KONASEEMA ROAD PACKAGE (1 DAY) Konaseema Is a Nature Gift

Total Page:16

File Type:pdf, Size:1020Kb

KONASEEMA ROAD PACKAGE (1 DAY) Konaseema Is a Nature Gift KONASEEMA ROAD PACKAGE (1 DAY ) Konaseema is a nature gift attracting every human being with its green plains, Coconut grooves and little islands in river godavari, Sea shore besides famour philigrim places viz., Ryali, Inavilli, Antharvedhi etc., Konaseema popularized as “Tourist Paradise” Mode of journey :By Non A/c.Hitech Buses / Tavera / Scarpio / Car Visiting places: Sl. No. Visiting place Name of the God / Holy place / Tourist spot 1 Kadiam/ Kadiapulanka World famous Flower and Ornamental Nurseries 2 Ryali Sri Jaganmohini Kesava Swamy Temple 3 Antharvedhi Sri Lakshmi Narasimha Swamy Temple, Beach 4 Inavilli Sri Varasiddi Vinayaka Swamy Temple 5 Dindi House Boat Unit and Coconut Country Resort Reporting place: Maruthi Mini Tours & Travels, Time: 7.00 AM ,Beside BPCL Petrol Bunk, Godavari Bund Road, RAJAHMUNDRY-1. Tourist occupancy Tariff per head Package includes (Rs) 2 packs by Car 850/- 3 packs by Car 600/- 4 packs by Car 450/- 5 packs by Scarpio / 560/- To and fro transportation only 6 packs by Scarpio 460/- 7 packas by Tavera / Innova 400/- 8 packs and above by Tavera / Mini Hitech Buses 350/- Tour Schedule : Time Details of journney Distance 7:00 AM Proceed to Kadiapulanka Visit flower nurseries. 15 KM 9:30 AM Reach Ryali, visit Sri Jaganmohini Kesava Swamy Temple 30 KM 12.00 noon Reach Dindi village of Razole mandal, visit “Coconut Country Resort, 55 KM House Boat Unit and Lunch Break and proceed to Antharvedhi 2.00 PM Reach Antharvedhi, visit Sri Lakshmi Narasimha Swamy Temple, 25 KM Beach, Godavari river confluence into bay of Bengal 5.30 PM Reach Sri Varasiddi Vinayaka Swamy Temple 60 KM 8.00 PM Reach Rajahmundry 65 KM Note:- The schedule will be modified by the Tour guide based on the circumstances..
Recommended publications
  • Committee for Consultations on the Situation in Andhra Pradesh
    COMMITTEE FOR CONSULTATIONS ON THE SITUATION IN ANDHRA PRADESH REPORT December 2010 THE COMMITTEE CHAIRPERSON Shri Justice B N Srikrishna (Retd.) Former Judge, Supreme Court of India MEMBER SECRETARY Shri Vinod Kumar Duggal, IAS (Retd.) Former Home Secretary, Government of India MEMBERS Prof (Dr.) Ranbir Singh Vice Chancellor, National Law University, Delhi Dr. Abusaleh Shariff Chief Economist /Senior Fellow, National Council of Applied Economic Research, Delhi Prof (Dr.) Ravinder Kaur Department of Humanities and Social Sciences, IIT, Delhi The Inter State Council Secretariat (ISCS) provided full secretarial assistance including technical and budgetary support to the Committee C O N T E N T S VOLUME - I Prologue i Approach and Methodology iv Acknowledgements xii List of Tables, Figures, Appendices xvii Abbreviations xxix Chapter 1 Developments in Andhra Pradesh-A Historical Background 1 Chapter 2 Regional Economic and Equity Analysis 63 Chapter 3 Education and Health 125 Chapter 4 Water Resources, Irrigation and Power Development 177 Chapter 5 Public Employment Issues 245 Chapter 6 Issues Relating to Hyderabad Metropolis 295 Chapter 7 Sociological and Cultural Issues 341 Chapter 8 Law & Order and Internal Security Dimensions 423 Chapter 9 The Way Forward 425 VOLUME - II Appendices 1-173 Index 174 “In ages long past a great son of India, the Buddha, said that the only real victory was one in which all were equally victorious and there was defeat for no one. In the world today that is the only practical victory; any other way will lead to disaster”. Pt. Jawaharlal Nehru speaking on „Disputes and Discord‟ in the United Nations General Assembly on October 3, 1960 Prologue It has not been an easy task.
