170107 Planning Report.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

170107 Planning Report.Pdf MERTHYR TYDFIL COUNTY BOROUGH COUNCIL DATE WRITTEN 10th January 2007 REPORT AUTHOR Norman Davies COMMITTEE Planning and Regulatory COMMITTEE DATE 17th January 2007 To: Chairman and Members of the Planning and Regulatory Committee to be held on Wednesday, 17th January 2007 ------------------------------------------------------------------------------------------------------------------------ Report of the Director of Customer Corporate Services on applications received for determination and recommendation under the Town and Country Planning Act 1990 and Planning and Compensation Act 1991. ------------------------------------------------------------------------------------------------------------------------ LIST OF CONTENTS 1. Planning Applications for Committee Determination. THE DURATION OF PLANNING PERMISSIONS In addition to those conditions specifically noted on the reports contained within this Committee Agenda, all decision notices issued (unless expressly noted as being an exception to this practice) will include a condition relating to the duration of the permission. These conditions are expressly imposed in accordance with Sections 91 and 92 of the Town and Country Planning Act 1990. All applications will be granted subject to a standard condition which requires that the development approved must commence within five years of the date of the permission (unless the Local Planning Authority stipulates an alternative time period). Outline planning permissions will be issued subject to a condition requiring “reserved matters” to be submitted within three years of the date of the outline permission. Works in relation to the development must commence within five years of the initial outline consent, or if later, the expiration of two years from the final approval of the “reserved matters” or, in the case of approval on different dates, the final approval of the last such matter to be approved. PLEASE NOTE: All related planning application documents are available for inspection within the Town Planning Division, at Ground Floor, Ty Keir Hardie, during normal office hours. 1. PLANNING APPLICATIONS FOR COMMITTEE DETERMINATION Application Location Proposed Development No. P/06/0412 Land At 13 Cardiff Road And 1 Erection of two buildings comprising 16 To 3 Perrott Street Treharris flats P/06/0447 Land To The South Of Heol Residential development Isaf, Ael-Y-Bryn And Bron Deg And To The West Of Maen Ganol Trelewis P/06/0475 Land And Buildings At Junction Re-cladding of existing buildings. Of Chestnut Way And Poplar Erection of extensions, new roof, Way, Gurnos (Gurnos Shops) external stairwell and rear compounds to Merthyr Tydfil buildings. Conversion of existing flats to office accommodation. Conversion of existing shop to office. Creation of new car parks P/06/0595 35 Sweetwater Park Trefechan Retention of decking and erection of Merthyr Tydfil CF48 2LF garden shed P/06/0599 163 High Street Cefn Coed Erection of two storey and first floor rear Merthyr Tydfil CF48 2PH extension P/06/0608 Former Council Depot Fell Erection of 2 No. detached dwellings and Street Treharris 4 No semi detached dwellings P/06/0612 24 Calluna Close Dowlais Conversion of garage to living Merthyr Tydfil CF48 3HF accommodation, and erection of single storey and first floor extension to front of property P/06/0617 Land At Brynffynon Captains Erection of 4 houses Hill Treharris Merthyr Tydfil P/06/0633 Leisure Centre And Erection of new building comprising ten Surrounding Land Rhydycar pin bowling suite, 9 screen cinema and Merthyr Tydfil restaurant, and associated car parking and site infrastructure P/06/0649 Brecon Road Infant School Erection of single storey extension Norman Terrace Merthyr Tydfil CF47 8SD Application No. Date Determining Authority P/06/0412 7th August 2006 MTCBC Proposed Development Location Name & Address of Applicant/Agent Erection of two buildings Land At 13 Cardiff Road Merthyr Tydfil Housing comprising 16 flats And 1 To 3 Perrott Street Association Ltd Treharris c/o CFW Architects Ltd 6 North Road Cardiff CF10 3DU APPLICATION DETAILS/SITE APPRAISAL The application is detailed for the erection of two buildings comprising 16 flats. The development is located at the junction of Cardiff Road and Perrott Street and occupies a prominent position within the street scene. It is intended to site the new development upon the footprint of the existing 2 / 2½ storey retail units fronting Cardiff Road and Perrott Street. The proposed development will have a similar overall height, but the massing of the building is broken up into smaller component units. The application proposes 16 no. flats, each having 2 no. bedrooms. Each flat would have an approximate floor area of 60m². Parking is proposed beneath the building fronting Perrott Street and in the courtyard at the rear of the buildings with vehicular access off Cardiff Road at the northeast of the site and pedestrian access off Cardiff Road at the northwest end of the site. No access to the individual flats is proposed from the courtyard area. Access will be from Cardiff Road and Perrott Street. An element of the existing dressed stonework is to be salvaged for the development. In addition to this, a blend of timber cladding, bricks and a coloured and white render is proposed for the materials. The plot is surrounded by a number of traditional terraced properties which are on a consistent building line. The proposed development is contemporary in design compared with the surrounding buildings. PLANNING HISTORY Planning consent was granted in November 2002 for a