THE LONDON GAZETTE, 20Rn OCTOBER 1989 12089

Total Page:16

File Type:pdf, Size:1020Kb

THE LONDON GAZETTE, 20Rn OCTOBER 1989 12089 THE LONDON GAZETTE, 20rn OCTOBER 1989 12089 (g) the operation of ornamental fountains or cascades, including amenity pool for trout fishing. The capacity of the reservoir at anywhere water is recycled; overflow level will be 1,300,000 gallons. (h) the operation, in relation to any building or other premises, of Further details of the application are: when the pool is filled to any cistern which flushes automatically, during any period design capacity, all flows will be passed along the line of the original when premises are wholly or substantially unoccupied. (950) water course. A copy of the application and of any map, plan or other document submitted with h, may be inspected free of charge at the YORKSHIRE WATER SERVICES LIMITED Dolbrawdmaeth Inn, Dinas Mawddwy, at all reasonable hours during the period beginning on 20th October 1989 and ending on WATER ACT 1989 18th November 1989. Any person who wishes to make representations about the Application for Drought Order—River Hull application should do so in writing to the Divisional Hydrologist, Notice is hereby given that Yorkshire Water Services Limited is National Rivers Authority, North Wales Division at applying to the Secretary of State for the Environment for an Order Penrhosgarnedd, Bangor, before the end of the said period. (to remain in force for 6 months) under section 131 of the Water Act /. H. Astill, on behalf of G. J. Williams 1989 authorising a temporary modification of the restrictions to 13th October 1989. (749) which the company is subject as respects abstraction of water from the River Hull and the West Beck at NCR TA 080 499 and TA 081 521 respectively under the provisions of the Kingston-upon-Hull Water Order 1955 and licence number 2/2631/47, namely the NATIONAL RIVERS AUTHORITY-SEVERN-TRENT restrictions prohibiting abstraction when the flow in the River Hull REGION (measured at Hempholme Weir) is less than 416,667 gallons per hour Notice of Application for Licence to Abstract Water (ten million gallons per day). The order would permit abstractions at the present authorised rate whenever the prescribed flow in the river Notice is hereby given that an application is being made to the at Hempholme Weir is not less than five million gallons per day. National Rivers Authority by Doris Emma Timmis & Sons of Within 7 days from the service of this notice, copies of the Knightley Eaves Farm, Eccleshall, Staffordshire, for a licence to application may be inspected at all reasonable hours at the offices of abstract the following quantities of water from The Lonco Brook at Yorkshire Water Services Limited at Essex House, Manor House, Knightley Eaves Farm, in the Parish of Gnosall in the District of Kingston-upon-Hull HU1 1YW (Telephone 0482-28591); Stafford at the following point of abstraction: 13,700 cubic metres Monkgate, York YO3 7RH (Telephone 0904-642131) and West per year at S J 798270. Riding House, 67 Albion Street, Leeds LSI 5AA (Telephone 0532- Further details of the application are: the water is to be abstracted 448201) and objections to the application may be made to the during the winter for spring irrigation. Secretary of State for the Environment at Room B.449, Romney A copy of the application and of any, map, plan or other House, 43 Marsham Street, London SW1P 3PY. document submitted with it may be inspected free of charge at Should it appear to the Secretary of State that the Order is Knightley Eaves Farm, Eccleshall, Staffordshire at all reasonable required to be made urgently if it is to enable the Company hours during the period beginning on 20th October 1989 and ending effectively to meet the deficiency of supplies in its area, he may direct on 20th November 1989. that die holding of a public local enquiry or a hearing by a person Any person who wishes to make representations about the appointed by him should be dispensed with. application should do so in writing to the Catchment Regulation Section, National Rivers Authority at Severn-Trent Region, A. Ward, Managing Director Sapphire East, 550 Streetsbrook Road, Solihull, B911QT before the West Riding House, end of the said period. 67 Albion Street, Leeds LSI 5AA. P. Timmis, on behalf of D. E. Timmis & Sons 18th October 1989 (951) 20th October 1989. (750) WATER RESOURCES ACT NATIONAL RIVERS AUTHORITY-SOUTHERN REGION Notice is hereby given that an application is being made to the NATIONAL RIVERS AUTHORITY National Rivers Authority Southern Region by Wadhurst Park Ltd, Morghew Farm, Tenterden, Kent to vary licence serial number Notice of Application for Licence to Abstract Water 9/40/6/36/SR to abstract water from private ditches at Morghew Notice is hereby given that an application is being made to the Farm, Tenterden, Kent and to abstract water from the said inland National Rivers Authority by E. J. & M. Redmayne, Blakey Hey water at or near that point. Farm, Samlesbury, Preston, for a licence to abstract water from a The variation applied for is: to increase the annual rates from borehold at the following point of abstraction: 3,750 gallons per day 18,185m3 to 40,000m* to increase the daily rates from 682m3 to at SD 617286 at Samlesbury. 