 Dhaka -Utholi-Banglabandh Road Km 476.38-478.28 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 11.04 N5 Dhaka -Utholi-Banglabandh Road Km 507.08-510.18 S 3.10 12114 National Overlay 80mm @ IRI 4-9 2014 32.201 10.99 N5 Dhaka -Utholi-Banglabandh Road Km 498.78-501.68 S 2.90 12114 National Overlay 80mm @ IRI 4-9 2014 30.124 10.95 N5 Dhaka -Utholi-Banglabandh Road Km 513.87-514.77 S 0.90 12114 National Overlay 80mm @ IRI 4-9 2014 9.349 10.94 N5 Dhaka -Utholi-Banglabandh Road Km 489.38-493.08 S 3.70 12114 National Overlay 80mm @ IRI 4-9 2014 38.434 10.93 N5 Dhaka -Utholi-Banglabandh Road Km 469.88-472.98 S 3.10 12114 National Overlay 80mm @ IRI 4-9 2014 32.201 10.92 N5 Dhaka -Utholi-Banglabandh Road Km 475.48-476.08 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 6.233 10.88 N5 Dhaka -Utholi-Banglabandh Road Km 445.98-446.68 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 10.87 N5 Dhaka -Utholi-Banglabandh Road Km 510.18-510.48 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.75 N5 Dhaka -Utholi-Banglabandh Road Km 517.17-519.87 S 2.70 12114 National Overlay 80mm @ IRI 4-9 2014 28.046 10.74 N5 Dhaka -Utholi-Banglabandh Road Km 513.17-513.57 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 10.63 N5 Dhaka -Utholi-Banglabandh Road Km 447.08-447.48 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 10.62 N5 Dhaka -Utholi-Banglabandh Road Km 498.38-498.58 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.62 N5 Dhaka -Utholi-Banglabandh Road Km 495.78-497.48 S 1.70 12114 National Overlay 80mm @ IRI 4-9 2014 17.659 10.52 N5 Dhaka -Utholi-Banglabandh Road Km 472.98-475.38 S 2.40 12114 National Overlay 80mm @ IRI 4-9 2014 24.930 10.48 N5 Dhaka -Utholi-Banglabandh Road Km 501.78-506.78 S 5.00 12114 National Overlay 80mm @ IRI 4-9 2014 51.938 10.48 N5 Dhaka -Utholi-Banglabandh Road Km 478.38-482.08 S 3.70 12114 National Overlay 80mm @ IRI 4-9 2014 38.434 10.45 N5 Dhaka -Utholi-Banglabandh Road Km 519.97-520.97 S 1.00 12114 National Overlay 80mm @ IRI 4-9 2014 10.388 10.45 N5 Dhaka -Utholi-Banglabandh Road Km 482.18-482.88 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 10.44 N5 Dhaka -Utholi-Banglabandh Road Km 511.08-511.48 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 10.42 N5 Dhaka -Utholi-Banglabandh Road Km 446.78-446.98 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.36 N5 Dhaka -Utholi-Banglabandh Road Km 448.38-448.88 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.33 N5 Dhaka -Utholi-Banglabandh Road Km 455.68-455.88 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.33 N5 Dhaka -Utholi-Banglabandh Road Km 455.98-456.58 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 6.233 10.27 N5 Dhaka -Utholi-Banglabandh Road Km 448.98-454.88 S 5.90 12114 National Overlay 80mm @ IRI 4-9 2014 61.286 10.15 N5 Dhaka -Utholi-Banglabandh Road Km 510.78-510.98 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.07

Appendix-B Page: 54 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 495.38-495.68 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 9.99 Sub-total Panchgarh Division 698.727

Rangpur Division N5 Dhaka -Utholi-Banglabandh Road Km 286.51-287.41 S 0.90 12114 National Overlay 80mm @ IRI 4-9 2014 9.349 12.56 N5 Dhaka -Utholi-Banglabandh Road Km 280.21-280.41 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.89 N5 Dhaka -Utholi-Banglabandh Road Km 325.91-326.01 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.87 N5 Dhaka -Utholi-Banglabandh Road Km 344.11-345.61 S 1.50 12114 National Overlay 80mm @ IRI 4-9 2014 15.581 10.61 N5 Dhaka -Utholi-Banglabandh Road Km 357.08-358.07 S 0.99 12114 National Overlay 80mm @ IRI 4-9 2014 10.284 10.36 N5 Dhaka -Utholi-Banglabandh Road Km 324.71-325.00 L 0.29 12114 National Overlay 80mm @ IRI 4-9 2014 2.722 10.30 N5 Dhaka -Utholi-Banglabandh Road Km 330.61-331.81 S 1.20 12114 National Overlay 80mm @ IRI 4-9 2014 12.465 10.25 N5 Dhaka -Utholi-Banglabandh Road Km 345.81-346.31 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.21 N5 Dhaka -Utholi-Banglabandh Road Km 320.71-321.21 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 10.17 N5 Dhaka -Utholi-Banglabandh Road Km 346.41-346.51 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.14 N5 Dhaka -Utholi-Banglabandh Road Km 315.41-315.81 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 10.03 N5 Dhaka -Utholi-Banglabandh Road Km 279.50-279.71 S 0.21 12114 National Overlay 80mm @ IRI 4-9 2014 2.192 9.87 N5 Dhaka -Utholi-Banglabandh Road Km 348.41-350.21 S 1.80 12114 National Overlay 80mm @ IRI 4-9 2014 18.698 9.86 N5 Dhaka -Utholi-Banglabandh Road Km 350.31-350.91 S 0.60 12114 National Overlay 80mm @ IRI 4-9 2014 6.233 9.80 N5 Dhaka -Utholi-Banglabandh Road Km 287.51-291.01 S 3.50 12114 National Overlay 80mm @ IRI 4-9 2014 36.356 9.74 N5 Dhaka -Utholi-Banglabandh Road Km 346.71-348.31 S 1.60 12114 National Overlay 80mm @ IRI 4-9 2014 16.620 9.74 N5 Dhaka -Utholi-Banglabandh Road Km 335.11-337.01 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 9.69 N5 Dhaka -Utholi-Banglabandh Road Km 337.11-340.51 S 3.40 12114 National Overlay 80mm @ IRI 4-9 2014 35.318 9.63 N5 Dhaka -Utholi-Banglabandh Road Km 323.81-324.21 L 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.767 9.61 N5 Dhaka -Utholi-Banglabandh Road Km 325.00-325.61 S 0.61 12114 National Overlay 80mm @ IRI 4-9 2014 6.347 9.59 N5 Dhaka -Utholi-Banglabandh Road Km 355.01-356.51 S 1.50 12114 National Overlay 80mm @ IRI 4-9 2014 15.581 9.59 N5 Dhaka -Utholi-Banglabandh Road Km 351.11-353.31 S 2.20 12114 National Overlay 80mm @ IRI 4-9 2014 22.853 9.53 N5 Dhaka -Utholi-Banglabandh Road Km 291.81-292.31 S 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 9.51 N5 Dhaka -Utholi-Banglabandh Road Km 331.91-334.51 S 2.60 12114 National Overlay 80mm @ IRI 4-9 2014 27.008 9.36 N5 Dhaka -Utholi-Banglabandh Road Km 280.61-286.31 S 5.70 12114 National Overlay 80mm @ IRI 4-9 2014 59.209 9.35 N5 Dhaka -Utholi-Banglabandh Road Km 353.51-354.91 S 1.40 12114 National Overlay 80mm @ IRI 4-9 2014 14.543 9.34 N5 Dhaka -Utholi-Banglabandh Road Km 327.61-330.21 S 2.60 12114 National Overlay 80mm @ IRI 4-9 2014 27.008 9.20 N5 Dhaka -Utholi-Banglabandh Road Km 326.11-327.41 S 1.30 12114 National Overlay 80mm @ IRI 4-9 2014 13.504 9.15 N5 Dhaka -Utholi-Banglabandh Road Km 324.71-325.00 R 0.29 12114 National Overlay 80mm @ IRI 4-9 2014 3.002 9.06 N5 Dhaka -Utholi-Banglabandh Road Km 291.31-291.71 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 8.75 N5 Dhaka -Utholi-Banglabandh Road Km 313.31-315.21 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 8.75 N5 Dhaka -Utholi-Banglabandh Road Km 321.61-323.80 S 2.19 12114 National Overlay 80mm @ IRI 4-9 2014 22.738 8.71 N5 Dhaka -Utholi-Banglabandh Road Km 315.91-320.61 S 4.70 12114 National Overlay 80mm @ IRI 4-9 2014 48.821 8.62