built development comprising community enterprise/workshop areas, bakery, cyber café, 2 no. flats, community IT training areas, community hall, entrance foyer and toilets (ref: P/02/0248). PUBLICITY In accordance with the provisions of Article 8 of 1995 Town and Country Planning (General Development Procedure) Order the following publicity measures were undertaken: site notice; press notice and individual letters sent to occupants of adjoining buildings. No written or other representations have been received. CONSULTATION • Head of Engineering – no objection to the proposal subject to conditions. • Head of Environmental Health - no response • Dwr Cymru Welsh Water - no objection subject to conditions and advisory notes. • Environment Agency - standard advice applies. • Western Power Distribution - no objection to the proposal. • Wales and West Utilities - no objection to the proposal. • Swalec - no response. POLICY CONTEXT Policy H2 of the Merthyr Tydfil Borough Local Plan states that Development proposals for housing within settlement boundaries on land not identified under Policy H1 will be permitted subject to consideration against the following criteria: - The proposal does not have an unacceptable impact on the character and amenity of the immediate neighbourhood. - The siting of the development is acceptable in relation to the design, scale, materials, and setting of the proposal. - The proposal does not have an unacceptable impact on the character, amenity and landscape quality of the area, including the need to retain features of water, wildlife, nature conservation interests and historical interests identified during the assessment and design of the scheme. - The proposal does not have an unacceptable impact on the rights of way network and other forms of public access to the countryside. - The proposal does not conflict with transportation considerations including car parking, traffic generation, access and accessibility to public transport. Policy H3 of the Mid Glamorgan (Merthyr Tydfil County Borough) Replacement Structure Plan 1991 – 2006 states that proposals for residential development on sites within settlement areas as defined in local plans will be permitted where this involves: 1. New residential development on derelict, undeveloped, potentially redundant or under used land where this does not conflict with uses identified in local plans. 2. The proposal is compatible with transportation considerations – including parking, traffic generation and access – the conservation of the environment and the maintenance of local amenity. PLANNING CONSIDERATIONS The proposed development is considered acceptable in planning terms. It complies with the provisions and policies of the relevant development plans. The structure, once built, will make a positive impact on the street scene with its contemporary design. Furthermore it will contribute to the regeneration of the Treharris area. The proposal would not appear out of character and thus would not have a material adverse effect upon the visual amenities of the area. Neither would it have a material adverse impact upon the amenities of neighbouring residents by way of loss of light or overbearing effect. Furthermore, the approved 2002 development was also modern in design terms. In addition, the Head of Engineering has stated that he has no objection to the proposals, subject to condition. Sixteen flats are proposed with 16 no. parking spaces to serve them. Whilst this does not meet the standard set by the 1993 South Wales Parking Guidelines, it is considered acceptable in this case as the proposal is a Housing Association development and lower levels of car ownership are expected. It is considered therefore that the proposal is acceptable from a highway safety point of view. To this end, it is considered that the proposed development is acceptable and it is recommended that planning permission be granted subject to the following conditions. RECOMMENDATION: BE APPROVED
Recommended publications
  • Roman Conquest, Occupation and Settlement of Wales AD 47–410
    no nonsense Roman Conquest, Occupation and Settlement of Wales AD 47–410 – interpretation ltd interpretation Contract number 1446 May 2011 no nonsense–interpretation ltd 27 Lyth Hill Road Bayston Hill Shrewsbury SY3 0EW www.nononsense-interpretation.co.uk Cadw would like to thank Richard Brewer, Research Keeper of Roman Archaeology, Amgueddfa Cymru – National Museum Wales, for his insight, help and support throughout the writing of this plan. Roman Conquest, Occupation and Settlement of Wales AD 47-410 Cadw 2011 no nonsense-interpretation ltd 2 Contents 1. Roman conquest, occupation and settlement of Wales AD 47410 .............................................. 5 1.1 Relationship to other plans under the HTP............................................................................. 5 1.2 Linking our Roman assets ....................................................................................................... 6 1.3 Sites not in Wales .................................................................................................................... 9 1.4 Criteria for the selection of sites in this plan .......................................................................... 9 2. Why read this plan? ...................................................................................................................... 10 2.1 Aim what we want to achieve ........................................................................................... 10 2.2 Objectives.............................................................................................................................
