NAURANGPUR, SECTOR – 79, GURGAON by M/S BESTECH HALF YEARLY COMPLIANCE REPORT OF “GROUP HOUSING PROJECT” AT VILLAGE – NAURANGPUR, SECTOR – 79, GURGAON BY M/s BESTECH INDIA PVT. LTD. ADDRESS: BESTECH HOUSE, PLOT NO. – 124, SECTOR – 44, GURGAON DECEMBER 2015 COMPLIANCE REPORT 34 STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY HARYANA Bay No. 55-58, Prayatan Bhawan, Sector-2, PANCHKULA. No, SEIAAIHN2LE f l€g ,359 Dated:,. /C.)r.?q/i., To M/s Bestech India Pvt. Ltd. Bestech House, Plot 124, Sector-44, Gurgaon, Haryana. Subject: Environmental Clearance for proposed Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana. Dear Sir, This letter is in reference to your application no. Nil dated 27-05-2013 addressed to M.S. SEIAA, Haryana received on 27-05-2013 and subsequent letter dated 29-07-2013 seeking prior Environmental Clearance for the above project under the EiA Notification, 2006. The proporui has been appraised as per prescribed procedure in the light of provisions under the EIA Notificalion, 2006 on the basis of the mandatory documents enclosed with the application viz., Form-1, Forml-A, Conceptual Plan and additional clarifications furnished in response to the observations of the State Expert Appraisal Cornmittee (SEAC) constituted by MOEF, GOI vide their Notification 23 .3 .2012, in its meeting held on 04-09-2013 awarded "Gold" grading to the project. I2l it is inter-alia, noted that the project involves the construction of Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana on a plot alea of 40873.25 sqmt. The total built up area shall be 93503.70 sqmt. The project shall have 7 Towers * 1 basement + GF * maximurl 19 Floors. The Group Housing shall have 613 Dwelling units (521 General plots + 92 EWS). The maximum height of the building shall be 59.9 meters. The total water requirement shall be 500 KLD. The fresh water requirement shall be 293 KLD. The waste water generation shall be 355 KLD, which will be treated in the STP of 430 KLD capacities. The total por,ver requirement shall be 3053.40 KW which will be supplied by DHB\N. The Project Pt'oponent has proposed to develop green belt on 34.33o/o of pro.iect area (24oh tree plantation * 10.33% landscaping). The Project Proponent proposed to construct 10 rain water harvesting pits. The solid waste generation will be 1324.2 kg/day, The bio-degradable rvaste will be : i treated in the project areaby adopting appropriate technology. The total parking spaces :, ') i proposed are 989 ECS. t3l The State Expert Appraisai Committee, Haryana alter due consideration of the relevant documents submitted by the project proponent and additional clarification furnished in response to its observations have recorunended the grant of environmental clearance for the project mentioned above, subject to compliance with the stipulated fi ii r, f. 35 I i in its conditions. Accordingly, the State Environment Impact Assessment Authority SEAC to meeting held on 28-11-2013 decided to agree with the recotnntendations of 8(a) of EIA accord necessary environmental clearance for the project under Category general conditions Notification 2006 subject to the strict compliance with the specific and mentioned below:- PART A- SPECIFIC CONDITIONS:. Construction Phase:- ffistablish,,shallbeobtainedfromHaryanaStatePo11ution Control Board under Air and vy'ater Act and a copy shall be submitted to the SEIAA, Haryana before the start of any construction work at site' tzt A first aid room as proposed in the project report shall be provided both during construction and operational phase ofthe project' t3] ' Adequate drinking water and sanitary facilities should be provided for construction workers at the site. Provision should be rrade for mobile toilets' Open defecation by the laboures is strictly prohibited. The safe disposal of waste water and solid wastes generated during the constiuction phase should be ensured. for use in t4] All the topsoil excavated during oonstruction activities shouid be stored horticulture/landscape development within the project site' l5l The project proponent shall ensure that the building material required during disposal of construction phase is properly stored within the project area and construction waste should not create any adverse effect on the neighboring and should be disposed of after taking necessary