Appendix-B Page: 55 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 323.81-324.21 R 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 4.155 8.50 N5 Dhaka -Utholi-Banglabandh Road Km 292.61-294.71 S 2.10 12114 National Overlay 80mm @ IRI 4-9 2014 21.814 8.50 N5 Dhaka -Utholi-Banglabandh Road Km 294.91-313.11 S 18.20 12114 National Overlay 80mm @ IRI 4-9 2014 189.052 8.48 N506 Rangpur-Barobari-Kurigram Road Km 002.20-003.00 S 0.80 9090 National Overlay 50mm @ IRI 5-7 2014 3.885 7.22 N506 Rangpur-Barobari-Kurigram Road Km 001.10-002.00 S 0.90 9090 National Overlay 50mm @ IRI 5-7 2014 4.371 7.19 N506 Rangpur-Barobari-Kurigram Road Km 020.50-021.00 S 0.50 3189 National Overlay 50mm @ IRI 5-9 2014 2.428 6.18 N506 Rangpur-Barobari-Kurigram Road Km 008.90-009.30 S 0.40 3189 National Overlay 50mm @ IRI 5-9 2014 1.943 6.05 N506 Rangpur-Barobari-Kurigram Road Km 003.20-003.30 S 0.10 3189 National Overlay 50mm @ IRI 5-9 2014 0.486 5.38 N506 Rangpur-Barobari-Kurigram Road Km 000.20-000.90 S 0.70 12114 National Overlay 80mm @ IRI 5-9 2014 5.361 11.18 R556 Mithapukur-Fulbaria Road Km 007.90-008.00 S 0.10 1067 Regional DBST 25mm Traff All 2014 0.273 5.32 R556 Mithapukur-Fulbaria Road Km 016.90-017.00 S 0.10 1067 Regional DBST 25mm Traff All 2014 0.273 0.02 R557 Madhypara-Badarganj Road Km 005.60-005.70 S 0.10 1131 Regional DBST 25mm Traff All 2014 0.218 0.23 R557 Madhypara-Badarganj Road Km 000.10-000.20 S 0.10 1131 Regional DBST 25mm Traff All 2014 0.218 0.14 R557 Madhypara-Badarganj Road Km 006.10-006.20 S 0.10 1131 Regional DBST 25mm Traff All 2014 0.218 0.14 R557 Madhypara-Badarganj Road Km 001.40-001.60 S 0.20 1131 Regional DBST 25mm Traff All 2014 0.437 0.09 R557 Madhypara-Badarganj Road Km 001.90-002.00 S 0.10 1131 Regional DBST 25mm Traff All 2014 0.218 0.09 R557 Madhypara-Badarganj Road Km 002.70-003.80 S 1.10 1131 Regional DBST 25mm Traff All 2014 2.402 0.08 R557 Madhypara-Badarganj Road Km 000.40-001.20 S 0.80 1131 Regional DBST 25mm Traff All 2014 1.747 0.07 R557 Madhypara-Badarganj Road Km 008.60-008.90 S 0.30 1131 Regional DBST 25mm Traff All 2014 0.655 0.03 R557 Madhypara-Badarganj Road Km 000.00-000.10 S 0.10 1131 Regional Overlay 50mm @ IRI 7-9 2014 0.459 1.00 R557 Madhypara-Badarganj Road Km 000.20-000.40 S 0.20 1131 Regional Overlay 50mm @ IRI 7-9 2014 0.918 0.85 Sub-total Rangpur Division 739.248

Thakurgaon Division N5 Dhaka -Utholi-Banglabandh Road Km 438.68-438.88 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 1.801 12.76 N5 Dhaka -Utholi-Banglabandh Road Km 438.98-439.08 S 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 0.900 11.95 N5 Dhaka -Utholi-Banglabandh Road Km 439.28-439.41 S 0.14 12114 National Overlay 80mm @ IRI 4-9 2014 1.215 11.82 N5 Dhaka -Utholi-Banglabandh Road Km 432.08-432.38 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 2.701 11.65 N5 Dhaka -Utholi-Banglabandh Road Km 417.68-419.38 S 1.70 12114 National Overlay 80mm @ IRI 4-9 2014 17.659 11.45 N5 Dhaka -Utholi-Banglabandh Road Km 432.68-432.88 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 1.801 11.18 N5 Dhaka -Utholi-Banglabandh Road Km 432.98-433.38 S 0.40 12114 National Overlay 80mm @ IRI 4-9 2014 3.601 11.17 N5 Dhaka -Utholi-Banglabandh Road Km 415.18-417.08 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 11.11 N5 Dhaka -Utholi-Banglabandh Road Km 398.28-400.18 S 1.90 12114 National Overlay 80mm @ IRI 4-9 2014 19.736 11.10 N5 Dhaka -Utholi-Banglabandh Road Km 419.78-420.08 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 11.09 N5 Dhaka -Utholi-Banglabandh Road Km 397.41-397.98 S 0.57 12114 National Overlay 80mm @ IRI 4-9 2014 5.890 11.01 N5 Dhaka -Utholi-Banglabandh Road Km 411.28-414.98 S 3.70 12114 National Overlay 80mm @ IRI 4-9 2014 38.434 11.00 N5 Dhaka -Utholi-Banglabandh Road Km 420.68-423.58 S 2.90 12114 National Overlay 80mm @ IRI 4-9 2014 30.124 10.95

