List of Thermal Power Stations As on 31.03.2021

Total Page:16

File Type:pdf, Size:1020Kb

List of Thermal Power Stations As on 31.03.2021 Appendix-A LIST OF THERMAL POWER STATIONS AS ON 31.03.2021 Installed Sl. No. Region/State/UT Sector Owner Name of Project Prime Mover Unit No. Year of Comm. Capacity MW 1. Northern Region (NR) 1 Delhi State Sector IPGCL I.P. CCPP GT-Gas 1 30.000 1986 Delhi State Sector IPGCL I.P. CCPP GT-Gas 2 30.000 1986 Delhi State Sector IPGCL I.P. CCPP GT-Gas 3 30.000 1986 Delhi State Sector IPGCL I.P. CCPP GT-Gas 4 30.000 1986 Delhi State Sector IPGCL I.P. CCPP GT-Gas 5 30.000 1986 Delhi State Sector IPGCL I.P. CCPP GT-Gas 6 30.000 1986 Delhi State Sector IPGCL I.P. CCPP ST-Gas 7 30.000 1995 Delhi State Sector IPGCL I.P. CCPP ST-Gas 8 30.000 1995 Delhi State Sector IPGCL I.P. CCPP ST-Gas 9 30.000 1996 2 Delhi State Sector PPCL PRAGATI CCPP GT-Gas 1 104.600 2002 Delhi State Sector PPCL PRAGATI CCPP GT-Gas 2 104.600 2002 Delhi State Sector PPCL PRAGATI CCPP ST-Gas 3 121.200 2003 3 Delhi State Sector PPCL PRAGATI CCGT-III GT-Gas 1 250.000 2010 Delhi State Sector PPCL PRAGATI CCGT-III GT-Gas 2 250.000 2011 Delhi State Sector PPCL PRAGATI CCGT-III ST-Gas 3 250.000 2012 Delhi State Sector PPCL PRAGATI CCGT-III GT-Gas 4 250.000 2012 Delhi State Sector PPCL PRAGATI CCGT-III GT-Gas 5 250.000 2013 Delhi State Sector PPCL PRAGATI CCGT-III ST-Gas 6 250.000 2014 4 Delhi Private Sector TPDDL RITHALA CCPP GT-Gas 1 35.750 2010 Delhi Private Sector TPDDL RITHALA CCPP GT-Gas 2 35.750 2010 Delhi Private Sector TPDDL RITHALA CCPP ST-Gas 3 36.500 2011 Total (Delhi) 2208.400 5 Haryana State Sector HPGCL YAMUNA NAGAR TPS Steam 1 300.000 2007 Haryana State Sector HPGCL YAMUNA NAGAR TPS Steam 2 300.000 2008 6 Haryana State Sector HPGCL RAJIV GANDHI TPS Steam 1 600.000 2010 Haryana State Sector HPGCL RAJIV GANDHI TPS Steam 2 600.000 2010 7 Haryana State Sector HPGCL PANIPAT TPS Steam 6 210.000 2001 Haryana State Sector HPGCL PANIPAT TPS Steam 7 250.000 2004 Haryana State Sector HPGCL PANIPAT TPS Steam 8 250.000 2005 8 Haryana Private Sector JHAJJAR POWER LTD. MAHATMA GANDHI TPS Steam 1 660.000 2012 Haryana Private Sector JHAJJAR POWER LTD. MAHATMA GANDHI TPS Steam 2 660.000 2012 Total (Haryana) 3830.000 9 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 1 25.000 1989 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 2 25.000 1989 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 3 25.000 1989 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 4 25.000 1994 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 5 25.000 1994 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 6 25.000 1994 Jammu & Kashmir State Sector JKSPDC PAMPORE GPS (Liq.) GT-Gas 7 25.000 1995 Total (Jammu & Kashmir) 175.000 10 Punjab State Sector PSPCL GH TPS (LEH.MOH.) Steam 1 210.000 1997 Appendix-A LIST OF THERMAL POWER STATIONS AS ON 31.03.2021 Installed Sl. No. Region/State/UT Sector Owner Name of Project Prime Mover Unit No. Year of Comm. Capacity MW Punjab State Sector PSPCL GH TPS (LEH.MOH.) Steam 2 210.000 1998 Punjab State Sector PSPCL GH TPS (LEH.MOH.) Steam 3 250.000 2008 Punjab State Sector PSPCL GH TPS (LEH.MOH.) Steam 4 250.000 2008 11 Punjab State Sector PSPCL ROPAR TPS Steam 3 210.000 1988 Punjab State Sector PSPCL ROPAR TPS Steam 4 210.000 1989 Punjab State Sector PSPCL ROPAR TPS Steam 5 210.000 1992 Punjab State Sector PSPCL ROPAR TPS Steam 6 210.000 1993 12 Punjab Private Sector Nabha Power Ltd RAJPURA TPP Steam 1 700.000 2014 Punjab Private Sector