    [Show full text]
  • Create Wealth Management Mountain Goats One Million Metre Challenge
    Create Wealth Management Mountain Goats One Million Metre Challenge The Planned Routes Two routes are part of larger organised events and so the dates are fixed. Route 8 (Dragon Ride) on 11th June and Route 13 (Velothon Wales) is on 9th July. Route numbers give orders of distance - shortest to longest - of each route. Dates for the other 11 routes haven't been set yet but are listed in the order we expect to do them and the date of the week we are targeting them for. Route 3 - Starting at Ystradfellte w/c 17th April Route Statistics: 70km of riding, 1459m of ascent. Classic Climbs: Glynneath; Heol Lan; Cray/Heol Senni; Devil's Elbow. Riding south from Ystradfellte to Glynneath we then climb along Inter-Valley Road (Glynneath 3.2km, 180m, average gradient 5.6%, max gradient 8%) and on to Pen- y-Cae. Following the A4067 we pass through Crai-y-nos before turning off left to commence Heol Lan (5.6km, 277m, average gradient 4.9%, max gradient 13%) eventually reaching the village of Cray. We turn south to Cnewr and continue southwards along the A4067 until we reach the point at which we turned off to commence the Heol Lan climb. Here we do a U-Turn as this is the starting point of Cray/Heol Senni (7.2km, 264m, average gradient 3.7%, max gradient 10%) which takes us back up the A4067 and on to Heol Senni. From here we turn south again, towards Ystradfellte but not before undertaking the Devil's Elbow (1.8km, 189m, average gradient 10.5%, max gradient 22%).
    [Show full text]
  • The Taff Trail Is Just One of a Series of Trails Running Right Rivals the Best in the World
    Feel Rested Other Trails in Merthyr Tydfil Aberfan Community Centre Merthyr has plenty of other trails on offer, Located in the centre of the village. so why not try one of these? The Open: 8am-8pm Mon - Fri and 9am – 4pm Sat & Sun. P Key Taff Trail (Route 8) Taff Trail Merthyr Tydfil Leisure Centre Trevithick Trail Located in Merthyr’s Leisure Village, just (Route 477) Merthyr Tydfil a short walk from the town centre. Celtic Trail (Route 4) Open: 8am-8pm Mon - Fri and 9am – 4pm Sat & Sun. Heads of the Valley Trail (Route 46) Steam Train Merthyr Town Centre St Tydfil’s Shopping centre provides a modern semi-covered pedestrian area with a diverse range of places to eat and drink. Various opening times. P Cyfarthfa Retail Park Various retail outlets including eateries. Open 9am – 8pm Mon – Sat, 11am -4pm Sun. MERTHYR TYDFIL M4 Cefn Coed Village A small car park is found on the High Street. Just look for the Church spire as it’s next door to it. The village has places to eat and drink. Looking for more? Open at various times. P visitmerthyr.co.uk Parkwood Outdoors Dolygaer Café For further information contact us at: A great stop at a stunning location for anyone visiting the National Park. You can also pick up needed repair tubes for your bikes. Email: [email protected] Open 9.30 – 5.30. Phone: 01685 725000 Merthyr Section 14 miles P Mail: VisitMerthyr, MerthyrTydfilCounty Borough Council, Tourism Dept. Largely TRAFFIC FREE There’s ample parking throughout the Borough with designated Civic Centre, Castle Street, National Cycle Route 8 car parks.
