Annual Report 2018

Total Page:16

File Type:pdf, Size:1020Kb

Annual Report 2018 Annual Report 2018 Annual Report 2018 Index TALGO AT A GLANCE 06 LETTER FROM THE EXECUTIVE CHAIRMAN 08 10 22 1 WHAT IS TALGO? 2 WHAT DO WE DO? 1.1. An innovative and sustainable project 12 2.1 Industrial activity and services 24 1.2. Distinctive proprietary technology 13 2.2 Commercial activity 30 1.3. Offering (products and services) 14 1.4. International presence 16 1.5. Corporate governance 20 32 50 3 HOW DO WE DO IT? 4 THE ANNUAL RESULTS FOR 2018 3.1. Strategy 34 4.1 Key financial and operational indicators 52 3.2. Business model 36 4.2 Talgo’s share price 54 3.3. R+D+i activities 38 3.4. People 40 3.5. Corporate Social Responsibility 43 56 5 FINANCIAL STATEMENTS 5.1 The Group’s Consolidated Financial Statements 58 5.2 Individual Financial Statements 68 6 Talgo at a glance NET TURNOVER QUARTERLY NET TURNOVER 2018 324.4 M€ 2017 1Q18 2Q18 3Q18 4Q18 85.2 M€ 77.8 M€ 73.7 M€ 87.7 M€ NET TURNOVER BY BUSINESS LINE (Average 2016-2018) 384.4 M€ 2018 52% 39% 9% MANUFACTURING MAINTENANCE SERVICES MAINTENANCE EQUIPMENT & OTHER ADJUSTED EBITDA AND MARGIN ADJUSTED PROFIT AND MARGIN FREE CASH FLOW (€ million and %) (€ million and %) (€ million) 20% 23% 20% (54.7) 188.2 153.0 12% 11% 8% 113.3 87.6 65.5 68.9 42.8 26.3 (54.7) 188.2 153.0 2016 2017 2018 2016 2017 2018 2016 2017 2018 Annual Report 2018 7 WORKING CAPITAL PERFORMANCE (€ million) Normalized 59.1 (15.6) 16.1 levels 23.9 Over 80 €m of Working Capital decrease in (1.4) 2018 and 215 €m in 2 years period, back to 265.2 132.2 59.1 (15.6) 16.1 23.9 (1.4) 50.1 company normalized levels 2016 2017 Accounts Inventory Advances Accounts Other 2018 receiv. payable NET FINANCIAL DEBT EBITDA CASH CONVERSION IN 2018 (€ million) (€ million) DFN / LTM Ebitda ajustado 23.0 (2.8) (5.1) 82.0 (9.6) 1.7X 0.3X (1.6X) 181 30 (134)€M (104) 65.5 153.0 2016 2017 2018 2018 ±NOF -CAPEX +DESIN, -IMP, ±OTROS FCF DEBT MATURITY SCHEDULE (DEC. 2018) DEBT MATURITY SCHEDULE (AFTER REFINANCING) (€ million) (€ million) 12 10 131 36 11 87 57 52 27 121 2019 2020 2021 2022 >2023 2019 2020 2021 2022 >2023 HAZARDOUS WASTE FUEL CONSUMPTION DIRECT GHG EMISSIONS ENERGY INTENSITY GENERATED (Tons) (Thousand litres) SCOPE 1 AND 2 (Ton. CO2 eq.) (KWh/employee) 2017 2018 2017 2018 2017 2018 2017 2018 262 186 638 397 2,733 2,226 15,109 15,431 8 Letter from the Executive Chairman In 2018, Talgo has continued to work tirelessly around the world, boosting its Dear Shareholders, considered in December 2018 "preferred commercial efforts and bidder" by the largest European railway It is an honour for me to address you operator Deutsche Bahn for a framework promoting its brand again this year and to present you agreement to deliver up to 100 long- to build a solid and with Talgo’s Annual Report for 2018, distance trains. The agreement was unbeatable portfolio of which reflects the developments and signed in February 2019 including a first relevant projects that achievements reached by the Company order of 23 Talgo trains with traction in turn will provide the during the year. worth 550 million euros. The trains company with stability manufactured by Talgo will connect and allow it to develop Talgo is a globally respected and Germany with its neighbouring countries its know-how. established brand because our operating national and international technology brings progress to where we service. Talgo was awarded this contract operate. Our trains vertebrate countries after submitting the most attractive and connect people, reducing journey offer in a Europe-wide bidding process times and offering comfortable and for one of the largest and most sustainable transport, thanks to our demanding railway corporations in the leading technology, which we have world, with a fleet of 274 high-speed developed over 77 years of constant trains carrying more than 4.6 billion innovation and an internationalisation passengers across Europe. Also in 2019 strategy that has allowed us to grow not Talgo was also awarded a new contract only in Spain, but also in markets such in Egypt for the supply of six last as the United States, Germany, Russia, generation trains and their maintenance Kazakhstan and Saudi Arabia, among for eight years. The contract was signed others, and to develop excellence as in April 2019 and amounts to 158 million we embarked on increasingly complex euros. projects. These excellent results are further In 2018, Talgo has continued to work proof of Talgo’s work to boost its tirelessly around the world, boosting its commercial efforts globally as well as commercial efforts and promoting its the global success of Talgo's industrial brand to build a solid and unbeatable development model and the quality of portfolio of relevant projects that in turn its products, which has been decisive in will provide the company with stability consolidating