Nabha Power Ltd RAJPURA TPP Steam 2 700.000 2014 13 Punjab Private Sector Talwandi Sabo Power Ltd TALWANDI SABO TPP Steam 1 660.000 2014 Punjab Private Sector Talwandi Sabo Power Ltd TALWANDI SABO TPP Steam 2 660.000 2015 Punjab Private Sector Talwandi Sabo Power Ltd TALWANDI SABO TPP Steam 3 660.000 2016 14 Punjab Private Sector GPGSL (GVK) GOINDWAL SAHIB TPP Steam 1 270.000 2016 Punjab Private Sector GPGSL (GVK) GOINDWAL SAHIB TPP Steam 2 270.000 2016 Total (Punjab) 5680.000 15 Rajasthan State Sector RRVUNL KOTA TPS Steam 1 110.000 1983 Rajasthan State Sector RRVUNL KOTA TPS Steam 2 110.000 1983 Rajasthan State Sector RRVUNL KOTA TPS Steam 3 210.000 1988 Rajasthan State Sector RRVUNL KOTA TPS Steam 4 210.000 1989 Rajasthan State Sector RRVUNL KOTA TPS Steam 5 210.000 1994 Rajasthan State Sector RRVUNL KOTA TPS Steam 6 195.000 2003 Rajasthan State Sector RRVUNL KOTA TPS Steam 7 195.000 2009 16 Rajasthan State Sector RRVUNL GIRAL TPS Steam 1 125.000 2007 Rajasthan State Sector RRVUNL GIRAL TPS Steam 2 125.000 2010 17 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 1 250.000 2009 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 2 250.000 2010 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 3 250.000 2013 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 4 250.000 2014 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 5 660.000 2017 Rajasthan State Sector RRVUNL CHHABRA TPP Steam 6 660.000 2019 18 Rajasthan State Sector RRVUNL SURATGARH TPS Steam 1 250.000 1998 Rajasthan State Sector RRVUNL SURATGARH TPS Steam 2 250.000 2000 Rajasthan State Sector RRVUNL SURATGARH TPS Steam 3 250.000 2001 Rajasthan State Sector RRVUNL SURATGARH TPS Steam 4 250.000 2002 Rajasthan State Sector RRVVNL SURATGARH TPS Steam 5 250.000 2003 Rajasthan State Sector RRVVNL SURATGARH TPS Steam 6 250.000 2009 Rajasthan State Sector RRVVNL SURATGARH TPS Steam 7 660.000 2020 19 Rajasthan State Sector RRVUNL KALISINDH TPS Steam 1 600.000 2014 Rajasthan State Sector RRVUNL KALISINDH TPS Steam 2 600.000 2015 20 Rajasthan State Sector RRVUNL DHOLPUR CCPP GT-Gas 1 110.000 2007 Rajasthan State Sector RRVUNL DHOLPUR CCPP GT-Gas 2 110.000 2007 Rajasthan State Sector RRVUNL DHOLPUR CCPP GT-Gas 3 110.000 2007 Appendix-A LIST OF THERMAL POWER STATIONS AS ON 31.03.2021 Installed Sl. No. Region/State/UT Sector Owner Name of Project Prime Mover Unit No. Year of Comm. Capacity MW 21 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 1 3.000 1994 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 2 35.500 1996 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 3 37.500 2002 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 4 37.800 2003 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 5 110.000 2013 Rajasthan State Sector RRVUNL RAMGARH CCPP GT-Gas 6 50.000 2013 22 Rajasthan Private Sector Adani Power Ltd KAWAI TPS Steam 1 660.000 2013 Rajasthan Private Sector Adani Power Ltd KAWAI TPS Steam 2 660.000 2013 23 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 1 135.000 2009 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 2 135.000 2010 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 3 135.000 2011 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 4 135.000 2011 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 5 135.000 2013 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 6 135.000 2013 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 7 135.000 2013 Rajasthan Private Sector RWPL (JSW) JALIPA KAPURDI TPP Steam 8 135.000 2013 Total (Rajasthan) 10173.800 24 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 1 210.000 1986 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 2 210.000 1987 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 3 210.000 1988 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 4 500.000 1993 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 5 500.000 1994 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 6 500.000 2015 Uttar Pardesh State Sector UPRVUNL ANPARA TPS Steam 7 500.000 2016 25 Uttar Pardesh State Sector UPRVUNL HARDUAGANJ TPS Steam 7 105.000 1978 Uttar Pardesh State Sector UPRVUNL HARDUAGANJ TPS Steam 8 250.000 2011 Uttar Pardesh State Sector UPRVUNL HARDUAGANJ TPS Steam 9 250.000 2012 26 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 7 94.000 1974 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 9 200.000 1980 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 10 200.000 1979 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 11 200.000 1977 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 12 200.000 1981 Uttar Pardesh State Sector UPRVUNL OBRA TPS Steam 13 200.000 1982 27 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 1 110.000 1984 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 2 110.000 1985 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 3 210.000 2006 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 4 210.000 2006 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 5 250.000 2012 Uttar Pardesh State Sector UPRVUNL PARICHHA TPS Steam 6 250.000 2013 28 Uttar Pardesh Private Sector BEPL KHAMBARKHERA TPS Steam 1 45.000 2011 Uttar Pardesh Private Sector BEPL KHAMBARKHERA TPS Steam 2 45.000 2011 29 Uttar Pardesh Private Sector BEPL MAQSOODPUR TPS Steam 1 45.000 2011 Appendix-A LIST OF THERMAL POWER STATIONS AS ON 31.03.2021 Installed Sl.
Recommended publications
  • M/S INDIAN OIL CORPORATION LIMITED
    SUBMISSION OF FORM-1 FOR PROPOSED LPG BOTTLING PLANT AT ADDITIONAL BUTI - BORI MIDC NAGPUR BY M/S INDIAN OIL CORPORATION LTD. SUBMITTED BY M/s INDIAN OIL CORPORATION LIMITED PREPARED BY M/s. ULTRA-TECH ENVIRONMENTAL LABORATORY AND CONSULTANCY (Gazzeted By MoEF) Unit No. 206, 224, 225 Jai Commercial Complex, Eastern Express Highway, Opp Cadbury Factory, Khopat, Thane (West) – 400 061 Tel: 022 2534 2776, Fax: 022 25429650, Email: [email protected] Website: www.ultratech.in Form 1 & ToR for EIA for FORM 1 (I) Basic Information S.No. Item Details 1. Name of the Project/s Proposed LPG Bottling Plant at Additional Buti- Bori MIDC Nagpur, Maharashtra by M/s Indian Oil Corporation Limited 2. S. No. in the schedule 6 (b) 3. Proposed capacity/ area/ length/ Type of Nos Capacity Total tonnage to be handled/ command Vessel Capacity area/ lease area/ number of wells to be Mounded 3 600 MT 1800 MT drilled Bullets The proposed project is located at Plot No:D- 143, Additional Buti-Bori MIDC, Nagpur 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. Total Plot Area – 16.7 ha (41.5 acres) 6. Category of Project i.e. ‘A’ or ‘B’ 6 (b), “B” 7. Does it attract the general condition? No If yes, please specify. 8. Does it attract the specific condition? No If yes, please specify. 9. Location Plot No:D- 143, Additional Buti-Bori MIDC, Nagpur Location Plan and Google Image are enclosed in Annexure II – Pre- Feasibility Report Plot/Survey/Khasra No Plot No: A–1 Annexure III – Lease Documents from Additional Buti Bori MIDC, Nagpur for 95 years Village Dudha Tehsil Hingna District Nagpur State Maharashtra 10.