    [Show full text]
  • Planning, Access and Rights of Way Committee
    Brecon Beacons National Park Authority PLANNING, ACCESS AND RIGHTS OF WAY COMMITTEE RECOMMENDATIONS OF THE DIRECTOR OF PLANNING ON APPLICATIONS FOR DETERMINATION BY THE PLANNING, ACCESS AND RIGHTS OF WAY COMMITTEE Page 1 of 52 APPLICATION NUMBER: 17/15291/FUL APPLICANTS NAME(S): Powys County Council SITE ADDRESS: Land Off Cerrigcochion Road Brecon Powys LD3 9SR GRID REF: E: 305287 N:229237 COMMUNITY: Brecon DATE VALIDATED: 21 September 2017 DECISION DUE DATE: 5 December 2107 CASE OFFICER: Donna Bowhay PROPOSAL Construction of a new high school, access, parking and associated works ADDRESS Land Off Cerrigcochion Road, Brecon , Powys Page 2 of 52 CONSULTATIONS/COMMENTS Mid And West Wales Wales Fire And Rescue Service 28th Sep 2017 I acknowledge receipt of your e-mail and letter dated 25th September 2017 in relation to the above proposed development. The Fire and Rescue Service will make comment on the submission once planning has been approved and the necessary plans are submitted to this Service by the local authority Building Control department or an Approved Inspector as part of the full consultation process. Should you require any further advice please contact the above-named Officer. Powys County Council Leisure And Recreation No comments received to-date. Sustrans Cymru 17th Oct 2017 Thanks you for allowing Sustrans the opportunity to comment on the design of the new school The 21st Century schools program all over Wales has consistently ignored the design outside of the school boundary and has not considered or provided adequate means to allow pupils and staff to access the new school by foot or cycle.
    [Show full text]
  • CPO Table 1 June 09
    The Schedule Table 1 1 2 3 Number Extent, description and situation of the land Qualifying persons under paragraph 3 of Schedule 1 to the Acquisition of Land act 1981 on map Owners or reputed owners Lessees or reputed Tenants or reputed Occupiers lessees tenants (other than lessees) IN THE TOWN OF PORTHMADOG IN THE COUNTY OF GWYNEDD 1/1 12148 square metres of part of half width of Mr R Williams Mr I Williams - Mr I Williams the A487 and part of full width of the Dinam Hall Ty Canol Ty Canol A498 at the junction between the Llangaffo Golan Golan A498 and A487 including part Gaerwen Garndolbenmaen Garndolbenmaen lengths of masonry highway Gwynedd Gwynedd Gwynedd boundary walls, part of full width of LL60 6LR LL51 9RQ LL51 9RQ an existing drainage ditch and pasture land in fields 0101, 0104, 0106 (A) and 0207(B) west of Tremadog. 1/1a 514 square metres of pasture land in Mr R Williams Mr I Williams - Mr I Williams field 0101(A) south of the A487 Dinam Hall Ty Canol Ty Canol Trunk road opposite Ysbyty Alltwen Llangaffo Golan Golan Community Hospital. Gaerwen Garndolbenmaen Garndolbenmaen Gwynedd Gwynedd Gwynedd LL60 6LR LL51 9RQ LL51 9RQ 1/1b 62 square metres of pasture land in Mr R Williams Mr I Williams - Mr I Williams field 0101(A) south of the A487 Dinam Hall Ty Canol Ty Canol Trunk road opposite Ysbyty Alltwen Llangaffo Golan Golan Community Hospital. Gaerwen Garndolbenmaen Garndolbenmaen Gwynedd Gwynedd Gwynedd LL60 6LR LL51 9RQ LL51 9RQ 1/1c 23 square metres of part of full width of Mr R Williams Mr I Williams Mr I Williams an existing drainage ditch between Dinam Hall Ty Canol Ty Canol fields 0101 and 0104(A) west of Llangaffo Golan Golan Tremadog.
