Options/Feasibility Study for the A23/A232 Fiveways Scheme

Total Page:16

File Type:pdf, Size:1020Kb

Options/Feasibility Study for the A23/A232 Fiveways Scheme Options/Feasibility Study for the A23/A232 Fiveways Scheme Transport for London 18 December 2013 Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme Notice This document and its contents have been prepared and are intended solely for Transport for London’s information and use in relation to the Options/feasibility study for the A23/A232 Fiveways scheme. Atkins Highways & Transportation assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 70 pages including the cover. Document history Job number: 5127130 Document ref: 5127130/FS/REP/001 Revision Purpose description Originated Checked Reviewed Authorised Date - Draft issue 05/12/13 A Final Issue 19/12/13 Client signoff Client Transport for London Project Fiveways Junction Improvement Document title Options/feasibility study for the A23/A232 Fiveways scheme Job no. 5127130 Copy no. Document 5127130/FS/REP/001 Rev A reference Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme Table of contents Chapter Pages Executive summary 5 1. Introduction 6 1.1. Client Brief 6 1.2. Aims of the Study 6 1.3. Background 6 1.4. Proposed Options 6 2. Existing Information 8 2.1. Location 8 2.2. Road Layout 8 2.3. Bridge Records 9 2.4. As Built Drawings 9 2.5. Health and Safety 9 2.6. Environment 9 2.7. Traffic 9 2.8. Accident Data 10 2.9. Statutory Undertakers Equipment 10 2.10. Network Rail Equipment / Geometry 10 2.11. Land Ownership 11 2.12. Geotechnical Information 11 2.13. Topographical Information 11 2.14. Drainage Details 11 3. General Design Constraints 12 3.1. Highways General Design Principles 12 3.2. Design Life 12 3.3. Design Speed 12 3.4. Cross Section 13 3.5. Horizontal Alignment 14 3.6. Vertical Alignment 16 3.7. Visibility 16 3.8. Loading 17 3.9. Vertical Clearance 17 3.10. Railway Lateral Clearance 17 3.11. Road Restraint Systems 17 3.12. Statutory Undertakers Equipment 18 3.13. Temporary Works/Traffic Management 18 3.14. Network Rail 21 3.15. Other Stakeholders 21 3.16. Architecture and Finishes 21 4. Highways Design Option Development 22 4.1. Existing Topography 22 4.2. Option 1 Parameters 23 4.3. Option 1A Parameters 26 4.4. Option 2 Parameters 29 5. Structural Design Option Development 30 5.1. Structural Attributes 30 5.2. Construction Sequence 33 Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme 5.3. Network Rail Consultation 33 6. Appraisal of Options 35 6.1. Description of Viable Options 35 6.2. Estimated Initial Capital Costs 44 6.3. Whole Life Costs 45 6.4. Outline Construction Programme 45 6.5. Key Risks 45 6.6. Departures from Standard 46 6.7. Advantages and Disadvantages 46 7. Health and Safety Considerations 50 8. Environmental Considerations 51 8.1. Potential Ecological Constraints 51 8.2. Environmental Management Plans 57 9. Conclusions 58 10. Recommendations 58 Appendices 59 Appendix A. Existing Bridge Record Information 60 Appendix B. Existing Statutory Undertaker’s Information 61 Appendix C. Drawings 62 Appendix D. Outline Design Programme 63 Appendix E. Outline Construction Programme 64 Appendix F. Project Risk Register 65 Appendix G. Designers’ Risk Assessment 66 Appendix H. Environmental Management Plans and Ecology Calendar 67 Appendix I. Topographical Survey Specification and Extent 68 Tables Table 3-1 Details of Proposed cross section 13 Table 3-2 Details of SSD for a 50kph urban design 16 Table 5-1 Information to be requested from Network Rail 34 Table 6-1 Construction Period and Railway Possessions 45 Figures Figure 2-1 Location Plan 8 Figure 3-1 Extract from TD 9/93 showing geometric parameters for a 50kph design speed 15 Figure 3-2 Typical Reinforced concrete H4a Parapet 18 Figure 4-1 Extract from TD 41/95 of a simple layout for a private access 24 Figure 4-2 Diverge Slip Road layouts 25 Figure 4-3 Diverge Slip Road dimensions 25 Figure 4-4 Merge Slip Road layouts 27 Figure 4-5 Merge Slip Road dimensions 27 Figure 4-6 TD 27/05 Slip Road Cross Section Details 28 Figure 6-1 Existing South Abutment and central trestle showing clearance to track 37 Figure 6-2 Existing North Abutment and adjacent platform 37 Figure 6-3 High Meads loop Construction 39 Figure 6-4 River Worth Keighley Construction 39 Figure 6-5 Wooferton Bridge Construction 40 Figure 6-6 Typical Piling Rig Layout 40 Figure 6-7 View of Existing Waddon Bridge from the station 41 Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme Executive summary Transport for London (TfL) is planning a scheme in the vicinity of Croydon’s Fiveways junction to improve capacity at the junction and support new developments in the wider