precautions for . communities approval general safety and health aspects of people, only in approved sites with the of competent authoritY. materials, t6l Construction spoils, including bituminous material and other hazardous sites for such must not.be allowed to contaminate watercourses and the dump the ground water and material must be secured so that they should not leach into phase, should be disposed offas any hazardous waste generated during construction perapplicablerulesandnormswithnecessaryapprovaloftheHaryanaState Pollution Control Board. should be of ultra 171 The diesel generator sets to be used during construction phase (Protection) Rules .low sulphur diesel type and should conform to Environrrent prescribed for air and noise emission standards' in undergrottnd tanks and t8l The diesel required for operating DG sets shall be stored be taken. if required, clearance frorn Chief Controller of Explosives shall boih during day l9l Ambient noise levels should conform to the residential standards air and noise quality should and night. Incremental pollution loads on the arnbient becloselymonitoredduringconstructionphase.Adequatemeasuresshouldbe 36 phase, so as to taken to reduce ambient air and noise level during construction conform to the stipulated residential standards' per the provisions t10] FIy ash should be used as building material in the construction as August 2003' of Fly Ash Notification of Septembet 1999 and as amended on27th for various tlu Storm water control and its re-use as per GGWB and BIS standards be ensured. , applications should pre-mixed concrete' ll2l Water demand during construction should be reduced by use of curing agents and other best practices' I13] In view of the severe constrains in water supply augmentation in the region and CGWA sustainability of water resources, the developer will submit the NOC from provider specifying water extraction quantities and assurance from HUDA/ utility indicating source of water supply and quantity of water with details of intended use of water * potable and non-potable. Assurance is required for both SEIAA construction and operation stages separately. It shall be submitted to the and RO, MOEF, Chandigarh before the start of construction' . per Energy conservation Building [14] Roof should meet prescriptive requirement as Code by using appropriate thermal insulation material' I15]opaquewallshouldmeetprescriptiverequirementaSperEnergyConservation Building code which is proposed to be mandatory for all air conditioned spaces thermal while it is desirable for non-air-conditioned spaces by use of appropriate insulation material to fulfill requirement' for structural safety of the [16] The approval of the competent authority shall be obtained etc. aS per building on account ofearthquake, adequacy offire fighting equipments, lightening etc' If any National Building code including protection measures from conservation land is involved in the proposed site, clearance under Forest . forest Act shall be obtained from the competent Authority' t17]overexploitedgroundwaterandimpendingsevereshortageofwatersupplyinthe conservation plan' region requires the developer to reciraw the water and energy proposed development' Project Developer shall reduce the overall footprint of the proponentshailincorporatewaterefliciency/savingslleasuresaswellaswater to the SEIAA' reuse/recycling within 3 months and belbre start of construction Haryana and RO, MOEF, GOI, Chandigarh' tlslTheProjectProponentasstatedintheproposalshallconstructtrOrainwater the project premises' Rain harvesting pits fbr recharging the ground water within for silting chamber and . water harvesting pits shall be designed to make provisions pit' Maintenance budget and removal of floating matter before enlering harvesting personsresponsibleformaintenancemustbeprovided.Careshallalsobetaken pit' that contaminated water do not enter any RWH I19]Theprojectproponentshallprovideforadequatefiresafetymeasuresand instructions issued equipments as required by Haryana Fire Service Act,2009 and the project by the local Authority/Directorate of fire from time to time' Further from proponent shall take necessary permission regarding fire safety schemeaJoc competent AuthoritY as required. the DHB\rN for supply of 3053 t20l The Project Proponent shall obtain assurance