    [Show full text]
  • Situation Report Nature of Hazard: Floods Current Situation
    India SITUATION REPORT NATURE OF HAZARD: FLOODS In Maharashtra Bhandara and Gondia were badly affected but situation has improved there. Andhra Pradesh situation is getting better in Khamam, East and West Godavary districts. Road connectivity getting restored and Communication is improving. People from the camps have started returning back. Flood Situation is under control as the Rivers in Andhra Pradesh are flowing at Low Flood Levels. In Surat situation is getting much better as Tapi at Ukai dam is flowing with falling trend In Maharashtra River Godavari is flowing below the danger level. In Maharashtra Konkan and Vidharbha regions have received heavy rainfall. Rainfall in Koyna is recorded at 24.9mm and Mahableshwar 18mm in Santa Cruz in Mumbai it is 11mm. The areas which received heavy rainfall in last 24 hours in Gujarat are Bhiloda, Himatnagar and Vadali in Sabarkantha district, Vav and Kankrej in Banskantha district and Visnagar in Mehsana. IMD Forecast; Yesterday’s (Aug16) depression over Orissa moved northwestwards and lay centred at 0830 hours IST of today, the 17th August, 2006 near Lat. 22.00 N and Long. 83.50 E, about 100 kms east of Champa. The system is likely to move in a northwesterly direction and weaken gradually. Under its influence, widespread rainfall with heavy to very heavy falls at few places are likely over Jharkhand and Chhattisgarh during next 24 hours. Widespread rainfall with heavy to very heavy falls at one or two places are also likely over Orissa, Vidarbha and east Madhya Pradesh during the same period
    [Show full text]
  • Oct Nov 2006
    Dams, Rivers & People VOL 4 ISSUE 9-10 OCT-NOV 2006 Rs 15/- Lead Piece Climate Change is Here – when will we wake up? There is increasing evidence that shows that Another recent report, titled Feeling the Heat from the ? climate change is already here. It is already Christian development agency Tearfund predicts that affecting the rainfall, floods, droughts, sea- Climate change threatens supplies of water for millions levels, land erosion and so on. of people in poorer countries. By 2050, five times as much land is likely to be under "extreme" drought as The frequency of extreme weather incidents is clearly now. "It's the extremes of water which are going to increasing, the unprecedented floods in Mumbai and provide the biggest threat to the developing world from Gujarat in 2005 and 2006, the unprecedented floods in climate change… droughts will tend to be longer, and Barmer this year the unusual rainfall deficit in Bihar and that's very bad news. Extreme droughts currently cover Assam this year are only a few of the recent incidents. about 2% of the world's land area, and that is going to 2005 has already been declared the warmest year in spread to about 10% by 2050." it said. The positive side recent times. of the Tearfund report is that simple measures to A recent study at the School of Oceanographic Studies "climate-proof" water problems, both drought and flood, of Jadavpur University (The Hindustan Times 011106) have proven to be very effective in some areas. In Niger, says that 70 000 people would be affected in the eastern the charity says that building low, stone dykes across and western part of the Suderbans due to rising sea contours has helped prevent runoff and get more water levels.
