7 BC12296(296) FEDERAL FUNDED PROJECTS Rs Charged

Total Page:16

File Type:pdf, Size:1020Kb

7 BC12296(296) FEDERAL FUNDED PROJECTS Rs Charged 7 BC12296(296) FEDERAL FUNDED PROJECTS Rs Charged: ______________ Voted: 48,025,289,000 ______________ Total: 48,025,289,000 ______________ ______________________________________________________________________________________________ Federal Funded Project ______________________________________________________________________________________________ Federal Funded Project ______________________________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 ______________________________________________________________________________________________ Rs Rs Rs 03 PUBLIC ORDER AND SAFETY AFFAIRS 032 POLICE 0321 POLICE 032102 PROVINCIAL POLICE QA7952 FPSDP. QA19005040 GWADAR SAFE CITY PROJECT PHASE-I (50:50) 50,000,000 576,136,000 A12470 Others 50,000,000 576,136,000 FPSDP.0662 QA19005039 RAISING OF BALOCHISTAN CONSTABULARY 88,053,000 BALOCHISTAN (REVISED) A12470 Others 88,053,000 8 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0421 AGRICULTURE 042103 AGRICULTURAL RESEARCH & EXTENSION SERVIC QA7954 FPSDP. QA19005077 IB-0644-NATIONAL PROGRAM FOR IMPROVEMENT OF 1,000,000,000 330,000,000 800,000,000 WATER COURSES & WATER STORAGE TANKS PHASE - II (BALOCHISTAN COMPONENT) 5 YEARS A09405 Workshop Equipment 1,000,000,000 330,000,000 800,000,000 FPSDP. QA19005078 NATIONAL OIL SEED ENHANCEMENT PROGRAM 70,000,000 28,000,000 50,000,000 (FEDERAL 40% SHARE RS. 386.418 MILLION) A09405 Workshop Equipment 70,000,000 28,000,000 50,000,000 FPSDP. QA19005079 NATIONAL AGRICULTURE EMERGENCY INCREASE 50,000,000 21,000,000 40,000,000 PRODUCTIVITY AND PROFITABILITY OF RICE. (FEDERAL 40% SHARE RS.220.636 MILLION) A09405 Workshop Equipment 50,000,000 21,000,000 40,000,000 FPSDP. QA19005080 NATIONAL AGRICULTURE EMERGENCY INCREASE 3,000,000 3,000,000 PRODUCTIVITY AND PROFITABILITY OF SUGARCANE. (FEDERAL 40% SHARE RS.2.140 MILLION) A09405 Workshop Equipment 3,000,000 3,000,000 9 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0421 AGRICULTURE 042103 AGRICULTURAL RESEARCH & EXTENSION SERVIC TB7954 FPSDP. TB19005076 CONSTRUCTION/ESTABLISHMENT OF COLD STORAGE 156,573,181 844,000 141,590,000 AND DATE PROCESSING UNIT DISTRICT TURBAT A09405 Workshop Equipment 156,573,181 844,000 141,590,000 10 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0421 AGRICULTURE 042106 ANIMAL HUSBANDRY QA7990 FPSDP. QA19005111 PRIME MINISTER'S INITIATIVE FOR SAVE THE CALF 25,000,000 27,120,000 54,339,000 (CALF FEEDLOT FATTENING IN PAKISTAN) (C03603) A09801 Livestock 25,000,000 27,120,000 54,339,000 FPSDP. QA19005110 PRIME MINISTER'S INITIATIVE FOR BACKYARD 3,000,000 8,306,000 15,000,000 POULTARY A09801 Livestock 3,000,000 8,306,000 15,000,000 11 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0422 IRRIGATION 042202 IRRIGATION DAMS AW7953 FPSDP.2021 AW21228019 Construction of Awaran Dam (SB) 1,500,000,000 A12270 Others 1,500,000,000 12 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0422 IRRIGATION 042202 IRRIGATION DAMS CG7953 FPSDP. CG19005091 CONSTRUCTION OF GENDERI STORAGE/DELAY ACTION 39,000,000 105,000,000 25,000,000 DAM KISHINGI AREA DISTRICT NOUSHKI (NI-0200) A12270 Others 39,000,000 105,000,000 25,000,000 FPSDP. CG19005060 KOH E MAHIM DELAY ACTION DAM CHAGAI 75,000,000 60,000,000 380,000,000 A12270 Others 75,000,000 60,000,000 380,000,000 FPSDP. CG19005104 CONSTRUCTION OF JULI STORAGE/DEKAT ACTION DAM 67,400,000 53,988,000 170,734,000 DISTRICT CHAGHI (CG-0204) A12270 Others 67,400,000 53,988,000 170,734,000 FPSDP. CG19005100 