Appendix-B Page: 56 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N5 Dhaka -Utholi-Banglabandh Road Km 417.28-417.58 S 0.30 12114 National Overlay 80mm @ IRI 4-9 2014 3.116 10.94 N5 Dhaka -Utholi-Banglabandh Road Km 420.28-420.48 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.62 N5 Dhaka -Utholi-Banglabandh Road Km 400.28-403.98 S 3.70 12114 National Overlay 80mm @ IRI 4-9 2014 38.434 10.51 N5 Dhaka -Utholi-Banglabandh Road Km 404.88-410.88 S 6.00 12114 National Overlay 80mm @ IRI 4-9 2014 62.325 10.51 N5 Dhaka -Utholi-Banglabandh Road Km 404.08-404.78 S 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 10.50 N5 Dhaka -Utholi-Banglabandh Road Km 423.68-428.68 S 5.00 12114 National Overlay 80mm @ IRI 4-9 2014 55.192 9.94 N5 Dhaka -Utholi-Banglabandh Road Km 434.98-438.58 S 3.60 12114 National Overlay 80mm @ IRI 4-9 2014 39.439 9.89 N5 Dhaka -Utholi-Banglabandh Road Km 428.98-432.08 S 3.10 12114 National Overlay 80mm @ IRI 4-9 2014 28.037 8.96 Sub-total Thakurgaon Division 382.605 Total Rangpur Zone 4,119.04

Sylhet Zone Habiganj Division N2 Dhaka-Sylhet-Jaflong Road Km 131.23-131.24 L 0.00 3019 National DBST 25mm Traff All 2014 0.007 8.05 N2 Dhaka-Sylhet-Jaflong Road Km 131.23-131.24 R 0.00 3019 National DBST 25mm Traff All 2014 0.007 8.05 N2 Dhaka-Sylhet-Jaflong Road Km 141.43-145.84 S 4.41 7663 National Overlay 50mm @ IRI 4-7 2014 28.816 6.26 N2 Dhaka-Sylhet-Jaflong Road Km 141.23-141.43 L 0.20 7663 National Overlay 50mm @ IRI 4-7 2014 1.406 5.16 N2 Dhaka-Sylhet-Jaflong Road Km 141.23-141.43 R 0.20 7663 National Overlay 50mm @ IRI 4-7 2014 1.406 5.16 N2 Dhaka-Sylhet-Jaflong Road Km 116.52-119.53 S 3.02 4126 National Overlay 50mm @ IRI 4-9 2014 19.707 4.33 N2 Dhaka-Sylhet-Jaflong Road Km 119.53-126.63 S 7.10 4126 National Overlay 50mm @ IRI 4-9 2014 46.393 4.23 N2 Dhaka-Sylhet-Jaflong Road Km 184.13-186.63 S 2.50 3712 National Overlay 50mm @ IRI 4-9 2014 16.336 4.20 N2 Dhaka-Sylhet-Jaflong Road Km 132.63-135.08 S 2.45 4126 National Overlay 50mm @ IRI 4-9 2014 16.009 4.09 N2 Dhaka-Sylhet-Jaflong Road Km 181.63-181.73 L 0.10 3712 National Overlay 50mm @ IRI 4-9 2014 0.692 4.01 N2 Dhaka-Sylhet-Jaflong Road Km 181.63-181.73 R 0.10 3712 National Overlay 50mm @ IRI 4-9 2014 0.692 4.01 N2 Dhaka-Sylhet-Jaflong Road Km 126.93-129.83 S 2.90 4126 National Overlay 50mm @ IRI 4-9 2014 18.949 4.00 N2 Dhaka-Sylhet-Jaflong Road Km 116.23-116.52 L 0.28 4126 National Overlay 50mm @ IRI 4-9 2014 1.630 3.92 N2 Dhaka-Sylhet-Jaflong Road Km 116.23-116.52 R 0.28 4126 National Overlay 50mm @ IRI 4-9 2014 1.630 3.92 N2 Dhaka-Sylhet-Jaflong Road Km 126.63-126.93 S 0.30 4126 National Overlay 50mm @ IRI 4-9 2014 1.960 3.92 N2 Dhaka-Sylhet-Jaflong Road Km 181.73-183.83 S 2.10 3712 National Overlay 50mm @ IRI 4-9 2014 13.735 3.63 N2 Dhaka-Sylhet-Jaflong Road Km 179.43-179.60 L 0.16 9090 National Overlay 60mm @ IRI 7-9 2014 0.856 8.62 N2 Dhaka-Sylhet-Jaflong Road Km 179.43-179.60 R 0.16 9090 National Overlay 60mm @ IRI 7-9 2014 0.856 8.62 N2 Dhaka-Sylhet-Jaflong Road Km 108.75-109.70 S 0.95 12114 National Overlay 80mm @ IRI 4-9 2014 9.737 11.92 N2 Dhaka-Sylhet-Jaflong Road Km 179.60-181.58 S 1.99 12114 National Overlay 80mm @ IRI 4-9 2014 20.344 11.44 N2 Dhaka-Sylhet-Jaflong Road Km 146.08-149.13 S 3.05 12114 National Overlay 80mm @ IRI 4-9 2014 31.270 10.69 N2 Dhaka-Sylhet-Jaflong Road Km 165.33-168.53 S 3.20 12114 National Overlay 80mm @ IRI 4-9 2014 33.107 10.61 N2 Dhaka-Sylhet-Jaflong Road Km 115.03-116.13 S 1.09 12114 National Overlay 80mm @ IRI 4-9 2014 11.212 10.42