1000m3; to include the months of July, August and September; to Further details of the application are: for agricultural purposes. include the land outlined in blue; to use sluice marked X, map A copy of the application and of any map, plan or other document reference TQ872291, to feed in the extra water. submitted with it may be inspected free of charge at Blakey Hey A copy of the application and of any map, plan or other document Farm, Samlesbury, Preston, at all reasonable hours during the submitted with it may be inspected free of charge at Morghew Farm period beginning on 19th October 1989 and ending on 19th Office at all reasonable hours during the period beginning on 20th November 1989. October 1989 (inc.) and ending on 18th November 1989 (inc.). Any person who wishes to make representations about the Any person who wishes to make representations about the application should do so in writing to National Rivers Authority, application should do so in writing to the Resources Manager NRA Control & Regulation Section, New Town House, Buttermarket Division Southern Water, Guildbourne House, Worthing, Sussex Street, Warrington, before the end of the said period. BN111LD before the end of the said period. £. J. Redmayne, on behalf of E. J. M. Redmayne R. /. Bryan 14th October 1989. (730) llth October 1989. (743) NATIONAL RIVERS AUTHORITY-NORTH WALES NATIONAL RIVERS AUTHORITY-SOUTHERN REGION DIVISION Notice of application to vary a licence to abstract water Notice of Application for Licence to Obstruct or Impede the Flow of an Notice is hereby given that an application is being made to the Inland Water by means of Impounding Works National Rivers Authority Southern Region by Care Leisure Ltd. to Notice is hereby given that an application is being made to the vary licence No. 11/42/10.2/12, to abstract water from a borehole at National Rivers Authority, North Wales Division by G. J. Williams, the Beualieu Road Hotel, Nr. Lyndhurst, Hants. Grid Ref. Dolbrawdmaeth Inn, Dinas Mawddwy, Machynlleth, Powys for a SU350063. licence to obstruct or impede the flow of a spring in OS No. 987 at The variation applied for is to increase the annual authorised Grid Reference 861135 in the Parish of Dinas Mawddwy. The object abstraction to 2300 cubic metres. Daily and hourly abstraction rates of impounding water by means of the works is the creation of an are to remain unchanged..
Recommended publications
  • Draft Minutes of Brandesburton Parish Council Meeting Held on Monday, 11 September 2017 at 7.00Pm in the Methodist Chapel Schoolroom
    Draft Minutes of Brandesburton parish council meeting held on Monday, 11 September 2017 at 7.00pm in the Methodist Chapel Schoolroom. Present: Mr Olsen (chair), Mr Atkinson, Mrs Richardson, Mrs Mossford, Miss Coates, Mrs Wright, Mr Kittmer, Mr Richardson, Cllr Owen, Cllr Evison Apologies: Mrs Malcolmson, Mrs Whitfield, Mr Voase An open meeting was held for the first 30 minutes as residents had attended to discuss various matters. Proposed parking restrictions Main Street: Jackie Suthernwood had attended the meeting to speak regarding the proposed parking restrictions. Mrs Suthernwood was not happy with some of the restrictions proposed and would be putting in comments if and when it goes to consultation. Mrs Suthernwood commented that it is useful to have vehicles parking on Main Street as it acts as a traffic calming measure which would stop if they were no longer allowed to park. Heavy vehicles are causing houses to shake. Cllr Evison commented on the fact that although there are double yellow lines outside of the shops at present, delivery vehicles are allowed to park outside of the shops to deliver and also other vehicles can for a very limited period. The proposed restrictions would have no waiting and no loading restrictions at any time and delivery vehicles would then have to park at the side when making deliveries. If the restrictions are approved then there would be a period of embedding then after 1-month motorists would be ticketed if parking in no waiting areas. Allotments: An allotment holder attended to discuss various matters regarding the allotments. A letter had been sent to all of the allotment holders at the request of one of the allotment holders regarding the weeds growing in some of the plots.
