Northamptonshire Transportation Plans

Total Page:16

File Type:pdf, Size:1020Kb

Northamptonshire Transportation Plans Agenda Item 8 Planning Policy Committee – 21 October 2013 Northamptonshire Transportation Plan: Phase Two Strategy Consultation Purpose of report The purpose of this report is to advise members about this consultation and to agree a response Attachment(s) Appendices 1-4: Highway Development Management Strategy Major Roads Strategy Road Freight Strategy Road Safety Strategy 1.0 Background 1.1 Northamptonshire Transportation Plan: Fit for Purpose is a strategic document that sets out aims and goals for transportation in Northamptonshire. That Plan is part of a suite of documents that includes a number of strategies that give more detail about the policies and vision for specific transport themes and areas. The first phase of strategies was adopted in December 2012. These can be viewed at http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/Pages/NTP-thematic- strategies.aspx The Northamptonshire Transportation Plan can be viewed at http://www.northamptonshire.gov.uk/en/councilservices/Transport/TP/pages/northamptonshire- transportation-plan.aspx 1.2 Consultation is now taking place on the second phase of strategies (16 September – 25 October 2013). These strategies are the Highway Development Management Strategy; Majors Roads Strategy; Road Freight Strategy; and Road Safety Strategy (appendices 1-4). 1.3 These four documents complement the main Northamptonshire Transportation Plan, setting out a series of policies relating to these respective transport issues. 1.4 It should also be noted that from 2015, the government is planning to devolve funding for road schemes to the local level, administered by Local Enterprise Partnerships as part of the Local Growth Fund. Page 11 of the Northamptonshire Major Roads Strategy highlights that only £11.6m is being directly allocated in this way to Northamptonshire over the four years 2015/16 to 2018/19. It also states that this is very small compared to the costs of major road schemes, for example, therefore other funding sources will therefore also be required. 2.0 Proposed Responses 2.1 The four proposed strategies cover both general and specific issues relating to transportation. The following provides the key areas where responses are proposed, however members may wish to add or amend this list. 2.2 General comments All four strategies are welcomed. However, all documents need to refer to what timescale period they aim to cover, as this is not specified or explained (having spoken to 1 Northamptonshire County Council, they have advised that there are no time limits to these strategies, but they are intended to act as documents that can be updated as and when required). This therefore needs to be explained in the introduction sections. It should also be noted that there are a series of typos throughout each document, which will need amending before final documents are published. The proposed response below does not focus on those errors. 2.3 Highway Development Management Strategy 2.4 The Policies within the Strategy are generally supported, however the wording on Community Infrastructure Levy needs re-phrasing (page 23). This currently reads as if CIL will definitely be implemented throughout the County, however individual local authorities can decide whether CIL is appropriate for their area or not. Some areas may therefore decide not to implement CIL. With reference to CIL, mention should also be made to the County Council needing to work closely with parishes etc, who will be receiving either 15 or 25% of CIL funds, if development relating to CIL occurs in their area, depending on whether they have a Neighbourhood Plan in place (25%) or not (15%). 2.5 Major Roads Strategy 2.6 Page 26, A45 Improvements The Highways Agency review of A45/A6 Chown’s Mill is strongly supported. Chowns Mill is a major congestion problem, which this Strategy also acknowledges and which this Council supports. 2.7 Page 26, Stanwick – Thrapston Dualling Dualling of the A45 between Stanwick and Thrapston (A14) is also a major issue, as this too causes congestion, particularly at peak times. This is not only an issue impacting local people, but impacts upon those travelling beyond the District, for example freight transport linking between the M1, A14 and A1. 2.8 Page 44, A6116 With current expansion plans at Corby, including Eurohub, it is anticipated that the A6116 will increasingly be used by freight traffic to/from the A14, which will continue to be an issue for this road. 2.9 Road Freight Strategy 2.10 General point – the Freight Strategy should also refer to the A1, which is an important freight route, adjacent to the County. 2.11 Page 34, Lorry Parking – new parking areas may also relate to Highways Agency’ roads, such as parking facilities linked to the A14 or A45, reference therefore needs to be made to involving the Highways Agency in developing proposals etc. 2.12 Road Safety Strategy 2.13 General point – all policy wording should be written in full, rather than using abbreviations e.g. page 39 Policy 3 ”…SRTS study….” 