CONSTRUCTION OF MASHRAQI KOH-E-SULTAN 27,500,000 23,000,000 57,000,000 STORAGE/DELAY DISTRICT CHAGHI (CG-0201) A12270 Others 27,500,000 23,000,000 57,000,000 FPSDP. CG19005101 CONSTRUCTION OF POSTI STORAGE/DELAY ACTION 50,900,000 44,752,000 DAM AT BOOLO ARBAB IN DISTRICT CHAGHI (CG-0200) A12270 Others 50,900,000 44,752,000 FPSDP. CG19005103 CONSTRUCTION OF MASHICHAH STORAGE/DELAY 41,400,000 33,120,000 104,880,000 ACTION DAM DISTRICT CHAGHI (CG-0202) A12270 Others 41,400,000 33,120,000 104,880,000 FPSDP. CG19005102 CONSTRUCTION OF KARUDI STORAGE/DELAY ACTION 33,300,000 84,360,000 84,360,000 DAM DISTRICT CHAGHI (CG-0203) 13 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0422 IRRIGATION 042202 IRRIGATION DAMS CG7953 A12270 Others 33,300,000 84,360,000 84,360,000 14 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates Estimates 2020-2021 2020-2021 2021-2022 _______________________________________________________________________________ Rs Rs Rs 04 ECONOMIC AFFAIRS 042 AGRI,FOOD,IRRIGATION,FORESTRY & FISHING 0422 IRRIGATION 042202 IRRIGATION DAMS GR7953 FPSDP.1206 GR19005030 CONSTRUCTION OF DOSI DAM PASNI AREA DISTRICT 305,904,000 305,900,000 GWADAR (QA-9058) A12270 Others 305,904,000 305,900,000 FPSDP.1211 GR19005007 CONSTRUCTION OF BASOOL DAM TEHSIL ORMARA 1,968,480,000 2,297,693,000 1,000,000,000 DISTRICT GWADAR (QA-9O27) A12270 Others 1,968,480,000 2,297,693,000 1,000,000,000 FPSDP.1250 GR19005019 RE-CONSTRUCTION OF SHADI KAUR DAM DISTRICT 239,089,000 214,251,000 GWADAR (QA-9053) A12270 Others 239,089,000 214,251,000 15 BC12296(296) FEDERAL FUNDED PROJECTS (Capital) _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ Federal Funded Project _______________________________________________________________________________ P./ADP DDO Functional-Cum-Object Classification & Budget Revised Budget NO. NO. Particular Of Scheme Estimates Estimates
Recommended publications
  • Pakistan Public Expenditure Management, Volume II
    Report No. 25665-PK PAKISTAN Public Expenditure Management Accelerated Development of Water Resources and Irrigated Agriculture VOLUME II January 28, 2004 Environment and Social Development Sector Unit Rural Development Sector Unit South Asia Region Document of the World Bank CURRENCY EQUIVALENTS Currency Unit = Pakistan Rupee US $1 = PKR 57.8 FISCAL YEAR July 1-June 30 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank MIS Management information system ADP Annual Development Plan MOWP Ministry of Water and Power AWB Area Water Board MTEF Medium Term Expenditure Framework BCM Billion cubic meters MTIP Medium Term Investment Plan CCA Canal command area NDP National Drainage Program DMP Drainage Master Plan NDS National Drainage System EFR Environmental Flow Requirement NSDS National System Drainage Study EIRR Economic internal rate of return NWFP North West Frontier Province FATA Federally Administered Tribal Areas NWP National Water Policy FGW Fresh groundwater OFWM On-farm water management FO Farmer organization O&M Operations and Maintenance GDP Gross development product PIDA Provincial Irrigation and Drainage Authority GIS Geographic Information System POE Panel of Experts GOP Government of Pakistan PRHS Pakistan Rural Household Survey HYV High yielding variety PSDP Public Sector Development Program IBIS Indus basin irrigation system PV Present Value IDA International Development Association RAP Revised Action Plan IPPs Independent Power Producers RBOD Right Bank Outfall Drain IRSA Indus River System Authority SCARP Salinity control
    [Show full text]
  • NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS for ORAL ANSWERS and THEIR REPLIES” to Be Asked A
    1 (47th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Friday, the 6th October, 2017 66. *Shaikh Rohale Asghar: (Deferred during 46th Session.) Will the Minister for Religious Affairs and Inter-faith Harmony be pleased to refer to the Starred Question No.204 replied on 21-04-2017 and to state the total number of persons sent for Hajj-2017 by the Ministry under the Government Hajj Scheme and Private Hajj Scheme separately? Minister for Religious Affairs and Inter-faith Harmony (Sardar Muhammad Yousaf): With the approval of the Cabinet, 60% Hujjaj performed Hajj-2017 under the Governemnt Hajj Scheme and 40% Hujjaj under Private Hajj Scheme as per following detail:— —————————————————————————————— Description No. of Hujjaj —————————————————————————————— Government Hajj 107,526 Scheme (60%) Private Hajj Scheme 71,684 (40%) —————————————————————————————— Total:— 179,210 —————————————————————————————— 79. *Mr. Junaid Akbar: (Deferred during 46th Session.) Will the Minister for Religious Affairs and Inter-faith Harmony be pleased to state whether there is any proposal under consideration of 2 the Government to give priority to the persons to perform Hajj-2018 who were dropped in the draw held for Hajj-2017; if so, the details; if not, the alternate idea/proposal/programme therefor? Minister for Religious Affairs and Inter-faith Harmony (Sardar Muhammad Yousaf): Due to large number of unsuccessful hajj applicants in the past, there is no such proposal under consideration of the Government to give priority to those Hajj applicants who remained continuously unsuccessful during the last few years.
    [Show full text]
  • Federal PSDP 2018-19 Releases As on 21-12-2018 (Million Rupees)
    Federal PSDP 2018-19 Releases as on 21-12-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid AVIATION DIVISION 1Airport Security Force (ASF) 2,586.9 0.0 1,726.3 860.6 859.690 0.000 859.690 343.880 Accommodation at New Islamabad International Airport (Revised) 2Construction of Rain Water 2,228.0 0.0 1,920.7 307.3 307.260 0.000 307.260 70.000 Harvesting Kasana Dam, Islamabad 3Construction of Single Barrack at 38.5 0.0 21.4 17.1 17.120 0.000 17.120 6.848 DG Khan Airport 4Construction of Single Barrack for 17.1 0.0 17.0 0.1 0.100 0.000 0.100 0.040 36 ASF Personnel alongwith OC Residence at Moen-jo-Daro Airport 5Establishment of Flood Forecasting 230.0 0.0 180.0 50.0 50.000 0.000 50.000 0.000 & Warning System for Kalpani Nullah Basin, Mardan (KPK) 6Establishment of Specialized 2,502.5 2,441.0 2,487.0 15.5 3.532 81.000 84.532 1.400 Medium Range Weather Forecasting Centre (SMRFC) and Strengthening of Weather Forecasting System 7Installation of Weather Surveillance 1,580.0 1,542.0 108.0 1,472.0 15.000 446.000 461.000 5.000 Radar at Karachi in the Islamic Republic of Pakistan 8 New Gwadar International Airport, 22,247.5 2,751.1 1,053.7 21,193.8 800.000 1,000.000 1800.000 Gwadar 9Reverse Linkage Project Between 101.0 30.0 8.2 92.8 31.830 10.975 42.805 12.732 Pakistan Meteorological Department and Marmara Research Centre(MRC), Turkey 10Installation of Weather Surveillance 1,842.0 1,720.0 0.0 1,842.0 9.000 20.000 29.000 3.600
    [Show full text]
  • Life Science Journal 2013;10(3) Http