area. This feasibility study considers three options, which were put forward by TfL, appraising the different variations within the options and this report provides the following deliverables for each option: Concept designs including any structural solution options; Structural design programme; Buildability risks and issues; Phasing of the works and buildability programme; Temporary works including traffic management; Recommendations In the absence of detailed costing for each of the options, together with the fact that traffic surveys and modelling have not been carried out, it is not possible to selected a preferred option for the scheme. Section 6.7 of this report discusses the advantages and disadvantages of each option. This discussion, together with cost analysis and traffic modelling will allow a reasoned comparison of the various options to be made, and will allow a preferred option to be selected. It is recommended that the additional required information discussed above, together with other recommendations discussed in section 9, is carried out in advance of the detailed design phase. Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme 1. Introduction 1.1. Client Brief Atkins has been commissioned by Transport for London (TfL) to undertake the feasibility study for the A23/A232 Fiveways scheme in accordance with its brief included in Tender Ref: tfl_scp_000027_task_24_co057. 1.2. Aims of the Study As stated in the client brief, the objective of the feasibility study is to consider three options, which were put forward by TfL, appraising the different variations within the options. This report provides the following deliverables for each option: Concept designs including any structural solution options; Structural design programme; Buildability risks and issues; Phasing of the works and buildability programme; Temporary works including traffic management; Recommendations 1.3. Background Fiveways junction in Croydon is a signalised junction between a number of roads – the A23 Purley Way to the north and south, the A232 Stafford Road to the north east, the B275 Denning Avenue to the east and the B271 Stafford Road to the south west. The junction is over-capacity, and traffic regularly builds up in the vicinity of the junction. The objective of the options proposed for this feasibility study is to alleviate the traffic feeding into the Fiveways junction. 1.4. Proposed Options The issues at Fiveways junction have been under investigation for some time, and TfL have developed two options to undertake feasibility and to undertake an analysis of the benefits of each option. The options considered are as follows: 1.4.1. Option 1 (and 1A): Elevated Link Road (ELR) connecting A232 Croydon Road and A232 Duppas Hill Road These options would keep both east and west-bound traffic on the A232 away from the Fiveways junction and any parallel running on the A23. The elevated section will run over the railways line and also cross the existing junction between the A232 Duppas Hill Road and the A232 Stafford Road. Option 1 takes the most direct route linking the A232, whereas The alignments for these options will be evaluated. The ELR will include a multi-span bridge. TfL has expressed aspirations to utilise, where appropriate, the spaces below the proposed bridge spans for commercial or private use purposes. Alternative structural solutions will be considered and the advantages and disadvantages of their attributes in the context of this feasibility study will be discussed. Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme 1.4.2. Option 2: Waddon Bridge replacement and widening of Epsom Road for two-way traffic This option proposes to replace the existing Waddon Station Bridge over the railway with a new replacement wider bridge. This is intended to provide more carriageway lanes and allow more traffic capacity on this short critical link where it carries both A23 and A232 traffic. Epsom Road is also proposed to be widened to allow a new two-way operation. This removes the need for Eastbound A232 traffic to use the Fiveways junction. Atkins Version 1.0 | 18 December 2013 Options/Feasibility Study for the A23/A232 Fiveways Scheme 2. Existing Information 2.1. Location Fiveways junction in Croydon is a junction between a number of roads – the A23 Purley Way to the north and south, the A232 Stafford Road to the north east, the B275 Denning Avenue to the east and the B271 Stafford Road to the south west. Fiveways Junction Figure 2-1 Location Plan 2.2. Road Layout The A23 road runs north-south providing a link between the M25/M23 and Kennington Park/Oval. The A23 passes to the west of Croydon, adjacent to Waddon Railway Station.
