NAURANGPUR, SECTOR – 79, GURGAON by M/S BESTECH

NAURANGPUR, SECTOR – 79, GURGAON by M/S BESTECH

HALF YEARLY COMPLIANCE REPORT OF “GROUP HOUSING PROJECT” AT VILLAGE – NAURANGPUR, SECTOR – 79, GURGAON BY M/s BESTECH INDIA PVT. LTD. ADDRESS: BESTECH HOUSE, PLOT NO. – 124, SECTOR – 44, GURGAON DECEMBER 2015 COMPLIANCE REPORT 34 STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY HARYANA Bay No. 55-58, Prayatan Bhawan, Sector-2, PANCHKULA. No, SEIAAIHN2LE f l€g ,359 Dated:,. /C.)r.?q/i., To M/s Bestech India Pvt. Ltd. Bestech House, Plot 124, Sector-44, Gurgaon, Haryana. Subject: Environmental Clearance for proposed Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana. Dear Sir, This letter is in reference to your application no. Nil dated 27-05-2013 addressed to M.S. SEIAA, Haryana received on 27-05-2013 and subsequent letter dated 29-07-2013 seeking prior Environmental Clearance for the above project under the EiA Notification, 2006. The proporui has been appraised as per prescribed procedure in the light of provisions under the EIA Notificalion, 2006 on the basis of the mandatory documents enclosed with the application viz., Form-1, Forml-A, Conceptual Plan and additional clarifications furnished in response to the observations of the State Expert Appraisal Cornmittee (SEAC) constituted by MOEF, GOI vide their Notification 23 .3 .2012, in its meeting held on 04-09-2013 awarded "Gold" grading to the project. I2l it is inter-alia, noted that the project involves the construction of Group Housing Project at Village Naurangpur, Sector-79, Gurgaon, Haryana on a plot alea of 40873.25 sqmt. The total built up area shall be 93503.70 sqmt. The project shall have 7 Towers * 1 basement + GF * maximurl 19 Floors. The Group Housing shall have 613 Dwelling units (521 General plots + 92 EWS). The maximum height of the building shall be 59.9 meters. The total water requirement shall be 500 KLD. The fresh water requirement shall be 293 KLD. The waste water generation shall be 355 KLD, which will be treated in the STP of 430 KLD capacities. The total por,ver requirement shall be 3053.40 KW which will be supplied by DHB\N. The Project Pt'oponent has proposed to develop green belt on 34.33o/o of pro.iect area (24oh tree plantation * 10.33% landscaping). The Project Proponent proposed to construct 10 rain water harvesting pits. The solid waste generation will be 1324.2 kg/day, The bio-degradable rvaste will be : i treated in the project areaby adopting appropriate technology. The total parking spaces :, ') i proposed are 989 ECS. t3l The State Expert Appraisai Committee, Haryana alter due consideration of the relevant documents submitted by the project proponent and additional clarification furnished in response to its observations have recorunended the grant of environmental clearance for the project mentioned above, subject to compliance with the stipulated fi ii r, f. 35 I i in its conditions. Accordingly, the State Environment Impact Assessment Authority SEAC to meeting held on 28-11-2013 decided to agree with the recotnntendations of 8(a) of EIA accord necessary environmental clearance for the project under Category general conditions Notification 2006 subject to the strict compliance with the specific and mentioned below:- PART A- SPECIFIC CONDITIONS:. Construction Phase:- ffistablish,,shallbeobtainedfromHaryanaStatePo11ution Control Board under Air and vy'ater Act and a copy shall be submitted to the SEIAA, Haryana before the start of any construction work at site' tzt A first aid room as proposed in the project report shall be provided both during construction and operational phase ofthe project' t3] ' Adequate drinking water and sanitary facilities should be provided for construction workers at the site. Provision should be rrade for mobile toilets' Open defecation by the laboures is strictly prohibited. The safe disposal of waste water and solid wastes generated during the constiuction phase should be ensured. for use in t4] All the topsoil excavated during oonstruction activities shouid be stored horticulture/landscape development within the project site' l5l The project proponent shall ensure that the building material required during disposal of construction phase is properly stored within the project area and construction waste should not create any adverse effect on the neighboring and should be disposed of after taking necessary precautions for . communities approval general safety and health aspects of people, only in approved sites with the of competent authoritY. materials, t6l Construction spoils, including bituminous material and other hazardous sites for such must not.be allowed to contaminate watercourses and the dump the ground water and material must be secured so that they should not leach into phase, should be disposed offas any hazardous waste generated during construction