One Grafton Mews. Milton Keynes

Total Page:16

File Type:pdf, Size:1020Kb

One Grafton Mews. Milton Keynes ONE GRAFTON MEWS 1 1 GRAFTON MEWS MILTON KEYNES ONE GRAFTON MEWS Grade A Office Space to Let - Second Floor - 5,368 sq ft ONE GRAFTON MEWS 1 1 GRAFTON MEWS MILTON KEYNES One Grafton Mews is located at the Heart of the Milton Keynes business district. The high quality office building totals 20,200 sq ft and ONE GRAFTONis situated adjacent to the Pinnacle a fullyMEWS occupied 190,000 sq ft property occupied by well established businesses such as Deloitte, Dentons and Baker Tilly. One Grafton Mews offers open plan, Grade A office accommodation over ground and first floors with excellent natural light throughout. Grafton Park First floor offices ONE GRAFTON MEWS 1 1 GRAFTON MEWS Bannatyne Gym The Centre: MK Xscape MK Jury’s Inn, Brasserie Blanc, Loch Fynes, BP, Shoosmiths Zen Garden KPMG MHA Macintyre Hudson Shakespeare ONE GRAFTON MEWS Martineau Travelodge Deloitte, Grant Thornton Baker Tilly, Dentons Network Rail Santander VmWare MILTON KEYNES Specification 3-pipe fan coil air-conditioning BREEAM ‘Excellent’ Rating 5,305 sq ft (492 sq m) Suspended ceilings with LG7 lighting 150mm fully accessible raised floors Passenger Lift Male and Female WCs on each floor First floor plan Shower facilities and bicycle storage EPC- B(42) Enhanced parking provision 4,706 sq ft (438 sq m) Ground floor plan ONE GRAFTON MEWS 1 1 GRAFTON MEWS onegraftonmews.co.uk MILTON KEYNES MK9 1FB One Grafton Mews sits at the heart of the One Grafton Mews is situated within the town. On its doorstep is The Centre:MK centre of the transport grid whatever shopping centre, housing over 250 shops, your mode of travel. cafés and department stores. Milton Keynes Central railway station The Hub, which is also just a few minutes is just a five minute walk away. From walk away, has more than 20 bars, cafés there, London Euston is a 30 minute train ONE GRAFTON MEWSand restaurants including Loch Fyne and journey and Birmingham is only Brassiere Blanc – perfect for a business 40 minutes in the opposite direction. lunch or relaxing after work. A10 A14 A509 BURY 9 ST EDMUNDS 16 NORTHAMPTON NEWMARKET D 0 OA 5 TO NEWPORT PAGNELL A14 TO BIRMINGHAM R A ON A428 T A5 15 A6 CAMBRIDGE ER LV O A11 W M1 BEDFORD A508 A1 M11M11 TO LONDON A509 A1198 D A5 ROA RT 14 WOLVERTON NEWPO A421 2 42 14 A 13 A MILTON A505 OAD 51 RD R GRAFTON S 3 10 RATFO TR 0 ST KEYNES E S ET A43 Y A A X A421 A6 W O M1 KS N N N Y T E A TO W O W ORTWAY O P M P N O A5 S NG RT A413 8 ONE GRAFTON MEWS T G M W 1 WE D A E STEVENAGE E 9 R L LUTON STANSTED A5 E 50 L BICESTER 1 GRAFTON MEWS ST A L L S Y A418 11 7 AIRPORT N B L W A CHILDS WAY T DUNSTABLE LUTON D S O WA ATLING STREET A R A41 AIRPORT R X O 1 O 2 10 A1(M)A1 (M) Y O A A U B 4 W N R D M40 A RT G I S G C M11 PO BLVD H K TA 9 A12 D A R H RON 4 AYLESBURY BLV T IL F E1 421 SILBURY ER E L F E4 A G A 6T M1 A414 A41 RA SUMM S A4042 4 ID BLVD CH M RY TRE A418 FT BU 8 HARLOW VE AY ST ALBANS ON A W S HEMEL 2 S A S D E T 13 L X T HEMPSTEAD 7 GT I R A H O E CHELMSFORD C Y 5 7 N E 1 A413 21 A OXFORD 6A T 3 A414 A4010 S W 0 D MILTON KEYNES 23 T E R V 1 M25 A128 CENTRAL GRAFTON 27 AY O D W R R DANSTEED WAY G RAILWAY STATION HIGHO WATFORD N S RO F AFF T WYCOMBE CH TONGWELL ST A M40 D 1 T WAY 2 A4 I BE ONE GRAFTON MEWS ING O D M25 2 AN N 1 ST ) R A404 (M STREET O A329 29 BASILDON 16 1 WATLING STREET