Recommended publications
  • Programmes and Investment Committee 11 October 2018
    Agenda Meeting: Programmes and Investment Committee Date: Thursday 11 October 2018 Time: 10.15am Place: Conference Rooms 1 and 2, Ground Floor, Palestra, 197 Blackfriars Road, London, SE1 8NJ Members Prof Greg Clark CBE (Chair) Dr Alice Maynard CBE Dr Nelson Ogunshakin OBE (Vice-Chair) Dr Nina Skorupska CBE Heidi Alexander Dr Lynn Sloman Ron Kalifa OBE Ben Story Copies of the papers and any attachments are available on tfl.gov.uk How We Are Governed. This meeting will be open to the public, except for where exempt information is being discussed as noted on the agenda. There is access for disabled people and induction loops are available. A guide for the press and public on attending and reporting meetings of local government bodies, including the use of film, photography, social media and other means is available on www.london.gov.uk/sites/default/files/Openness-in-Meetings.pdf. Further Information If you have questions, would like further information about the meeting or require special facilities please contact: Jamie Mordue, Senior Committee Officer; Tel: 020 7983 5537 Email: [email protected]. For media enquiries please contact the TfL Press Office; telephone: 0845 604 4141; email: [email protected] Howard Carter, General Counsel Wednesday 3 October 2018 Agenda Programmes and Investment Committee Thursday 11 October 2018 1 Apologies for Absence and Chair's Announcements 2 Declarations of Interests General Counsel Members are reminded that any interests in a matter under discussion must be declared at the start of the meeting, or at the commencement of the item of business.
    [Show full text]
  • Research on Weather Conditions and Their Relationship to Crashes December 31, 2020 6
    INVESTIGATION OF WEATHER CONDITIONS AND THEIR RELATIONSHIP TO CRASHES 1 Dr. Mark Anderson 2 Dr. Aemal J. Khattak 2 Muhammad Umer Farooq 1 John Cecava 3 Curtis Walker 1. Department of Earth and Atmospheric Sciences 2. Department of Civil & Environmental Engineering University of Nebraska-Lincoln Lincoln, NE 68583-0851 3. National Center for Atmospheric Research, Boulder, CO Sponsored by Nebraska Department of Transportation and U.S. Department of Transportation Federal Highway Administration December 31, 2020 TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. SPR-21 (20) M097 4. Title and Subtitle 5. Report Date Research on Weather conditions and their relationship to crashes December 31, 2020 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Dr. Mark Anderson, Dr. Aemal J. Khattak, Muhammad Umer Farooq, John 26-0514-0202-001 Cecava, Dr. Curtis Walker 9. Performing Organization Name and Address 10. Work Unit No. University of Nebraska-Lincoln 2200 Vine Street, PO Box 830851 11. Contract or Grant No. Lincoln, NE 68583-0851 SPR-21 (20) M097 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Nebraska Department of Transportation NDOT Final Report 1500 Nebraska 2 Lincoln, NE 68502 14. Sponsoring Agency Code 15. Supplementary Notes Conducted in cooperation with the U.S. Department of Transportation, Federal Highway Administration. 16. Abstract The objectives of the research were to conduct a seasonal investigation of when winter weather conditions are a factor in crashes reported in Nebraska, to perform statistical analyses on Nebraska crash and meteorological data and identify weather conditions causing the significant safety concerns, and to investigate whether knowing the snowfall amount and/or storm intensity/severity could be a precursor to the number and severity of crashes.