3.0 Conclusion 3.1 This report is provided for member’s information and to seek their comments on a proposed response. Following receipt of consultation responses, Northamptonshire County Council plan to submit final versions of the documents to their Cabinet on 10th December 2013. The Strategies would then be published in January 2014. Members shall also note for information that the document entitled Town Strategy for East Northamptonshire, which is mentioned in all of the consultation documents is yet to be prepared by Northamptonshire County Council and this is now anticipated to take place in early 2014. 2 4.0 Equality and Diversity Implications 4.1 There are no equality and diversity implications arising from this report. 5.0 Legal Implications 5.1 There are no legal implications arising from this report. 6.0 Risk Management 6.1 There are no significant risks associated with this report. 7.0 Financial Implications 7.1 There are no financial implications associated with this report. 8.0 Corporate Outcomes 8.1 The relevant Corporate Outcomes are: • Good quality of life: Sustainable development • Effective partnership working • Strong community leadership • Effective management 9.0 Recommendation 9.1 Members are requested to agree a response to the consultation (Reason – to provide transportation strategies for Northamptonshire) Power: Transport Act 2000 and Local Transport Act 2008 Legal Other None considerations: Background Papers: Person Originating Karen Britton – Planning Policy and Conservation Manager Report: Ext: 2142 [email protected] Date: 14 October 2013 CFO MO CX (Committee Report Normal Rev. 22) 3 Northamptonshire Transportation Plan FitNorthamptonshire for Purpose Transportation Plan Fit for Purpose Northamptonshire Highway Development Management Strategy – Draft 2013 Northamptonshire Highway Development Management Strategy Fit for Purpose Draft for Consultation September 2013 1 Northamptonshire Highway Development Management Strategy – Draft 2013 (Blank Page) 2 Northamptonshire Development Management Strategy – Draft 2013 Northamptonshire Highway Development Management Strategy Contacts and Further Information This is Northamptonshire County Council’s Highway Development Management Strategy produced for consultation in September 2013. We would like to hear your thoughts on this document to help us in finalising the document before it is approved by Cabinet in December2013. This document sets out the overarching vision for development management within Northamptonshire and sets out our strategy to achieve it. This strategy is one of a series of thematic daughter documents to the Northamptonshire Transportation Plan adopted in April 2012. Consultation Timetable: Consultation Begins: 16rd September 2013 Consultation Ends: 25th October 2013 Final Version to Cabinet: 10th December 2013 Final Version Published: January 2014 If you have any comments that you would like to make regarding any of the issues outlined in this strategy, please contact the Transport Planning Team. Transport Planning Highways, Transportation and Infrastructure Northamptonshire County Council County Hall Northampton NN1 1ED Email: [email protected] 3 Northamptonshire Highway Development Management Strategy – Draft 2013 (Blank Page) 4 Development Management Development Northamptonshire Development Management Strategy – Draft 2013 Contents Chapter Theme & Content Page No. Chapter 1 Highway Development Management 13 Chapter 2 Delivering the Strategy 31 Appendix 1 Summary of Policies 33 Appendix 2 Estate Street Conditions and Notes, August 2013 35 5 Northamptonshire Development Management Strategy – Draft 2013 (Blank Page) 6 Development Management Development Northamptonshire Development Management Strategy – Draft 2013 Northamptonshire Transportation Plan: Fit for Purpose Transportation is not an end in itself. The movement of people and goods takes place not for its own sake, but to fulfil the diverse needs and desires of the public. Therefore the County Council’s transport policies are similarly promoted for their effect on other specific goals, priorities and objectives, rather than as an end in themselves. Northamptonshire Transportation Plan Vision: For Transport and Travel to contribute towards making Northamptonshire a great place to live and work, through creating tangible transport options to satisfy individual needs and to encourage more sustainable travel. The transport system will provide fast and efficient movement of people and
Recommended publications
  • Consultation Technical Report