    [Show full text]
  • Plundered Histories, Forgotten Terrains & Entangled People
    Plundered Histories, Forgotten Terrains & Entangled People ** (A critical search on Planning and Commission on Mining) Goldy M. George I. Conflict in Interest: Planning, Commissioning and Development In the early 1950s India embarked on a program of planned industrial development. Borrowing planning concepts from the Soviet Union, the government tried to stimulate 1 development through massive investment in the public sector, imposing a system of tight controls on foreign ownership of capital in India and playing a highly interventionist role in all aspects of economic policy. The private sector was allowed to continue to operate in agriculture and in a wide range of ‘non-essential’ industrial sectors.1 The steady economic growth of industries with active support from the state machinery is directly proportional to the unchecked exploitation of masses. Several instances of eviction, evacuation etc. had put before a long array of questions on the very edifice of mining and development. Marginalised communities such as Dalits, Adivasis, women, working class, etc. are the first victims of this. Though during the independence struggle “factory to the workers” prominently came on to the national agenda, nowhere in India it was implemented in the post independence era. Resultant displacement, migration, repercussion of workers, loss of land and livelihood, pilfering state revenue, forest resources, etc. has outgrown to monstrous magnitude. Decolonisation of erstwhile colonies invariably saw the elite take control of political power. Naturally they were inclined to capitalism preferring to inherit the colonial state – its laws, structure and character – rather than to transform it fundamentally in ways to respond to the most urgent needs of the oppressed sections.
    [Show full text]
  • ANSWERED ON:31.07.2017 Promotion of Eco-Tourism Mondal Smt
    GOVERNMENT OF INDIA TOURISM LOK SABHA UNSTARRED QUESTION NO:2449 ANSWERED ON:31.07.2017 Promotion of Eco-tourism Mondal Smt. Pratima;Pandula Dr. Ravindra Babu ;Patil Shri Bheemrao Baswanthrao;Ram Mohan Naidu Shri Kinjarapu;Sahu Shri Chandu Lal Will the Minister of TOURISM be pleased to state: (a) whether the Government has developed the concept of eco-tourism in the country; (b) if so, the details thereof along with the places identified in this regard, State/ UT-wise; (c) the details of projects undertaken for the promotion of eco-tourism in various States of the country, State/UT-wise including Andhra Pradesh along with the progress made in this regard; and (d) the funds allocated and expenditure incurred on the said projects during the last three years along with the revenue generated therefrom? Answer MINISTER OF STATE FOR TOURISM (INDEPENDENT CHARGE) (DR. MAHESH SHARMA) (a) to (d): Yes, Madam. Ministry of Tourism has identified Eco Circuit as one of the thirteen thematic circuits for development under Swadesh Darshan Scheme. The submission of project proposals by the State Governments/UT Administrations under Swadesh Darshan Scheme is a continuous process. The projects are sanctioned subject to availability of funds, liquidation of pending utilization certificates, submission of suitable Detailed Project Report and adherence to the scheme guidelines for creating tourist infrastructure facilities for public good. The details of projects sanctioned along with funds released under the Eco Circuit of Swadesh Darshan Scheme are given at Annexure. However, Ministry of Tourism has sanctioned two projects under the Coastal Circuit theme under Swadesh Darshan to State Government of Andhra Pradesh as detailed below: <pre> (Rs.