    [Show full text]
  • Travel from the UK
    Travel from the UK The University of Sussex campus is well served by public transport with Falmer train station on the south side of campus, and frequent buses on campus to and from Brighton. The adjoining A27 also gives good access by car. Train Falmer train station is directly opposite the University campus. Pedestrian access is through a subway under the A27 - follow signs for the University of Sussex (the University of Brighton has a campus at Falmer too). Falmer is on the line between Brighton and Lewes, about eight minutes' travel time in each direction. Four trains an hour go there during the day time. Visitors travelling via London and the west should take a train to Brighton and change there for Falmer. The journey time from London to Brighton is just under an hour. You can also change at Lewes for Falmer, if you are coming from the east. Falmer station National Rail Enquiries Coach National Express Coaches to Brighton depart from London Victoria Coach Station and arrive at Pool Valley in the centre of the city. Services are every hour during the day and take about two hours. Coaches also run to Brighton from Gatwick and Heathrow. From Pool Valley you need to walk 100 metres to the Old Steine where you can catch a bus direct to the University (see Local buses section below), or you can take a taxi. National Express Coaches Taxi Taxis are available at both Brighton and Lewes train stations and at many places in the centre of Brighton. It is about four miles (six kilometres) from central Brighton to the University.
    [Show full text]
  • IASON Final Report March 2004
    FINAL PUBLISHABLE REPORT CONTRACT N° : GRD1/2000/25351-SI2.316053 IASON PROJECT N° : SI2.316053 IASON DOCUMENTNUMBER: 04 3N 026 31671 ACRONYM : IASON TITLE : INTEGRATED ASSESSMENT OF SPATIAL ECONOMIC AND NETWORK EFFECTS OF TRANSPORT PROJECTS AND POLICIES PROJECT CO-ORDINATOR : • TNO PARTNERS : • NETR • UNIKARL • UNIV. LEEDS • CAU KIEL • IRPUD • RUG • NEA • ME & P • TRANSMAN • FUA • VTT REPORTING PERIOD : FROM APRIL 1, 2002 TO DECEMBER 31, 2003 PROJECT START DATE : APRIL 1, 2001 DURATION : 33 months Date of issue of this report : March, 2004 Project funded by the European Community under the ‘Competitive and Sustainable Growth’ Programme (1998- 2002) IASON Final Report March 2004 ASSESSING THE INDIRECT EFFECTS OF TRANSPORT PROJECTS AND POLICIES FINAL REPORT FOR PUBLICATION: CONCLUSIONS AND RECOMMENDATIONS FOR THE ASSESSMENT OF ECONOMIC IMPACTS OF TRANSPORT PROJECTS AND POLICIES IASON DELIVERABLE D10 The IASON Consortium March 2004 2 IASON Final Report March 2004 IASON GRD1/2000/25351 S12.316053 Integrated Appraisal of Spatial economic and Network effects of transport investments and policies FINAL PUBLISHABLE REPORT This document should be referenced as: Final Publishable Report: Conclusions and recommendations for the assessment of economic impacts of transport projects and policies, IASON (Integrated Appraisal of Spatial economic and Network effects of transport investments and policies) Deliverable D10. Funded by 5th Framework RTD Programme. TNO Inro, Delft, Netherlands, March 2004 Authors : Tavasszy, L.A., A. Burgess, G. Renes PROJECT INFORMATION Contract no: GRD1/2000/25351 S12.316053: Integrated Appraisal of Spatial economic and Network effects of transport investments and policies Website: www.inro.tno.nl/iason Commissioned by: European Commission – DG TREN; Fifth Framework Programme Lead Partner: TNO Inro, Delft (NL) Partners: TNO Inro (NL), CAU Kiel (De), FUA (Nl), IRPUD (D), ITS/UNIVLEEDS (UK), ME&P (UK), NEA (Nl), NETR (Fr), RUG (Nl), UNIKARL (De), TRANSMAN (Hu), VTT (Fi).