its position at the forefront and allow it to develop its know-how. of the Spanish industrial development As a result of this remarkable effort, last and in reinforcing Talgo’s brand as an year Talgo was awarded contracts worth international benchmark. The direct 176 million euros, of which it is worth consequence of the conscientious work highlighting the contract with Renfe for of our professionals is a portfolio of the conversion of hotel trains Talgo serie orders that will ensure our industrial 7 into Very High-Speed compositions activity for the next few years, with star that can circulate at a maximum speed projects throughout the world. of 330 km/h. In addition, Talgo was 8 Annual Report 2018 9 In addition to these new and exciting All of these excellent news have two projects, I would also like to highlight clear orchestrators: our employees the effective and efficient execution and our shareholders. The former of the ongoing projects, which has because without their talent, daily contributed to improving the company’s effort, commitment and innovative cash flow and reducing debt and capacity, we would not be able to which will continue to boost revenues celebrate our successes and remain the in 2019. A noteworthy milestone is leading company in our sector. And our that Talgo successfully completed the shareholders because your trust in Talgo manufacturing phase of the Haramain strengthens the company, ratifies our project, which has helped the company management and promotes our future consolidate its global leadership. Since projects. last October the Haramain project connects Mecca and Medina in a first Looking ahead to 2019, Talgo's proactive phase of commercial phase. During the commercial action will continue to first six months of the operation, Talgo strengthen our order book in the high- trains in Saudi Arabia have carried over speed, maintenance and suburban and 410,000 passengers through close to regional rail segments, particularly in 1,000 services delivering a punctuality those markets where Talgo’s experience rate of 99.5%. and distinctive technology affords it a clear competitive advantage. We have a Among other relevant milestones it is great year ahead of us with new contract worth highlighting that Talgo has begun opportunities which I am convinced in 2018 the manufacture of one of its we will be able to leverage as we have star projects: the Talgo Avril train. We are always done. particularly proud of the development of this unique train, which is more Last, I would like to thank our advanced, faster, lighter, more efficient shareholders and clients for the trust and more sustainable. The Talgo Avril you continue to place in our Company; it will help consolidate Spain to be once strengthens Talgo and ratifies our long- again at the forefront of the major global term vision and innovative leadership trends in the railway and sustainable mobility sectors. Innovation activities underpin the Carlos de Palacio Oriol business culture that the Company was Chairman founded upon and, nowadays, they represent the axes around which the development of new products is based, with the aim of meeting the current and future demand. In this sense, Talgo signed an agreement with Google Cloud in 2018 to revolutionize the rolling stock maintenance, transmitting sensor data in real time and applying automatic learning to solve problems, without stopping the service. 1 What is Talgo? 1.1. An innovative and sustainable project 1.2. Distinctive proprietary technology 1.3. Offering (products and services) 1.4. International presence 1.5. Corporate governance 12 1.1. An innovative and sustainable project Talgo is a leading company in the design, The Company was founded more than Talgo’s trains are designed to be the manufacture and maintenance of rolling 75 years ago with a clear technological most efficient and respectful of the stock around the world. Its product offer and industrial vocation and is recognised environment, offering high ratios is focused on high-speed and very high- around the world for its innovative of reliability, availability and great speed lightweight trains, as well as on capability, distinctive unique technology passenger capacity with the best passenger cars with tilting technology and efficiency and excellence in contract accessibility. and regional and suburban trains, execution in the railway sector. From and other railway solutions. It has an its origins to the present day, it has Talgo’s mission is based on its industrial presence in seven countries: continuously evolved to develop commitment to continue developing Spain, Germany, Kazakhstan, Uzbekistan, solutions that are adapted to meet the applicable, sustainable and efficient Russia, Saudi Arabia and the United needs of railway operators around the technologies that improve passenger rail States of America.