from project will be KW of power supply before the start of construction. In no case externai operational solely on generators without any power supply from any ' power utilitY. project shall be l2l1 Detail calculation of power load and ultimate power load of the start of submitted to DHB\-rN under intimation to SEIAA Haryana before the the project construction. provisions shall be made for electrical infrastructure in area. any construction in the natural land 1221 The Project Proponent shall not raise from the depression / Nallah/water course and shall ensure that the natural flow Nallahiwater course is not obstructed' level of the building blocks 123] The Project Proponent shall keep the plinth per prescribed sufficiently above the level of the approach road to the Project as kept suitably so as by-laws. Levels of the other areas in the Projects shall also be to avoid flooding' does not exceed I24l construction shall be
Recommended publications
  • Village & Townwise Primary Census Abstract, Gurgaon, Part XIII a & B
    CENSUS OF INDIA 1981 SBRIES-6 HARYANA DISTRICT CENSUS HANDBOOK- PARTS XIII A & B VILLAGE & TOWN DIRECTORY VILLAGE & TOWNWISE PRIMARY CENSUS ABSTRACT GURGAON DISTRICT o. P. BHARADWAJ OF THE INDIAN ADMTNISTRATIVE SERVICE Director of Census Operations Haryana published by the Government of Haryana 1983 The name GUT9(uJn !"uppo$ed :c be u (:()t1V Upt form oj G1.t1'UgTom is traced to Daronachary«, the teacheT of "the Kuru princes-the Pandavas and }~auTavas. In the motif, Da1fOnIJi.CM1·rya i..s helping the little princes in ge-ttiHg their ball out oj the wif'lZ by c"r-eating a st11.ny oj a1"'7'01.tI$o He was engaged for training the-rn ·i.n archery by theiT grandfather Bhisma when the depicted incident t.oo,.:;· T(i'"(.qled to him CENSUS OF INDIA-1981 A-CENTRAL GOVERNMENT PUBLICATIONS 'fhe publications relating to Haryana bear Series No. 6 and will he published as follows: PartI~A Administration Report-Enumeration (for official use only) Part I-B Administration Report-Tabulation (for official use only) Part II-A General Popul[\tion Tables ') ~ combined Part Il-B primary Censu') Abstract J Part III General Economic Tables . Part IV Social and Cultural Tables / part V Migration Tables Part VI Fertility Tables Part VII Tables on Houses an.d Disabled Population Part ViiI Household Tables Part IX Special Tables on Scheduled Castes part X-A Town Directory Part X-B Survey Reports on selected towns P4rt x-C Survey Reports on selected villages Part XI Ethnographic notes and special studies on Scheduled Castes Part XII Census Atlas B-HARYrANA GOVERNMENT PUBLJCATIONS Parts XIII-A & B .
    [Show full text]
  • List of the Projects to Be Taken-Up in the 123Rd Meeting of SEIAA to Be Held on 11.03.2020 at 11:00 AM
    List of the projects to be taken-up in the 123rd meeting of SEIAA to be held on 11.03.2020 at 11:00 AM Sr. Name and Address of the Project Proponent Location of the Project Status No. 1 M/s Synergy Waste Management (P) Ltd. Environment Clearance for proposed “Common Bio-Medical Waste Treatment EC Facility (CBWTF) at Plot No. 66, Roz KaMeo Industrial Area, Sohna, Mewat, Haryana. 2 M/s Jewel Classic Hotels Pvt. Ltd. Environment Clearance for Hotel, Restaurant & Banquet Hall, Recreational Park Violation (EC) and Health Club “Noor Mahal” at Village Phusgarh, Distt. Karnal, Haryana. 3 HSIIDC Environment Clearance for Proposed Development of Sector-37 at Karnal, Complaint made by Sh. Haryana developed by HSIIDC. Vikram Singh 4 In the matter of O.A. No. 840 of 2019 as Ayush Garg V/s Union of India against illegal manufacturing of formaldehyde without Next date of hearing is obtaining Environment Clearance by M/s Om Chem under EIA Notification dated 14.09.2006. 03.04.2020 at NGT, New Delhi. 5 M/S Oasis Landmarks LLP Environment Clearance for Expansion of Group Housing Colony at Sec 88A & Site Visit report 89A, Village-Harsaru, Tehsil Gurgaon, Haryana received on 6 M/s Antariksh Warehousing & Logistics Parks Environment Clearance for Revision and Expansion of Warehouse and Logistic EC Park at Village Bhaproda, Tehsil Bahadurgarh, District Jhajjar, Haryana 7 M/s Consolidate Realtors Pvt. Ltd Environment for Expansion for expansion of Group Housing Project on area EC measuring 13.344 acres at Village-Badshahpur, Sector-67, Gurugram, Haryana. 8 M/s Balaji Infra.