    [Show full text]
  • Modelling the Socio-Economic and Spatial Impacts of EU Transport Policy
    COMPETITIVE AND SUSTAINABLE GROWTH PROGRAMME Integrated Appraisal of Spatial economic and Network effects of transport investments and policies Deliverable 6: Modelling the Socio-economic and Spatial Impacts of EU Transport Policy Version 1 12th January 2004 Authors: Bröcker, J., Meyer, R., Schneekloth, N., Schürmann, C., Spiekermann, K., Wegener, M. Contract: GRD1/2000/25351 S12.316053 Project Coordinator: TNO Inro, Delft, Netherlands. Funded by the European Commission 5th Framework – Transport RTD IASON Partner Organisations TNO Inro (Nl), CAU Kiel (D), FUA (Nl), IRPUD (D), ITS/UNIVLEEDS (UK), ME&P (UK), NEA (Nl), NETR (Fr), RUG (Nl), UNIKARL (D), TRANSMAN (Hu), VTT (Fi). 3 IASON GRD1/2000/25351 S12.316053 Integrated Appraisal of Spatial economic and Network effects of transport investments and policies Deliverable 6: Modelling the Socio-economic and Spatial Impacts of EU Transport Policy This document should be referenced as: Bröcker, J., Meyer, R.., Schneekloth, N., Schürmann, C., Spiekermann, K., Wegener, M. (2004): Modelling the Socio-economic and Spatial Impacts of EU Transport Policy. IASON (Integrated Appraisal of Spatial economic and Network effects of transport investments and policies) Deliverable 6. Funded by 5th Framework RTD Programme. Kiel/Dortmund: Christian-Albrechts-Universität Kiel/Institut für Raumplanung, Universität Dortmund. 12 January 2004 Version No: 1.0 Authors: as above PROJECT INFORMATION Contract no: GRD1/2000/25351 SI2.316053: Integrated Appraisal of Spatial economic and Network effects of transport investments and policies Website: http://www.wt.tno.nl/iason/ Commissioned by: European Commission – DG TREN; Fifth Framework Programme Lead Partner: TNO Inro, Delft (Nl) Partners: TNO Inro (Nl), CAU Kiel (D), FUA (Nl), IRPUD (D), ITS/UNIVLEEDS (UK), ME&P (UK), NEA (Nl), NETR (Fr), RUG (Nl), UNIKARL (D), TRANSMAN (Hu), VTT (Fi).
    [Show full text]
  • Groundwater Flooding in Brighton & Hove
    Section 19 Flood Investigations Report Groundwater Flooding in Brighton and Hove City (February 2014) May 2014 Revision Schedule Rev Date Details Author Checked and Approved by 1 April 2014 M Moran N Fearnley 2 May 2014 Following comments from the EA and M Moran N Fearnley Southern Water (6/05/2014) 3 June 2014 Following comments from Southern Water M Moran N Fearnley Contents 1. Introduction............................................................................................................... 1 2. Groundwater Flood History...................................................................................... 5 3. Groundwater Flood Event - February 2014............................................................. 7 4. Recommendations.................................................................................................... 13 Figures Figure 1 Geological bedrock map. (Environment Agency) ....................................................... 3 Figure 2 Topography and Areas Affected in Brighton and Hove City – February 2014 ............ 4 Figure 3 Groundwater Levels – 2000/2001 ............................................................................... 5 Figure 4 Flood Event 2000/2001 ............................................................................................... 6 Figure 5 Ditchling Road - Rainfall (mm) .................................................................................... 7 Figure 6 High Park Farm - Rainfall (mm)..................................................................................
    [Show full text]
  • Investigation of Weather Conditions and Their Relationship to Crashes
    INVESTIGATION OF WEATHER CONDITIONS AND THEIR RELATIONSHIP TO CRASHES Dr. Mark Anderson1 Dr. Aemal J. Khattak2 Muhammad Umer Farooq2 John Cecava1 Curtis Walker3 1. Department of Earth and Atmospheric Sciences 2. Department of Civil & Environmental Engineering University of Nebraska-Lincoln Lincoln, NE 68583-0851 3. National Center for Atmospheric Research, Boulder, CO Sponsored by Nebraska Department of Transportation and U.S. Department of Transportation Federal Highway Administration December 31, 2020 TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. SPR-21 (20) M097 4. Title and Subtitle 5. Report Date Research on Weather conditions and their relationship to crashes December 31, 2020 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Dr. Mark Anderson, Dr. Aemal J. Khattak, Muhammad Umer Farooq, John 26-0514-0202-001 Cecava, Dr. Curtis Walker 9. Performing Organization Name and Address 10. Work Unit No. University of Nebraska-Lincoln 2200 Vine Street, PO Box 830851 11. Contract or Grant No. Lincoln, NE 68583-0851 SPR-21 (20) M097 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Nebraska Department of Transportation NDOT Final Report 1500 Nebraska 2 Lincoln, NE 68502 14. Sponsoring Agency Code 15. Supplementary Notes Conducted in cooperation with the U.S. Department of Transportation, Federal Highway Administration. 16. Abstract The objectives of the research were to conduct a seasonal investigation of when winter weather conditions are a factor in crashes reported in Nebraska, to perform statistical analyses on Nebraska crash and meteorological data and identify weather conditions causing the significant safety concerns, and to investigate whether knowing the snowfall amount and/or storm intensity/severity could be a precursor to the number and severity of crashes.