Recommended publications
  • Lightweight Primary Structures for High-Speed Railway Carbodies
    25 número 5 - junio - 2018. Pág 9 - 21 Lightweight primary structures for High-speed railway carbodies De la Guerra, Eduardo Talgo1 Abstract The railway industry are looking to increase the capacity of the railway system, bringing flexibility in order to align capacity and demand, to increase availability, reliability and energy efficiency reducing life cycle costs (LCC) and an improvement of the passenger comfort and the attractiveness of the rail transport. One of the lines of action to solve the above challenges is the introduction of new carbody structures. The weight saving potential of the use of new materials and technologies in the carbody structures would result in reduced power consumption, lower inertia, less track wear and the ability to carry greater payloads. One example of the employ of light structures is Talgo AVRIL train, with an innovative layout of seats that allows to introduce one extra seat per row (3+2 configuration), increasing dramatically the capacity of the train. It has been possible, respecting the current regulatory framework, with an optimized design of the extruded aluminium structure. It will be presented different challenges of introducing lighter structures in the carbodies of coaches of high speed train and different studies and projects to describe the future possibilities of new material and methodologies to improve the lightness of the vehicles. Keywords: lightweight, Rolling stock, carbody. 1 De la Guerra, Eduardo. Technical Leader of the R&D Projects. Structures Department.Talgo. Email: [email protected] International Congress on High-speed Rail: Technologies and Long Term Impacts - Ciudad Real (Spain) - 25th anniversary Madrid-Sevilla corridor 9 De la Guerra, Eduardo 1.
    [Show full text]
  • Avril by Talgo. the New Renfe High-Speed Train
    Report - New high-speed train Avril by Talgo: Renfe’s new high-speed, variable gauge train On 28 November the Minister of Pub- Renfe Viajeros has awarded Talgo the tender for the sup- lic Works, Íñigo de la Serna, officially -an ply and maintenance over 30 years of fifteen high-speed trains at a cost of €22.5 million for each composition and nounced the award of a tender for the Ra maintenance cost of €2.49 per kilometre travelled. supply of fifteen new high-speed trains to This involves a total amount of €786.47 million, which represents a 28% reduction on the tender price Patentes Talgo for an overall price, includ- and includes entire lifecycle, with secondary mainte- nance activities being reserved for Renfe Integria work- ing maintenance for thirty years, of €786.5 shops. The trains will make it possible to cope with grow- million. ing demand for high-speed services, which has increased by 60% since 2013, as well as the new lines currently under construction that will expand the network in the coming and Asfa Digital signalling systems, with ten of them years and also the process of Passenger service liberaliza- having the French TVM signalling system. The trains will tion that will entail new demands for operators from 2020. be able to run at a maximum speed of 330 km/h. The new Avril (expected to be classified as Renfe The trains Class 106 or Renfe Class 122) will be interoperable, light- weight units - the lightest on the market with 30% less The new Avril trains will be twelve car units, three mass than a standard train - and 25% more energy-effi- of them being business class, eight tourist class cars and cient than the previous high-speed series.