A S 1A 1 D CH RD A13 Y MAIDENHEAD O PORTWAY O M25 A L W A SLOUGHL LONDON A MILL S 5 N D A4 E 30 L Y I EWA 8/9 15 4 1 H GROV 4B M4 31 C READING 4A A5 HEATHROW AIRPORT 1 12 10 2 A4 A2 11W M4 1 O 12 2 1 TATTENHOE ST WOKINGHAMB 3 U 2 R N M3 3 M20 M2 R 4 O 3 4 A A30 WOKING 5 D 4 10 6 TURNPIKE ROAD 4 BLE 14 M25 9 3 TCHAM A4 5 6 M2 WAY A339 M3 5 A25 7 A3 LEATHERHEAD M25 5 FARNBOROUGH 8 7 8 FLEET 6 A26 6 GUILDFORD M20 A21 MAIDSTONE REIGATE A22 A31 TONBRIDGE 0 A25 M23 7 A24 8 CBRE & Bray Fox Smith or themselves and for the vendors or lessors of this property, whose agents they are, give notice that: (i) the particulars are set out as a general outline only, for the guidance of intending purchasers or lessees and do not constitute, nor constitute part of, an offer or contract; (ii) all descriptions, dimensions, references to condition, necessary permissions for use and occupation and other details are given without responsibility and any intending purchasers or tenants Ian Leather - t: 020 7629 5456 Matt Willcock - t: 020 7182 2491 should not rely on them as statements or representations of fact, but must satisfy themselves by inspection or e: [email protected] e: [email protected] otherwise as to the correctness of each of them; (iii) no person in the employment of CBRE & Bray Fox Smith has any authority to make or give any representation or warranty whatever in relation to the property; (iv) Claudio Palmiero - t: 01908061262 e: Joe Gibbon - t: 020 3257 6173 rents quoted in the above particulars may be subject to VAT in addition. e: [email protected] Particulars prepared January 2019. [email protected].
Recommended publications
  • Premises, Sites Etc Within 30 Miles of Harrington Museum Used for Military Purposes in the 20Th Century
    Premises, Sites etc within 30 miles of Harrington Museum used for Military Purposes in the 20th Century The following listing attempts to identify those premises and sites that were used for military purposes during the 20th Century. The listing is very much a works in progress document so if you are aware of any other sites or premises within 30 miles of Harrington, Northamptonshire, then we would very much appreciate receiving details of them. Similarly if you spot any errors, or have further information on those premises/sites that are listed then we would be pleased to hear from you. Please use the reporting sheets at the end of this document and send or email to the Carpetbagger Aviation Museum, Sunnyvale Farm, Harrington, Northampton, NN6 9PF, [email protected] We hope that you find this document of interest. Village/ Town Name of Location / Address Distance to Period used Use Premises Museum Abthorpe SP 646 464 34.8 km World War 2 ANTI AIRCRAFT SEARCHLIGHT BATTERY Northamptonshire The site of a World War II searchlight battery. The site is known to have had a generator and Nissen huts. It was probably constructed between 1939 and 1945 but the site had been destroyed by the time of the Defence of Britain survey. Ailsworth Manor House Cambridgeshire World War 2 HOME GUARD STORE A Company of the 2nd (Peterborough) Battalion Northamptonshire Home Guard used two rooms and a cellar for a company store at the Manor House at Ailsworth Alconbury RAF Alconbury TL 211 767 44.3 km 1938 - 1995 AIRFIELD Huntingdonshire It was previously named 'RAF Abbots Ripton' from 1938 to 9 September 1942 while under RAF Bomber Command control.
