Environmental and Social Management Plan of Longata Drinking Water Maintenance Sub-Project Gaurisankhar Rural Municipality-8

Total Page:16

File Type:pdf, Size:1020Kb

Environmental and Social Management Plan of Longata Drinking Water Maintenance Sub-Project Gaurisankhar Rural Municipality-8 Government of Nepal National Reconstruction Authority Central Level Project Implementation Unit District Level Project Implementation Unit (Grant Management and Local Infrastructure) Dolakha Environmental and Social Management Plan of Longata Drinking Water Maintenance Sub-Project Gaurisankhar Rural Municipality-8 February, 2019 Silent Features (Additional Information) of the Sub Project SN Particulars Description 1 Name of Project Longata Drinking Water Maintenance Sub-Project 2 Type of Project Rehabilitation / Maintenance/ Reconstruction 3 Location Gaurisankhar RM-8, Longata, Khare 4 District Dolakha 5 No. of Beneficiary HHs with in sub- 15 project area 6 No. of Earthquake Beneficiary 15 7 Major Works earthwork, stone masonry wall, Stone soling, PCC, RCC and water tank fitting, Distribution pipeline fitting, tap construction 8 Existing Structures with Capacity Cracked RVT, 60% HDPE pipe damaged 9 Total Estimated Cost (NRs.) 668,909.91 Project Contribution 600,000.00 User Contribution 68,909.91 Other Contribution 0 10 Rationality (a) Source Damage Intake, reserve tank and distribution (b) Increased Demand pipeline damaged which had increased (c) New Scheme the shortage of water and and no (d) Extension (e) Others (………………) earthquake beneficiaries house could start the construction. 11 How does the Proposed Project Fulfill the Before Gorkha earthquake, the drinking Provision of EHRP-ESMF? water system was working properly. After the earthquake, intake, reserve tank and distribution pipelines have damaged and thus local people of Longata got affected. It has halted reconstruction process for 8 households as they have difficulties to manage the water needed for drinking and reconstruction purpose 12 Is ESSR Approved? (if applicable) Yes 13 Is Separate ESMP Prepared? Yes 14 Earthquake and Safeguard Perspective of the Proposal: Previously working drinking water system was damaged in Post-Gorkha earthquake Local people of Longata have deficit of water supply for drinking & reconstruction Due to deficit of water supply people have conflict in of use water especially in dry season. ii 15 Technical Data 1. Number of HHs to be reconstructed during project 8 selection 2. Vulnerable HHs (with Categories) 0 3. Source Name Longata Sim 4. Source discharge (Dry Season) 0.49 Liter/s 5. Water Demand (m3/day) 0.75 (50 Liter per HH) 6. Reservoir capacity 8m3 7. Break Pressure Tank number 0 8. Length of pipe line (transmission 1120m mains and distribution 9. Type of transmission mains and HDPE distribution pipe 10. Numbers of tap stand 4 (A) Endorsement: DL-PIU (GMaLI) Prepared By: Approved By: Designation: Designation: ………………….. ………………….. (B) Endorsement: CL-PIU (GMaLI) Reviewed By: Approved By: Designation: ………………….. ………………….. iii Table of Contents Silent Features (Additional Information) of the Sub Project ......................................... ii 1. Introduction ............................................................................................................ 1 2. Objectives of ESMP ............................................................................................... 3 3. Methodology ........................................................................................................... 3 4. Site Description ...................................................................................................... 3 5. Environmental and Social Issues ............................................................................ 3 6. Environmental and Social Mitigation Plan ............................................................. 4 7. ESMP Cost ............................................................................................................. 4 ANNEXES ..................................................................................................................... I Annex-I: Detail Cost-Estimate .................................................................................. II Annex-II: Design and drawing ................................................................................. III Annex-III: Google Map ........................................................................................... IV Annex-IV: Photographs ............................................................................................ V Annex-V: Beneficiaries List .................................................................................... VI Annex-VI: Meeting Minutes .................................................................................. VII Annex-VII: Letter from DL-PIU .............................................................................. X Annex-VII: Letter from Ward Office ...................................................................... XI iv 1. Introduction A magnitude 7.6 earthquake of shallow depth struck central Nepal with an epicenter approximately 77km north-west of Kathmandu on April 25th 2015 causing widespread destruction. On May 12, 2015 a large after shock of a magnitude 6.8 hit Nepal and caused further causalities and damage. As of 3 June 2015, the reported casualties include: 8,702 deaths and 22,493 people injured. As the earthquake sequence destroyed 490,000 houses mostly traditional mud brick and mud stone built and occupied by the rural poor and rendered another 265,000 houses at least temporarily uninhabitable, the largest single need identified in the Post Disaster Needs Assessment (PDNA) was housing and human settlements, accounting for US$ 3.27 billion of needs. The Government of Nepal (GON) has requested support from a number of development partners, including the WB, to address the immediate and long-term damage inflicted by the earthquake in Nepal. In response to this, World Bank approved a US$200 million loan to finance the Earthquake Reconstruction Project (EHRP) approved on 18 June 2015 to support 55 thousand households of three severely affected districts namely: Dolakha, Dhading and Nuwakot. The project will support in restoring affected houses with multi hazard resistant core housing units in target areas and to enhance government’s ability to improve long-term disaster resilience. Initially, the EHRP is to be completed by July 2020. Considering the further need to support GoN, International Development Association (the World Bank) has agreed to support additional US$300 million loan to finance the Earthquake Housing Reconstruction Project (EHRP). The recent additional loan support will cover another eleven severely affected districts including Gorkha covering 96000 households from Additional Financing and 3200 households from Multi Donor Fund. Environment and Social Management Framework serves as a practical tool to ensure that environment and social aspects are duly considered in the planning and implementation process of earthquake housing reconstruction project. Accordingly, Revised ESMF, have guided to address the environmental and social issues of the projects by site-specific environmental and social management plan after selection of the sub-projects prioritized by orientation and consultation in the respective local government. Dolakha district is located in province- 3 situated in the height from 762 m to 7132 m from mean sea level. The district lies in the latitude of 85 50' to 86 32' East and longitude of 27 28' to 28 00' North. The climatic condition of districts varies from tropical to alpine and tundra type. The average annual maximum temperature is 19° C and minimum temperature is 8° C. The average rainfall is 2043.5 ml (District Profile Dolakha, 2015). Dolakha is one the earthquake affected district. According to National Reconstruction Authority (NRA), the total number of houses damaged in district is 58,388 of which 56553 are fully damaged and 1835 partially damaged. Dolakha district is administratively divided into 7 Rural Municipality and 2 municipalities (former: 48 VDCs & 2 Municipalities). The total population residing in the district is about 186,557 in 45,688 households (HH) with an average HH size of 4.11 The female population (99554) in the 1 districts is higher than that of male population (87003). The sex ratio of the district is 85.47 (CBS, 2012) Beneficiaries’ data of Dolakha District: SN Beneficiaries Beneficiaries Ist tranche 2nd tranche 3rd tranche (Nos) with (Nos) (Nos) (Nos) Agreement (Nos) 1 72819 67337 63532 54130 46856 Source: MIS dated 2076/01/02 Gaurisankhar Rural Municipality ranges from the altitude of 930 to 7132 meter covers the former VDCs Jugu, Jhyaku, Suri, Chankhu, Marbu, Khare and Gaurisankhar. Administratively it is divided into 9 wards. Mount Gaurishankar is located in the Gaurishankar Rural Municipality -9 (former Gaurishankar VDC). The Tso Rolpa Glacial Lake is also located at Ward-9 of GRM. Rolwaling river is the major river in Gaurishankar Rural Municipality. 