    [Show full text]
  • Honda Motorcycle & Scooter India Pvt
    HONDA MOTORCYCLE & SCOOTER INDIA PVT LTD PLOT NO.1, SECTOR – 3. IMT MANESAR, DISTT GURGAON, HARYANA- 122050 www.honda2wheelersindia.com E-Business Dot Com Pvt. Ltd. is an authorized e- commerce service provider for “Honda Motorcycle & Scooter India Pvt Ltd, Manesar (Proper Format)” (Seller) to obtain rates online through www.steelez.com HONDA MOTORCYCLE & SCOOTER INDIA PVT LTD SELLER NAME PLOT NO.1, SECTOR – 3. IMT MANESAR, DIST GURGAON, HARYANA- 122050 E-BUSINESS DOT COM PVT LTD 14/2 SOUTH TUKOGANJ , INDORE AUCTION TO BE MADHYA PRADESH. CONDUCTED BY PH:-0731-4715403/12 MOB- 9996781272/9752492134 PORTAL :WWW.STEELEZ.COM 21ST JUNE 19. OPENING TIME 01:00 PM & CLOSING TIME 02:00 PM (WITH THE GAP OF 3 MINUTES BETWEEN EVERY LOT, FOR DETAILS PLS CHECK WEBSITE) DATE & TIME OF AUCTION (AUTO EXTENSION AS APPLICABLE) AUCTION WEBSITE : WWW.STEELEZ.COM BIDDING IN THE LAST MINUTES AND SECONDS SHOULD BE AVOIDED IN THE BIDDERS OWN INTEREST SPECIAL INSTRUCTIONS NEITHER THE SERVICE PROVIDER NOR SELLER WILL BE RESPONSIBLE FOR ANY LAPSES /FAILURE ON THE PART OF THE VENDOR, IN SUCH CASES. SCHEDULE OF PROGRAM INSPECTION OF MATERIAL TILL 20TH JUNE 19 HONDA MOTORCYCLE & SCOOTER INDIA PVT LTD VENUE OF INSPECTION PLOT NO.1, SECTOR – 3. IMT MANESAR, DIST GURGAON HARYANA- 122050 DD FAVORING HONDA MOTORCYCLE & SCOOTER INDIA PVT LTD PAYABLE AT NEW DELHI FOR DD EMD DETAILS AMOUNT REFERS DETAILS MENTIONED BELOW. (ONLY DD ACCEPTABLE). STRICTLY DEPOSIT TILL 20TH JUNE 2019 PARTICIPATION FEE (NOT 14750 RS - FOR ONE YEAR APPLICABLE FOR EXISTING 59000 RS – FOR LIFE TIME MEMBERS REGISTERED A/C DETAIL- IFSC CODE- HDFC0000036 WITH E-BUSINESS DOT BRANCH CODE-000036 COM PVT LTD.) A/C NO.
    [Show full text]
  • Risk Assessment & Hazard Management
    Expansion cum modification of IT park at Village - Ghatta, Sector -61, Gurugram, Haryana M/s Active Promoters Pvt. Ltd. & Others. Report of Functional Area Expert For “Risk Assessment & Hazard Management” (RH) Prepared and submitted by FAE- Mrs. Anuradha Sharma Study Period: Nov,2017 – Jan, 2018 Prepared by : Anuradha Sharma FAE-RH Cat “A” Page 1 Expansion cum modification of IT park at Village - Ghatta, Sector -61, Gurugram, Haryana M/s Active Promoters Pvt. Ltd. & Others. 1.0 INTRODUCTION Project Proponent: M/S Active Promoters Pvt Ltd & Others 1.1 Name of the Project: Expansion Cum Modification of IT Park 1.2 Location: At Village- Ghatta, Sector-61, Gurugram, Haryana 1.3 Project Category as per EIA Notification: 8 (b) Cat “b” 2.0 Project Identification Table 1.1: Project Description S. No. Items Details Name of the Project Expansion cum modification of IT Park by M/s Active 1 Promoters Pvt. Ltd. & Others. Serial No. in schedule 8(b) “Building & Construction Projects” as per MoEF 2 notification 14/9/2006 Proposed capacity/area/length/tonnage to Total area = 50,342.94 m2 be handled/command area/lease Total Built-up area = 2,48,179.10 m2 area/number of wells to be drilled 2 3 Permissible Ground Coverage @ 40% : 21,345.1 m Proposed Ground Coverage @35.50%: 15,308.66 m2 Permissible FAR: 1,47,620.32 m2 Achieved FAR : 1,46,944.40 m2 4 New/Expansion/Modernization Modification cum Expansion 5 Existing capacity/area etc. Existing Built up area- 2,13,417.52 m2 6 Category of project B 7 Does it attract the general condition? If No Yes, please specify 8 Does it attract the specific condition? If No Yes, please specify 9 i) Location of unit Village – Ghatta, Sector-61, Gurugram, Haryana ii) Khasra No.