    [Show full text]
  • Severe Rainstorms in the Vidarbha Subdivision of Maharashtra State, India
    CLIMATE RESEARCH l Vol. 6: 275-281, 1996 Published June 13 Clim Res NOTE Severe rainstorms in the Vidarbha subdivision of Maharashtra State, India B. D. Kulkarni *, S. Nandargi Indian Institute of Tropical Meteorology, Dr. Homi Bhabha Road, Pune 411008. India ABSTRACT: This paper discusses the results of Depth-Area- the design engineers and hydrologists of this region Duration (DAD) analysis of the 8 most severe rainstorms that for estimating probable maximum flood (PMF) values, affected the Vidarbha subdiv~sion of Maharashtra State, which are required for the design of dam spillway Ind~a,dur~ng the 100 yr period from 1891 to 1990. It was found from this analvsis that rainstorms In June 1908. Julv 1930 and capacities as as verifying and checking the August 1912 yielded greater ramdepths for smaller areas, i.e. spillway capacities of existing dams and reservoirs and 11000 km2 and S25000 km2, and that the August 1986 rain- for takinq remedia] measures where necessary. storm yielded greater raindepths for all the larger areas, for 2. Rainfall climatology of Vidarbha. Areawise, Vi- measurement penods of 1 to 3 days The DAD raindepths of these severe rainstorms for different durat~onswill be useful darbha (about 97537 km2) is the second largest sub- for the desian- storm estimates of different water resources division of Maharashtra State. The rainfall characteris- projects in the Vidarbha region, as well as for checking the tics of this subdivision are governed to a large extent sp~llwaycapacity of existing dams. by its location in the central part of the country. The southwest or summer monsoon rainfall sets in over the KEY WORDS: Rainstorm .
    [Show full text]
  • GRMB Annual Report 2017-18
    Government of India Ministry of Water Resources, RD & GR Godavari River Management Board ANNUAL REPORT 2017-18 GODAVARI BASIN – Dakshina Ganga Origin Brahmagiri near Trimbakeshwar, Nasik Dist., Maharashtra Geographical Area 9.50 % of Total GA of India Area & Location Latitude - 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 4’ East Boundaries West: Western Ghats North: Satmala hills, the Ajanta range and the Mahadeo hills East: Eastern Ghats & the Bay of Bengal South: Balaghat & Mahadeo ranges stretching forth from eastern flank of the Western Ghats & the Anantgiri and other ranges of the hills and ridges separate the Gadavari basin from the Krishna basin. Catchment Area 3,12,812 Sq.km Length of the River 1465 km States Maharashtra (48.6%), Telangana (18.8%), Andhra Pradesh (4.5%), Chhattisgarh (10.9%), Madhya Pradesh (10.0%), Odisha (5.7%), Karnataka (1.4%) and Puducherry (Yanam) and emptying into Bay of Bengal Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Dams Gangapur Dam, Jayakwadi dam, Vishnupuri barrage, Ghatghar Dam, Upper Vaitarna reservoir, Sriram Sagar Dam, Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2017-18 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha, Errum Manzil, Hyderabad- 500082 FROM CHAIRMAN’S DESK It gives me immense pleasure to present the Annual Report of Godavari River Management Board (GRMB) for the year 2017-18.
    [Show full text]
  • Ecosurvey 2013 Eng.Pdf
    PREFACE ‘Economic Survey of Maharashtra’ is prepared by the Directorate of Economics and Statistics, Planning Department every year for presentation in the Budget Session of the State Legislature. The present publication for the year 2012-13 is the 52nd issue in the series. The information related to various socio-economic sectors of the economy alongwith indicators and trends, wherever available, are also provided for ready reference. 2. In an attempt to use latest available data for this publication, some of the data / estimates used are provisional. 3. This Directorate is thankful to the concerned Departments of Central, State Government and undertakings for providing useful information in time that enabled us to bring out this publication. S. M. Aparajit Director of Economics and Statistics, Government of Maharashtra Mumbai Dated : 19th March, 2013 ECONOMIC SURVEY OF MAHARASHTRA 2012-13 CONTENTS Subject Page No. Overview of the State 1 A. Maharashtra at a Glance 3 B. Maharashtra’s comparison with India 6 1. State Economy 9 2. Population 13 3. State Income 23 4. Prices and Public Distribution System 39 Prices Public Distribution System 5. Public Finance 57 6. Institutional Finance & Capital Market 73 7. Agriculture and Allied Activities 83 Agriculture Irrigation Horticulture Animal Husbandry Dairy Development Fisheries Forests and Social Forestry 8. Industry & Co-operation 111 Industry Co-operation 9. Infrastructure 137 Energy Transport & Communications 10. Social Sector 165 Education Public Health Women & Child Welfare Employment & Poverty Housing Water Supply & Sanitation Environment Conservation Social Justice 11. Human Development 227 Glossary 231 C. Selected Socio-economic indicators of States in India 236 Economic Survey of Maharashtra 2012-13 ANNEXURES Subject Page No.