2 2. Objectives of ESMP This Environmental and Social Management Plan (ESMP) is addresses the problem arise by shortage of water on hygiene, sanitation and other daily activities due to increase demand of water for reconstruction and decreased capacity of storage tank. Therefore the Main Objective of this ESMP is to maintain and rehabilitate the RVT, Intake, distribution pipeline and construction of public taps of Water Supply System to support in reconstruction of remaining houses of EHRP beneficiaries 3. Methodology Consultation and discussion: Consultation and discussion program was held with Local Government (Chair of RM, deputy Chair, chief administrative officer, ward chair persons and secretary) and engineers from DLPIU and
Recommended publications
  • National Parks and Iccas in the High Himalayan Region of Nepal: Challenges and Opportunities
    [Downloaded free from http://www.conservationandsociety.org on Tuesday, June 11, 2013, IP: 129.79.203.216] || Click here to download free Android application for this journal Conservation and Society 11(1): 29-45, 2013 Special Section: Article National Parks and ICCAs in the High Himalayan Region of Nepal: Challenges and Opportunities Stan Stevens Department of Geosciences, University of Massachusetts Amherst, Amherst, MA, USA E-mail: [email protected] Abstract In Nepal, as in many states worldwide, national parks and other protected areas have often been established in the customary territories of indigenous peoples by superimposing state-declared and governed protected areas on pre-existing systems of land use and management which are now internationally considered to be Indigenous Peoples’ and Community Conserved Territories and Areas (ICCAs, also referred to Community Conserved Areas, CCAs). State intervention often ignores or suppresses ICCAs, inadvertently or deliberately undermining and destroying them along with other aspects of indigenous peoples’ cultures, livelihoods, self-governance, and self-determination. Nepal’s high Himalayan national parks, however, provide examples of how some indigenous peoples such as the Sharwa (Sherpa) of Sagarmatha (Mount Everest/Chomolungma) National Park (SNP) have continued to maintain customary ICCAs and even to develop new ones despite lack of state recognition, respect, and coordination. The survival of these ICCAs offers Nepal an opportunity to reform existing laws, policies, and practices, both to honour UN-recognised human and indigenous rights that support ICCAs and to meet International Union for Conservation of Nature (IUCN) and Convention on Biological Diversity (CBD) standards and guidelines for ICCA recognition and for the governance and management of protected areas established in indigenous peoples’ territories.
    [Show full text]
  • A Statistical Analysis of Mountaineering in the Nepal Himalaya
    The Himalaya by the Numbers A Statistical Analysis of Mountaineering in the Nepal Himalaya Richard Salisbury Elizabeth Hawley September 2007 Cover Photo: Annapurna South Face at sunrise (Richard Salisbury) © Copyright 2007 by Richard Salisbury and Elizabeth Hawley No portion of this book may be reproduced and/or redistributed without the written permission of the authors. 2 Contents Introduction . .5 Analysis of Climbing Activity . 9 Yearly Activity . 9 Regional Activity . .18 Seasonal Activity . .25 Activity by Age and Gender . 33 Activity by Citizenship . 33 Team Composition . 34 Expedition Results . 36 Ascent Analysis . 41 Ascents by Altitude Range . .41 Popular Peaks by Altitude Range . .43 Ascents by Climbing Season . .46 Ascents by Expedition Years . .50 Ascents by Age Groups . 55 Ascents by Citizenship . 60 Ascents by Gender . 62 Ascents by Team Composition . 66 Average Expedition Duration and Days to Summit . .70 Oxygen and the 8000ers . .76 Death Analysis . 81 Deaths by Peak Altitude Ranges . 81 Deaths on Popular Peaks . 84 Deadliest Peaks for Members . 86 Deadliest Peaks for Hired Personnel . 89 Deaths by Geographical Regions . .92 Deaths by Climbing Season . 93 Altitudes of Death . 96 Causes of Death . 97 Avalanche Deaths . 102 Deaths by Falling . 110 Deaths by Physiological Causes . .116 Deaths by Age Groups . 118 Deaths by Expedition Years . .120 Deaths by Citizenship . 121 Deaths by Gender . 123 Deaths by Team Composition . .125 Major Accidents . .129 Appendix A: Peak Summary . .135 Appendix B: Supplemental Charts and Tables . .147 3 4 Introduction The Himalayan Database, published by the American Alpine Club in 2004, is a compilation of records for all expeditions that have climbed in the Nepal Himalaya.