    [Show full text]
  • Una Perspectiva Internacional Del
    Tecnología ferroviaria española Una perspectiva internacional Real Academia Española de Ingeniería Madrid, 19 marzo 2013 Iñaki Barrón de Angoiti Director del Departamento Viajeros y Alta Velocidad, UIC I Barrón – La experiencia española en la alta velocitat ferroviaria – Madrid, 19 marzo 2013 1/58 Contenido • La alta velocidad ferroviaria en el mundo • La experiencia española en alta velocidad • El futuro de la alta velocidad • Conclusiones I Barrón – La experiencia española en la alta velocitat ferroviaria – Madrid, 19 marzo 2013 2/58 • La alta velocidad ferroviaria en el mundo • La experiencia española en alta velocidad • El futuro de la alta velocidad • Conclusiones I Barrón – La experiencia española en la alta velocitat ferroviaria – Madrid, 19 marzo 2013 3/58 Primer principio básico de la alta velocidad La alta velocidad es un sistema Un sistema (muy) complejo, que debe tener en cuenta: - Infraestructura - Estaciones - Material rodante - Normas de explotación - Señalización - Marketing - Mantenimientos - Financiación - Gestión - Aspectos legales -… Cada elemento se utiliza al más alto nivel Considerarlo todo es fundamental (Seminario UIC) I Barrón – La experiencia española en la alta velocitat ferroviaria – Madrid, 19 marzo 2013 4/58 Segundo principio básico de la alta velocidad La alta velocidad no es única • Diferentes conceptos de servicio y marketing • Diferentes tipos de explotación (velocidades máximas, paradas, etc.) • Diferentes criterios de aceptación del tráfico (en particular admisión de mercancías) • La capacidad, el
    [Show full text]
  • Shinkansen - Wikipedia 7/3/20, 1048 AM
    Shinkansen - Wikipedia 7/3/20, 10)48 AM Shinkansen The Shinkansen (Japanese: 新幹線, pronounced [ɕiŋkaꜜɰ̃ seɴ], lit. ''new trunk line''), colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, in order to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network.[1][2] It is operated by five Japan Railways Group companies. A lineup of JR East Shinkansen trains in October Over the Shinkansen's 50-plus year history, carrying 2012 over 10 billion passengers, there has been not a single passenger fatality or injury due to train accidents.[3] Starting with the Tōkaidō Shinkansen (515.4 km, 320.3 mi) in 1964,[4] the network has expanded to currently consist of 2,764.6 km (1,717.8 mi) of lines with maximum speeds of 240–320 km/h (150– 200 mph), 283.5 km (176.2 mi) of Mini-Shinkansen lines with a maximum speed of 130 km/h (80 mph), and 10.3 km (6.4 mi) of spur lines with Shinkansen services.[5] The network presently links most major A lineup of JR West Shinkansen trains in October cities on the islands of Honshu and Kyushu, and 2008 Hakodate on northern island of Hokkaido, with an extension to Sapporo under construction and scheduled to commence in March 2031.[6] The maximum operating speed is 320 km/h (200 mph) (on a 387.5 km section of the Tōhoku Shinkansen).[7] Test runs have reached 443 km/h (275 mph) for conventional rail in 1996, and up to a world record 603 km/h (375 mph) for SCMaglev trains in April 2015.[8] The original Tōkaidō Shinkansen, connecting Tokyo, Nagoya and Osaka, three of Japan's largest cities, is one of the world's busiest high-speed rail lines.