Appendix-B Page: 57 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N2 Dhaka-Sylhet-Jaflong Road Km 138.63-138.83 S 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.078 10.38 N2 Dhaka-Sylhet-Jaflong Road Km 149.13-158.83 S 9.70 12114 National Overlay 80mm @ IRI 4-9 2014 100.759 10.35 N2 Dhaka-Sylhet-Jaflong Road Km 112.03-115.03 S 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 30.747 10.24 N2 Dhaka-Sylhet-Jaflong Road Km 175.83-179.35 S 3.51 12114 National Overlay 80mm @ IRI 4-9 2014 36.005 10.21 N2 Dhaka-Sylhet-Jaflong Road Km 110.20-111.10 S 0.90 12114 National Overlay 80mm @ IRI 4-9 2014 9.224 10.11 N2 Dhaka-Sylhet-Jaflong Road Km 138.93-140.13 S 1.20 12114 National Overlay 80mm @ IRI 4-9 2014 12.465 9.94 N2 Dhaka-Sylhet-Jaflong Road Km 135.83-138.43 S 2.60 12114 National Overlay 80mm @ IRI 4-9 2014 27.008 9.90 N2 Dhaka-Sylhet-Jaflong Road Km 145.96-146.08 L 0.12 12114 National Overlay 80mm @ IRI 4-9 2014 1.330 9.80 N2 Dhaka-Sylhet-Jaflong Road Km 145.96-146.08 R 0.12 12114 National Overlay 80mm @ IRI 4-9 2014 1.330 9.80 N2 Dhaka-Sylhet-Jaflong Road Km 158.83-165.33 S 6.50 12114 National Overlay 80mm @ IRI 4-9 2014 68.779 9.67 N2 Dhaka-Sylhet-Jaflong Road Km 186.63-190.50 S 3.87 12114 National Overlay 80mm @ IRI 4-9 2014 39.643 9.60 N2 Dhaka-Sylhet-Jaflong Road Km 168.53-172.63 S 4.10 12114 National Overlay 80mm @ IRI 4-9 2014 42.532 9.27 N204 Jagadishpur-Shaistaganj Km 006.80-007.00 S 0.20 1203 National DBST 25mm Traff All 2014 0.445 0.15 N204 Jagadishpur-Shaistaganj Km 003.60-004.10 S 0.50 1203 National DBST 25mm Traff All 2014 1.113 0.14 N204 Jagadishpur-Shaistaganj Km 001.20-001.30 S 0.10 1203 National DBST 25mm Traff All 2014 0.223 0.14 N204 Jagadishpur-Shaistaganj Km 001.40-001.50 S 0.10 1203 National DBST 25mm Traff All 2014 0.223 0.14 N204 Jagadishpur-Shaistaganj Km 000.10-000.30 S 0.20 1203 National DBST 25mm Traff All 2014 0.445 0.09 N204 Jagadishpur-Shaistaganj Km 004.90-005.20 S 0.30 1203 National DBST 25mm Traff All 2014 0.668 0.07 N204 Jagadishpur-Shaistaganj Km 007.50-007.70 S 0.20 1203 National Overlay 50mm @ IRI 5-9 2014 0.918 1.24 N204 Jagadishpur-Shaistaganj Km 005.20-006.80 S 1.60 1203 National Overlay 50mm @ IRI 5-9 2014 7.488 1.04 N204 Jagadishpur-Shaistaganj Km 020.70-021.70 S 1.00 1203 National Overlay 50mm @ IRI 5-9 2014 4.680 1.04 N204 Jagadishpur-Shaistaganj Km 000.30-001.20 S 0.90 1203 National Overlay 50mm @ IRI 5-9 2014 4.212 1.02 N204 Jagadishpur-Shaistaganj Km 021.70-022.20 S 0.50 1203 National Overlay 50mm @ IRI 5-9 2014 2.340 1.00 N204 Jagadishpur-Shaistaganj Km 023.50-025.70 S 2.20 1203 National Overlay 50mm @ IRI 5-9 2014 10.179 0.99 N204 Jagadishpur-Shaistaganj Km 003.40-003.60 S 0.20 1203 National Overlay 50mm @ IRI 5-9 2014 0.936 0.98 N204 Jagadishpur-Shaistaganj Km 022.50-022.70 S 0.20 1203 National Overlay 50mm @ IRI 5-9 2014 0.936 0.97 N204 Jagadishpur-Shaistaganj Km 004.10-004.90 S 0.80 1203 National Overlay 50mm @ IRI 5-9 2014 3.744 0.94 N204 Jagadishpur-Shaistaganj Km 017.10-017.50 S 0.40 1203 National Overlay 50mm @ IRI 5-9 2014 1.872 0.88 N204 Jagadishpur-Shaistaganj Km 009.10-017.10 S 8.00 1203 National Overlay 50mm @ IRI 5-9 2014 37.439 0.86 N204 Jagadishpur-Shaistaganj Km 017.60-018.10 S 0.50 1203 National Overlay 50mm @ IRI 5-9 2014 2.340 0.84 N204 Jagadishpur-Shaistaganj Km 029.50-029.60 S 0.10 9090 National Overlay 60mm @ IRI 7-9 2014 0.546 9.63 N207 Mirpur-Sherpur Road Km 000.20-000.50 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.493 13.38 N207 Mirpur-Sherpur Road Km 015.50-015.88 S 0.38 12114 National Overlay 80mm @ IRI 5-9 2014 3.158 11.61 N207 Mirpur-Sherpur Road Km 010.40-015.40 S 5.00 12114 National Overlay 80mm @ IRI 5-9 2014 42.035 10.67 N207 Mirpur-Sherpur Road Km 000.60-010.20 S 9.60 12114 National Overlay 80mm @ IRI 5-9 2014 81.770 10.63 R220 Sarail-Habiganj Road Km 019.00-051.67 S 32.67 2186 Regional Overlay 50mm @ IRI 7-9 2014 155.777 0.79 R240 Shaistaganj-Sherpur Road Km 008.50-009.00 S 0.50 2649 Regional DBST 25mm Traff All 2014 1.155 0.60

Appendix-B Page: 58 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R240 Shaistaganj-Sherpur Road Km 012.20-013.40 S 1.20 2649 Regional Overlay 50mm @ IRI 5-7 2014 5.828 4.32 R240 Shaistaganj-Sherpur Road Km 010.70-012.10 S 1.40 2649 Regional Overlay 50mm @ IRI 5-7 2014 6.799 3.80 R240 Shaistaganj-Sherpur Road Km 013.70-014.10 S 0.40 2649 Regional Overlay 50mm @ IRI 5-7 2014 1.943 3.31 R240 Shaistaganj-Sherpur Road Km 046.60-046.80 S 0.20 1519 Regional Overlay 50mm @ IRI 5-7 2014 0.989 0.66 R240 Shaistaganj-Sherpur Road Km 009.00-010.60 S 1.60 2649 Regional Overlay 50mm @ IRI 7-9 2014 7.770 4.63 R240 Shaistaganj-Sherpur Road Km 004.70-008.00 S 3.30 2649 Regional Overlay 50mm @ IRI 7-9 2014 16.230 3.89 R240 Shaistaganj-Sherpur Road Km 008.00-008.50 S 0.50 2649 Regional Overlay 50mm @ IRI 7-9 2014 2.428 3.84 R240 Shaistaganj-Sherpur Road Km 045.30-046.60 S 1.30 1519 Regional Overlay 50mm @ IRI 7-9 2014 6.428 0.98 R240 Shaistaganj-Sherpur Road Km 046.80-049.42 S 2.62 1519 Regional Overlay 50mm @ IRI 7-9 2014 12.955 0.95 R240 Shaistaganj-Sherpur Road Km 037.70-037.80 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.578 7.66 R240 Shaistaganj-Sherpur Road Km 004.60-004.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.42 R240 Shaistaganj-Sherpur Road Km 020.20-020.40 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 7.41 R240 Shaistaganj-Sherpur Road Km 019.70-020.00 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 7.36 R240 Shaistaganj-Sherpur Road Km 004.00-004.30 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 7.15 R240 Shaistaganj-Sherpur Road Km 017.90-018.10 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 6.83 R240 Shaistaganj-Sherpur Road Km 000.10-000.50 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.352 6.81 R240 Shaistaganj-Sherpur Road Km 021.10-023.60 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.674 6.79 R240 Shaistaganj-Sherpur Road Km 002.40-003.10 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.116 6.74 R240 Shaistaganj-Sherpur Road Km 038.10-038.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.733 6.71 R240 Shaistaganj-Sherpur Road Km 018.90-019.60 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.116 6.54 R240 Shaistaganj-Sherpur Road Km 025.10-025.90 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.620 6.48 R240 Shaistaganj-Sherpur Road Km 016.70-017.50 S 0.80 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.687 6.45 R240 Shaistaganj-Sherpur Road Km 026.00-033.30 S 7.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 42.158 6.32 R240 Shaistaganj-Sherpur Road Km 001.80-002.30 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.940 6.24 R240 Shaistaganj-Sherpur Road Km 023.90-024.80 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.198 6.14 R240 Shaistaganj-Sherpur Road Km 037.10-037.50 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.310 6.08 R240 Shaistaganj-Sherpur Road Km 015.10-016.30 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.90 R240 Shaistaganj-Sherpur Road Km 033.30-036.80 S 3.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.213 5.65 Sub-total Habiganj Division 1,200.250