    [Show full text]
  • PROPOSED HYDROELECTRIC PROJECT TAMAKOSHI 3 (TA3) August 2009 1
    Information Brochure 01 PROPOSED HYDROELECTRIC PROJECT TAMAKOSHI 3 (TA3) August 2009 1 Information on the Proposed Tamakoshi 3 (TA3) Hydroelectric Project The Proponent/Developer for the project with new boundaries between SN Power is a growing international renewable Tamakoshi-Singati confl uence, and about 100 m energy company with projects in Asia, Latin upstream of the Tamakoshi bridge, at Kirnetar America and Africa. SN Power is a long-term was obtained on March 6th 2009. The TA-2 and industrial investor and is committed to social TA-3 projects have now been combined into one, and environmental sustainability throughout its i.e. the Tamakoshi 3 (TA3). The installed capacity business. The company’s current portfolio includes of the amended licence is 600 MW. hydropower projects in Nepal (Khimti Hydropower TA3 Project is located in Dolakha and Ramechhap Plant), India, the Phillipines, Sri Lanka, Chile, Peru districts. The proposed project will utilize the and Brazil. SN Power was established in 2002 fl ow of Tamakoshi River to generate electricity as a Norwegian limited company owned by by diverting the river at Betane and discharging Stratkraft, Norway’s largest utility company, and the water back into the river near Kirnetar. The Norfund, Norwegian state’s investment fund for project is under the optimization process and private companies in developing countries. In the various options are under evaluation. course of seven years, SN Power has established a strong platform for long-term growth. SN Power The project is a Peak Run-of-River (PROR) type is headquartered in Oslo, Norway. project. It is proposed to build a 102 m high dam near Betane to create a reservoir.
    [Show full text]
  • The Geology of the Tama Kosi and Rolwaling Valley Region, East-Central Nepal
    The geology of the Tama Kosi and Rolwaling valley region, East-Central Nepal Kyle P. Larson* Department of Geological Sciences, University of Saskatchewan, 114 Science Place, Saskatoon, Saskatchewan, S7N 5E2, Canada ABSTRACT Tama Kosi valley in east-central Nepal (Fig. 1). which were in turn assigned to either the Hima- In order to properly evaluate the evolution of the layan gneiss group or the Midlands metasedi- The Tama Kosi/Rolwaling area of east- Himalaya and understand the processes respon- ment group (Fig. 2). The units of Ishida (1969) central Nepal is underlain by the exhumed sible for its formation, it is critical that all areas and Ishida and Ohta (1973) are quite similar in mid-crustal core of the Himalaya. The geol- along the length of the mountain chain be inves- description to the tectonostratigraphy reported ogy of the area consists of Greater Hima- tigated, at least at a reconnaissance scale. by Schelling (1992) who revisited and expanded layan sequence phyllitic schist, paragneiss, The Tama Kosi valley is situated between the the scope of their early reconnaissance work. and orthogneiss that generally increase in Cho Oyu/Everest/Makalu massifs to the east Schelling (1992) separated the geology of metamorphic grade from biotite ± garnet and the Kathmandu klippe/nappe to the west the lower and middle portion of the Tama Kosi assemblages to sillimanite-grade migmatite (Fig. 1). Recent work in these areas serves to into the more traditional Greater Himalayan up structural section. All metamorphic rocks highlight stark differences between them. In the sequence (Higher Himalayan Crystallines) and are pervasively deformed and commonly Kathmandu region, the extruded midcrustal core Lesser Himalayan sequence lithotectonic assem- record top-to-the-south sense shear.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Gaurishankar Conservation Area - a Prime Habitat for Red Panda (Ailurus Fulgens) in Central Nepal