    Life Science Journal 2013;10(3) http://www.lifesciencesite.com Pakistan’s Hydro Potential and Energy Crisis Tahir Mahmood 1, Hasham Khan 2, Mohammad Ahmad Choudhry 1 1. Department of Electrical Engineering, University of Engineering & Technology, Taxila 47050, Pakistan 2. Department of Electrical Engineering, GCT, Abbottabad, Pakistan [email protected] Abstract: Pakistan has abundant water resources. Hydro-potential resources can play effective role in contributing towards energy security as well as energy independence of Pakistan. This research paper delineates hydro potential in Pakistan. At present, Pakistan is facing severe short fall of electric energy. A brief history and the present situation of the hydro-electricity production, its consumption in the country and importance of utilization of water resources for the production of electric power have been discussed. Predictions to solve energy crises are made on the basis of empirical data and preliminary observations. The root causes of the shortfall in energy generation, an estimated forecast of demand and generation of electricity for the next twenty years has also been predicted. Energy projections have been discussed in detail. [T. MAhmoo, H. Khan, M.A. Choudhry. Pakistan’s Hydro Potential and Energy Crisis. Life Sci J 2013;10(3):1059-1069] (ISSN:1097-8135). http://www.lifesciencesite.com. 154 Keywords: Energy crisis, electricity generation, hydro potential. 1. Introduction facing by the whole world now a day. At present, the Pakistan, at present facing serious short fall duration of forced load shedding in peak season is of electric energy and this has evolved as crises. All between 8 hrs to 10 hrs in urban areas while 16 hrs to kinds of industries as well as common man had been 18 hours in rural areas.
    [Show full text]
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • Development Expenditure (Volume-IV) Budget Estimates 2021-22
    For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101
    [Show full text]
  • Annual Plan 2019-20 of 12Th Five Year Plan (2018-23) Is Very Challenging
    ANNUAL PLAN 2019-20 Table of Contents No. Contents Page No. Foreword iii Review Committee v Executive Summary vii Abbreviations and Acronyms xix Part I: Economic Recovery to Inclusive and Sustainable Growth 1 1. Economic Framework-Growth, Investment and Savings 3 2. Balance of Payments 13 3. Fiscal, Monetary and Capital Market Development 25 4. Public Sector Development Programme (PSDP) 35 5. Food Security and Agriculture Development 45 6. Manufacturing, Mineral and Commerce Sectors 57 7. Information & Communication Technology 63 8. Population 69 9. School and College Education 75 10. Higher Education 79 11. Science and Technology 87 12. Health 93 13. Nutrition 105 14. Labour, Employment and Skill Development 111 15. Mass Media, Culture & National Heritage 119 16. Energy 127 17. Water Resources Development 147 18. Transport and Logistics 153 19. Physical Planning & Housing 161 20. Poverty Alleviation and Achieving SDGs 163 21. Social Welfare- Inclusion of Vulnerable Groups 171 22. Gender and Women Empowerment 175 23. Religious Pluralism and Interfaith Harmony 179 24. Governance and Institutional Reforms 181 Part II: Special Areas of Focus 189 25. Balanced Development – Focus on the Less Developed Regions 191 26. Climate Change and Environment 199 FOREWORD The Annual Plan 2019-20 of 12th Five Year Plan (2018-23) is very challenging. It is first year of the present government which is committed to put Pakistan on sustainable and inclusive economic growth trajectory. In pursuance of its agenda, the government has already taken various urgent Fiscal and External sectors measures to stabilize the economy. In addition, Extended Financing Facility (EFF) with the IMF has already been concluded for providing support to the reform program and seek assistance from WB and ADB to build fundamentals of the economy.