    [Show full text]
  • Sherington Village Appraisal November 2004
    SSHHEERRIINNGGTTOONN VVIILLLLAAGGEE AAPPPPRRAAIISSAALL Issue 1 November 2004 Sherington Village Appraisal November 2004 Table of Contents 1. Introduction ________________________________________________________3 2. Environment________________________________________________________5 3. Economy __________________________________________________________7 4. Social _____________________________________________________________8 5. Village Groups ______________________________________________________9 6. Local Media & Points of Information ___________________________________10 7. Programme & Priorities______________________________________________11 8. Sherington Residents Management Group – Perry Lane Sports & Recreation Field _____________________________________________________________14 9. Contact Sherington Parish Council ____________________________________16 10. Response Form __________________________________________________17 11. Table of Responses _______________________________________________18 12. Table of Village Groups/Individuals that responded_____________________22 13. History of Sherington _____________________________________________23 14. Design Statement_________________________________________________25 15. Milton Keynes Local Plan __________________________________________27 16. Conservation Area Plan____________________________________________28 17. Aerial Photograph ________________________________________________35 18. Ordnance Survey Extract __________________________________________36 19. Sherington Parish Council
    [Show full text]
  • 20/00133/OUTEIS Description Outline Planning Application
    ITEM 6(a) Application Number: 20/00133/OUTEIS Description Outline planning application (all matters reserved except access) for the demolition of the existing farm buildings on site and the development of up to 930 dwellings (including affordable dwellings), primary school, local centre, open space, sports pitches, play areas, pavilion/wellbeing centre and other associated works. At Tickford Fields Farm, North Crawley Road, Newport Pagnell, MK16 9HG For Milton Keynes Council Statutory Target: 20.04.2020 Extension of Time: Yes - 15.10.2020 Ward: Newport Pagnell South Parish: Newport Pagnell Report Author/Case Officer: David Buckley Senior Planning Officer Contact Details: 07775 110877 [email protected] Team Manager: Jon Palmer Head of Planning [email protected] 1.0 RECOMMENDATION 1.1 It is recommended that permission is granted subject to conditions set out in this report and signing of the Memorandum of Understanding. 2.0 INTRODUCTION The Site 2.1 The application site is a plot of land 45.17 hectares in area, which lies approximately 1km to the east of the centre of Newport Pagnell. The site is allocated for development in the adopted Newport Pagnell Neighbourhood Plan (NPNP) under policy NP2 and comprises most of the site allocation. 2.2 The remainder of this site allocation, formerly part of the North Crawley Industrial Estate to the south-west of the application site, is now the Tickford Mews residential estate, a Bellway homes development of 73 dwellings approved under planning reference 14/02799/FUL. Adjacent to this, to the southwest of the site lies a Council owned, public waste recycling facility.