    [Show full text]
  • 1.00 Pm  SIAMBR Y CYNGOR, SWYDDFEYDD Y COUNCIL CHAMBER, COUNCIL CYNGOR, LLANGEFNI OFFICES, LLANGEFNI Ann Holmes Swyddog Pwyllgor Committee Officer 01248 752518
    Mr Richard Parry Jones, MA. Prif Weithredwr – Chief Executive CYNGOR SIR YNYS MÔN ISLE OF ANGLESEY COUNTY COUNCIL Swyddfeydd y Cyngor - Council Offices LLANGEFNI Ynys Môn - Anglesey LL77 7TW Ffôn / tel (01248) 752500 Ffacs / fax (01248) 750839 RHYBUDD O GYFARFOD NOTICE OF MEETING PWYLLGOR CYNLLUNIO A PLANNING AND ORDERS GORCHMYNION COMMITTEE DYDD MERCHER, 2 HYDREF, 2013 WEDNESDAY, 2 OCTOBER DYDDIAD 2013 1:00 pm 1.00 pm SIAMBR Y CYNGOR, SWYDDFEYDD Y COUNCIL CHAMBER, COUNCIL CYNGOR, LLANGEFNI OFFICES, LLANGEFNI Ann Holmes Swyddog Pwyllgor Committee Officer 01248 752518 AELODAU / MEMBERS Cynghorwyr / Councillors: W T Hughes (Cadeirydd/Chair) Ann Griffith (Is-Gadeirydd/Vice-Chair) John Griffith Vaughan Hughes Victor Hughes Richard Owain Jones Raymond Jones Jeffrey M.Evans Lewis Davies K P Hughes Nicola Roberts A g e n d a Members are reminded that background papers referred to within committee reports are available for inspection in electronic format on the day of the meeting at the Council Chamber from 12.30 p.m. onwards; alternatively these may be inspected at the Development Management during normal office hours. Documents referred to in reports may also be viewed in full on the electronic application files. Any additional information to hand following publication of reports will be verbally reported upon to the meeting. Before a decision notice is released conditions of approval or reasons for refusal given in written reports may be subject to minor amendments to account for typographical errors. Index 1 APOLOGIES 2 DECLARATION OF INTEREST 3 MINUTES OF THE 4TH SEPTEMBER, 2013 MEETING (Pages 1 - 10) To submit for confirmation, the minutes of the previous meeting of the Planning and Orders Committee held on 4th September, 2013.
    [Show full text]
  • Menai Strait Crossing Report (2016)
    DOCUMENT 9.6 Menai Strait Crossing Report (2016) National Grid (North Wales Connection Project) Regulation 5(2)(q) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 First published September 2016 Application Reference EN020015 September 2018 Page intentionally blank North Wales Connection Project Menai Strait Crossing Report (Document 2.3) National Grid National Grid House Warwick Technology Park Gallows Hill Warwick CV34 6DA September 2016 North Wales Connection Project Menai Strait Crossing Report Page intentionally blank North Wales Connection Project Menai Strait Crossing Report Table of Contents 1. INTRODUCTION 1 1.1 Background 1 1.2 Purpose of Report 4 1.3 Structure of the Report 4 1.4 Outcome 5 2. NATIONAL GRID DUTIES AND POLICIES 6 2.1 Introduction 6 2.2 Duty to Provide a Connection 6 2.3 Economic Duties 7 2.4 Duty to Protect the Environment 7 2.5 Stakeholder, Community and Amenity Policy 8 2.6 Transmission Line Design and Routeing 8 3. CONTEXT FOR THE APPRAISAL 9 3.1 Factors in Appraising Options 9 3.2 Statutory Duties 9 3.3 Planning Act 2008 9 3.4 National Policy Statements 10 4. OVERVIEW 15 4.1 Introduction 15 4.2 Landscape 15 4.3 Historic Environment 15 4.4 Ecology 16 4.5 Marine Ecology 17 4.6 Local Economy 17 4.7 Transport 17 4.8 Hydrology and Flood Risk 18 4.9 Geology 18 4.10 Topography and Bathymetry 19 4.11 Seabed Morphology 19 5. CONSTRUCTION CONSIDERATIONS – NEW NATIONAL GRID INFRASTRUCTURE 26 5.1 Introduction 26 5.2 Overhead Line 26 5.3 Cable Sealing End Compounds 27 5.4 Underground Cables 28 5.5 Crossing Techniques for the Menai Crossing 30 September 2016 North Wales Connection Project Menai Strait Crossing Report 5.6 Initial Preference 45 6.