    [Show full text]
  • River Hull Integrated Catchment Strategy Strategy Document
    River Hull Advisory Board River Hull Integrated Catchment Strategy April 2015 Strategy Document Draft report This Page is intentionally left blank 2 Inner Leaf TITLE PAGE 3 This page is intentionally left blank 4 Contents 1 This Document.............................................................................................................................17 2 Executive Summary ..............................................................................................................18 3 Introduction and background to the strategy ..................................20 3.1 Project Summary .................................................................................................................................... 20 3.2 Strategy Vision ........................................................................................................................................ 20 3.2.1 Links to other policies and strategies .......................................................................................21 3.3 Background .............................................................................................................................................. 22 3.3.1 Location ........................................................................................................................................... 22 3.3.2 Key characteristics and issues of the River Hull catchment ...............................................22 3.3.3 EA Draft River Hull Flood Risk Management Strategy .........................................................26
    [Show full text]
  • HUMBER PROJECTS MONITORING SHEET Last Update: 23 June 2017
    HUMBER PROJECT MONITORING SHEET Paper D HUMBER PROJECTS MONITORING SHEET Last update: 23 June 2017 Notes for completion Project number LGF project EZ site refs Project title and brief Named project owner / Project progress and Current delivery description Last updated main delivery barriers milestones Create a project number To identify if the project Insert site number(s) of Consistent project title in State the name and Note progress to date. Identify those issues Hxx in sequence. This or component(s) of it are related EZ sites. bold. organisation of the Note future milestones. which are currently, or number will act as a funded via LGF funds. Humber LEP to circulate Brief project description person who is anticipated to be barriers unique reference across H – Humber LEP these site references in new paragraph below. responsible for this to timely and cost- all LEP activity. record, and can be effective delivery. NY – York, North shortly. contacted for more Yorkshire & East Riding information. LEP Enter the month and year GL – Greater the record was last Lincolnshire LEP updated. TOTAL PROJECT IMPACTS SINGLE CONVERSATION MATTERS Action progress notes Capital value (£M) Jobs Homes Need for action Matters needing statutory agency action / intervention Insert total capital value Identify the direct jobs Identify the direct homes 1 (RED) – Immediate Clearly identify the Note important updates of the project. This potential (including potential (including action or intervention actions or interventions since the entry was last provides an indication of enabled) of the end enabled) of the end required. required from statutory updated and important scale, potential economic scheme, as used in any scheme, as used in any 2 (AMBER) – Actively agencies in order for the progress / continued impact, particularly for appraisal.
    [Show full text]
  • EAST RIDING YORKSHIRE. [KELLY's Chapel, Erected in I876, Will Seat Aso Persona
    572 LEVEN. EAST RIDING YORKSHIRE. [KELLY's chapel, erected in I876, will seat aso persona. The Clerk to the Magiat.rates, Jas. Mills, Lairgat&, Beverley Temperance Hall, erected in 186o, belongs to the Deputy Clerk, John Cooper, Butcher row, Beverley Wesleyan bod7, and will hold I.5o. The reading room Petty Sessions are held at the Court house, Leven, evarr was erected in 1913, and contains games rooms. alternate wedneaday, at II a.m. The following places Heigholme Hall is the residence of Capt. William are included in the petty sessional divi1ion :-A.rnold, Harrison Preston J.P. Capt. Preston and William Atwick, Arram, Bewholme &c. Bonwick, Brandea­ Bethell esq. of Rise Park, who is lord of the manor, burton, Catfoss, Catwick, Dringh()e, Dunnington, Gox­ Major F. 0. Strickland-Constable, of Wassand Hall, hill, Hatfield Magna, Hatfield Parva, Leven, Maple­ and the rector are the. principal landowners ; there ton, Moortown, Riae, Biston, Rowl9ton, Routh, Sig­ are also manr smaller landowners in the parish, the glesthorpe, Skipsea, Skirlaugh, Wassand &; Seaton, portion of it being copyhold. The soils are Withernwick various and of a gravelly nature on the high lands, but on the low lands a loamy vegetable earth ; the subsoil is County rolice Station, built m I8S:;a; John William chiefly elay. The chief crops are wheat, oats, barley, Rob son, superintendent; a sergeants & 10 constables roots and seeds. The area of the civil parish is 3,984 Public Elementary Scllools. acres of land, a4 of water, 10 of tidal water and 4 of Leven (mixed), erected to hold 181; average attendance, foreshore; rateable value, £4,948 ; the population in 140; William J.