    The Initiation Gaurishankar Conservation Area - A Prime Habitat for Red Panda (Ailurus fulgens) in Central Nepal Arjun Thapa1 Sunil Thapa1 and Shambu Poudel2 Corresponding email: [email protected] Abstract: Globally threatened Red Panda is found in isolated high mountain’s bamboo- forest patches in Nepal, India, Bhutan, China and Burma. This study was focused in Gaurishankar Conservation Area, one of the newly declared protected areas of Nepal, with aim to glean baseline information regarding existence of Red Panda, its habitat status and conservation issues. Methods like altitudinal line intercept, key informant survey and consultation (with local people, herders, conservation stakeholder) were used to address the objectives. Marbu, Kalinchok, Gaurishankar (Dolkha District), Chuchure, Gumdel (Ramechhap District) and Fulpingkatti (Sindupalchok District) area were surveyed in first phase of study and presence of Red Panda distribution was recorded from Marbu, Kalinchok, Chuchure and Fulpingkatti forests areas through sign evidence (fecal pellets). A total of 24 transects were established randomly in the whole area and only 16 transects were worked effectively because of topographical barrier. Distribution of Red Panda was found as clumped pattern ( ). Among these sites, frequent sign encounter was recorded in Marbu (5.45/km) area followed by Fulpingkatti (5.06/km), Kalinchok (3.73/km) and Chuchre (1.67/km). Like in other areas, conservation issues like habitat destruction, livestock pressure, fire wood collection and illegal poaching were rampant in Gaurishankar also. This study recommended for detail survey on population status and conservation activities should be elaborated in current identified habitat as well as further survey should be focused on other possible habitats within conservation area.
    [Show full text]
  • District Profile - Dolakha (As of 10 May 2017) HRRP
    District Profile - Dolakha (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 280,8741 48 VDCs and 2 municipalities Damage Status - Private Structures Type of housing walls Dolakha National Mud-bonded bricks/stone 92% 41% Cement-bonded bricks/stone 5% 29% Damage Grade (3-5) 56,293 Other 3% 30% Damage Grade (1-2) 4,346 % of households who own 94% 85% Total 60,6392 their housing unit (Census 2011)1 NEWS & UPDATES 1. NRA Dolakha is planning to do survey of buildings which were missed out or where people were not convinced by the previous survey. NRA is planning to use the same DLPIU Engineers for the survey. The start date is yet to be finalized because of the election. 2. Bhimeshwor Municipality ward 1 (new) Bosimpa has been identified as one major village to resettle and they are planning to resettle 82 HH to Panipokhari. This is also taken as major pilot resettlement project in Dolakha. HRRP Dolakha HRRP © PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) BC PLAN 2,338 1,645 CA CEEPAARD,HURADEC SHORT TRAINING CARITAS - L POURAKHI VOCATIONAL TRAINING 599 5,398 CARITAS-N (Targets Achieved) CW RRN
    [Show full text]
  • Ttamak Koshi 3 Hyd Droel Ectric C Pro Oject
    TAMAKOSHI 3 HYDROELECTRIC PROJECT EXECUTIVE SUMMARY - VOLUME XI Document for Disclosure Final Report – November 30, 2009 SWECO Norge AS Lysaker, P O Box 400 Oslo, NORWAY Telephone +47 67 12 80 00 www.sweco.no Abbreviations and Acronyms ACBP Awareness and Capacity Building Plan ADB Asian Development Bank CF Community Forest CFUG Community Forest User Group CITES Convention of International Trade in Endangered Species CSR Corporate Social Responsibility DFO District Forest Office DOED Department of Electricity Development EHSP Environment, Health and Safety Plan EIA Environmental Impact Assessment EMP Environmental Management Plan EMU Environmental Management Unit EPA Environmental Protection Agency EPR Environmental Protection Rules GLOF Glacial Lake Outburst Floods GON Government of Nepal GRU Grievance Redressal Unit GW Giga-watt GWh Giga-watt per hour HEP Hydroelectric Project HH/hh Household ICAMDP Immediate Catchment Area Management and Development Plan IFC International Financial Corporation IUCN International Union for the Conservation of Nature LSEP Livelihood Support and Enhancement Program m asl meters above sea level MOE Ministry of Energy MoEn Ministry of Environment MoWR Ministry of Water Resources MT Million Tons MW Mega Watt NEA National Electricity Authority PAF Project Affected Families PAP Project Affected Persons PCDP Public Consultation and Disclosure Plan PS Performance Standards RAP Resettlement Action Plan RRP Resettlement and Rehabilitation Plan SBA Safeguard Buffer Area SchEMS School of Environmental Management and Sustainable Development SEMD Social and Environmental Management Division SNP SN Power SPAF Severely Project Affected Families SPS Safeguard Policy Statement TA3HEP Tamakoshi 3 Hydroelectric Project TOR Terms of Reference VDC Village Development Committee WBG World Bank Group WHO World Health Organization Table of Content Page nos 1 Project Proponent and Organization Responsible for Preparing the EIA Report .........................................................