Moulavi Bazar Division N207 Mirpur-Sherpur Road Km 056.20-056.30 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.252 9.55 N207 Mirpur-Sherpur Road Km 061.80-061.90 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.262 8.86 N207 Mirpur-Sherpur Road Km 038.60-038.90 S 0.30 2652 National DBST 25mm Traff All 2014 0.756 0.35 N207 Mirpur-Sherpur Road Km 040.70-041.10 S 0.40 2652 National DBST 25mm Traff All 2014 1.008 0.31 N207 Mirpur-Sherpur Road Km 044.70-044.80 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.831 13.77 N207 Mirpur-Sherpur Road Km 043.50-043.80 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.493 13.72

Appendix-B Page: 59 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N207 Mirpur-Sherpur Road Km 053.30-053.90 S 0.60 12114 National Overlay 80mm @ IRI 5-9 2014 4.986 13.15 N207 Mirpur-Sherpur Road Km 044.90-045.00 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.831 12.99 N207 Mirpur-Sherpur Road Km 044.30-044.50 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.662 12.75 N207 Mirpur-Sherpur Road Km 054.70-056.10 S 1.40 12114 National Overlay 80mm @ IRI 5-9 2014 11.634 12.37 N207 Mirpur-Sherpur Road Km 045.30-046.10 S 0.80 12114 National Overlay 80mm @ IRI 5-9 2014 6.648 12.33 N207 Mirpur-Sherpur Road Km 058.00-058.20 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.662 12.32 N207 Mirpur-Sherpur Road Km 051.50-051.80 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.493 12.26 N207 Mirpur-Sherpur Road Km 058.30-060.60 S 2.30 12114 National Overlay 80mm @ IRI 5-9 2014 19.113 12.01 N207 Mirpur-Sherpur Road Km 046.30-049.10 S 2.80 12114 National Overlay 80mm @ IRI 5-9 2014 23.268 11.88 N207 Mirpur-Sherpur Road Km 060.80-061.60 S 0.80 12114 National Overlay 80mm @ IRI 5-9 2014 6.648 11.74 N207 Mirpur-Sherpur Road Km 049.20-051.20 S 2.00 12114 National Overlay 80mm @ IRI 5-9 2014 16.620 11.74 N207 Mirpur-Sherpur Road Km 056.40-057.60 S 1.20 12114 National Overlay 80mm @ IRI 5-9 2014 9.972 11.71 N207 Mirpur-Sherpur Road Km 051.90-053.00 S 1.10 12114 National Overlay 80mm @ IRI 5-9 2014 9.141 11.48 N208 Moulvibazar-Sylhet Road Km 008.00-008.10 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.256 8.95 N208 Moulvibazar-Sylhet Road Km 004.40-004.50 S 0.10 12114 National DBST 25mm Traff > 6000 2014 0.260 8.53 N208 Moulvibazar-Sylhet Road Km 003.50-003.80 S 0.30 12114 National DBST 25mm Traff > 6000 2014 0.781 7.93 N208 Moulvibazar-Sylhet Road Km 016.67-016.87 S 0.20 6517 National DBST 25mm Traff > 6000 2014 0.487 7.63 N208 Moulvibazar-Sylhet Road Km 016.57-016.67 S 0.10 6517 National Overlay 50mm @ IRI 5-7 2014 0.512 8.65 N208 Moulvibazar-Sylhet Road Km 015.60-015.80 S 0.20 6517 National Overlay 50mm @ IRI 5-7 2014 1.024 7.57 N208 Moulvibazar-Sylhet Road Km 015.10-015.40 S 0.30 6517 National Overlay 50mm @ IRI 5-7 2014 1.536 6.84 N208 Moulvibazar-Sylhet Road Km 014.50-015.00 S 0.50 6517 National Overlay 50mm @ IRI 5-7 2014 2.561 6.49 N208 Moulvibazar-Sylhet Road Km 011.60-011.70 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.845 13.93 N208 Moulvibazar-Sylhet Road Km 002.60-002.90 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.576 13.12 N208 Moulvibazar-Sylhet Road Km 012.40-012.50 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.845 13.11 N208 Moulvibazar-Sylhet Road Km 010.60-011.50 S 0.90 12114 National Overlay 80mm @ IRI 5-9 2014 7.604 12.66 N208 Moulvibazar-Sylhet Road Km 004.00-004.10 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.859 12.26 N208 Moulvibazar-Sylhet Road Km 012.80-013.00 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.690 11.62 N208 Moulvibazar-Sylhet Road Km 011.80-012.30 S 0.50 12114 National Overlay 80mm @ IRI 5-9 2014 4.224 11.16 N208 Moulvibazar-Sylhet Road Km 006.80-007.00 S 0.20 12114 National Overlay 80mm @ IRI 5-9 2014 1.690 11.02 R281 Rajnagar-Charkhai Road Km 003.50-003.60 S 0.10 2253 Regional DBST 25mm Traff 2000-400 2014 0.235 1.79 R281 Rajnagar-Charkhai Road Km 046.20-046.30 S 0.10 1813 Regional DBST 25mm Traff All 2014 0.227 0.41 R281 Rajnagar-Charkhai Road Km 045.70-045.90 S 0.20 1813 Regional DBST 25mm Traff All 2014 0.454 0.33 R281 Rajnagar-Charkhai Road Km 047.40-047.50 S 0.10 1813 Regional DBST 25mm Traff All 2014 0.223 0.32 R281 Rajnagar-Charkhai Road Km 047.50-047.80 S 0.30 1813 Regional Overlay 50mm @ IRI 5-7 2014 1.404 0.92 R281 Rajnagar-Charkhai Road Km 036.20-045.70 S 9.50 1813 Regional Overlay 50mm @ IRI 5-7 2014 45.298 0.63 R281 Rajnagar-Charkhai Road Km 047.20-047.40 S 0.20 1813 Regional Overlay 50mm @ IRI 7-9 2014 0.941 1.64 R281 Rajnagar-Charkhai Road Km 019.60-019.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 7.64