    [Show full text]
  • Solutions for Energy Crisis in Pakistan I
    Solutions for Energy Crisis in Pakistan i ii Solutions for Energy Crisis in Pakistan Solutions for Energy Crisis in Pakistan iii iv Solutions for Energy Crisis in Pakistan Acknowledgements his volume is based on papers presented at the one-day National T Workshop on the topical and vital theme of Solutions for Energy Crisis in Pakistan held on December 17, 2014 at Marriott Hotel, Islamabad. The Workshop was jointly organised and financed by the Islamabad Policy Research Institute (IPRI) and the Hanns Seidel Foundation, (HSF) Islamabad. We are grateful to the contributors who presented their scholarly papers at the workshop and the chairpersons who presided over the lengthy proceedings and summed up the findings of each session with their valuable comments. We are also thankful to the representatives of public sector institutions who accepted our invitation to participate in the workshop as discussants. All efforts were made to make the workshop as productive and result- oriented as possible. However, if there was any area left wanting in some respect the workshop management owns responsibility for that. Solutions for Energy Crisis in Pakistan v CONTENTS Acknowledgements Acronyms Introduction 1 Welcome Address Ambassador (R) Sohail Amin 5 Opening Remarks Mr. Kristof W. Duwaerts 7 Concluding Remarks Ambassador (R) Sohail Amin 9 Chapter 1 Solutions for Energy Crisis in Pakistan Air Cdr. (R) Khalid Iqbal and Aftab Hussain 10 Chapter 2 Review of Energy Sector with Focus on Electricity Tariff Determination Advocate Ameena Sohail 19 Chapter 3 Implementation of National Energy Policy: Challenges and Options Ashfaq Mahmood 32 Chapter 4 Fund Raising for Energy Projects in Pakistan Dr.
    [Show full text]
  • Hydel Power Potential of Pakistan 15
    Foreword God has blessed Pakistan with a tremendous hydel potential of more than 40,000 MW. However, only 15% of the hydroelectric potential has been harnessed so far. The remaining untapped potential, if properly exploited, can effectively meet Pakistan’s ever-increasing demand for electricity in a cost-effective way. To exploit Pakistan’s hydel resource productively, huge investments are necessary, which our economy cannot afford except at the expense of social sector spending. Considering the limitations and financial constraints of the public sector, the Government of Pakistan announced its “Policy for Power Generation Projects 2002” package for attracting overseas investment, and to facilitate tapping the domestic capital market to raise local financing for power projects. The main characteristics of this package are internationally competitive terms, an attractive framework for domestic investors, simplification of procedures, and steps to create and encourage a domestic corporate debt securities market. In order to facilitate prospective investors, the Private Power & Infrastructure Board has prepared a report titled “Pakistan Hydel Power Potential”, which provides comprehensive information on hydel projects in Pakistan. The report covers projects merely identified, projects with feasibility studies completed or in progress, projects under implementation by the public sector or the private sector, and projects in operation. Today, Pakistan offers a secure, politically stable investment environment which is moving towards deregulation
    [Show full text]
  • Azad Kashmir
    Azad Kashmir The home of British Kashmiris Waving flags of their countries of origin by some members of diaspora (overseas) communities in public space is one of the most common and visible expressions of their ‘other’ or ‘homeland’ identity or identities. In Britain, the South Asian diaspora communities are usually perceived as Indian, Pakistani, (since 1971) Bangladeshis and Sri Lankans. However, there is another flag that is sometimes sighted on such public gatherings as Eid festivals, Pakistani/Indian Cricket Matches or political protests across Britain. 1 This is the official flag of the government of Azad Jammu and Kashmir. 'Azad Kashmir' is a part of the divided state of Jammu Kashmir. Its future is yet to be determined along with rest of the state. As explained below in detail, Azad Kashmir is administered by Pakistan but it is not part of Pakistan like Punjab, Sindh, Pakhtoon Khuwa and Baluchistan. However, as a result of the invasion of India and Pakistan to capture Kashmir in October 1947 and the subsequent involvement of United Nations, Pakistan is responsible for the development and service provision including passports for the people of Azad Kashmir and Gilgit Baltistan, another part of Kashmir that is not part of, but is controlled by, Pakistan. Under the same UN resolutions India is responsible for the Indian controlled part of Kashmir. In all parts of the divided Kashmir there are political movements of different intensity striving for greater rights and autonomy, self-rule and/or independence. The focus of this chapter, however, is primarily on Azad Kashmir, the home of nearly a million strong British Kashmiri community.