    [Show full text]
  • 1158 of 2021 (@ out of Special Leave Petition (Civil) No.24520 of 2018)
    1 REPORTA BLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL No(s). 1158 of 2021 (@ out of Special Leave Petition (Civil) No.24520 of 2018) VED & ANR. …APPELLANTS VERSUS STATE OF HARYANA & ANR. …RESPONDENTS WITH CIVIL APPEAL No(s). 1159 of 2021 (@ out of Special Leave Petition (Civil) No. 30239 of 2018) WITH CIVIL APPEAL No(s). 1160-1197 of 2021 (@ out of Special Leave Petition (Civil) Nos. 3431-3468 of 2019) WITH CIVIL APPEAL No(s). 1198-1210 of 2021 (@ out of Special Leave Petition (Civil) Nos. 31256-31268 of 2018) WITH CIVIL APPEAL No(s). 1211-1218 of 2021 (@ out of Special Leave Petition (Civil) Nos. 31770-31777 of 2018) WITH CIVIL APPEAL No(s). 1219-1227 of 2021 (@ out of Special Leave Petition (Civil) No(s). 5753-5761 of 2021) (@ Diary No.32001 of 2018) WITH CIVIL APPEAL No(s). 1228 of 2021 (@ out of Special Leave Petition (Civil) No(s). 30237 of 2018) 2 WITH CIVIL APPEAL No(s). 1229 of 2021 (@ out of Special Leave Petition (Civil) No.30230 of 2018) WITH CIVIL APPEAL No(s). 1230 of 2021 (@ out of Special Leave Petition (Civil) No. 30235 of 2018) WITH CIVIL APPEAL No(s). 1231 of 2021 (@ out of Special Leave Petition (Civil) No. 3263 of 2019) WITH CIVIL APPEAL No(s). 1232-1233 of 2021 (@ out of Special Leave Petition (Civil) Nos.3273-3274 of 2019) WITH CIVIL APPEAL No(s). 1234-1240 of 2021 (@ out of Special Leave Petition (Civil) Nos.3266-3272 of 2019) WITH CIVIL APPEAL No(s).
    [Show full text]
  • Gurgaon-Manesar Urban Complex
    Trans.Inst.Indian Geographers ISSN 0970-9851 Gurgaon-Manesar Urban Complex Sheetal Sharma and Anjan Sen, Delhi Abstract Central National Capital Region/Central NCR is one of the four policy zones of National Capital Region (NCR) as per its Regional Plan 2021. Central NCR is an ‘inter-state functional region’ pivoted upon the National Capital Territory of Delhi (NCT of Delhi), and is successor to the Delhi Metropolitan Area (DMA). It comprises six urban complexes or zones, four in Haryana (Sonipat-Kundli, Bahadurgarh, Gurgaon-Manesar, and Faridabad- Ballabhgarh) and two in Uttar Pradesh (NOIDA and Ghaziabad-Loni). The study presents the levels of development in terms of urban influence on settlements, and functional hierarchy of settlements, in the Gurgaon-Manesar urban complex of Central NCR. The present study is a micro-level study, where all 120 settlements (both urban and rural) comprising Gurgaon- Manesar urban complex of Central NCR, form part of the study. The study is based upon secondary data sources, available from Census of India; at settlement level (both town and village) for the decennial years 1981, 1991 and 2001. The paper determines the level of urban influence and functional hierarchy in each settlement, at these three points of time, and analyses the changes occurring among them. The study reveals the occurrence of intra- regional differentials in demographic characteristics and infrastructural facilities. The study also emphasis on issues of development in rural settlements and growth centers, in the emerging urban complex within Central NCR. The work evaluates the role of Haryana Urban Development Authority in the current planning processes of development and formulates suitable indicators for development.