Appendix-B Page: 60 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R281 Rajnagar-Charkhai Road Km 020.80-021.80 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.670 6.34 R281 Rajnagar-Charkhai Road Km 016.80-018.00 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.804 6.03 R281 Rajnagar-Charkhai Road Km 028.80-031.30 S 2.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 14.438 6.02 R281 Rajnagar-Charkhai Road Km 021.90-023.90 S 2.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 11.487 5.88 R281 Rajnagar-Charkhai Road Km 024.00-025.60 S 1.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 9.240 5.80 R281 Rajnagar-Charkhai Road Km 027.10-028.30 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 6.930 5.67 R281 Rajnagar-Charkhai Road Km 025.70-027.00 S 1.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.507 5.65 R282 Juri-Lathidila Road Km 003.20-003.40 S 0.20 5170 Regional DBST 25mm Traff 4000-600 2014 0.454 5.27 R282 Juri-Lathidila Road Km 008.10-008.20 S 0.10 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.265 6.20 R282 Juri-Lathidila Road Km 007.70-007.90 S 0.20 3029 Regional Overlay 50mm @ IRI 5-7 2014 0.530 5.86 R282 Juri-Lathidila Road Km 000.40-000.60 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.134 7.07 R282 Juri-Lathidila Road Km 004.20-007.30 S 3.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 13.834 6.81 R282 Juri-Lathidila Road Km 001.30-001.40 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.567 6.36 R282 Juri-Lathidila Road Km 002.40-002.90 S 0.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.835 6.21 Sub-total Moulavi Bazar Division 279.073

Sunamganj Division R241 Auskandi-Pagla Road Km 017.00-017.20 S 0.20 733 Regional DBST 25mm Traff All 2014 0.311 0.25 R241 Auskandi-Pagla Road Km 020.30-020.50 S 0.20 733 Regional DBST 25mm Traff All 2014 0.311 0.22 R241 Auskandi-Pagla Road Km 034.10-034.20 S 0.10 733 Regional DBST 25mm Traff All 2014 0.155 0.22 R241 Auskandi-Pagla Road Km 040.70-040.80 S 0.10 733 Regional DBST 25mm Traff All 2014 0.160 0.20 R241 Auskandi-Pagla Road Km 032.30-032.50 S 0.20 733 Regional DBST 25mm Traff All 2014 0.311 0.19 R241 Auskandi-Pagla Road Km 038.00-038.20 S 0.20 733 Regional DBST 25mm Traff All 2014 0.319 0.07 R241 Auskandi-Pagla Road Km 026.40-029.40 S 3.00 733 Regional Overlay 50mm @ IRI 5-7 2014 10.013 0.80 R241 Auskandi-Pagla Road Km 035.60-036.60 S 1.00 733 Regional Overlay 50mm @ IRI 5-7 2014 3.267 0.79 R241 Auskandi-Pagla Road Km 036.80-038.00 S 1.20 733 Regional Overlay 50mm @ IRI 7-9 2014 3.921 1.14 R280 Sylhet-Sunamganj Road Km 062.70-066.43 S 3.72 5170 Regional DBST 25mm Traff 4000-600 2014 8.761 4.75 R280 Sylhet-Sunamganj Road Km 026.80-027.00 S 0.20 4275 Regional Overlay 50mm @ IRI 5-7 2014 1.007 2.91 R280 Sylhet-Sunamganj Road Km 036.20-043.46 S 7.26 4275 Regional Overlay 50mm @ IRI 5-7 2014 35.899 2.29 R280 Sylhet-Sunamganj Road Km 047.50-047.80 S 0.30 1977 Regional Overlay 50mm @ IRI 5-7 2014 1.510 1.86 R280 Sylhet-Sunamganj Road Km 053.80-054.10 S 0.30 1977 Regional Overlay 50mm @ IRI 7-9 2014 1.510 2.71 R280 Sylhet-Sunamganj Road Km 047.20-047.40 S 0.20 1977 Regional Overlay 50mm @ IRI 7-9 2014 0.989 2.69 R280 Sylhet-Sunamganj Road Km 043.46-046.50 S 3.04 1977 Regional Overlay 50mm @ IRI 7-9 2014 15.032 2.13 R280 Sylhet-Sunamganj Road Km 054.10-054.70 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.534 6.87 R280 Sylhet-Sunamganj Road Km 054.80-059.30 S 4.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 26.460 6.53 R280 Sylhet-Sunamganj Road Km 061.80-062.40 S 0.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 3.528 5.83 R280 Sylhet-Sunamganj Road Km 020.48-023.60 S 3.12 4275 Regional Overlay 60mm @ IRI 7-9 2014 19.001 2.75

Appendix-B Page: 61 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost Sub-total Sunamganj Division 135.999

Sylhet Division N2 Dhaka-Sylhet-Jaflong Road Km 192.16-195.53 S 3.37 5723 National DBST 25mm Traff 4000-600 2014 10.480 4.62 N2 Dhaka-Sylhet-Jaflong Road Km 198.73-200.73 S 2.00 5723 National DBST 25mm Traff 4000-600 2014 6.216 3.96 N2 Dhaka-Sylhet-Jaflong Road Km 191.93-192.16 L 0.23 3442 National Overlay 50mm @ IRI 4-9 2014 0.805 5.81 N2 Dhaka-Sylhet-Jaflong Road Km 191.93-192.16 R 0.23 3442 National Overlay 50mm @ IRI 4-9 2014 0.805 5.81 N2 Dhaka-Sylhet-Jaflong Road Km 203.93-205.13 S 1.20 5723 National Overlay 50mm @ IRI 4-9 2014 7.883 5.43 N2 Dhaka-Sylhet-Jaflong Road Km 191.63-191.91 S 0.28 5723 National Overlay 50mm @ IRI 4-9 2014 1.949 5.38 N2 Dhaka-Sylhet-Jaflong Road Km 203.63-203.83 S 0.20 5723 National Overlay 50mm @ IRI 4-9 2014 1.325 5.38 N2 Dhaka-Sylhet-Jaflong Road Km 197.63-198.63 S 1.00 5723 National Overlay 50mm @ IRI 4-9 2014 6.534 5.33 N2 Dhaka-Sylhet-Jaflong Road Km 200.83-203.43 S 2.60 5723 National Overlay 50mm @ IRI 4-9 2014 17.104 5.24 N2 Dhaka-Sylhet-Jaflong Road Km 190.83-190.97 L 0.14 5723 National Overlay 50mm @ IRI 4-9 2014 0.975 5.03 N2 Dhaka-Sylhet-Jaflong Road Km 190.83-190.97 R 0.14 5723 National Overlay 50mm @ IRI 4-9 2014 0.975 5.03 N2 Dhaka-Sylhet-Jaflong Road Km 190.97-191.63 S 0.66 5723 National Overlay 50mm @ IRI 4-9 2014 4.676 4.52 N2 Dhaka-Sylhet-Jaflong Road Km 256.03-256.53 R 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 5.194 11.75 N2 Dhaka-Sylhet-Jaflong Road Km 224.22-225.32 S 1.10 12114 National Overlay 80mm @ IRI 4-9 2014 11.289 11.35 N2 Dhaka-Sylhet-Jaflong Road Km 213.13-222.63 S 9.50 12114 National Overlay 80mm @ IRI 4-9 2014 97.366 11.13 N2 Dhaka-Sylhet-Jaflong Road Km 234.63-234.73 R 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.58 N2 Dhaka-Sylhet-Jaflong Road Km 205.63-213.13 S 7.50 12114 National Overlay 80mm @ IRI 4-9 2014 76.868 10.17 N2 Dhaka-Sylhet-Jaflong Road Km 222.63-223.92 S 1.29 12114 National Overlay 80mm @ IRI 4-9 2014 13.231 10.04 N2 Dhaka-Sylhet-Jaflong Road Km 234.43-234.53 R 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 10.00 N2 Dhaka-Sylhet-Jaflong Road Km 234.93-251.03 R 16.10 12114 National Overlay 80mm @ IRI 4-9 2014 167.239 10.00 N2 Dhaka-Sylhet-Jaflong Road Km 190.50-190.82 S 0.32 12114 National Overlay 80mm @ IRI 4-9 2014 3.280 9.93 N2 Dhaka-Sylhet-Jaflong Road Km 260.03-260.13 R 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.039 9.71 N2 Dhaka-Sylhet-Jaflong Road Km 260.43-263.13 R 2.70 12114 National Overlay 80mm @ IRI 4-9 2014 28.046 9.71 N2 Dhaka-Sylhet-Jaflong Road Km 263.23-272.13 R 8.90 12114 National Overlay 80mm @ IRI 4-9 2014 92.449 9.66 N2 Dhaka-Sylhet-Jaflong Road Km 251.13-256.03 R 4.90 12114 National Overlay 80mm @ IRI 4-9 2014 50.899 9.63 N2 Dhaka-Sylhet-Jaflong Road Km 225.33-225.53 L 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.172 9.58 N2 Dhaka-Sylhet-Jaflong Road Km 225.33-225.53 R 0.20 12114 National Overlay 80mm @ IRI 4-9 2014 2.172 9.58 N2 Dhaka-Sylhet-Jaflong Road Km 256.83-259.83 R 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 31.163 9.57 N2 Dhaka-Sylhet-Jaflong Road Km 272.33-274.33 R 2.00 12114 National Overlay 80mm @ IRI 4-9 2014 20.775 9.48 N2 Dhaka-Sylhet-Jaflong Road Km 274.53-275.33 R 0.80 12114 National Overlay 80mm @ IRI 4-9 2014 8.310 9.13 N2 Dhaka-Sylhet-Jaflong Road Km 275.53-276.23 R 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 7.271 8.94 N2 Dhaka-Sylhet-Jaflong Road Km 225.53-228.05 S 2.53 12114 National Overlay 80mm @ IRI 4-9 2014 26.963 8.63 N2 Dhaka-Sylhet-Jaflong Road Km 256.03-256.53 L 0.50 12114 National Overlay 80mm @ IRI 4-9 2014 6.717 7.57 N2 Dhaka-Sylhet-Jaflong Road Km 234.43-234.53 L 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.343 6.44