    [Show full text]
  • Federal PSDP 2018-19 Releases As on 07-09-2018 (Million Rupees)
    Federal PSDP 2018-19 Releases as on 07-09-2018 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2018-19 Releases Upto June forward (Rupee Total Foreign Rupees Foreign Total 2018 Component) Aid Aid AVIATION DIVISION 1 Acquisition of Land for Construction/ 1,600.0 0.0 450.4 1,149.6 250.000 0.000 250.000 Establishment of Airport at Mansehra, KPK 2Airport Security Force (ASF) 2,586.9 0.0 1,726.3 860.6 859.690 0.000 859.690 171.940 Accommodation at New Islamabad International Airport (Revised) 3Construction of Rain Water 2,228.0 0.0 1,920.7 307.3 307.260 0.000 307.260 20.000 Harvesting Kasana Dam, Islamabad 4Construction of Single Barrack at 38.5 0.0 21.4 17.1 17.120 0.000 17.120 3.424 DG Khan Airport 5Construction of Single Barrack for 17.1 0.0 17.0 0.1 0.100 0.000 0.100 0.020 36 ASF Personnel alongwith OC Residence at Moen-jo-Daro Airport 6 Establishment of Flood Forecasting 230.0 0.0 180.0 50.0 50.000 0.000 50.000 & Warning System for Kalpani Nullah Basin, Mardan (KPK) 7Establishment of Specialized 2,502.5 2,441.0 2,487.0 15.5 3.532 81.000 84.532 0.700 Medium Range Weather Forecasting Centre (SMRFC) and Strengthening of Weather Forecasting System 8Installation of Weather Surveillance 1,580.0 1,542.0 108.0 1,472.0 15.000 446.000 461.000 3.000 Radar at Karachi in the Islamic Republic of Pakistan 9 New Gwadar International Airport, 22,247.5 2,751.1 1,053.7 21,193.8 800.000 1,000.000 1800.000 Gwadar 10Reverse Linkage Project Between 101.0 30.0 8.2 92.8 31.830 10.975 42.805 6.366 Pakistan Meteorological Department and Marmara
    [Show full text]
  • SENATE SECRETARIAT ————— “QUESTIONS for ORAL ANSWERS and THEIR REPLIES” to Be Asked at A
    1 (279th Session) SENATE SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the Senate to be held on Friday, the 13th July, 2018 DEFERRED QUESTIONS [Questions Nos. 196, 68 and 191 deferred on 23rd February, 2018, (276th Session)] (Def.) *Question No. 196 Senator Dr. Jehanzeb Jamaldini: (Notice Received on 28/11/2017 at 12:10 PM) QID: 33828 Will the Minister for Law and Justice be pleased to state the details of foreign visits made by Chief Justices and Judges of the Supreme Court and High Courts separately during the last five years with year-wise break up indicating also the duration and purpose of visit and expenditure incurred in each case? Reply not received. (Def.) *Question No. 68 Senator Dr. Jehanzeb Jamaldini: (Notice Received on 22/11/2017 at 1:30 AM) QID: 33674 Will the Minister for Water Resources be pleased to state whether it is a fact that Afghanistan is building Hydro Power projects on River Kabul, if so, its possible impacts on water situation in Pakistan and the steps being taken to tackle the same? Syed Ali Zafar: So far the Government of Afghanistan has reconstructed the hydropower project destroyed during the war including Kama and some other hydroelectric plants, therefore, till to date there is no impact on the inflows in the common rivers with Afghanistan. However, there are certain new projects in the pipeline as per information gathered from different sources. After the completion 2 of the new projects there will be certainly some impact on the water inflows in the common rivers.
    [Show full text]