    [Show full text]
  • Cancelling Or Amending a Published Walk NB
    Ramblers Association East Yorkshire and Derwent Area Winter 2017 Cancelling or Amending a Published Walk Thankfully, cancellation of a Led Walk published on the Ramblers National Walks Finder is infrequent and often because the: - 1. Start point is inaccessible due to weather 2. Planned route cannot be walked or is hazardous 3. Named leader is unavailable and a replacement cannot be found Fuller explanation of the above and policy can be read on the Area website www.eastyorkshireramblers.org.uk/doc-store/area- policy-reports When a Group Secretary, Walks Secretary or Leader wishes to cancel or make an amendment to the National Walks Finder they should contact one of the following: Geoff Richardson - email [email protected] or phone 0113 2813576 Tony Corrigan - email [email protected] or phone 01430 873734 Martin Hill - email [email protected] or phone 01377 270731 When a change is implemented please notify the appropriate Group Secretary. Check for the latest information relating to cancelled or amended led walks by looking at www.eastyorkshireramblers.org.uk NB: Explanation of Notes abbreviations follow the walks list DateHeadingDay Time Group Leader Miles Grid Ref. Location details Notes 24-Sep-17 Sun 10:00 B J Neal 8 TA 102 633 Burton Agnes House CP DoL 24-Sep-17 Sun 10:30 H&G D Stuart 8 SE 735 658 Kirkham Priory CP, near Malton YO60 7JS 24-Sep-17 Sun 10:00 P T Ashbridge 11 TA 216 696 Danes Dyke CP ND 24-Sep-17 Sun 10:00 R A Strickland 9.5 SE 612 887 Cowhouse Bank CP ND 24-Sep-17 Sun 10:00 S S Earnshaw 10 SE 830 519 Millington
    [Show full text]
  • 7M Environment Kjagency
    7m Environment KJ Agency River factfiles The Hull catchment et to kn ow our rivers We are the Environment Agency. It’s our job to look after your environment and make it a better place - foryou, and for future generations. Your environm<xyD ‘ e water you drink and the grounc business, Government ar En v ir o n m e n t Ag en cy e makingyour environment cl Information Services Unit ---------------------------------------------------------------- __________________________________ u:- t-. .u _ The Environme Please return or renew this item by the due date —g your environment Due Date a better place. Published by: Environment Agency Rivers House 21 Park Square South Leeds LSI 2QG Tel: 08708 506 506 Email: [email protected] www.environment-agency.gov.uk © Environment Agency All rights reserved. This document may be reproduced with prior permission of the Environment Agency. The River Hull starts life as a series of small becks in the East Yorkshire Wolds. The river’s headwaters form the most northerly chalk stream system in Britain and the clean waters support a variety of plant and animal life. This part of the catchment has largely escaped the pressures of industry and urban development. The Hull catchment The picture changes further By the early nineteenth century, the effects of industrial effluent and downstream - when the river industries such as shipbuilding, oil sewage dumped into its waters. reaches Hempholme Weir it and sugar refining and animals Thankfully, the River Hull and its becomes tidal and is heavily foodstuffs processing had tributaries have seen engineered and contained within developed.
    [Show full text]
  • Minutes of Brandesburton Parish Council Meeting Held on Monday, 12 February 2018 at 7.00Pm in the Methodist Chapel Schoolroom
    Minutes of Brandesburton parish council meeting held on Monday, 12 February 2018 at 7.00pm in the Methodist Chapel Schoolroom. Present: Mr. Olsen (Chair), Mr. Kittmer, Mr. Richardson, Mrs. Mossford, Mrs. Whitfield, Mrs. Richardson, Miss. Coates, Mr. Voase, Mrs. Wright Apologies: Mr. Atkinson, Cllr. Owen, Cllr, Evison The proprietors of Costcutter and Munro’s Newsagents attended the meeting as they had received a letter from the Chair regarding the proposed parking restrictions for the village. Letters are also going to be sent to all of the other businesses in the village. The Chair apologised that at this moment only letters had been sent to Costcutter and Munro’s. Costcutter deliveries are made to round the back of the premises early in the morning and the newsagent has deliveries to the front of the shop between 6.30am- 7.00 am and therefore do not affect the bus service at that time in the morning. However, if they were stopped from having the delivery to the front of the shop on Main street and had to have the delivery to round the back of the premises then they could not guarantee that this wouldn't coincide with the delivery to Costcutter. This would then cause problems for vehicles entering and exiting Frodingham Road onto Main Street. They also feel that if the parish council stop people from parking for 5 minutes outside of the shops then the parish council will drive away trade. It was explained to them that this is the last thing that we want but that the problem with parking is not new and that we are trying to find a solution that will please as many as possible.