    Making Meaningful Connections Consultation Technical Report East West Rail Consultation: 31 March – 9 June 2021 This document contains the full Consultation Technical Report, without the Appendices. To access the Appendices, please visit www.eastwestrail.co.uk 01. Introduction 18 - 26 07. Project Section B: Bletchley and the Marston Vale Line 100 - 229 1.1. Chapter Summary 18 7.1. Chapter Summary 101 1.2. East West Rail 19 7.2. Introduction 104 1.3. The Project 19 7.3. Service Concepts 109 1.4. Consultation 23 7.4. Bletchley Station 141 1.5. Technical Report 26 7.5. Fenny Stratford Additional Track 144 02. The Case for East West Rail 27 - 31 7.6. Level Crossings on the Marston Vale Line 146 2.1. Chapter Summary 27 7.7. Marston Vale Line Infrastructure Upgrade 228 2.2. The overall case for East West Rail 28 08. Project Section C: Bedford 230 - 299 2.3. Benefits of railways over road improvements 31 8.1. Chapter Summary 230 03. Project Objectives 32 - 42 8.2. Introduction 234 3.1. Chapter Summary 32 8.3. Bedford St Johns 238 3.2. Introduction 33 8.4. Bedford Station 250 3.3. Safety 34 8.5. North Bedford 268 3.4. Environment 34 8.6. Conclusion 297 3.5. EWR Services 34 09. Project Section D: Clapham Green to The Eversdens 300 - 371 3.6. Connectivity 36 9.1. Chapter Summary 301 3.7. Customer Experience and Stations 37 9.2. Introduction 303 3.8. Powering EWR Services 38 9.3. Option Development 306 3.9.
    [Show full text]
  • Public-Private Partnerships Financed by the European Investment Bank from 1990 to 2020
    EUROPEAN PPP EXPERTISE CENTRE Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Terms of Use of this Publication The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other States. For more information about EPEC and its membership, please visit www.eib.org/epec. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the public-private partnership (PPP) market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside of Europe since 1990.
    [Show full text]
  • South Caldecotte Development Framework AMENDED DD 120319 Low Res.Indd
    ANNEX B Urban Design & Landscape Architecture South Caldecotte Development Framework Supplementary Planning Document REVISED CONSULTATION DRAFT www.milton-keynes.gov.uk/udla February 2019 South Caldecotte Development Framework SPD This document has been prepared by Milton Keynes Council’s Urban Design and Landscape Architecture Team. For further information please contact: David Blandamer Urban Design and Landscape Architecture Placemaking Milton Keynes Council Civic Offices 1 Saxon Gate East Milton Keynes MK9 3EJ T +44 (0) 1908 254836 F +44 (0) 1908 252329 E [email protected] 2 Urban Design & Landscape Architecture Contents SECTION 1 SECTION 3 INTRODUCTION DEVELOPMENT FRAMEWORK 1.1 Introduction 7 3.1 Introduction 35 1.2 Role of the Development Framework 7 3.2 The Vision 35 1.3 Status of Development Framework 7 3.3 Land Uses 36 1.4 Planning Policy Background 73.4 Landscape and Open Space Strategy 36 1.5 Planning Summary 103.5 Movement Framework 38 3.6 Design 41 SECTION 2 3.7 Sustainability 44 3.8 Indicative Development Framework Plan 46 THE SITE AND ITS CONTEXT 2.1 Introduction 13 SECTION 4 2.2 South Caldecotte 13 DELIVERY 2.3 Surrounding Area and Edge Conditions 14 2.4 Topography, Views and Drainage 18 4.1 Infrastructure Delivery 49 2.5 Landscape Character 20 2.6 Habitat and Vegetation 22 4.2 Management and Maintenance 49 2.7 Access and Movement 244.3 Outline Application 49 2.8 Heritage 284.4 Design and Access Statements 49 2.9 Utilities 30 2.10 Opportunities and Constraints 32 www.milton-keynes.gov.uk/udla 3 South
    [Show full text]
  • Premises, Sites Etc Within 30 Miles of Harrington Museum Used for Military Purposes in the 20Th Century
    Premises, Sites etc within 30 miles of Harrington Museum used for Military Purposes in the 20th Century The following listing attempts to identify those premises and sites that were used for military purposes during the 20th Century. The listing is very much a works in progress document so if you are aware of any other sites or premises within 30 miles of Harrington, Northamptonshire, then we would very much appreciate receiving details of them. Similarly if you spot any errors, or have further information on those premises/sites that are listed then we would be pleased to hear from you. Please use the reporting sheets at the end of this document and send or email to the Carpetbagger Aviation Museum, Sunnyvale Farm, Harrington, Northampton, NN6 9PF, [email protected] We hope that you find this document of interest. Village/ Town Name of Location / Address Distance to Period used Use Premises Museum Abthorpe SP 646 464 34.8 km World War 2 ANTI AIRCRAFT SEARCHLIGHT BATTERY Northamptonshire The site of a World War II searchlight battery. The site is known to have had a generator and Nissen huts. It was probably constructed between 1939 and 1945 but the site had been destroyed by the time of the Defence of Britain survey. Ailsworth Manor House Cambridgeshire World War 2 HOME GUARD STORE A Company of the 2nd (Peterborough) Battalion Northamptonshire Home Guard used two rooms and a cellar for a company store at the Manor House at Ailsworth Alconbury RAF Alconbury TL 211 767 44.3 km 1938 - 1995 AIRFIELD Huntingdonshire It was previously named 'RAF Abbots Ripton' from 1938 to 9 September 1942 while under RAF Bomber Command control.