    [Show full text]
  • SPEEDLINES, HSIPR Committee, Issue
    High-Speed Intercity Passenger Rail SPEEDLINES JULY 2017 ISSUE #21 2 CONTENTS SPEEDLINES MAGAZINE 3 HSIPR COMMITTEE CHAIR LETTER 5 APTA’S HS&IPR ROI STUDY Planes, trains, and automobiles may have carried us through the 7 VIRGINIA VIEW 20th century, but these days, the future buzz is magnetic levitation, autonomous vehicles, skytran, jet- 10 AUTONOMOUS VEHICLES packs, and zip lines that fit in a backpack. 15 MAGLEV » p.15 18 HYPERLOOP On the front cover: Futuristic visions of transport systems are unlikely to 20 SPOTLIGHT solve our current challenges, it’s always good to dream. Technology promises cleaner transportation systems for busy metropolitan cities where residents don’t have 21 CASCADE CORRIDOR much time to spend in traffic jams. 23 USDOT FUNDING TO CALTRAINS CHAIR: ANNA BARRY VICE CHAIR: AL ENGEL SECRETARY: JENNIFER BERGENER OFFICER AT LARGE: DAVID CAMERON 25 APTA’S 2017 HSIPR CONFERENCE IMMEDIATE PAST CHAIR: PETER GERTLER EDITOR: WENDY WENNER PUBLISHER: AL ENGEL 29 LEGISLATIVE OUTLOOK ASSOCIATE PUBLISHER: KENNETH SISLAK ASSOCIATE PUBLISHER: ERIC PETERSON LAYOUT DESIGNER: WENDY WENNER 31 NY PENN STATION RENEWAL © 2011-2017 APTA - ALL RIGHTS RESERVED SPEEDLINES is published in cooperation with: 32 GATEWAY PROGRAM AMERICAN PUBLIC TRANSPORTATION ASSOCIATION 1300 I Street NW, Suite 1200 East Washington, DC 20005 35 INTERNATIONAL DEVELOPMENTS “The purpose of SPEEDLINES is to keep our members and friends apprised of the high performance passenger rail envi- ronment by covering project and technology developments domestically and globally, along with policy/financing break- throughs. Opinions expressed represent the views of the authors, and do not necessarily represent the views of APTA nor its High-Speed and Intercity Passenger Rail Committee.” 4 Dear HS&IPR Committee & Friends : I am pleased to continue to the newest issue of our Committee publication, the acclaimed SPEEDLINES.
    [Show full text]
  • Nº 341 (Febrero 2017)
    SECRETARÍA GENERAL TÉCNICA CENTRO DE DOCUMENTACIÓN DEL TRANSPORTE Nº 341 (FEBRERO 2017) CORREO ELECTRÓNICO: Pº de la Castellana, 67 [email protected] Planta 2ª - C-217 28071 MADRID WEB:: TEL.:91 597 79 87 http://www.fomento.gob.es/MFOM/LANG_CASTELLANO/ATENCION_CIUDADANO/DOCUMENTACION/documentacion_transportes/ FAX: 91 597 84 53 MINISTERIO DE FOMENTO SECRETARÍA GENERAL TÉCNICA CENTRO DE DOCUMENTACIÓN DEL TRANSPORTE BOLETÍN DE DOCUMENTACIÓN DEL TRANSPORTE Nº 341 (FEBRERO 2017) I. NOVEDADES BIBLIOGRÁFICAS Pº de la Castellana, 67 CORREO ELECTRÓNICO: Planta 2ª - C-217 [email protected] 28071 MADRID TEL.:91 597 79 87 DIRECCIÓN INTERNET: FAX: 91 597 84 53 http://www.fomento.gob.es/MFOM/LANG_CASTELLANO/ATENCION_CIUDADANO/DOCUMENTACION/documentacion_transportes/ PRESENTACIÓN El Boletín de Documentación del Transporte tiene por objeto dar a conocer las publicaciones, tanto periódicas como monográficas, que se reciben regularmente en el Centro de Documentación del Transporte, con el fin de ofrecer una información actualizada del sector que ayude al conocimiento de la producción bibliográfica sobre el transporte y a la toma de decisiones en la materia. Se incluyen también las disposiciones más relevantes, relativas al Transporte, publicadas en el Boletín Oficial del Estado, en el Boletín Oficial de las Cortes Generales, y en el Diario Oficial de la Unión Europea, series L (Legislación) y C (Comunicaciones e informaciones). Para facilitar su utilización este Boletín se ha estructurado en dos volúmenes, que constan de los siguientes apartados: Volumen I. Novedades bibliográficas: 1. Monografías 2. Artículos de Revista seleccionados 3. Informes Anuales 4. Publicaciones Estadísticas 5. Legislación: 5.1 Boletín Oficial del Estado 5.2 Boletín Oficial de las Cortes Generales 5.3 Diario Oficial de la Unión Europea 5.4 Documentos COM 6.