    [Show full text]
  • Walking and Outdoors Festival 8Th - 16Th September 2018
    WALKING AND OUTDOORS FESTIVAL 8TH - 16TH SEPTEMBER 2018 © Martin Jones Booking Clothing and what For health and safety to bring with you WALK, CYCLE, RIDE, reasons some events have Warm and waterproof a maximum number of clothing and suitable participants. Booking is footwear is recommended essential for these events. on all events. Please wear EAT, DRINK, EXPLORE Please book early as places walking boots on all walks. are limited. Please bring plenty to drink and on longer events you & DISCOVER Details of how to book can may need a packed lunch. If be found with each individual refreshments are available at event. Some events do not the event location this will be This fabulous festival in the beautiful Yorkshire range of outdoor pursuits including cycling, require pre-booking. Wolds offers superb activities that will appeal special interest and historical walks, horse stated in the programme or to families, casual walkers and enthusiasts riding, nature safaris, bushcraft, nordic walking, Cancellations and when you make your booking. alike. specialist guided walks, boat trips and even a refunds Cycle Rides Now in it’s 8th year the Yorkshire Wolds Buddhist experience plus lots more. No refund will be given unless All cycles must be roadworthy Walking and Outdoors Festival 2018 has For a full list of events in the East Riding of the event is cancelled by and in a good working grown in reputation showcasing the wonderful Yorkshire, please visit: the organisers or there are condition. If in doubt please exceptional circumstances. landscape and celebrating the rich heritage www.visithullandeastyorkshire.com get your bike professionally of the Yorkshire Wolds.
    [Show full text]
  • "Providing Long Term Sustainable Management of Flood Risk"
    River Hull Advisory Board River Hull Integrated Catchment Strategy May 2016 Strategy Document Final report "Providing long term sustainable management of flood risk" This document was issued and approved as follows: Version Control Version Originator Checked Date Comment 1 BK AM 10/07/2015 2 CB AM 30/03/2016 3 BK AM 31/05/2016 Partner Approvals Record Organisation Approver Date of Approval East Riding of Yorkshire Council Cabinet 7 July 2015 Hull City Council Cabinet 22 June 2015 Area Flood and Coastal Environment Agency 3 July 2015 Risk Manager Beverley & North Holderness Board 8 July 2015 Internal Drainage Board Yorkshire Water Flood Risk Manager 9 July 2015 River Hull Advisory Board Board 10 July 2015 Through the above approval the partners are recognising the work that has been carried out to produce the River Hull Integrated Catchment Strategy which sets out a holistic and strategic approach to managing the flood risk for the River Hull catchment. The partners have agreed to have regard to this Strategy in formulating their future proposals for managing flood risk within the catchment. The progression of individual projects or interventions identified within this Strategy will be subject to the normal assurance and approval processes of the individual body concerned and those of any relevant funding body. i RIVER HULL ADVISORY BOARD RIVER HULL INTEGRATED CATCHMENT STRATEGY MAY 2016 ©2016. East Riding of Yorkshire Council. All rights reserved. No part of this publication may be reproduced in any form or by any means without the prior permission of East Riding of Yorkshire Council ii Contact information For further information about this Strategy, please contact us using the details below.
    [Show full text]
  • Waterways Strategy 2012-2020
    Rural Development Programme for England/LEADER East Riding of Yorkshire and North Yorkshire (Ryedale District and Scarborough Borough) Coast,LEADER W olds,Local Action W Groupetlands & Waterways Coast, Wolds, Wetlands & Waterways East Riding & North Yorkshire Waterways Partnership WATERWAYS STRATEGY 2012-2020 The European Agricultural Fund for Rural Coast, Wolds, Wetlands & Waterways Development: Europe investing in rural areas ACKNOWLEDGEMENTS Acknowledgements This is a Partnership Strategy that has been driven by, and written for, its members. As such, thanks go to all partners that have contributed throughout the strategy development process, on a formal and informal basis. Without this willingness to share issues and opportunities and balance priorities, the creation of this document would not have been possible. Thank you to members of the Community and Technical Forums for the consistent input into the document, and the shaping of its outcomes, priorities and objectives. Thank you to everyone else that has made comments on the document or who has had an involvement in its production. Thank you to the LEADER CWWW Local Action Group for developing the Partnership, for their vision in identifying the potential that the area’s waterways possess and for providing funding for the Partnership, and the projects that is has been able to support. Thank you to East Riding of Yorkshire Council for hosting Partnership staff, and for providing crucial ongoing support to the Partnership’s development. Thank you to North Yorkshire County Council, Scarborough Borough Council and Ryedale District Council for their involvement and support. Finally, thank you to the Partnership Executive Committee for their ongoing direction and guidance.