    [Show full text]
  • Archaeological Desk Based Assessment
    Archaeological Desk Based Assessment __________ Brockley Hill, Stanmore - New Banqueting Facility, Brockley Hill, London Borough of Harrow Brockley Hill DBA Update | 1 June 2020 | Project Ref 6129A Project Number: 06129A File Origin: P:\HC\Projects\Projects 6001-6500\6101 - 6200\06129 - Former Stanmore and Edgware Golf Club, Brockley Hill\AC\Reports\2020.08.25 - Brockley Hill DBAv3.docx Author with date Reviewer code, with date AJ, 25.02.2020 RD-0023, 25.02.2020 JM-0057,13.08.202019 JM, 25.08.2020 HGH Consulting, 15.08.2020 Brockley Hill DBA Update | 2 Contents Non-Technical Summary 1. Introduction ........................................................................................ 6 2. Methodology ...................................................................................... 13 3. Relevant Policy Framework ............................................................... 16 4. Archaeological Background ............................................................... 21 5. Proposed Development, Assessment of Significance and Potential Effects ............................................................................................... 37 6. Conclusions ....................................................................................... 41 7. Sources Consulted ............................................................................. 43 8. Figures .............................................................................................. 46 Appendices Appendix 1: Greater London Historic Environment Record Data Figures
    [Show full text]
  • Sherington Village Appraisal November 2004
    SSHHEERRIINNGGTTOONN VVIILLLLAAGGEE AAPPPPRRAAIISSAALL Issue 1 November 2004 Sherington Village Appraisal November 2004 Table of Contents 1. Introduction ________________________________________________________3 2. Environment________________________________________________________5 3. Economy __________________________________________________________7 4. Social _____________________________________________________________8 5. Village Groups ______________________________________________________9 6. Local Media & Points of Information ___________________________________10 7. Programme & Priorities______________________________________________11 8. Sherington Residents Management Group – Perry Lane Sports & Recreation Field _____________________________________________________________14 9. Contact Sherington Parish Council ____________________________________16 10. Response Form __________________________________________________17 11. Table of Responses _______________________________________________18 12. Table of Village Groups/Individuals that responded_____________________22 13. History of Sherington _____________________________________________23 14. Design Statement_________________________________________________25 15. Milton Keynes Local Plan __________________________________________27 16. Conservation Area Plan____________________________________________28 17. Aerial Photograph ________________________________________________35 18. Ordnance Survey Extract __________________________________________36 19. Sherington Parish Council
    [Show full text]
  • 20/00133/OUTEIS Description Outline Planning Application
    ITEM 6(a) Application Number: 20/00133/OUTEIS Description Outline planning application (all matters reserved except access) for the demolition of the existing farm buildings on site and the development of up to 930 dwellings (including affordable dwellings), primary school, local centre, open space, sports pitches, play areas, pavilion/wellbeing centre and other associated works. At Tickford Fields Farm, North Crawley Road, Newport Pagnell, MK16 9HG For Milton Keynes Council Statutory Target: 20.04.2020 Extension of Time: Yes - 15.10.2020 Ward: Newport Pagnell South Parish: Newport Pagnell Report Author/Case Officer: David Buckley Senior Planning Officer Contact Details: 07775 110877 [email protected] Team Manager: Jon Palmer Head of Planning [email protected] 1.0 RECOMMENDATION 1.1 It is recommended that permission is granted subject to conditions set out in this report and signing of the Memorandum of Understanding. 2.0 INTRODUCTION The Site 2.1 The application site is a plot of land 45.17 hectares in area, which lies approximately 1km to the east of the centre of Newport Pagnell. The site is allocated for development in the adopted Newport Pagnell Neighbourhood Plan (NPNP) under policy NP2 and comprises most of the site allocation. 2.2 The remainder of this site allocation, formerly part of the North Crawley Industrial Estate to the south-west of the application site, is now the Tickford Mews residential estate, a Bellway homes development of 73 dwellings approved under planning reference 14/02799/FUL. Adjacent to this, to the southwest of the site lies a Council owned, public waste recycling facility.