    [Show full text]
  • Train Parameters Study Part 1 - Development of Concept and Design Criteria
    Train Parameters Study Part 1 - Development of Concept and Design Criteria Delivering a Step-Improvement in Passenger Experience HIGH SPEED 2 LTD TRAIN PARAMETERS STUDY PART 1 – DEVELOPMENT OF CONCEPT AND DESIGN CRITERIA Presented to: HS2 Ltd Eland House Bressenden Place London SW1E 5DU Prepared by: Design Triangle Limited The Maltings Burwell Cambridge CB25 0HB © Copyright Design Triangle Limited 2013 281/R/HS2 Rep 03C.doc 1 of 104 revised: 18th June 2013 CONTENTS Synopsis Introduction 1.0 Passenger Capacity 2.0 Station Dwell Time 3.0 Step Improvement in Passenger Experience 4.0 Reference Layout 5.0 Options Appendix 1 ‐ Research Into Boarding and Alighting Times Appendix 2 ‐ Human Factors Research Appendix 3 ‐ Research Into Existing High Speed Trains Appendix 4 ‐ Potential Seating Capacity of Existing High Speed Trains Appendix 5 ‐ Research Into the Exterior Dimensions of Existing High Speed Trains Appendix 6 ‐ Comparison Of Existing High Speed Trains Appendix 7 ‐ Research Into Exterior Details of Existing High Speed Trains Appendix 8 ‐ Research Into Existing UK Trains Appendix 9 ‐ UK Rail Survey Appendix 10 ‐ Research Into Catering Facilities Appendix 11 ‐ Research Into Display Technology Appendix 12 ‐ Brainstorm Ideas List Appendix 13 ‐ Rendered Images Appendix 14 ‐ Station Dwell Time Estimates Appendix 15 ‐ Seat Space Annex A ‐ Concept Sketches (separate document) Annex B ‐ Layout Drawings (separate document) 281/R/HS2 Rep 03C.doc 2 of 104 revised: 18th June 2013 SYNOPSIS Aims The aim of the HS2 Train Parameters Study is to demonstrate how the train capability requirements associated with Passenger Capacities and Station Dwell Times can be best achievable while delivering a Step Improvement in Passenger Experience.
    [Show full text]
  • Informe Anual 2020 1 Annual Report 2020 2 Talgo 2020 Index
    Informe Anual 2020 1 Annual Report 2020 2 Talgo 2020 Index Main results 2020 How do we achieve this? About this report 2.1. Profile, identity and commitments 4.1. Methodology, scope and coverage Message from the President 2.2. Business model 4.2. Materiality analysis 2.3. Proprietary products and technologies 4.3. GRI Index 2 2.4. Innovation 4 2.5. Strategy A year of challenges 1.1. Main milestones 1.2. Financial results How do we manage it? Annexes 1.3. Industrial activity and services 1.4. Commercial activity 3.1. Corporate governance structure Consolidated Group Financial Statements 1 3.2. Risk management Individual Financial Statements 1.5. Creation of shareholder value 1.6. Commitment to people 3.3. Ethics and compliance 1.7. Commitment to the environment 3 3.4. Social accountability management 1.8. Sustainable supply chain 1.9. Social development 3 Main results 2020 Revenue Quarterly revenue development (€M) (€m) 324.4 Q1-2020 Q2-2020 Q3-2020 Q4-2020 2018 112.8 103.8 122.7 147.7 €m €m €m €m 401.7 2018 2019 2020 Human Resources 2018 2019 2020 2019 Adjusted EBITDA (€m) 65.6 75.2 34.2 Number of employees 2.240 2.597 2.668 Men 1.980 2.267 2.305 Adjusted EBITDA margin (%) 20.2% 18.7% 7.0% Women 260 330 363 Accident resulting in medical leave frequency 3.16 7.47 6.66 Net profit (€m) 17.7 38.4 -17.4 487.1 Severity index 0.117 0.252 0.17 Net profit margin (%) 5.5 % 9.6% -3.6% 2020 Environment 2018 2019 2020 Free cash flow (€m) 153.0 35.3 -100.6 Hazardous waste generated (tonnes) 186 217 211 Investments - Capex (€m) 9.6 23.3 24.7 Fuel consumption (thousands of litres) 397 286 226 NetConversión Financial Debt* en (€m)2019 -104.4 -59.3 48.1 GHG Emissions - Scopes 1 and 2 (Ton.