    [Show full text]
  • Infrastructure Delivery Plan
    East Riding of Yorkshire Council Infrastructure Delivery Plan March 2015 Infrastructure Delivery Plan East Riding Infrastructure Delivery Plan 1.1 This Infrastructure Delivery Plan (IDP) sets out what infrastructure is likely to be needed to support the amount and distribution of housing and economic development set out within the East Riding Local Plan. It draws on information from the East Riding Infrastructure Study and identifies the main partners that will have a role in helping to deliver the Local Plan. The Community Infrastructure Levy (CIL) is likely to be an important way of funding infrastructure, where existing funding sources are insufficient. The delivery timescales set out in the IDP are indicative and based on development occurring at a linear rate each year. However, the baseline (existing) capacity of infrastructure can also change over time, which may result in changes to timescales over which new investment would be required 1.2 The infrastructure set out within the IDP has been broken down to highlight those elements considered to be essential in delivering the scale and location of development promoted within the Local Plan. Essential infrastructure is that which definitely needs to be provided prior to particular developments taking place. Whilst a need exists for other infrastructure, and has been set out within the Delivery Plan, it may still be possible for development to go ahead prior to this infrastructure being in place. East Riding of Yorkshire Council 1 Infrastructure Deli Infrastructure Infrastructure Delivery
    [Show full text]
  • Humber Eel Management Issues: Barriers and Stocking
    UNIVERSITY OF Hull International Fisheries Institute HIFI Humber eel management issues: barriers and stocking FINAL REPORT A. D. Nunn, J. P. Harvey, R. A. A. Noble & I. G. Cowx April 2007 TABLE OF CONTENTS Page No. LIST OF TABLES iv LIST OF FIGURES iv LIST OF PLATES v ACKNOWLEDGEMENTS viii 1. INTRODUCTION 1 2. OBJECTIVES 1 2.1 Specific objectives 2 3. PROJECT STRATEGY 2 3.1 Identification of eel migration barriers 2 3.1.1 Collection and collation of fisheries data 2 3.1.2 Prioritisation of eel migration barriers 2 3.2 Elver stocking 3 4. DEVELOPMENT OF PRIORITISATION MATRICES 3 4.1 Eel migration barrier prioritisation matrix 3 4.2 Elver stocking prioritisation matrix 6 5. PRIORITISATION OF EEL MIGRATION BARRIERS 7 5.1 River Hull 7 5.2 Yorkshire Ouse 11 5.3 Yorkshire Derwent 11 5.4 River Ure 13 5.5 River Swale 14 5.6 River Nidd 15 5.7 River Wharfe 16 5.8 River Trent 17 5.9 River Don 19 5.10 River Rother 20 5.11 River Dearne 21 5.12 River Aire 22 5.13 River Calder 23 5.14 River Ancholme 24 5.15 River Foulness/Market Weighton Canal 25 5.16 Swinefleet Warping Drain 26 5.17 Tetney Haven 26 5.18 Adlingfleet Drain 27 5.19 Pauper’s Drain 27 5.20 Bosky Dyke (Keadby Warping Drain) 28 6. PRIORITISATION OF ELVER STOCKING AREAS 28 6.1 Yorkshire Ouse 28 6.2 Yorkshire Derwent 36 6.3 River Ure 39 6.4 River Trent 39 6.5 River Don 46 6.6 River Rother 49 6.7 River Dearne 51 6.8 River Aire 54 6.9 River Calder 57 6.10 River Ancholme 60 ii 6.11 Swinefleet Warping Drain 60 6.12 Tetney Haven 62 6.13 Adlingfleet Drain 62 6.14 Pauper’s Drain 62 6.15 Bosky Dyke (Keadby Warping Drain) 64 7.
    [Show full text]