    [Show full text]
  • Welcome to the University of Sussex Our Campus
    the University. the port, take the train to London and travel from Victoria train station via Brighton. via station train Victoria from travel and London to train the take port, recognition of its exceptional interest. exceptional its of recognition A27 eastbound, signposted Lewes. Drivers from the east or west take the A27 direct to to direct A27 the take west or east the from Drivers Lewes. signposted eastbound, A27 Southampton, take the train to Brighton and change for Falmer. From any other other any From Falmer. for change and Brighton to train the take Southampton, the M23/A23 road towards Brighton. Before entering the centre of Brighton, join the the join Brighton, of centre the entering Before Brighton. towards road M23/A23 the educational buildings in the UK to be Grade I listed in in listed I Grade be to UK the in buildings educational Newhaven, which then has a direct train link to Falmer. From Portsmouth or or Portsmouth From Falmer. to link train direct a has then which Newhaven, Falmer on the south side of the A27. Visitors from London and the north should take take should north the and London from Visitors A27. the of side south the on Falmer Cross-channel car and passenger ferries operate between Dieppe in France and and France in Dieppe between operate ferries passenger and car Cross-channel Sussex on the north side of the A27; the University of Brighton also has a campus at at campus a has also Brighton of University the A27; the of side north the on Sussex status in 1993.
    [Show full text]
  • Vebraalto.Com
    Grange Road, Hove, East Sussex Guide price £375,000 Entrance Hall Bedroom One 13'20 x 11'69 Living Room 13'98 x 10'90 Bedroom Two 11;10 x 9'14 Kitchen 13'85 x 10'67 Bathroom Landing Garden A two bedroom terraced house situated in the highly residential area of Grange Road Two Bedrooms, Living Room, Kitchen, Bathroom, Garden Middleton Estates are delighted to offer to the Grange Road is the west of Hove and is market this two bedroom terraced house between Old Shoreham Road and Portland situated on Grange Road. Road which is a highly popular residential The property comprises of an entrance hall, area. bay front living room, spacious open kitchen It offers great access to a great selection of with under stairs cupboard and doors out onto independent shops and national retailers the rear garden. along Portland Road as well as being within The first floor has a main bedroom the front of reach of Aldrington, Portslade and Hove the house with built in wardrobes, the second Railway Stations, local bus services towards bedroom is of a good size which can fit a Brighton City Centre and good road links to double bed in and the bathroom comes with the A27/A23 road networks. a bath, separate shower and WC. Local schools to Grange Road including West The rear garden is very low maintenance with Hove Infants, St. Christopher’s, St. Andrew’s C of astro turf and its own outdoor spacious shed E, Aldrington C of E, Goldstone Primary, Hove which can be used as an office or for storage.