    [Show full text]
  • Download File
    Project Update Newsletter ofPrakritiPrakriti the National Trust for Nature Conservation July-December, 2014 TWO NEW ANIMAL SPECIES RECORDED FOR THE 1ST TIME IN NEPAL Senior Conservation Officer of National Trust for Nature Conservation (NTNC), Mr. Madhu Chetri, a PhD fellow at Hedmark University College, Norway has recorded 2 new species for the first time in Nepal. The new species are the Steppe polecat Mustela eversmanii, recorded on June 23, 2014 and Tibetan/Himalayan wolf Canis lupus chanco, recorded on May 27, 2014 in Dharkeko pass of Upper Mustang at 5046 m asl. Mr. Chetri shared his research experience and process of identification of species in a press conference held at NTNC premises on August 22, 2014. NTNC organized a Steppe Polecat press conference to announce the record of the Chitwan Annapurna Landscape Judy Oglethorpe, Chief of Party of Hariyo of both species for the first time in Nepal (CHAL) since September 2013 through Ban Program spoke about the significance in the presence of government officials, various methods like camera trapping of this scientific achievement. Mr. academia, experts, donor agencies, and and genomic studies. Govinda Gajural, the Member Secreatary conservation partners. of the Trust welcomed the invitiees at On the occasion, Dr. Maheshwar Dhakal, Information on biological resources are Ecologist of Department of National Parks the conference. This study was initiated scanty and limited to isolated pocket and Wildlife Conservation (DNPWC); Dr. by NTNC with the support of the areas. Hence, NTNC has initiated long Ghanshyam Gurung, Sr. Conservation USAID Hariyo Ban Program and further term ecological research with an aim to Program Director of WWF Nepal; Mr.
    [Show full text]
  • Politics of R Esistance
    Politics of Resistance Politics Tis book illustrates an exciting approach to understanding both Indigenous Peoples of Nepal are searching for the state momentous and everyday events in the history of South Asia. It which recognizes and refects their identities. Exclusion of advances notions of rupture and repair to comprehend the afermath indigenous peoples in the ruling apparatus and from resources of natural, social and personal disasters, and demonstrates the of the “modern states,” and absence of their representation and generality of the approach by seeking their historical resolution. belongingness to its structures and processes have been sources Te introduction of rice milling technology in a rural landscape of conficts. Indigenous peoples are engaged in resistance in Bengal,movements the post-cold as the warstate global has been shi factive in international in destroying, relations, instead of the assassinationbuilding, their attempt political, on a economicjournalist and in acultural rented institutions.city house inThe Kathmandu,new constitution the alternate of 2015and simultaneousfailed to address existence the issues, of violencehence the in non-violentongoing movements,struggle for political,a fash feconomic,ood caused and by cultural torrential rights rains and in the plainsdemocratization of Nepal, theof the closure country. of a China-India border afer the army invasionIf the in Tibet,country and belongs the appearance to all, if the of outsiderspeople have in andemocratic ethnic Taru hinterlandvalues, the – indigenous scholars in peoples’ this volume agenda have would analysed become the a origins, common anatomiesagenda and ofdevelopment all. If the state of these is democratic events as andruptures inclusive, and itraised would interestingaddress questions the issue regarding of justice theirto all.