    [Show full text]
  • East Godavari District Annual Report
    OM SRI SAIRAM East Godavari District Annual Report st st from 1 April 2018 - 31 March 2019 Contents FOREWORD FROM THE DISTRICT PRESIDENT ............................................................... SRI SATHYA SAI SEVA ORGANISATIONS – AN INTRODUCTION ......................................... WINGS OF THE ORGANISATIONS .............................................................................................. ADMINISTRATION OF THE ORGANISATION ............................................................................... THE 9 POINT CODE OF CONDUCT AND 10 PRINCIPLES ...................................................................... SRI SATHYA SAI SEVA ORGANISATIONS, [EAST GODAWARI District] ................................. BRIEF HISTORY .................................................................................................................................... DIVINE VISIT .............................................................................................................................. OVERVIEW ................................................................................................................................ SAI CENTRES ....................................................................................................................................... ACTIVITIES ................................................................................................................................ OFFICE BEARERS ...............................................................................................................................
    [Show full text]
  • LIST of LICENSED BLOOD BANKS in INDIA * (February, 2015)
    LIST OF LICENSED BLOOD BANKS IN INDIA * (February, 2015) Sr. State Total No. of Blood Banks No. 1. Andaman and Nicobar Islands 03 2. Andhra Pradesh 140 3. Arunachal Pradesh 13 4. Assam 76 5. Bihar 84 6. Chandigarh 04 7. Chhattisgarh 49 8. Dadra and Nagar Haveli 01 9. Daman and Diu 02 10. Delhi (NCT) 72 11. Goa 05 12. Gujarat 136 13. Haryana 79 14. Himachal Pradesh 22 15. Jammu and Kashmir 31 16. Jharkhand 54 17. Karnataka 185 18. Kerala 172 19. Lakshadweep 01 20. Madhya Pradesh 144 21. Maharashtra 297 22. Manipur 05 23. Meghalaya 07 24. Mizoram 10 25. Nagaland 06 26. Odisha(Orissa) 91 27. Puducherry 18 28. Punjab 103 29. Rajasthan 102 30. Sikkim 03 31. Tamil Nadu 304 32. Telangana 151 33. Tripura 08 34. Uttar Pradesh 240 35. Uttarakhand 24 36. West Bengal 118 Total 2760 * List as received from the Zonal / Sub-Zonal Offices of CDSCO. Sr. No Sr.No Name and address of the Blood bank Central-wise State-wise (1). ANDAMAN & NICOBAR 1. 1) M/s G.B Pant Hospital, Atlanta Point, Port Blair-744104 2. 2) M/s I.N.H.S. Dhanvantri, Minni Bay, Port Blair-744103 3. 3) M/s Pillar Health Centre, Lamba Line, P.B. No.526, P.O.- Junglighat, Port Blair-744103 (2). ANDHRA PRADESH 4. 1) A.P.Vidya Vidhana Parishad Community Hospital Blood Bank, Hospital Road, Gudur-524101, Nellore Dist. 5. 2) A.S.N. Raju Charitable Trust Blood Bank, Door No. 24-1-1, R.K. Plaza (Sarovar Complex), J.P.
    [Show full text]
  • Konaseema Gas Power Limited
    +91-8048361271 Konaseema Gas Power Limited https://www.indiamart.com/konaseema-gas-power/ KONASEEMA GAS POWER LTD : 460 MW With the advent of Gas discoveries in the Krishna-Godavari (KG) Basin of A.P., the company has been conceived to generate power. In its constant endeavour to power the economy of the region and the ... About Us KONASEEMA GAS POWER LTD : 460 MW With the advent of Gas discoveries in the Krishna- Godavari (KG) Basin of A.P., the company has been conceived to generate power. In its constant endeavour to power the economy of the region and the nation at large, KONASEEMA GAS POWER LTD is born at the KONASEEMA Region in the vicinity of Natural Gas wells. The largest natural gas based combined cycle power plant in the private sector at Ravulapalam, near Rajahmundry in the East Godavari district in A.P., is testimony to our efforts in a humble manner to bring this predominantly agricultural region to Industrial Map of India. 445 MW Combined Cycle Power Plant (Phase-I) consists of two gas turbine generators from SIEMENS, A.G. Germany (model V94.2) with compatible triple pressure, natural circulation, heat recovery Steam Generators (HRSG), L&T make (CMI design) and a steam Turbine Generator of LMZ Russia make (type K-166-107) arranged in multi shaft configuration. The Gas turbines have the capability of firing liquid fuel as alternate fuel in exigencies. The Capital cost of the project is Rs. 2100 Crores. The Company has a Power Purchase agreement (PPA) with AP TRANSCO for a period of 23 years, to purchase power at 85% plant load factor.