Appendix-B Page: 62 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost N2 Dhaka-Sylhet-Jaflong Road Km 234.93-251.03 L 16.10 12114 National Overlay 80mm @ IRI 4-9 2014 216.295 6.40 N2 Dhaka-Sylhet-Jaflong Road Km 234.63-234.73 L 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.343 5.86 N2 Dhaka-Sylhet-Jaflong Road Km 260.03-260.13 L 0.10 12114 National Overlay 80mm @ IRI 4-9 2014 1.343 5.58 N2 Dhaka-Sylhet-Jaflong Road Km 260.43-263.13 L 2.70 12114 National Overlay 80mm @ IRI 4-9 2014 36.273 5.58 N2 Dhaka-Sylhet-Jaflong Road Km 263.23-272.13 L 8.90 12114 National Overlay 80mm @ IRI 4-9 2014 119.567 5.53 N2 Dhaka-Sylhet-Jaflong Road Km 251.13-256.03 L 4.90 12114 National Overlay 80mm @ IRI 4-9 2014 65.829 5.49 N2 Dhaka-Sylhet-Jaflong Road Km 256.83-259.83 L 3.00 12114 National Overlay 80mm @ IRI 4-9 2014 40.304 5.44 N2 Dhaka-Sylhet-Jaflong Road Km 272.33-274.33 L 2.00 12114 National Overlay 80mm @ IRI 4-9 2014 26.869 5.37 N2 Dhaka-Sylhet-Jaflong Road Km 274.53-275.33 L 0.80 12114 National Overlay 80mm @ IRI 4-9 2014 10.748 5.11 N2 Dhaka-Sylhet-Jaflong Road Km 275.53-276.23 L 0.70 12114 National Overlay 80mm @ IRI 4-9 2014 9.404 4.97 N208 Moulvibazar-Sylhet Road Km 050.17-054.07 S 3.90 4994 National DBST 25mm Traff 4000-600 2014 9.894 5.30 N208 Moulvibazar-Sylhet Road Km 041.97-042.07 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.803 12.76 N208 Moulvibazar-Sylhet Road Km 038.37-038.47 S 0.10 12114 National Overlay 80mm @ IRI 5-9 2014 0.789 12.72 N208 Moulvibazar-Sylhet Road Km 035.37-035.67 S 0.30 12114 National Overlay 80mm @ IRI 5-9 2014 2.368 11.45 N208 Moulvibazar-Sylhet Road Km 035.04-035.27 S 0.23 12114 National Overlay 80mm @ IRI 5-9 2014 1.792 11.22 N208 Moulvibazar-Sylhet Road Km 042.37-044.97 S 2.60 12114 National Overlay 80mm @ IRI 5-9 2014 20.886 10.96 N208 Moulvibazar-Sylhet Road Km 046.77-049.87 S 3.10 12114 National Overlay 80mm @ IRI 5-9 2014 24.902 10.91 N208 Moulvibazar-Sylhet Road Km 035.77-038.27 S 2.50 12114 National Overlay 80mm @ IRI 5-9 2014 19.736 10.83 N208 Moulvibazar-Sylhet Road Km 045.17-046.67 S 1.50 12114 National Overlay 80mm @ IRI 5-9 2014 12.050 10.83 N208 Moulvibazar-Sylhet Road Km 038.77-041.77 S 3.00 12114 National Overlay 80mm @ IRI 5-9 2014 23.974 10.83 N209 Sylhet Twn By-Pass Road Km 000.00-001.46 S 1.46 7057 National Overlay 50mm @ IRI 5-7 2014 5.286 8.91 N210 Sylhet Twn By-Pass Road Km 008.50-010.83 S 2.33 12114 National Overlay 80mm @ IRI 5-9 2014 23.185 11.85 N210 Sylhet Twn By-Pass Road Km 001.90-004.00 S 2.10 12114 National Overlay 80mm @ IRI 5-9 2014 20.941 11.77 N210 Sylhet Twn By-Pass Road Km 000.90-001.80 S 0.90 12114 National Overlay 80mm @ IRI 5-9 2014 8.975 11.42 N210 Sylhet Twn By-Pass Road Km 004.20-006.90 S 2.70 12114 National Overlay 80mm @ IRI 5-9 2014 26.924 11.35 N210 Sylhet Twn By-Pass Road Km 000.20-000.60 S 0.40 12114 National Overlay 80mm @ IRI 5-9 2014 3.989 11.24 N210 Sylhet Twn By-Pass Road Km 007.00-008.00 S 1.00 12114 National Overlay 80mm @ IRI 5-9 2014 9.972 11.06 R247 Auskandi-Pagla Road Km 000.00-001.23 S 1.23 5170 Regional DBST 25mm Traff 4000-600 2014 2.376 5.25 R248 Auskandi-Pagla Road Km 000.00-004.29 S 4.29 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 30.631 5.08 R249 Auskandi-Pagla Road Km 000.00-001.07 S 1.07 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.065 7.04 R250 Sylhet-Jakiganj Road Km 012.60-012.90 S 0.30 5170 Regional DBST 25mm Traff 4000-600 2014 0.706 5.17 R250 Sylhet-Jakiganj Road Km 013.10-014.80 S 1.70 5170 Regional DBST 25mm Traff 4000-600 2014 3.998 4.87 R250 Sylhet-Jakiganj Road Km 007.40-009.80 S 2.40 5170 Regional DBST 25mm Traff 4000-600 2014 5.554 4.76 R250 Sylhet-Jakiganj Road Km 047.40-047.50 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.16 R250 Sylhet-Jakiganj Road Km 062.40-062.70 S 0.30 1320 Regional DBST 25mm Traff All 2014 0.713 0.14 R250 Sylhet-Jakiganj Road Km 080.40-080.60 S 0.20 1320 Regional DBST 25mm Traff All 2014 0.470 0.14 R250 Sylhet-Jakiganj Road Km 073.50-073.60 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.239 0.11