    [Show full text]
  • Committee for Consultations on the Situation in Andhra Pradesh
    COMMITTEE FOR CONSULTATIONS ON THE SITUATION IN ANDHRA PRADESH REPORT December 2010 THE COMMITTEE CHAIRPERSON Shri Justice B N Srikrishna (Retd.) Former Judge, Supreme Court of India MEMBER SECRETARY Shri Vinod Kumar Duggal, IAS (Retd.) Former Home Secretary, Government of India MEMBERS Prof (Dr.) Ranbir Singh Vice Chancellor, National Law University, Delhi Dr. Abusaleh Shariff Chief Economist /Senior Fellow, National Council of Applied Economic Research, Delhi Prof (Dr.) Ravinder Kaur Department of Humanities and Social Sciences, IIT, Delhi The Inter State Council Secretariat (ISCS) provided full secretarial assistance including technical and budgetary support to the Committee C O N T E N T S VOLUME - I Prologue i Approach and Methodology iv Acknowledgements xii List of Tables, Figures, Appendices xvii Abbreviations xxix Chapter 1 Developments in Andhra Pradesh-A Historical Background 1 Chapter 2 Regional Economic and Equity Analysis 63 Chapter 3 Education and Health 125 Chapter 4 Water Resources, Irrigation and Power Development 177 Chapter 5 Public Employment Issues 245 Chapter 6 Issues Relating to Hyderabad Metropolis 295 Chapter 7 Sociological and Cultural Issues 341 Chapter 8 Law & Order and Internal Security Dimensions 423 Chapter 9 The Way Forward 425 VOLUME - II Appendices 1-173 Index 174 “In ages long past a great son of India, the Buddha, said that the only real victory was one in which all were equally victorious and there was defeat for no one. In the world today that is the only practical victory; any other way will lead to disaster”. Pt. Jawaharlal Nehru speaking on „Disputes and Discord‟ in the United Nations General Assembly on October 3, 1960 Prologue It has not been an easy task.
    [Show full text]
  • State Textile Policy 2018-23 Government of Maharashtra Co
    State Textile Policy 2018-23 Government of Maharashtra Co-operation, Marketing and Textile Department Government Resolution No.: Policy 2017/C.R. 6/Text-5 Mantralaya, Mumbai 400 032 Dated 17th February, 2018 Introduction: Maharashtra State, covering the western and central parts of the country, is blessed with a 720km long coastal line of the Arabian Sea. The Sahyadri range of the Western Ghats forms the natural backbone of the State, with the Satpura range in the north and Bhamragadh- Chiroli- Gaikhuri ranges in the east forming its natural boundaries. The State is surrounded by Gujarat in the Northwest, Madhya Pradesh in the North, Chhattisgarh in the East, Telangana in the Southeast, Karnataka in the South and Goa in the Southwest. As per the Census 2011, the State has a population of 11.24 crore, accounting for 9.3% of the total population of the country and ranks second nationally. Its geographical area is 3.08 lakh sq.km. The State is highly urbanized at 45.2%. Many leading corporates and financial institutions have established their headquarters in Mumbai, which is the capital of the State and also the commercial capital of the country. The leading stock market, the capital market and commodity exchange centers of India are situated in Mumbai. The State has 36 districts, divided into six revenue divisions, viz. Mumbai, Nashik, Pune, Aurangabad, Amravati and Nagpur. Agriculture is the main occupation in Maharashtra. Both, food as well as cash crops are cultivated in the State. Well developed infrastructure facilities, abundant natural resources, good connectivity with the rest of the country through all modes, skilled manpower and quality education have made Maharashtra an ideal business destination for existing as well upcoming industries.