    [Show full text]
  • Borough Council of Wellingborough Planning Committee Wednesday 2Nd November 2011 at 7.00 Pm Council Chamber, Swanspool House
    Borough Council of Wellingborough Planning Committee Wednesday 2nd November 2011 at 7.00 pm Council Chamber, Swanspool House INDEX Page No. SITE VIEWING GROUP WP/2011/0216/F - 41 and 45 Main Road, Grendon. 1 WP/2011/0344/F - Land east of Easton Way, Grendon. 5 WP/2011/0361/RVC - 94 Farndish Road, Irchester. 12 WP/2011/0363/F - 38 Hardwick Road, Wellingborough. 18 WP/2011/0372/O - Adjacent 204 Priory Road, Wellingborough. 23 DISTRICT WP/2011/0296/F - Newlands Farm, 75 Harrold Road, Bozeat. 28 WP/2011/0366/F - Manor Farm, 7 Dychurch Lane, Bozeat. 43 WP/2011/0440/C - 3 4 (Larner Pallets) Bevan Close, Wellingborough. 53 WP/2011/0442/C - Land to the West of the Village of Isham, A509, Isham. 58 FOR INFORMATION WP/2011/0342/C - Friars School, Friars Close, Wellingborough. 65 WP/2011/0343/C - Rowangate Primary School, Finedon Road, Wellingborough. 67 WP/2011/0373/C - Oakway Infant School, Oakway, Wellingborough. 69 - 1 - BOROUGH COUNCIL OF WELLINGBOROUGH AGENDA ITEM SITE VIEWING (Date of visit Tuesday 1st November 2011 at 11.20 a.m.) Planning Committee 02/11/2011 Report of the Head of Planning and Development APPLICATION REF: WP/2011/0216/F PROPOSAL: Re-modelling of 3 no. cottages to create 2 no. cottages with the creation of a new subservient extension. Amended Plan. Further amended plan. LOCATION: 41 and 45 Main Road, Grendon, Northampton. NN7 1JW APPLICANT: Ms Judith Lynne Smith. This application is referred to the Planning Committee for determination at the request of the Parish Council and as a result of the number of residents’ objections.
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • Location ID Site Name Local Authority Camera Type
    Location ID Site Name Local Authority Camera Type Installation Date Status Speed Limit Offence Rate Average (Last 3 years) 2003 2004 2005 2006 2007 2008 2009 184 M1 Motorway, Buckinghamshire - Northbound Milton Keynes Lastec 04/11/2009 Active 70 <2 <2 <2 <2 <2 <2 <2 <2 185 M1 Motorway, Buckinghamshire - Southbound Milton Keynes Lastec 04/11/2009 Active 70 <2 <2 <2 <2 <2 <2 <2 <2 186 M1 Motorway, Buckinghamshire - Northbound Milton Keynes Lastec 04/11/2009 Active 70 <2 <2 <2 <2 <2 <2 <2 <2 187 M1 Motorway, Buckinghamshire - Southbound Milton Keynes Lastec 04/11/2009 Active 70 <2 <2 <2 <2 <2 <2 <2 <2 187 M1 Motorway, Buckinghamshire - Southbound Milton Keynes Lastec 04/11/2009 Active 70 <2 <2 <2 <2 <2 <2 <2 <2 191 A40 / Cassington (2) West Oxfordshire Lastec 08/03/2002 Decommissioned 60 <2 <2 <2 <2 <2 <2 <2 <2 194 B4034 / Buckingham Road / Bletchley (1) Milton Keynes Lastec 24/03/2002 Active 30 2.2 <2 <2 3.3 2.6 <2 2.2 <2 195 A40 / West Wycombe Road / High Wycombe (2) High Wycombe Lastec 24/03/2002 Active 30 4.1 <2 <2 <2 3.1 <2 4.5 3.7 196 Opladen Way / Bracknell (1) Bracknell Forest Lastec 07/01/2003 Decommissioned 30 <2 <2 <2 <2 <2 <2 <2 <2 197 B4011 / Piddington Cherwell Lastec 28/01/2004 Decommissioned 60 <2 <2 2.4 <2 <2 <2 <2 <2 198 A509 / Newport Pagnell By Pass / Newport Pagnell (2) Milton Keynes Lastec 28/05/2002 Decommissioned 70 <2 35.6 19.8 9.6 21.5 <2 <2 <2 199 A5 / Bletchley Milton Keynes Lastec 28/05/2002 Decommissioned 70 <2 88.0 44.5 53.0 69.7 <2 <2 <2 200 Midsummer Boulevard / Milton Keynes Milton Keynes Lastec 24/03/2002
    [Show full text]
  • Walnut Cottage
    11 Forest Glade, Kettering Accommodation and Dimensions Accommodation and Dimensions Living Room 16'4" x 13'1" (4.98m x 3.99m) Dining Room 13'1" x 9' (3.99m x 2.74m) Measurements 11 Forest Glade, Kettering Kitchen 11'4" x 11'1" (3.45m x 3.38m) Living Room 14'6" x 13' Breakfast Room 8'4" x 7'4" (2.54m x (4.42m x 3.96m) 2.24m) Utility 7'5" x 6'4" (2.26m x 1.93m) Dining Room 17'2" x 11'5" (5.23m x 3.48m) Accommodation and Dimensions Study 10'4" x 8'6" (3.15m x 2.59m) Accommodation and Dimensions Kitchen 14'7" x 8'5" Family Room 25'1" x 10'6" (7.65m x Living Room 16'4" x 13'1" (4.98m x 3.99m) (4.45m x 2.57m) 3.20m) Snug 10'6" x 10' (3.20m Dining Room 13'1" x 9' (3.99m x 2.74m)Bedroom One 12'3" x 9'4" (3.73m x 2.84m) x 3.05m) Kitchen 11'4" x 11'1" (3.45m x 3.38m) En Suite 9'6" x 4'11" (2.90m x 1.50m) Bedroom One 14'7" x Breakfast Room 8'4" x 7'4" (2.54m x 12'7" (4.45m x 3.84m) 2.24m) Bedroom Two 12'3" x 9'4" (3.73m x 2.84m) Bedroom Two 8'10" x Utility 7'5" x 6'4" (2.26m x 1.93m) Bedroom Three 10'6" x 8'9" (3.20m x 8'4" (2.69m x 2.54m) Study 10'4" x 8'6" (3.15m x 2.59m) 2.67m) En Suite 8'6" x 5'5" Family Room 25'1" x 10'6" (7.65m xBedroom Four 9'2" x 8'9" (2.79m x 2.67m) (2.59m x 1.65m) 3.20m) Bathroom 7'8" x 6'2" (2.34m x 1.88m) Bedroom Three 6'9" x Bedroom One 12'3" x 9'4" (3.73m x 6'9" (2.06m x 2.06m) 2.84m) En Suite 9'6" x 4'11" (2.90m x 1.50m) Bathroom 9'9" x 7' (2.97m x 2.13m) Bedroom Two 12'3" x 9'4" (3.73m x 2.84m) Bedroom Three 10'6" x 8'9" (3.20m x 2.67m) Bedroom Four 9'2" x 8'9" (2.79m x 2.67m) Bathroom 7'8" x 6'2" (2.34m Tel:x 1.88m) 01536 417888 Tel: 01536 417888 ESTATE AGENTS 15-16 Market Place, Kettering, Northamptonshire NN16 0AJ Walnut Cottage Sales (01536) 417888 email: [email protected] Lettings and Property Management (01536) 416555 email: [email protected] Walnut Cottage, 9 South Street, Isham PRICE ON APPLICATION Village information Isham is positioned on the A509 road, three miles south of Kettering and a mile to the west of Burton Latimer with the River Ise is to the east of the village.