Appendix-B Page: 63 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R250 Sylhet-Jakiganj Road Km 054.70-054.80 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.11 R250 Sylhet-Jakiganj Road Km 059.30-059.40 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.11 R250 Sylhet-Jakiganj Road Km 083.10-083.20 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.11 R250 Sylhet-Jakiganj Road Km 086.30-086.40 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.11 R250 Sylhet-Jakiganj Road Km 047.80-047.90 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.11 R250 Sylhet-Jakiganj Road Km 076.50-076.60 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.239 0.10 R250 Sylhet-Jakiganj Road Km 046.40-046.50 S 0.10 1320 Regional DBST 25mm Traff All 2014 0.235 0.08 R250 Sylhet-Jakiganj Road Km 061.50-061.80 S 0.30 1320 Regional DBST 25mm Traff All 2014 0.706 0.06 R250 Sylhet-Jakiganj Road Km 053.60-053.80 S 0.20 1320 Regional DBST 25mm Traff All 2014 0.470 0.04 R250 Sylhet-Jakiganj Road Km 039.80-046.30 S 6.50 1320 Regional Overlay 50mm @ IRI 5-7 2014 31.854 0.66 R250 Sylhet-Jakiganj Road Km 047.50-047.80 S 0.30 1320 Regional Overlay 50mm @ IRI 5-7 2014 1.483 0.63 R250 Sylhet-Jakiganj Road Km 053.80-054.70 S 0.90 1320 Regional Overlay 50mm @ IRI 5-7 2014 4.450 0.63 R250 Sylhet-Jakiganj Road Km 047.20-047.40 S 0.20 1320 Regional Overlay 50mm @ IRI 7-9 2014 0.989 0.97 R250 Sylhet-Jakiganj Road Km 019.60-019.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.588 7.75 R250 Sylhet-Jakiganj Road Km 026.80-027.00 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.176 7.27 R250 Sylhet-Jakiganj Road Km 015.10-015.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.764 6.79 R250 Sylhet-Jakiganj Road Km 025.70-026.60 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.292 6.59 R250 Sylhet-Jakiganj Road Km 000.10-001.60 S 1.50 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 8.678 6.50 R250 Sylhet-Jakiganj Road Km 021.90-022.30 S 0.40 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 2.352 6.48 R250 Sylhet-Jakiganj Road Km 020.80-021.80 S 1.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.880 6.39 R250 Sylhet-Jakiganj Road Km 027.10-028.30 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.056 6.28 R250 Sylhet-Jakiganj Road Km 028.80-032.90 S 4.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 24.022 6.28 R250 Sylhet-Jakiganj Road Km 022.70-025.70 S 3.00 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 17.640 6.23 R250 Sylhet-Jakiganj Road Km 017.10-018.00 S 0.90 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 5.292 6.20 R250 Sylhet-Jakiganj Road Km 033.00-036.20 S 3.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 18.480 6.19 R250 Sylhet-Jakiganj Road Km 036.20-039.80 S 3.60 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 20.790 5.72 R251 Golapganj-Vadeswar Road Km 004.90-005.00 S 0.10 3970 Regional Overlay 50mm @ IRI 5-7 2014 0.494 2.59 R251 Golapganj-Vadeswar Road Km 007.10-009.40 S 2.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 13.283 6.04 R280 Sylhet-Sunamganj Road Km 012.60-012.90 S 0.30 5170 Regional DBST 25mm Traff 4000-600 2014 0.731 4.87 R280 Sylhet-Sunamganj Road Km 013.10-014.80 S 1.70 5170 Regional DBST 25mm Traff 4000-600 2014 4.141 4.61 R280 Sylhet-Sunamganj Road Km 007.30-010.50 S 3.20 5170 Regional DBST 25mm Traff 4000-600 2014 7.795 4.56 R280 Sylhet-Sunamganj Road Km 019.60-019.70 S 0.10 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 0.609 6.66 R280 Sylhet-Sunamganj Road Km 006.20-006.90 S 0.70 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 4.263 6.41 R280 Sylhet-Sunamganj Road Km 015.50-016.70 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.308 6.21 R280 Sylhet-Sunamganj Road Km 016.80-018.00 S 1.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 7.308 5.75 R280 Sylhet-Sunamganj Road Km 015.10-015.40 S 0.30 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.827 5.43 R280 Sylhet-Sunamganj Road Km 020.40-020.48 S 0.08 4275 Regional Overlay 60mm @ IRI 7-9 2014 0.487 4.16

Appendix-B Page: 64 of 65 Appendix-B 1st Year Periodic Works of National and Regional Roads Million Taka Annual Needs Report 2014 (Excluding Ongoing)

Road Cway Length Road Fin Cost NPV/ Road Name Chainage AADT WorkName Year No Side (km) Class (Mill Tk) Cost R281 Rajnagar-Charkhai Road Km 070.00-073.50 S 3.50 5170 Regional DBST 25mm Traff 4000-600 2014 8.232 4.78 R281 Rajnagar-Charkhai Road Km 080.60-082.98 S 2.38 5170 Regional DBST 25mm Traff 4000-600 2014 5.486 4.77 R281 Rajnagar-Charkhai Road Km 077.10-080.40 S 3.30 5170 Regional DBST 25mm Traff 4000-600 2014 7.623 4.67 R281 Rajnagar-Charkhai Road Km 062.40-062.70 S 0.30 1813 Regional DBST 25mm Traff All 2014 0.706 0.18 R281 Rajnagar-Charkhai Road Km 061.80-062.40 S 0.60 1813 Regional Overlay 50mm @ IRI 5-7 2014 2.967 0.74 R281 Rajnagar-Charkhai Road Km 076.60-076.80 S 0.20 5170 Regional Overlay 60mm @ IRI 5.5-9 2014 1.155 6.56 Sub-total Sylhet Division 1,745.05 Total Sylhet Zone 3,360.37 Grand Total 21,632.57

Appendix-B Page: 65 of 65