    [Show full text]
  • Agriculture Practices Sustainability in Vidarbha
    IOSR Journal of Agriculture and Veterinary Science (IOSR-JAVS) e-ISSN: 2319-2380, p-ISSN: 2319-2372. Volume 9, Issue 7 Ver. I (July 2016), PP 05-10 www.iosrjournals.org Agriculture Practices Sustainability in Vidarbha Dr. Raju M. Thakare1, Kalpana R. Thakare (Kawathekar)2, 1Director, Online computer academy, Nagpur, M.S., India, 2Research Scholarand Associate Prof., Dept. of Architecture, K.I.T.S., Ramtek, Dist. Nagpur, M.S.,India. Abstract: Agriculture is a largest economic sector and plays a very significant role in the socio economic development of our country, which is now in crises. The farmers of various states particularly in Maharashtra are in distress due to multiple factors ending in suicide in large scale. Farmer’s suicides in growing numbers throughout the states of Maharashtra, Karnataka, Andhra Pradesh, and Punjab is the most crucial problem and calls for the topmost priority in the agenda of rulers & policy makers. The suicidal trend set in 1991 by the farmers of Andhra Pradesh has spread to Maharashtra in 2000-01 and has been continued even today. Vidarbha is observed as the suicide prone/ danger zone of the state. In Vidarbha region more numbers of farmers have committed suicide to overcome the miseries due to various reasons viz. nonproduction of crops, bad debts, drought, lack of markets, marketing and irrigation facilities exploitation by private money lenders and other social and family causes arising out of the combination of various factors, but no one particular reason could be attributed to this saddest event of the mankind in the Indian history. The Rural Development agencies are coming in picture for the post suicidal help within their limits.
    [Show full text]
  • KONASEEMA ROAD PACKAGE (1 DAY) Konaseema Is a Nature Gift
    KONASEEMA ROAD PACKAGE (1 DAY ) Konaseema is a nature gift attracting every human being with its green plains, Coconut grooves and little islands in river godavari, Sea shore besides famour philigrim places viz., Ryali, Inavilli, Antharvedhi etc., Konaseema popularized as “Tourist Paradise” Mode of journey :By Non A/c.Hitech Buses / Tavera / Scarpio / Car Visiting places: Sl. No. Visiting place Name of the God / Holy place / Tourist spot 1 Kadiam/ Kadiapulanka World famous Flower and Ornamental Nurseries 2 Ryali Sri Jaganmohini Kesava Swamy Temple 3 Antharvedhi Sri Lakshmi Narasimha Swamy Temple, Beach 4 Inavilli Sri Varasiddi Vinayaka Swamy Temple 5 Dindi House Boat Unit and Coconut Country Resort Reporting place: Maruthi Mini Tours & Travels, Time: 7.00 AM ,Beside BPCL Petrol Bunk, Godavari Bund Road, RAJAHMUNDRY-1. Tourist occupancy Tariff per head Package includes (Rs) 2 packs by Car 850/- 3 packs by Car 600/- 4 packs by Car 450/- 5 packs by Scarpio / 560/- To and fro transportation only 6 packs by Scarpio 460/- 7 packas by Tavera / Innova 400/- 8 packs and above by Tavera / Mini Hitech Buses 350/- Tour Schedule : Time Details of journney Distance 7:00 AM Proceed to Kadiapulanka Visit flower nurseries. 15 KM 9:30 AM Reach Ryali, visit Sri Jaganmohini Kesava Swamy Temple 30 KM 12.00 noon Reach Dindi village of Razole mandal, visit “Coconut Country Resort, 55 KM House Boat Unit and Lunch Break and proceed to Antharvedhi 2.00 PM Reach Antharvedhi, visit Sri Lakshmi Narasimha Swamy Temple, 25 KM Beach, Godavari river confluence into bay of Bengal 5.30 PM Reach Sri Varasiddi Vinayaka Swamy Temple 60 KM 8.00 PM Reach Rajahmundry 65 KM Note:- The schedule will be modified by the Tour guide based on the circumstances..