    [Show full text]
  • Northamptonshire Transportation Plans
    Agenda Item 8 Planning Policy Committee – 21 October 2013 Northamptonshire Transportation Plan: Phase Two Strategy Consultation Purpose of report The purpose of this report is to advise members about this consultation and to agree a response Attachment(s) Appendices 1-4: Highway Development Management Strategy Major Roads Strategy Road Freight Strategy Road Safety Strategy 1.0 Background 1.1 Northamptonshire Transportation Plan: Fit for Purpose is a strategic document that sets out aims and goals for transportation in Northamptonshire. That Plan is part of a suite of documents that includes a number of strategies that give more detail about the policies and vision for specific transport themes and areas. The first phase of strategies was adopted in December 2012. These can be viewed at http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/Pages/NTP-thematic- strategies.aspx The Northamptonshire Transportation Plan can be viewed at http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/pages/northamptonshire- transportation-plan.aspx 1.2 Consultation is now taking place on the second phase of strategies (16 September – 25 October 2013). These strategies are the Highway Development Management Strategy; Majors Roads Strategy; Road Freight Strategy; and Road Safety Strategy (appendices 1-4). 1.3 These four documents complement the main Northamptonshire Transportation Plan, setting out a series of policies relating to these respective transport issues. 1.4 It should also be noted that from 2015, the government is planning to devolve funding for road schemes to the local level, administered by Local Enterprise Partnerships as part of the Local Growth Fund. Page 11 of the Northamptonshire Major Roads Strategy highlights that only £11.6m is being directly allocated in this way to Northamptonshire over the four years 2015/16 to 2018/19.
    [Show full text]
  • A509 Isham Bypass Regulation 3 - Planning Support Statement April 2011
    A509 Isham Bypass Regulation 3 - Planning Support Statement April 2011 A509 Isham Bypass Application No’s KE/05/790 and WP/05/584 Regulation 3 Planning Support Statement 1.0 Summery of Current Situation On 5th May 2006 Northamptonshire County Council were granted planning approval for the A509 Isham Bypass, and following a Public Inquiry in October 2007 the Compulsory Purchase Order (CPO) and the Side Roads Order (SRO) were confirmed in April 2008 by the Secretary of State. In January 2010 and March 2010 the tenders were issued and returned respectively, and the Major Schemes Business Case (MSBC) for full funding approval was programmed for issue in April 2010, but on advice from the Department for Transport (DfT) no MSBC‟s were being accepted prior to the Governments Comprehensive Spending Review (CSR) In October 2010, the post CSR announcement by the DfT as part of their “Investment in Local Major Transport Schemes” document which included the A509 Isham Bypass in their “Pre-Qualification” pool. In early January 2011, the Authority to submitted the required Expression of Interest (EoI) for the scheme, and subsequently in early February 2011 the DfT issued an update to the Investment in Local Major Transport Schemes which confirmed that the A509 Isham Bypass would not receive funding in the current spending period between 2011 /12 and 2014/15 and therefore the delivery of this piece of infrastructure will be delayed until post 2015 at the earliest. A report to the Authorities Cabinet on 10th May 2011, will recommends that cabinet: reaffirms the Authorities position of the A509 Isham Bypass as a high priority scheme within the county and commit funding from the existing NCC capital allocations.
    [Show full text]
  • Milton Keynes Wind Farm Non Technical Summary
    Milton Keynes Wind Farm Non Technical Summary Preface The Environmental Statement (ES) summarised here, has been prepared in support of a planning application submitted to Milton Keynes Council (the “Council”) in August 2006 for the Milton Keynes Wind Farm (the “Proposal”). The ES has been prepared and compiled by E4environment Ltd (E4e), an independent environmental consultancy, on behalf of MK Windfarm Ltd (as the Applicant) and Your Energy Ltd (as the Developer). The Proposal is on farmland comprising Petsoe Manor Farm, 2.5km east of the village of Emberton, and is for the purpose of generating electricity from wind energy. The ES is presented in three main volumes, namely: Volume 1 – Non Technical Summary The non technical summary (NTS) presents a summary of the Proposal, its likely environmental impacts and proposed mitigation. Volume 2 – Written Statement main text The written statement comprises: • An introduction and description of the Applicant/Developer and the scoping and consultation process; • The reasons for the site selection and a description of the Proposal. Then for each environmental issue identified through the scoping and consultation process the following is provided: • A description of the prevailing baseline conditions; • An assessment of the likely affects of the Proposal during construction and operation; • The mitigation measures proposed to avoid, minimise or compensate for possible adverse environmental effects. Volume 3 – Figures Volume 3 comprises the figures which show the site location, site layout, wind farm construction details, landscape character, photomontages, wireframes, and maps exhibiting the zone of visual influence (ZVI), sites of ecological and archaeological significance, and noise monitoring locations.