    [Show full text]
  • Haryana Government Town and Country Planning
    HARYANA GOVERNMENT TOWN AND COUNTRY PLANNING DEPARTMENT NOTIFICATION The 24th May, 2011 No.CCP(NCR)/FDP(G)/2011/1386 -In exercise of the powers conferred by Sub-Section (7) of Section 5 of the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963 ( Punjab Act 41 of 1963) and with reference to Haryana Government, Town and Country Planning Department, notification No. CCP (NCR) DDP (G)/ 2010 / 3785, dated the 4th October, 2010 and in supersession of all other notifications issued in this behalf from time to time, the Governor of Haryana hereby publishes the Final Development Plan 2025 AD for Gurgaon-Manesar Urban Complex, along with restrictions and conditions as given in Annexures A and B proposed to be made applicable to the controlled areas specified in Annexure B. Drawings 1. Gurgaon-Manesar Urban Complex Existing Land Use Plan Drawing No. DTP(G)1936/2010, dated the 16th April, 2010. 2. Gurgaon-Manesar Urban Complex Final Development Plan-2025 Drawing No. DTP(G) 2006 /2011, dated the 28th April, 2011. Annexure A Explanatory note on the Final Development Plan 2025 A.D. for the Controlled Area of Gurgaon- Manesar Urban Complex. Introduction: The Gurgaon-Manesar Urban Complex which is known for Automobile Industries, Modern Commercial Malls, Towers of Cyber Parks and Software Development is situated on prime location on National Highway Number 8, only at a distance of 4 kilometres from the Indra-Gandhi International Air Port and is well linked with all capitals of the world through airways. The name of this town emerged on the world map in 1972, when world fame Maruti Industry was set up in Gurgaon with the collaboration of Suzuki Company of Japan.
    [Show full text]
  • DBA-VOTING-LIST-2018.Pdf
    Sl.No. Name Address Bar Council Bar No. Phone Phone T.U.P. H.No-322/14, Jacubpura, 1 A.L.Sahni P/1007/1983 2 2321473 9313401837 Gurgaon H.No-763-A, Ist Floor, 2 Aakash Aggarwal Block-H, Palam Vihar, P/695/1999 4 9350840785 9910991353 Gurgaon. V.P.O. Dhunela, Post 3 Aakil Ali P/3239/2014 4051 9050300395 9813313823 Office Sohna, Gurgaon H.No-249,Sector-17-A 4 Aarti Bhalla P/2016/2015 4246 9350320004 Gurgaon. H.No-224/7, H.B. 5 Aarti Hans Colony, Sec-7 Ext, P/1398/2011 3061 9910383914 Gurgaon Vill- Udaka, PO-Sohna, 6 Aazad P/3601/2009 2544 9711115701 Distt- Gurgaon Gandhi Nagar Ward No. 7 Abdul Hamid 8 Opp Mewat Model P/778/1994 4054 8860481185 School Tauru. Vill-Rewasan, Teh -Nuh, 8 Abdul Rehman P/95/1998 6 9416256151 9813039030 Distt-Gurgaon PWO Housing Complex, B-2/301, Sector 43, 9 Abha Sinha Sushant Lok-I, Gurgaon P/1800/1999 4751 9871957449 At(P) C-6/6360, Vasant Kunj, New Delhi H.No-645/20, Gali No-6, 10 Abhai singh Yadav P/514/1977 3100 9250171144 Shivji Park, Gurgaon Abhey singh H.No.1434, Sec-15, Part- 0124- 11 P/1132/2001 8 9811198319 Dahima II, Gurgaon. 6568432 Resi-Vill-Dhanwa Pur, Abhey Singh 12 Po-Daulta Bad, Distt- P/857/1995 9 9811934070 Dahiya Gurgaon H.No-209/4, Subhash 13 Abhey Singla P/420/2007 2008 9999499932 9811779952 Nagar, Gur. H.No. 225, sector 15, 14 Abhijeet Gupta P/4107/2016 4757 9654010101 Part-I, Gurgaon.