perapplicablerulesandnormswithnecessaryapprovaloftheHaryanaState Pollution Control Board. should be of ultra 171 The diesel generator sets to be used during construction phase (Protection) Rules .low sulphur diesel type and should conform to Environrrent prescribed for air and noise emission standards' in undergrottnd tanks and t8l The diesel required for operating DG sets shall be stored be taken. if required, clearance frorn Chief Controller of Explosives shall boih during day l9l Ambient noise levels should conform to the residential standards air and noise quality should and night. Incremental pollution loads on the arnbient becloselymonitoredduringconstructionphase.Adequatemeasuresshouldbe 36 phase, so as to taken to reduce ambient air and noise level during construction conform to the stipulated residential standards' per the provisions t10] FIy ash should be used as building material in the construction as August 2003' of Fly Ash Notification of Septembet 1999 and as amended on27th for various tlu Storm water control and its re-use as per GGWB and BIS standards be ensured. , applications should pre-mixed concrete' ll2l Water demand during construction should be reduced by use of curing agents and other best practices' I13] In view of the severe constrains in water supply augmentation in the region and CGWA sustainability of water resources, the developer will submit the NOC from provider specifying water extraction quantities and assurance from HUDA/ utility indicating source of water supply and quantity of water with details of intended use of water * potable and non-potable. Assurance is required for both SEIAA construction and operation stages separately. It shall be submitted to the and RO, MOEF, Chandigarh before the start of construction' . per Energy conservation Building [14] Roof should meet prescriptive requirement as Code by using appropriate thermal insulation material' I15]opaquewallshouldmeetprescriptiverequirementaSperEnergyConservation Building code which is proposed to be mandatory for all air conditioned spaces thermal while it is desirable for non-air-conditioned spaces by use of appropriate insulation material to fulfill requirement' for structural safety of the [16] The approval of the competent authority shall be obtained etc. aS per building on account ofearthquake, adequacy offire fighting equipments, lightening etc' If any National Building code including protection measures from conservation land is involved in the proposed site, clearance under Forest . forest Act shall be obtained from the competent Authority' t17]overexploitedgroundwaterandimpendingsevereshortageofwatersupplyinthe conservation plan' region requires the developer to reciraw the water and energy proposed development' Project Developer shall reduce the overall footprint of the proponentshailincorporatewaterefliciency/savingslleasuresaswellaswater to the SEIAA' reuse/recycling within 3 months and belbre start of construction Haryana and RO, MOEF, GOI, Chandigarh' tlslTheProjectProponentasstatedintheproposalshallconstructtrOrainwater the project premises' Rain harvesting pits fbr recharging the ground water within for silting chamber and . water harvesting pits shall be designed to make provisions pit' Maintenance budget and removal of floating matter before enlering harvesting personsresponsibleformaintenancemustbeprovided.Careshallalsobetaken pit' that contaminated water do not enter any RWH I19]Theprojectproponentshallprovideforadequatefiresafetymeasuresand instructions issued equipments as required by Haryana Fire Service Act,2009 and the project by the local Authority/Directorate of fire from time to time' Further from proponent shall take necessary permission regarding fire safety schemeaJoc competent AuthoritY as required. the DHB\rN for supply of 3053 t20l The Project Proponent shall obtain assurance from project will be KW of power supply before the start of construction. In no case externai operational solely on generators without any power supply from any ' power utilitY. project shall be l2l1 Detail calculation of power load and ultimate power load of the start of submitted to DHB\-rN under intimation to SEIAA Haryana before the the project construction. provisions shall be made for electrical infrastructure in area. any construction in the natural land 1221 The Project Proponent shall not raise from the depression / Nallah/water course and shall ensure that the natural flow Nallahiwater course is not obstructed' level of the building blocks 123] The Project Proponent shall keep the plinth per prescribed sufficiently above the level of the approach road to the Project as kept suitably so as by-laws. Levels of the other areas in the Projects shall also be to avoid flooding' does not exceed I24l construction shall be

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    54 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us