    [Show full text]
  • Investment Programme Report
    Transport for London investment programme report Quarter 4 2017/18 About Transport for London (TfL) Contents Part of the Greater London Authority We are moving ahead with many of family led by Mayor of London Sadiq London’s most significant infrastructure Khan, we are the integrated transport projects, using transport to unlock growth. authority responsible for delivering the We are working with partners on major Mayor’s aims for transport. projects like Crossrail 2 and the Bakerloo line extension that will deliver the new 4 Introduction 42 London Underground We have a key role in shaping what homes and jobs London and the UK need. 42 Stations life is like in London, helping to realise We are in the final phases of completing 47 Accessibility the Mayor’s vision for a ‘City for All the Elizabeth line which, when it opens, will 8 Mayor’s Transport Strategy 48 Track renewals Londoners’. We are committed to add 10 per cent to London’s rail capacity. themes in this report 50 Infrastructure renewals creating a fairer, greener, healthier 52 Rolling stock renewals and more prosperous city. The Mayor’s Supporting the delivery of high-density, 54 Signalling and control Transport Strategy sets a target for mixed-use developments that are 11 Safety 80 per cent of all journeys to be made planned around active and sustainable on foot, by cycle or using public travel will ensure that London’s growth 57 Surface transport by 2041. To make this a reality, is good growth. We also use our own 14 Business at a glance 57 Healthy Streets we prioritise health and the quality of land to provide thousands of new 64 Air quality and environment people’s experience in everything we do.
    [Show full text]
  • Homelees House, Dyke Road, Brighton, BN1 3JP
    Homelees House, Dyke Road, Brighton, BN1 3JP £120,000 1 1 1 C • Modern One Bedroom Retirement • Minimum Age of 60 Apartment • Popular Seven Dials Location • Brighton Mainline Railway Station (0.2 mile) • Communal Garden & Facilities • 2 Lifts & 24 Hour Emergency Apello Call System • Sold With No Onward Chain • Total Floor Area 41m²/441ft² The Property The Location A modern one bedroom apartment situated within Homelees House is situated on Dyke Road and a level walk of Seven Dials. The property forms offers an excellent location within the vibrant area part of a popular residential retirement residence, of Seven Dials. Seven Dials is a popular leafy area with a minimum age of sixty, having an on site of central Brighton which offers an eclectic variety manager, communal gardens, sitting room and of boutiques, cafés and amenities including a Co- laundry facilities. Well presented throughout, the operative, Post Office, The Flour Pot Bakery, The apartment comprises an entrance hall with walk- Gourmet Deli and The Good Companion. St in storage housing pre lagged hotwater tank, a Nicholas Rest Garden, with its neighbouring St modern shower room with low level WC, electric Nicholas Churchyard and Children’s Garden, is shower and sink with vanity storage below. There just a short walk away (0.2 mile). Brighton city is a modern kitchen with inset ceramic hob, white centre is within easy reach offering several high gloss base and wall units with white tiled attractions including the trendy North Laine (0.5 splash back, a through lounge/dining room with mile), Brighton Dome (0.6 mile) and Churchill double glazed bay window and a good size double Square Shopping Centre (0.5 mile).
    [Show full text]
  • Sussex RARE PLANT REGISTER of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens
    The Sussex RARE PLANT REGISTER of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens NB - Dummy Front Page The Sussex Rare Plant Register of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens Editor: Mary Briggs Record editors: Paul Harmes and Alan Knapp May 2001 Authors of species accounts Vascular plants: Frances Abraham (40), Mary Briggs (70), Beryl Clough (35), Pat Donovan (10), Paul Harmes (40), Arthur Hoare (10), Alan Knapp (65), David Lang (20), Trevor Lording (5), Rachel Nicholson (1), Tony Spiers (10), Nick Sturt (35), Rod Stern (25), Dennis Vinall (5) and Belinda Wheeler (1). Charophytes: (Stoneworts): Frances Abraham. Bryophytes: (Mosses and Liverworts): Rod Stern. Lichens: Simon Davey. Acknowledgements Seldom is it possible to produce a publication such as this without the input of a team of volunteers, backed by organisations sympathetic to the subject-matter, and this report is no exception. The records which form the basis for this work were made by the dedicated fieldwork of the members of the Sussex Botanical Recording Society (SBRS), The Botanical Society of the British Isles (BSBI), the British Bryological Society (BBS), The British Lichen Society (BLS) and other keen enthusiasts. This data is held by the nominated County Recorders. The Sussex Biodiversity Record Centre (SxBRC) compiled the tables of the Sussex rare Bryophytes and Lichens. It is important to note that the many contributors to the text gave their time freely and with generosity to ensure this work was completed within a tight timescale. Many of the contributions were typed by Rita Hemsley. Special thanks must go to Alan Knapp for compiling and formatting all the computerised text.
    [Show full text]