    [Show full text]
  • Borough Council of Wellingborough Planning Committee Wednesday 2Nd November 2011 at 7.00 Pm Council Chamber, Swanspool House
    Borough Council of Wellingborough Planning Committee Wednesday 2nd November 2011 at 7.00 pm Council Chamber, Swanspool House INDEX Page No. SITE VIEWING GROUP WP/2011/0216/F - 41 and 45 Main Road, Grendon. 1 WP/2011/0344/F - Land east of Easton Way, Grendon. 5 WP/2011/0361/RVC - 94 Farndish Road, Irchester. 12 WP/2011/0363/F - 38 Hardwick Road, Wellingborough. 18 WP/2011/0372/O - Adjacent 204 Priory Road, Wellingborough. 23 DISTRICT WP/2011/0296/F - Newlands Farm, 75 Harrold Road, Bozeat. 28 WP/2011/0366/F - Manor Farm, 7 Dychurch Lane, Bozeat. 43 WP/2011/0440/C - 3 4 (Larner Pallets) Bevan Close, Wellingborough. 53 WP/2011/0442/C - Land to the West of the Village of Isham, A509, Isham. 58 FOR INFORMATION WP/2011/0342/C - Friars School, Friars Close, Wellingborough. 65 WP/2011/0343/C - Rowangate Primary School, Finedon Road, Wellingborough. 67 WP/2011/0373/C - Oakway Infant School, Oakway, Wellingborough. 69 - 1 - BOROUGH COUNCIL OF WELLINGBOROUGH AGENDA ITEM SITE VIEWING (Date of visit Tuesday 1st November 2011 at 11.20 a.m.) Planning Committee 02/11/2011 Report of the Head of Planning and Development APPLICATION REF: WP/2011/0216/F PROPOSAL: Re-modelling of 3 no. cottages to create 2 no. cottages with the creation of a new subservient extension. Amended Plan. Further amended plan. LOCATION: 41 and 45 Main Road, Grendon, Northampton. NN7 1JW APPLICANT: Ms Judith Lynne Smith. This application is referred to the Planning Committee for determination at the request of the Parish Council and as a result of the number of residents’ objections.
    [Show full text]
  • Draft Local Implementation Plan 3
    Brent’s Third Local Implementation Plan 2019-2041 March 2019 Foreword iii Executive summary iv 1. Introduction and preparing a LIP 1 Introduction 1 Local approval process 1 Statutory consultation Error! Bookmark not defined. Statutory duties 3 LIP approval 3 2. Borough Transport Objectives 4 Introduction 4 Local context 4 Changing the transport mix 16 Mayor’s Transport Strategy outcomes 22 Outcome 1: London’s streets will be healthy and more Londoners will travel actively 22 Outcome 2: London’s streets will be safe and secure 28 Outcome 3: London’s streets will be used more efficiently and have less traffic on them 36 Outcome 4: London’s streets will be clean and green 39 Outcome 5: The public transport network will meet the needs of a growing London 46 Outcome 6: Public transport will be safe, affordable and accessible to all 50 Outcome 7: Journeys by public transport will be pleasant, fast and reliable 54 Outcome 8: Active, efficient and sustainable travel will be the best option in new developments 56 Outcome 9: Transport investment will unlock the delivery of new homes and jobs’ 60 Other Mayoral Strategies 63 3. The Delivery Plan 64 i Introduction 64 Linkages to the Mayor’s Transport Strategy priorities 64 TfL Business Plan 68 Sources of funding 72 Long-Term interventions to 2041 74 Three-year indicative Programme of Investment 78 Supporting commentary for the three-year programme 80 Risks to the delivery of the three-year programme 85 Annual programme of schemes and initiatives 94 Supporting commentary for the annual programme 94 Risk assessment for the annual programme 94 Monitoring the delivery of the outcomes of the Mayor’s Transport Strategy 104 Overarching mode-share aim and outcome Indicators 104 Delivery indicators 104 Local targets 104 ii Foreword The Mayor of London has set an ambitious vision for London.