    [Show full text]
  • Haryana Government Town and Country Planning Department Notification
    HARYANA GOVERNMENT TOWN AND COUNTRY PLANNING DEPARTMENT NOTIFICATION The 5th February, 2007 No. CCP (NCR) FDP (G) /2007/359 .-In exercise of the powers conferred by sub-section (7) of section 5 of the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963 (41 of 1963) and with reference to Haryana Government, Town and Country Planning Department, Notification No. CCP(NCR) DDP(G)/ 2006 /1697, dated the 11th July, 2006 and in supersession of all other notifications issued in this behalf from time to time, the Governor of Haryana hereby publishes the final development plan 2021 AD for Gurgaon-Manesar Urban Complex, along with restrictions and conditions as given in Annexures A and B proposed to be made applicable to the controlled areas specified in Annexure B. Drawings 1. Gurgaon-Manesar Urban Complex Existing Land Use Plan Drawing No. DTP(G)1405/05, dated the 22nd July, 2005. (already published vide Haryana Government, Town and Country Planning Department, Notification No. CCP(NCR) DDP(G)/ 2006 /1697, dated the 11th July, 2006). 2. Gurgaon -Manesar Urban Complex Final Development Plan-2021 Drawing No. DTP(G)1520/06, dated the 14th November, 2006. Annexure 'A' EXPLANATORY NOTE ON THE FINAL DEVELOPMENT PLAN 2021 A.D. FOR THE CONTROLLED AREA OF GURGAON-MANESAR URBAN COMPLEX. Introduction: The Gurgaon-Manesar Urban Complex which is known for Automobile Industries, Modern Commercial Malls, Towers of Cyber Parks and Software Development is situated on prime location on National Highway No. 8, only at a distance of 4 kilometers from the Indira-Gandhi International Air Port and is well linked with all capitals of the world through airways.
    [Show full text]
  • Form 9 Pataudi
    8/8/2019 Form9 Print ANNEXURE 5.8 (CHAPTER V, PARA 25) FORM 9 List of Applications for inclusion received in Form 6 Designated location identity (where Constituency (Assembly/£Parliamentary): PATAUDI(SC) Revision identity applications have been received) From date To date @ 2. Period of applications (covered in this list) 1. List number 01/08/2019 01/08/2019 3. Place of hearing* Serial Name of Father / Mother / $ Date of Name of Date of Time of number Husband and Place of residence of receipt claimant hearing* hearing* (Relationship)# application 1 01/08/2019 Shivam Abhey singh (F) 376, near airtel tower, Nanu kalan, , GURGAON MAMTA 01, WARD NO 8 JAIDEV COLONY, HAILY 2 01/08/2019 JOGINDER SINGH (H) YADAV MANDI, , GURGAON PRASHANT SATYA SWAROOP 127, MEHCHANA, FARRUKH 3 01/08/2019 CHAUHAN CHAUHAN (F) NAGAR, , GURGAON PRIYA 127, MEHCHANA, FARUKH NAGAR 4 01/08/2019 SATYA SWAROOP (F) CHAUHAN , , GURGAON BHANU SATYA 127, MEHCHANA, FARRUKH NAGAR 5 01/08/2019 PRATAP SWAROOP CHAUHAN (F) , , GURGAON CHAUHAN Mohinder Singh 6 01/08/2019 Jagdish Chander (F) 101, Ward No 7 , Tajnagar , , GURGAON 7 01/08/2019 ASHA MOHINDER SINGH (H) 101, TAJNAGAR, TAJNAGAR, , GURGAON 8 01/08/2019 Priyanka yadav rahul yadav (H) 41, jamalpur, jamalpur, , GURGAON 9 01/08/2019 BIMLA DEVI JAGMAL SINGH (H) 243, jamalpur, jamalpur, , GURGAON 10 01/08/2019 RAHUL JAGAT SINGH (M) 243, jamalpur, jamalpur, , GURGAON 11 01/08/2019 PUSHPA DEVI MADAN (H) 302, jamalpur, jamalpur, , GURGAON 12 01/08/2019 REETU RANI MANJEET KUMAR (H) 44/3, JAMALPUR, JAMALPUR, , GURGAON SANTOSH 13 01/08/2019
    [Show full text]