    [Show full text]
  • Government of India Ministry of Tourism Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF TOURISM LOK SABHA UNSTARRED QUESTION NO.4575 ANSWERED ON 22.07.2019 DEVELOPMENT OF HOPE ISLAND IN ANDHRA PRADESH 4575. SHRIMATI VANGA GEETHA VISWANATH: Will the Minister of TOURISM be pleased to state: (a) whether the Government proposes to develop Hope Island in Kakinada, East Godavari district in Andhra Pradesh, Konaseema Circuit and Akhand Godavari under PRASAD scheme, Coastal tourism development circuits in Nellore District, setting up of restaurants with 7, 5 & 3 star hotels around Polavaram Projects to attract tourists; (b) if so, the details thereof and present status of each project in Andhra Pradesh; (c) the funds released/spent on each said project in Andhra Pradesh; and (d) the reasons for snail’s pace of work on the Hope Island Circuit in Kakinada, Andhra Pradesh? ANSWER MINISTER OF STATE FOR TOURISM (INDEPENDENT CHARGE) (SHRI PRAHLAD SINGH PATEL) (a) to (d): The Ministry of Tourism, under the Swadesh Darshan Scheme provides Central Financial Assistance to State Governments/Union Territory (UT) Administrations for development of thematic tourist circuits in the country, with the objective of improving connectivity and infrastructure of tourism destinations to enrich overall tourist experience, enhance livelihood and employment opportunities and to attract domestic as well as foreign tourists to the destinations. The projects for development are identified in consultation with the State Governments/UT Administrations and are sanctioned subject to submission of project proposals, their adherence to relevant scheme guidelines, submission of suitable detailed project reports, availability of funds and utilization of funds released earlier. Based on the above, the Ministry has sanctioned the following projects to the State of Andhra Pradesh – (Rs.
    [Show full text]
  • Appeal Tel: 41 22 791 6033 Fax: 41 22 791 6506 E-Mail: [email protected]
    150 route de Ferney, P.O. Box 2100 1211 Geneva 2, Switzerland Appeal Tel: 41 22 791 6033 Fax: 41 22 791 6506 E-mail: [email protected] India – Floods Coordinating Office Assistance to Flood Affected ( Revision 2) - ASIN62 Appeal Target: US$ 2,339,437 Balance Requested from the ACT Alliance: US$ 1,756,117 Geneva, 15 September 2006 Dear Colleagues, Torrential rains since the end of July have caused widespread flooding in the Indian states of Andhra Pradesh, Orissa, Madhya Pradesh, Gujarat, Maharashtra and Rajasthan. Many lives have been lost. The floods have also caused widespread damage to property, standing crops, flood control embankments and other basic infrastructure. People have lost their belongings in the swirling floodwaters and are facing a scarcity of food, drinking water, shelter and clothing. Those who have managed to escape to safety are currently deprived of the basic necessities of life. The loss to crops and livestock is massive. In addition, there is extensive damage to the general infrastructure, including that of the road and rail systems. This second revision of the appeal includes the assistance to flood affected families proposed by Church’s Auxiliary for Social Action (CASA) in the states of Orissa and Rajasthan and by Lutheran World Service India (LWSI) in the state of Orissa. The United Evangelical Lutheran Church in India (UELCI) proposal remains unchanged. This revision replaces the previous revision (1) issued 24 August 2006. ACT is a global alliance of churches and related agencies working to save lives and support communities in emergencies worldwide. The ACT Coordinating Office is based with the World Council of Churches (WCC) and The Lutheran World Federation (LWF) in Switzerland.