    [Show full text]
  • HIGH SPEED RAIL in SPAIN: SAVING ENERGY and INCREASING SUSTAINABLE MOBILITY ALONG 25 YEARS of SUCESSFUL EXPERIENCE Delhi, 27Th October 2017
    HIGH SPEED RAIL IN SPAIN: SAVING ENERGY AND INCREASING SUSTAINABLE MOBILITY ALONG 25 YEARS OF SUCESSFUL EXPERIENCE Delhi, 27th October 2017 José Conrado Martínez, General Directorate Strategy&Transformation,ADIF Joaqq,yyuín Jiménez, Feasibility Study HS Mumbai-Nagpur-Kolkata,ADIF INTERNATIONAL CONFERENCE ON GREEN INITIATIVES & RAILWAY ELECTRIFICATION I. ADIF references, as Infrastructure Railways Manager in Spain II. Relevant results on Energy and Environment management III.Energy Management technologies for High Speed IV. Sharing Spanish experience with Indian HS projects: Simulation of Energy savings over Thane-Nas ik sthttrecht (feasibilit y stdtudy of New HSL Mumbai-Kolkata / phase 1: Muubambai-Nagpur) ew Background. Current Railways Scenario in Spain . NEW LEGAL FRAMEWORK. RAILWAYS ACT (()2003) AND ULTERIOR In 2005, the National Railways company, RENFE, splits into Adif (the Infrastructure manager) and RENFE Operadora (railway undertaking in charge of transport opp,eration, both ppgassengers and freigg)ht). Both companies remain 100% state-owned. Opening of rail freight (2007) and passengers (2013) traffics to competition Railway policy, legislation and plans MINISTRY OF PUBLIC WORKS RAILWAY SAFETY NATIONAL COMMISSION ON AGENCY MARKETS AND COMPETITION Licenses undertaking INFRASTRUCTURE RAILWAY Capacity allocation MANAGER UNDERTAKING COMPANIES Freight (liberalized) (ADIF) Fee and tariff collection Passengers (Renfe) OTHER EQUIPMENT AND SERVICE SUPPLIERS 3 Adif + Adif AV. Global Figures . MiMain invest or in Spai n, in last 25 years
    [Show full text]
  • 20111103 Talgo-Western High Speed Rail Alliance.Pdf
    Las Vegas October 3, 2011 Talgo Inc. Proprietary and Confidential Information Content • TlgTalgo company profile •Experience • Talgo Innovation • Product descriptions • Q&A TALGO COMPANY PROFILE Company Profile • Year established: 1942 • Employees in 2010: 1,232 His tory • Revenues 2010: $467 million • Over 60 years in business • Over 3,000 vehicles built • High speed applications • Built in the U.S. in 1950’s • Continuous service in the U.S. since 1994 • Safety record (accidents demonstrated crashworthiness; minimal injuries/deaths) Core Business Design, Manufacture, Maintenance of: • Passenger Trains • Maintenance Equipment • Automatic Dual Gauge System 4 Talgo Worldwide Offices and MAINTENANCE WORKSHOP MANUFACTURING PLANT MAINTENANCE EQUIPMENT TALGO ROUTES SPAIN AND EUROPE Long distance, Intercity and International services SPAIN High Speed KAZAKHSTAN UZBEKISTAN BOSNIA AND UNITED STATES HERZEGOVINA TALGO EXPERIENCE Talgo’s portfolio Very High Speed -220 High Speed-150 Intercity-125 Locomotives-150 Market Share High Speed Rail Spain Alstom TlTalgo Others Siemens Talgo Talgo High Speed Trains in Operation & Backlog Max Speed Max Speed No of Traisets Production Country Customer Series Desing Name No. Cars No. Powerheads mph kph built Timeframe Spain Renfe Series 3-RD Series 3-RD 113 180 14 0 1 1964-1981 Spain Renfe Series 4 Series 4 125 200 274 0 24 1979-1987 Spain Renfe Series 5 Series 5 125 200 51 0 5 1989-1991 Spain/France Renfe/SNCF Series 6 Series 6 125 200 382 0 25 1989-2003 Germany Deutsche Bahn Series 6 Talgo Intercitynight 138 220 150 0 6 1994-1996 Kazahkstan Themir Zholy Series 6 Talgo Kazakhstan 138 220 54 0 3 2003 USA Amtrak-WSDOT Series 6 Talgo USA 138 220 67 0 5 1998 Spain ADIF Talgo XXI Talgo XXI 138 220 6 2 2 2002 Spain Renfe Series 7 Talgo 250 156 250 495 90 45 2007-2009 Spain Renfe Series 7 Talgo 350 219 350 192 32 16 2004 Spain ADIF Series 7 Talgo 350 219 350 3 2 1 2007 Spain Renfe Series 7 Hotel Talgo S7 Hotel Train 138 220 203 0 10 2008-2009 Spain Renfe Series 7 Talgo 350 219 350 360 60 30 2008-2011 Bosnia Herzego.