  • Construction Work of Bye Pass
    Construction Work of Bye Pass *276. SH. SATYA PARKASH JRAWTA, M.L.A.: Will the Deputy Chief Minister be pleased to state whether there is any proposal under consideration of the Government to start construction work of Bye Pass of Pataudi; if so, the time by which it is likely to be started? ____________________________________________________ DUSHYANT CHAUTALA, DEPUTY CHIEF MINISTER, HARYANA _________ Yes, Sir. However, no definite time frame for starting construction work can be given since work has not been awarded yet by the NHAI. STARRED ASSEMBLY QUESTION NO. 276 RAISED BY SH. SATYA PARKASH JRAWTA, M.L.A, PATAUDI ASSEMBLY CONSTITUENCY NOTE FOR PAD It is intimated that Gurugram-Pataudi-Rewari road was declared as “in-principle” National Highway by Ministry of Road Transport & Highways (MoRTH) vide letter no. NH-14012/30/2015-P&M dated 08.02.2016 and MoRTH desired to prepare Detailed Project Report (DPR) for this road. Accordingly, Haryana PWD B&R invited tenders for engagement of DPR consultant and on the basis of bid evaluation, tender based estimate was submitted to MoRTH in favor of M/s Xplorer Consultancy Services Pvt. Ltd. MoRTH approved the estimate and accorded administrative approval for preparation of DPR. The consultant submitted alignment report for the Gurugram-Pataudi-Rewari road and the alignment report was submitted to MoRTH for approval. Thereafter, alignment report was also approved by MoRTH. In the meantime, Gurugram-Pataudi-Rewari road was identified as Feeder route under Bharatmala Pariyojna and National Highways Authority of India (NHAI) appointed M/s RITES as consultant for preparation of Detailed Project Report (DPR) of this road.
    [Show full text]
  • List of the Projects to Be Taken-Up in the 118Th Meeting of SEIAA to Be Held on 12.06.2019 at 11:30 AM Sr. No. File No. Name
    List of the projects to be taken-up in the 118th meeting of SEIAA to be held on 12.06.2019 at 11:30 AM Sr. No. File No. Name and Address of the Project Proponent Location of the Project 1. SEIAA/HR/18/ 441 M/s Gurgaon Inforspace Ltd, A-23, New Office EC for Modification & Expansion of IT & ITES SEZ EC SEIAA/HR/19/96 Complex, Defence Colony, New Delhi-110024. project located at Village-Dundahera, Sector-21, Gurugram, Haryana 2. SEIAA/HR/19/24 M/s Agrasain Spaces LLP # A-59, Sector 11, Faridabad. ECfor Revision & Expansion of Affordable Group EC Housing Project located at Village Mujeri, Sector 70, Faridabad 3. SEIAA/HR/19/18 M/s Sai Aaina Farms Pvt. Ltd. EC for Expansion of Affordable Group Housing ToR Colony at Village- Badshahpur, Sector- 68, Gurugram, Haryana 4. SEIAA/HR/19/21 M/s Union Buildmart Pvt. Ltd. EC for Proposed Mixed Land Use colony under TOD EC Policy on land measuring 13.23 acres in Sector-113, Gurgaon Manesar Urban Complex, Gurgaon, Haryana 5. SEIAA/HR/19/42 M/s Nexus Infracon Pvt. Limited, Suncity Business EC for Affordable Group Housing Colony at Village EC Tower Kherki-Daula, Sector-76, Gurugram 6. SEIAA/HR/18/ 440 M/s Alesia Buildtech Pvt. Ltd. EC for construction of affordable group housing colony EC at revenue estate Village Riwazpur and Tikawali, SEIAA/HR/19/102 Sector 89, Faridabad, Haryana 7. SEIAA/HR/VIO/19/02 M/s Spaze Towers Pvt. Ltd. ECfor Commercial Complex “Spaze Arrow” at Village EC Naurangpur, Sector-78, Gurgaon, Haryana by Sh.
    [Show full text]