    [Show full text]
  • Materiovigilance: Concept, Structure and Emerging Perspective for Patient’S Safety in India
    Published online: 2020-08-03 Opinion Paper Thieme Materiovigilance: Concept, Structure and Emerging Perspective for Patient’s Safety in India Authors Farazul Hoda1, Rishabh Verma1, Mawrah Arshad1, Ali Nasir Siddiqui2, Mohammad Ahmed Khan1, Mohammad Akhtar1 , Abul Kalam Najmi1 Affiliations ABSTraCT 1 Department of Pharmacology, School of Pharmaceutical There has been an escalation in the number, diversity, and com- Education and Research, Jamia Hamdard, New Delhi, plexity of medical devices. Regulation of these devices has also India advanced due to the requirement of better regulatory perspec- 2 Department of Pharmaceutical Medicine, School of tive induced due to elevation in the number of adverse events Pharmaceutical Education and Research, Jamia Hamdard, associated with medical devices. All over the globe, various New Delhi, India measures are undertaken to provide better safety to the pa- tients along with attempts to improve the standard of medical Key words devices. The initial and ultimate objective of the concept hap- diagnostics, adverse drug reactions, drug regulation, drug pens to be unfailingly to ensure patient safety as well as impart research required guidance for both manufacturers and adept authori- ties enabling them to superintend cases coherently and ap- received 07.02.2020 propriately. Materiovigilance programme of India (MvPI) was accepted 29.05.2020 launched by the Drug Controller General of India at the Indian Pharmacopoeia commission (IPC) in Ghaziabad in 2015. The Bibliography main purpose of this initiative is to monitor adverse events DOI https://doi.org/10.1055/a-1195-1945 associated with medical devices in order to generate safety Published online: 3.8.2020 data, create awareness among the various stakeholders, and Drug Res 2020; 70: 429–436 prescribe best practices for patient safety.
    [Show full text]
  • 2020-2021 (As on 31 July, 2020)
    NATIONAL ASSESSMENT AND ACCREDITATION COUNCIL (NAAC) Universities accredited by NAAC having valid accreditations during the period 01.07.2020 to 30.06.2021 ACCREDITATION VALID S. NO. STATE NAME UPTO 1 Andhra Pradesh Acharya Nagarjuna University, Guntur – 522510 (Third Cycle) 12/15/2021 2 Andhra Pradesh Andhra University,Visakhapatnam–530003 (Third Cycle) 2/18/2023 Gandhi Institute of Technology and Management [GITAM] (Deemed-to-be-University u/s 3 of the UGC Act 1956), 3 Andhra Pradesh 3/27/2022 Rushikonda, Visakhapatnam – 530045 (Second Cycle) 4 Andhra Pradesh Jawaharlal Nehru Technological University Kakinada, East Godavari, Kakinada – 533003 (First Cycle) 5/1/2022 Rashtriya Sanskrit Vidyapeetha (Deemed-to-be-University u/s 3 of the UGC Act 1956), Tirupati – 517507 (Second 5 Andhra Pradesh 11/14/2020 Cycle) 6 Andhra Pradesh Sri Krishnadevaraya University Anantapur – 515003 (Third Cycle) 5/24/2021 7 Andhra Pradesh Sri Padmavati Mahila Visvavidyalayam, Tirupati – 517502 (Third Cycle) 9/15/2021 8 Andhra Pradesh Sri Venkateswara University, Tirupati, Chittoor - 517502 (Third Cycle) 6/8/2022 9 Andhra Pradesh Vignan's Foundation for Science Technology and Research Vadlamudi (First Cycle) 11/15/2020 10 Andhra Pradesh Yogi Vemana University Kadapa (Cuddapah) – 516003 (First Cycle) 1/18/2021 11 Andhra Pradesh Dravidian University ,Srinivasavanam, Kuppam,Chittoor - 517426 (First Cycle) 9/25/2023 Koneru Lakshmaiah Education Foundation (Deemed-to-be-University u/s 3 of the UGC Act 1956),Green Fields, 12 Andhra Pradesh 11/1/2023 Vaddeswaram,Guntur