    [Show full text]
  • SCOPING OPINION Proposed Wylfa Newydd Project
    SCOPING OPINION Proposed Wylfa Newydd Project Planning Inspectorate Reference: EN010007 June 2017 Scoping Opinion for Wylfa Newydd Project TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................... 3 1 INTRODUCTION .......................................................................... 5 BACKGROUND ..........................................................................................5 THE SECRETARY OF STATE’S CONSULTATION ..............................................7 STRUCTURE OF THE DOCUMENT .................................................................8 2 THE PROPOSED DEVELOPMENT .................................................. 9 INTRODUCTION ........................................................................................9 THE APPLICANT’S INFORMATION ................................................................9 THE SECRETARY OF STATE’S COMMENTS .................................................. 15 3 EIA APPROACH AND TOPIC AREAS ........................................... 21 INTRODUCTION ...................................................................................... 21 EU DIRECTIVE 2014/52/EU ...................................................................... 21 NATIONAL POLICY STATEMENTS (NPS) ..................................................... 21 ENVIRONMENTAL STATEMENT APPROACH ................................................. 22 ENVIRONMENTAL STATEMENT STRUCTURE ................................................ 22 MATTERS TO BE SCOPED IN/ OUT ...........................................................
    [Show full text]
  • Isle of Anglesey County Council Cycling Strategy
    ISLE OF ANGLESEY COUNTY COUNCIL Committee: Executive Committee Date: 13 January 2014 Portfolio Holder: Councillor Richard A Dew Corporate Director: Arthur W Owen Title: Isle of Anglesey County Council Cycling Strategy 1.0 Purpose of Report 1.1 To gain Executive approval for the Isle of Anglesey County Council Cycling Strategy. 2.0 Background 2.1 The need for a co-ordinated approach across the Council to maximise the benefits to Anglesey of cycling has been highlighted by a number of issues. A strategy has therefore been produced to address these points and assist Anglesey to grow economically, in health and with an improved environment. 2.2 In November 2013 the Active Travel (Wales) Act 2013 was given Royal Assent and it will bring with it a number of new statutory functions which aim to encourage active travel to work, education and other destinations which would otherwise be made by car. 2.3 A number of potential major projects across the island are set to be developed over the next few years which emphasise the need for a strategy to ensure that the island receives the legacy benefits which should come from such schemes. 2.4 Tourism initiatives such as the Ymweld â Môn project will be assisted by a cycling strategy helping to target funding to encourage Anglesey as a cycling destination. 3.0 Recommendations 3.1 That the Council approve the Cycling Strategy for use as a lead document for the development of cycle facilities on Anglesey. Report by: Dewi R Williams Job Title: Head of Service (Environment and Technical Service) Department: Sustainable Development Department Date: 20th November 2013 Appendices: Isle of Anglesey County Council Cycling Strategy Background Papers: None Isle of Anglesey County Council Cycling Strategy November 2013 Isle of Anglesey County Council Cycling Strategy Contents Executive Summary ................................................................................................................................
    [Show full text]
  • Chapter 7 Townscape and Visual
    Environmental Statement Volume 1 March 2021 Chapter 7 Townscape and Visual Figure 7.1 Site Location Figure 7.2 Historical Development Figure 7.3 Townscape Character Figure 7.4 Building Heights Figure 7.5 Urban Grain Figure 7.6 Land Use Figure 7.7 Landscape Character Figure 7.8 LANDMAP Landscape Visual Sensitivity Figure 7.9 Public Open Space and Environmental Designations Figure 7.10 Movement and Linkages Figure 7.11 Site Character Figure 7.12 Key Viewpoints 7. Townscape and Visual Introduction 7.1 This Chapter reports the outcome of the assessment of likely significant environmental effects arising from the Proposed Scheme in relation to townscape and views. 7.2 The Chapter describes the consultation that has been undertaken during the EIA, the scope of the assessment and assessment methodology, and a summary of the baseline information that has informed the assessment. 7.3 In line with Chapter 2. Approach to EIA, the assessment reports on the likely significant environmental effects, the further mitigation measures required to prevent, reduce or offset any significant adverse effects, or further enhance beneficial effects. The conclusions are provided both in terms of the residual effects and whether these are considered significant. The assessment of effects takes into consideration both Primary and Tertiary mitigation (see Chapter 2: Approach to EIA for further details), as well as applying proportionality to those effects considered within the EIA, based on the outputs of the EIA Scoping process (Appendix 2.1 - 2.2). 7.4 This Chapter, and its associated Figures 7.1-7.12 and Appendix 7.1-7.4, is intended to be read as part of the wider ES with particular reference to the introductory Chapters of this ES (Chapters 1 - 5), as well as Chapter 8.
