KG/JD/P5413 1 June 2021 Brent Council (Planning) the Planning

Total Page:16

File Type:pdf, Size:1020Kb

KG/JD/P5413 1 June 2021 Brent Council (Planning) the Planning KG/JD/P5413 1 June 2021 Brent Council (Planning) The Planning Service, Brent Civic Centre Engineers Way Wembley HA9 0FJ Dear Sir/Madam, Town and Country Planning Act 1990 (as amended) Application for the Approval of Details under Condition 16(b) (Post-Completion Report) of Planning Permission 16/0304 Land at the Corner of Edgeware Road and Capitol Way, NW9 Planning Portal Ref: PP-09899142 On behalf of our client, RLAM and Neat Developments Ltd, please find enclosed an application for the full discharge of details under Condition 16(b) of Permission 16/0304 in relation to Blocks A – D of the development. The requisite planning fee of £116.00 has been paid online via the Planning Portal. To assist with your consideration of this application, please find enclosed: • Application Form • Site Location Plan • Post-Completion Report, prepared by Hoare Lea Site Context Capitol Way is a mixed-use development which is part of the Colindale and Burnt Oak Opportunity Area falling within the London Borough of Brent. The wider area comprises, Asda Superstore to the south with the recently consented Oriental City redevelopment to the south. To the north is the Mercedes car garage and to the north-west is the Capitol Way industrial and business area. To the east of Edgware Road is LB Barnet and comprises several large-scale redevelopment schemes for mixed-use and high density new residential development. Works completed on Block E building in February 2021. The parent permission (ref. 08/2823) comprised the following development: ‘Demolition of existing units and erection of replacement 4-storey and 6-storey blocks above two-storey podium decks and a frontage block of 17 storeys above the podium, comprising 460 self-contained flats, 5,360m² of retail (Use Class A1 bulky goods), a 734m² garden centre, 1922m² of floor space for alternative uses falling within Use Classes A uses (A1, A3) or B1 (a- Architecture Planning Interiors Old Church Court, Claylands Road, The Oval, London SW8 1NZ DD 020 7556 1510 T 020 7556 1500 E [email protected] www.rolfe-judd.co.uk Rolfe Judd Holdings Limited. Registration No.4198298 Rolfe Judd Architecture Limited. Registration No.1439773 Rolfe Judd Planning Limited. Registration No.2741774 All Registered at the above address London Borough of Brent Approval of Details – Condition 16b April 2021 c), and 649m² for alternative uses falling within Use Classes A uses (A1, A3), Class B1 or Class D1 (community/health centre), 97m² of crèche facilities (Use Class D1), 281 residential car- parking spaces, 500 residential cycle-parking spaces, 172 commercial car-parking and 80 commercial cycle-parking spaces, 527m² energy centre, bin stores and associated landscaping, with access from Capitol Way NW9 and Plaza Walk NW9.’ Non-material and minor-material amendments were subsequently made to the scheme through various applications, most notably the most recent minor-material amendment application 16/0304, granted on 9 March 2017. This application is related to part b) of Condition 16, which states: b) Following completion of the building works a post – completion report demonstrating that “good” internal noise levels (in accordance with S8233: 1999 Sound insulation and noise reduction for buildings) have been achieved in all habitable rooms shall be submitted to and approved in writing by the Local Planning Authority. You must then carry out the work fully in accordance with the approved details Part b), as set out above, follows part a) of Condition 16, whereby it is outlined that the development shall be completed fully in accordance with the methodologies and approved details set out within the Hoare Lee Technical Response (dated June 2011) as approved under application ref. 11/1708 on 24 August 2011. Part b) of the Condition requires a ‘post-completion report’ following the completion of the building works on-site. As such, this application seeks to provide the details of sound insulation testing that was carried out on the completed phase of the development, comprising Blocks A – D, in accordance with the requirements of Condition 16(b). The applicant has already submitted the post-completion report relevant to Block E of the development under application ref. 21/1486 and these details have been accepted by Environmental Health. It has come the Applicant’s attention that the information pertaining to the other phase of the development was not submitted after the testing was completed. Therefore, it is proposed to formally submit the relevant details for the Council’s approval to fully discharge Condition 16. The report confirms ‘Internal measurements were taken throughout the day and the night over a weekend period …and the results demonstrate compliance with the specification for both living rooms and bedrooms.’ We trust the information provided is sufficient to register and validate the application. The post- completion report has been carried out in accordance with the requirements of Condition 16b of Permission 16/0304 and the condition can now be fully discharged. Yours sincerely Katie Gwilliam For and on behalf of Rolfe Judd Planning Limited 2 .