    [Show full text]
  • List of Projects in Andhra Pradesh (As on 15/05/2018)
    List of Projects in Andhra Pradesh (as on 15/05/2018) Estimate S. Implementing Project Name Theme d Cost Project Status No. agency (Rs. Cr) 1 Upgradation of OB 1 & 2 for Iron Ore Handling - Phase 1 Port Modernization 395 VPT Completed 2 Development of WQ N (WQ-7 and WQ-8) - Vizag Port Modernization 243 VPT Completed 3 RFID system - Vizag Port Port Modernization 7 VPT Completed Supply, Erection, Testing and commissioning of 2 HMCs of 4 Port Modernization 39 VPT Completed capacity greater than 100MT at east quay berth - Vizag Port 5 2 to 4 laning of port road connectivity to NH – 5 (Phase II) Port Connectivity 77 VPT Completed Upgrading B.T Road from Burmah Shell area to security gate near Department of 6 Port Connectivity 15 Completed Sakthi Gas Plant at Kakinada Anchorage port Ports, GoAP 7 Road Connectivity of VPT to NH-16 (Phase II) Port Connectivity 77 NHAI Completed 8 Construction of coastal Berth at VPT Port Modernization 43 VPT Completed 9 Electrification of east yard revamped lines. 23.489 TKM Port Connectivity 20 VPT Completed Rail Connectivity to South Port of Krishnapatnam Port from 10 Port Connectivity 300 Indian Railways Completed Guduru 11 Krishnapatnam-Venkatachalam - Doubling with electrification Port Connectivity 87 Indian Railways Completed 12 Vishnupuram- Mellacheruvu New BG line Port Connectivity 378 Indian Railways Completed Development of Kakinada Hope Island Konaseema as World Class Coastal Community AP Forest 13 70 Completed Coastal & Eco-Tourism Circuit in Andhra Pradesh Development Department 14 Development of
    [Show full text]
  • Government of India Ministry of Power Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.428 ANSWERED ON 25.04.2013 HYDRO POWER GENERATION CAPACITY *428. SHRI KISHNBHAI V. PATEL: SHRI RAVNEET SINGH: Will the Minister of POWER be pleased to state: (a) whether there is any proposal to explore the potential of hydro power generation capacity in the country and invite Foreign Direct Investment (FDI) in the sector; (b) if so, the details thereof; (c) the target fixed for increasing the hydro power generation capacity during the 12th Five Year Plan period along with the funds proposed to be allocated/released and the steps taken/being taken by the Government to achieve the target; and (d) the locations identified for setting up of new hydro power projects in the country along with the steps being taken by the Government to remove the bottlenecks for construction of hydro power projects in the country? A N S W E R THE MINISTER OF STATE (INDEPENDENT CHARGE) OF THE MINISTRY OF POWER ( SHRI JYOTIRADITYA M. SCINDIA ) (a) to (d) : A Statement is laid on the Table of the House. ******* STATEMENT STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED QUESTION NO. 428 TO BE ANSWERED IN THE LOK SABHA ON 25.04.2013 REGARDING HYDRO POWER GENERATION CAPACITY. *********** (a) & (b): As per the re-assessment studies carried out by Central Electricity Authority (CEA) during 1978-1987, the hydro power potential in terms of Installed Capacity (I.C.) is estimated at 148701 MW out of which 145320 MW of the potential consists of hydro electric schemes having I.C.
    [Show full text]