    [Show full text]
  • Management Plan 2016‒2020
    SAGARMATHA NATIONAL PARK AND ITS BUFFER ZONE MANAGEMENT PLAN 2016‒2020 Government of Nepal Ministry of Forests and Soil Conservation Department of National Parks and Wildlife Conservation Sagarmatha National Park Office Namche Bazaar, Solukhumbu, Nepal Published by : Sagarmatha National Park Office, Namche Bazaar, Solukhumbu, Nepal Copyright : 2016, SNP- Any reproduction in full or in part of this publication must mention the title and credit the above mentioned publisher as the copyright owner. Cover Photo : Ganesh Pant, Chief Conservation Officer Design and Printing : Creative Link Pvt. Ltd., Bagbazaar, Kathmandu, Nepal Telephone: +977-1-4216913 SAGARMATHA NATIONAL PARK AND ITS BUFFER ZONE MANAGEMENT PLAN 2016‒2020 Government of Nepal Ministry of Forests and Soil Conservation Department of National Parks and Wildlife Conservation Sagarmatha National Park Office Namche Bazaar, Solukhumbu, Nepal Government of Nepal Ministry of Forests and Soil Conservation D e M n i n o p n G l io ti Department of Nationala is o Parks aandt a Wildlife Conservation rt tr ver ep va v m y nment of N r r e of se se nt Fo on n o rests Soil C Co f N and fe atio ildli nal Parks and W 2037 FOREWORD Sagarmatha National Park was established in 1976 with the aim of conserving endangered wildlife species, majestic landscape and local culture of the Khumbu region. In recognition of its superlative natural phenomenon, the park was listed in the World Heritage Site in 1979. The area was opened to the foreigners since 1950. The region got popularity in global community, when Sir Edmund Hillary and Tenzing Norgay Sherpa first climbed the Mt.
    [Show full text]
  • Nepal Studies Association Bulletin, No. 10 Nepal Studies Association
    Yale University EliScholar – A Digital Platform for Scholarly Publishing at Yale Nepal Studies Association Newsletter Yale Himalaya Initiative Spring 1976 Nepal Studies Association Bulletin, No. 10 Nepal Studies Association Donald A. Messerschmidt Washington State University Follow this and additional works at: http://elischolar.library.yale.edu/ yale_himalaya_initiative_nepal_studies Part of the Asian Studies Commons, Forest Management Commons, Geography Commons, Social and Cultural Anthropology Commons, and the South and Southeast Asian Languages and Societies Commons Recommended Citation Nepal Studies Association and Messerschmidt, Donald A., "Nepal Studies Association Bulletin, No. 10" (1976). Nepal Studies Association Newsletter. 10. http://elischolar.library.yale.edu/yale_himalaya_initiative_nepal_studies/10 This Newsletter is brought to you for free and open access by the Yale Himalaya Initiative at EliScholar – A Digital Platform for Scholarly Publishing at Yale. It has been accepted for inclusion in Nepal Studies Association Newsletter by an authorized administrator of EliScholar – A Digital Platform for Scholarly Publishing at Yale. For more information, please contact [email protected]. 'NEPAL STUDIES ASSOCIATION BULLETIN SPRING 1976 THREE TIMES ANNUALLY NUMBER 10 TABLE OF CONTENTS IN THIS ISSUE - SPECIAL NOTE: INFORMATION FOR THE MEMBERS: p.2 Election for Executive Committee Please vote for the three Executive Membership Fees Due Committeemen (for terms 1976-1979) p.3 Treasurer's Report on the attached colored ballot form. Report from Kathmandu See page 2 for details. p.4 Report from Claremont Nepalese Students at SIU Please pay your membership dues SEMINARS AND MEETINGS: promptly. The future of this p.5 Humanities Seminar (in Nepal) Bulletin depends on them! See page Hill Lands Seminar (in USA) 2 and the Treasurer's Report, page 3.
    [Show full text]