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • The Transport System of Medieval England and Wales
    THE TRANSPORT SYSTEM OF MEDIEVAL ENGLAND AND WALES - A GEOGRAPHICAL SYNTHESIS by James Frederick Edwards M.Sc., Dip.Eng.,C.Eng.,M.I.Mech.E., LRCATS A Thesis presented for the Degree of Doctor of Philosophy University of Salford Department of Geography 1987 1. CONTENTS Page, List of Tables iv List of Figures A Note on References Acknowledgements ix Abstract xi PART ONE INTRODUCTION 1 Chapter One: Setting Out 2 Chapter Two: Previous Research 11 PART TWO THE MEDIEVAL ROAD NETWORK 28 Introduction 29 Chapter Three: Cartographic Evidence 31 Chapter Four: The Evidence of Royal Itineraries 47 Chapter Five: Premonstratensian Itineraries from 62 Titchfield Abbey Chapter Six: The Significance of the Titchfield 74 Abbey Itineraries Chapter Seven: Some Further Evidence 89 Chapter Eight: The Basic Medieval Road Network 99 Conclusions 11? Page PART THREE THr NAVIGABLE MEDIEVAL WATERWAYS 115 Introduction 116 Chapter Hine: The Rivers of Horth-Fastern England 122 Chapter Ten: The Rivers of Yorkshire 142 Chapter Eleven: The Trent and the other Rivers of 180 Central Eastern England Chapter Twelve: The Rivers of the Fens 212 Chapter Thirteen: The Rivers of the Coast of East Anglia 238 Chapter Fourteen: The River Thames and Its Tributaries 265 Chapter Fifteen: The Rivers of the South Coast of England 298 Chapter Sixteen: The Rivers of South-Western England 315 Chapter Seventeen: The River Severn and Its Tributaries 330 Chapter Eighteen: The Rivers of Wales 348 Chapter Nineteen: The Rivers of North-Western England 362 Chapter Twenty: The Navigable Rivers of
    [Show full text]
  • Roman Roads of Britain
    Roman Roads of Britain A Wikipedia Compilation by Michael A. Linton PDF generated using the open source mwlib toolkit. See http://code.pediapress.com/ for more information. PDF generated at: Thu, 04 Jul 2013 02:32:02 UTC Contents Articles Roman roads in Britain 1 Ackling Dyke 9 Akeman Street 10 Cade's Road 11 Dere Street 13 Devil's Causeway 17 Ermin Street 20 Ermine Street 21 Fen Causeway 23 Fosse Way 24 Icknield Street 27 King Street (Roman road) 33 Military Way (Hadrian's Wall) 36 Peddars Way 37 Portway 39 Pye Road 40 Stane Street (Chichester) 41 Stane Street (Colchester) 46 Stanegate 48 Watling Street 51 Via Devana 56 Wade's Causeway 57 References Article Sources and Contributors 59 Image Sources, Licenses and Contributors 61 Article Licenses License 63 Roman roads in Britain 1 Roman roads in Britain Roman roads, together with Roman aqueducts and the vast standing Roman army, constituted the three most impressive features of the Roman Empire. In Britain, as in their other provinces, the Romans constructed a comprehensive network of paved trunk roads (i.e. surfaced highways) during their nearly four centuries of occupation (43 - 410 AD). This article focuses on the ca. 2,000 mi (3,200 km) of Roman roads in Britain shown on the Ordnance Survey's Map of Roman Britain.[1] This contains the most accurate and up-to-date layout of certain and probable routes that is readily available to the general public. The pre-Roman Britons used mostly unpaved trackways for their communications, including very ancient ones running along elevated ridges of hills, such as the South Downs Way, now a public long-distance footpath.
    [Show full text]