    [Show full text]
  • Planning Committee Wednesday 6 June 2012 at 7.00 Pm
    Planning Committee Wednesday 6 June 2012 at 7.00 pm Council Chamber, Swanspool House, Doddington Road, Wellingborough, Northamptonshire NN8 1BP 1. Apologies for absence. Ι 2. Declarations of Interest. Ι 3. Confirmation of the minutes of the meeting held on 09/05/2012. Ι 4. Applications for planning permission, listed building consent, building regulation approval and appeals information. 5. Any other items that the Chairman decides are urgent. Ι Enclosed There are no Site Viewing Group visits. John T Campbell Chief Executive Date issued: 29 May 2012. For further information contact Fiona Marshall on 01933 231519; fax 01933 231543; [email protected] If you wish to address the Committee on an agenda item you can register by: • going on-line to ‘on-line forms’ then ‘addressing Council meetings’; or • completing the appropriate form which is available at reception desks; or • contacting Fiona Marshall. Membership: Councillor Ward (Chairman), Councillor Griffiths (Vice Chairman), Councillors Beirne, Bell, Dholakia, Maguire, Morrall, B Patel, Scarborough, Timms and Waters. Swanspool House, Doddington Road, Wellingborough, Northamptonshire NN8 1BP Tel: 01933 229777 Fax: 01933 231684 www.wellingborough.gov.uk Agenda item 4 Borough Council of Wellingborough Planning Committee Wednesday 6th June 2012 at 7.00 pm Council Chamber, Swanspool House INDEX Page No. DISTRICT WP/2011/0442/C - Land to the West of the Village of Isham A509, Isham. 1 WP/2012/0164/F - Land adjacent 1 Harrowick Lane, Earls Barton. 11 WP/2012/0222/F - 3 Orlingbury Road, Little Harrowden. 18 - 1 - BOROUGH COUNCIL OF WELLINGBOROUGH Planning Committee 06/06/2012 Report of the Head of Planning and Development APPLICATION REF: WP/2011/0442/C PROPOSAL: Replacement of extant planning permission KE/05/790 and WP/05/584 to extend the time limit for the implementation of the A509 Isham Bypass.
    [Show full text]
  • Isham Bypass
    A509 Wellingborough Development Link Phase 1 (Isham Bypass) This note is prepared in response to a question asked by the Inspector during the hearing sessions for the Plan for the Borough of Wellingborough (PBW) examination. It has been prepared jointly by officers of the Borough Council and Northamptonshire County Council. The route for the Wellingborough Development Link (Isham Bypass) lies within a corridor between the towns of Kettering in the north and Wellingborough in the south. The existing A509 road which passes through the village of Isham provides an important north / south link between the A14 and A45 Trunk roads. The proposal is to construct a 4.3km dual carriageway road. The route will commence at the A14 Pytchley roundabout and run in a southerly direction, to the west of the village of Isham, and re-join the A509 Kettering Road midway between Hill Top and Great Harrowden. Planning Status Planning permission was approved on 5th May 2006, with an extension of time approved on 20th June 2012. Land The land required for the road is currently in the ownership of a number of individual private land owners. Previously obtained CPO powers have now expired, and it will be necessary to advertise new draft orders. Timetable • Completion of procurement – June 2016 • Draft Orders published – Oct 2018 • Enabling works – Late spring/early summer 2019 • Start of works – Oct 2019 • Completion of Works - April 2021 • Scheme brought into public use May 2021. Funding As set out in the Infrastructure Delivery Plan (INF 1) the total cost of the scheme is £38,500,000.
    [Show full text]