    [Show full text]
  • Coal Power Station
    Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Coal Power Station ( Fly Ash , Bottom Ash & Flue Gas Desulfurization ) BY Tarek Ismail Kakhia 1 Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Contents No Item Page 1 Fossil - fuel power station 3 2 Chimney 11 3 Fly Ash -1 21 4 Fly Ash -2 44 5 Electrostatic precipitator 44 4 Bottom Ash 52 7 Flue - Gas Desulfurization ( FGD ) 53 8 Flue-gas emissions from fossil-fuel combustion 44 1 Flue - gas stack 47 10 Calcium Sulfite 72 11 Calcium bi sulfite 73 12 Calcium sulfate 74 2 Copyright © Tarek Kakhia. All rights reserved. http://tarek.kakhia.org Fossil - fuel power station Contents 1 Basic concepts o 1.1 Heat into mechanical energy 2 Fuel transport and delivery 3 Fuel processing 4 Steam - electric 5 Gas turbine plants 6 Reciprocating engines 7 Environmental impacts o 7.1 Carbon dioxide o 7.2 Particulate matter o 7.3 Radioactive trace elements o 7.4 Water and air contamination by coal ash . 7.4.1 Range of mercury contamination in fish 8 Greening of fossil fuel power plants o 8.1 Low NOx Burners o 8.2 Clean coal 9 Combined heat and power 10 Alternatives to fossil fuel power plants o 10.1 Relative cost by generation source - Introduction : A fossil - fuel power station is a power station that burns fossil fuels such as coal, natural gas or petroleum (oil) to produce electricity. Central station fossil - fuel power plants are designed on a large scale for continuous operation. In many countries, such plants provide most of the electrical energy used.
    [Show full text]
  • Pre-Feasibility Report Proposed Ajansara Barrage Project for Lift
    PRE-FEASIBILITY REPORT PROPOSED AJANSARA BARRAGE PROJECT M/s. Vidharbha FOR LIFT IRRIGATION CAPACITY:TOTAL 30004 CCA Irrigation Development at Village Ajansara, Taluka Hinganghat, District Wardha, Maharashtra Corporation (VIDC) STUDY PERIOD PROPOSED AJANSARA BARRAGE PROJECT FOR LIFT IRRIGATION FOR TOTAL 30004 CCA AND 24000 ICA AT VILLAGE AJANSARA, TALUKA HINGANGHAT, DISTRICT WARDHA, MS INDEX BY M/S. VIDHARBHA IRRIGATION DEVELOPMENT CORPORATION (VIDC) INDEX Sr. No. Particular Page No. 1 Executive Summary 1 2 INTRODUCTION OF THE PROJECT/ BACKGROUND 6 INFORMATION 2.1 Identification of project 6 2.2 Brief History of nature of the project 7 2.3 Need for the project and its importance to the country and 7 region 2.4 Benefit of Project 9 3 PROJECT DESCRIPTION 10 3.1 Type of project including interlinked and interdependent 10 projects, if any 3.2 Regulatory Frame Work 10 3.3 Location (map showing general location, specific location, 11 and project boundary & project site layout) with coordinates 3.4 Details of alternate sites considered and the basis of 21 selecting the proposed site, particularly the environmental considerations gone into should be highlighted 3.5 Size or magnitude of operation 21 3.6 Project description with process details (a schematic 21 diagram/ flow chart showing the project layout, components of the project etc. 3.6.1 Design Feature of Head Work 21 3.6.2 Rolled Filled Earth Dam 22 3.6.3 Barrage 23 3.6.4 Design of Barrage 23 3.6.5 Foundation of Barrage 23 4 IRRIGATION PLANNING 24 4.1 Existing and Proposed Facilities in Command Area 24 4.2 Existing and Proposed Cropping Patterns 24 4.3 Soil Survey 24 4.4 Evaporation Losses 25 5 SURVEY AND INVESTIGATION 25 5.1 Topographical Survey & Investigation 25 5.2 Survey for Barrage 25 5.3 Submergence Survey 25 5.4 Canal and Command Area Survey 25 5.5 Survey for Construction Material 25 5.6 Geotechnical Investigation 26 6 PROJECT HYDROLOGY 26 6.1 General Climate and Hydrology 26 6.2 Hydrological Data 27 6.2.1 Catchment Area 27 SMS Envocare Ltd.
    [Show full text]