    [Show full text]
  • Merthyr Tydfil
    bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Merthyr Tydfi l Walk Approximate distance: 7.5 miles For this walk we’ve included OS grid references should you wish to use them. 6 5 7 8 4 1 2 Start End N 3 W E S Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2009.All rights reserved. Ordnance Survey Licence number 100019855 The Weatherman Walking maps are intended as a guide to help you walk the route. We recommend using an OS map of the area in conjunction with this guide. Routes and conditions may have changed since this guide was written. The BBC takes no responsibility for any accident or injury that may occur while following the route. Always wear appropriate clothing and 1 footwear and check weather conditions before heading out. bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Merthyr Tydfi l Walk Start: Cyfarthfa Castle (free car parking at the castle and also by entrance gates) Starting ref: SO 041 073 Distance: About 7.5 miles Grade: Easy/Moderate Walk time : Allow 3.25 hours This is a fascinating walk through both town and country, packed full of history with a few surprises thrown in for good measure. Walking in the footsteps of iron workers and their wealthy masters, our route starts from Cyfarthfa Castle and heads down over the river Taff to the site of the old Cyfarthfa ironworks before heading up the Taff Trail along a green corridor out of town. Calling in at Vaynor Church, the route then loops back to climb to the summit of Morlais Hill, site of a ruined Norman castle, before returning down along the banks of the delightful cascading Taf Fechan river, and back to the start.
    [Show full text]
  • Planning & Development Committee 5 July 2018
    PLANNING & DEVELOPMENT COMMITTEE 5 JULY 2018 REPORT OF THE SERVICE DIRECTOR, PLANNING PURPOSE OF THE REPORT Members are asked to determine the planning application outlined below: APPLICATION NO: 18/0314/34 (DJB) APPLICANT: Transport for Wales DEVELOPMENT: Hybrid Planning Application to deliver a rolling stock depot on the existing Garth Works Industrial Estate site comprising of the following: Part A: Full planning application for the demolition of existing warehouses on the existing Garth Works Industrial Estate site. Part B: Outline planning application to provide a rolling stock depot comprising of a warehousing building, stabling area accommodating rolling stock, substation, wash down point, sanding facility and delivery tracks, ancillary workshop and offices, decked car parking providing a maximum of 214 car parking spaces, demolition and relocation of existing railway footbridge and platforms, and associated landscaping, highways and access infrastructure works. LOCATION: LAND AT THE GARTH WORKS INDUSTRIAL ESTATE, TAFFS WELL, DATE REGISTERED: 03/04/2018 ELECTORAL DIVISION: Ffynon Taf RECOMMENDATION: APPROVE REASONS: The proposed development forms an important element of the development of the South Wales Metro Phase 2, which focuses on the Core Valley Lines (CVL). This important commercial/industrial site, which is currently partially vacant and of a tired and run-down appearance, lies adjacent to the A470 on an important gateway into Rhondda Cynon Taf. The proposal to develop the site as a major Transport for Wales Rail Depot is a positive boost to the regeneration of Rhondda Cynon Taf which will also have a significant impact on growth in the Cardiff Capital Region. It is considered that this investment will lead to new employment opportunities in the area and also improve access to employment for commuters in the region by its contribution to the South Wales Metro as well as a significant improvement and modernisation of the Taffs Well Station and the associated Park and Ride facility.
    [Show full text]