    [Show full text]
  • From TGV to Inoui SNCF Looks to the Future As New High-Speed Lines Open
    July 2017 I Volume 57 Issue 7 www.railjournal.com | @railjournal IRJInternational Railway Journal From TGV to inOui SNCF looks to the future as new high-speed lines open Race to the north Binding the Baltic Britain poised to begin Trilateral consensus builds construction on HS2 behind Rail Baltica Contents Contact us July 2017 Volume 57 issue 7 Editorial offices News Post 46 Killigrew Street 4 This month Falmouth Cornwall, TR11 3PP 6 News headlines UK 12 Transit Tel +44 1326 313945 14 Financial Fax +44 1326 211576 Web www.railjournal.com 16 Technology news: UITP summit 18 Technology news: IAF track show Editor-in-Chief 20 Analysis David Briginshaw 18 [email protected] Associate Editor France Keith Barrow [email protected] 22 Will France say “oui” to inOui? Features Editor SNCF relaunches TGV as inOui in bold move to revitalise Kevin Smith an iconic brand [email protected] 28 Reconnecting Paris Features & News Reporter Dan Templeton France’s ambitious Grand Paris metro project starts to [email protected] take shape Market Researcher 32 Developing the new TGV, brick by brick Jonny Dearden 28 Alstom begins development of its next-generation [email protected] Sales Executive high-speed train Chloe Pickering [email protected] High-speed Production Manager 36 HS2 poised for start of construction Sue Morant [email protected] Preliminary works are underway on Britain’s second high-speed rail project Advertising sales offices 40 Rail Baltica gathers momentum Post 19 John De Mierre House Bridge Road Creating a standard-gauge
    [Show full text]
  • Factors Influencing the Energy Consumption of High Speed Rail and Comparisons with Other Modes
    Imperial College London Department of Mechanical Engineering Factors Influencing the Energy Consumption of High Speed Rail and Comparisons with other Modes Robert Watson July 2012 Thesis submitted for the Diploma of Imperial College (DIC) PhD degree of Imperial College London 1 I declare that the research presented is my own work and that the work of others is properly acknowledged and referenced. Robert Watson 2 Abstract High speed rail is increasingly viewed as an effective solution to the inter-city passenger transportation challenge of the 21st century due to its ability to significantly increase capacity and reduce journey times between city centres. The motivation behind this thesis is to try to establish whether high speed rail is an efficient mode of transport in terms of operational, traction energy consumption and associated carbon dioxide emissions, and to investigate scope for its improvement. A computational model is developed and validated against existing data and simulations are carried out to estimate the energy consumption of a modern, European high speed train, labelled the HS2 reference train, running on the UK's proposed High Speed Two (HS2) line between London and Birmingham. Investigations are conducted to quantify the effects of different parameters on the operational energy consumption of the line according to a defined Key Performance Indicator. Comparisons are made with the car and domestic air in terms of primary energy consumption, carbon dioxide emissions and journey time. Further simulations are conducted of a Class 390 'Pendolino' train running on the existing West Coast Main Line route between London and Birmingham and comparisons are made with the HS2 reference train, again with reference to the Key Performance Indicator and journey time.
    [Show full text]