Recommended publications
  • Greater London Authority
    Consumer Expenditure and Comparison Goods Retail Floorspace Need in London March 2009 Consumer Expenditure and Comparison Goods Retail Floorspace Need in London A report by Experian for the Greater London Authority March 2009 copyright Greater London Authority March 2009 Published by Greater London Authority City Hall The Queen’s Walk London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 ISBN 978 1 84781 227 8 This publication is printed on recycled paper Experian - Business Strategies Cardinal Place 6th Floor 80 Victoria Street London SW1E 5JL T: +44 (0) 207 746 8255 F: +44 (0) 207 746 8277 This project was funded by the Greater London Authority and the London Development Agency. The views expressed in this report are those of Experian Business Strategies and do not necessarily represent those of the Greater London Authority or the London Development Agency. 1 EXECUTIVE SUMMARY.................................................................................................... 5 BACKGROUND ........................................................................................................................... 5 CONSUMER EXPENDITURE PROJECTIONS .................................................................................... 6 CURRENT COMPARISON FLOORSPACE PROVISION ....................................................................... 9 RETAIL CENTRE TURNOVER........................................................................................................ 9 COMPARISON GOODS FLOORSPACE REQUIREMENTS
    [Show full text]
  • Getting to Brent Civic Centre Step by Step Directions
    Getting to Brent Civic Centre Step by step directions Page 1………………………….Walking and public transport step by step guide Page 3…………………………………………………………………………………Map Page 4………………………………………………………….……Images of the area Walking directions from Wembley Park Station to Brent Civic Centre 1. Exit the station via the wide steps. This exit is signposted ‘Wembley Stadium’. 2. At the foot of the steps, continue straight ahead on Olympic Way for a quarter of a mile. (See ‘Images of the area’ section ‘Image 1’) 3. Walk under the ramp for the stadium, and turn right into Engineers Way. You will see the civic centre on your right, with the large orange letters of Wembley Library facing you. (See ‘Images of the area’ section ‘Images 2 and 3’) 4. Continue for 200 yards, the main doors are at the front of the building facing the stadium and Wembley Arena. Time taken: Between 5 and 10 minute depending on your walking speed. Walking directions from Brent Town Hall to Brent Civic Centre 1. Cross the road at the pedestrian lights opposite Asda and turn right. 2. At the Torch public house, follow the footpath to your left and continue until you are opposite Wembley Park Station. 3. Keeping to the same side of the road, take the steps or ramp to your left down into Olympic Way. 4. Now follow the directions as if you had exited from Wembley Park station. Time taken: Between 10 and 20 minutes depending on your walking speed. Walking directions from Wembley Central Station 1. Exit the station and turn right on to Wembley High Road.
    [Show full text]
  • Open for Business Brent Business Guide
    Brent is Open for Business Brent Business Guide Business Development Services What we offer • Apprenticeships & work- based training • Bespoke staff development • Industry-oriented English language • Professional short courses • Facilities hire We have a dedicated Business Development Team who deal solely with the training needs of businesses. Our role is to provide bespoke training or adapt existing qualifications and training to fit the needs of individual organisations. Training can be provided to groups on company premises or at the College, depending on the type of specialist equipment required. If you are self-employed we have short specialist courses open to individuals. “The service and delivery provided by the College of North West London... is excellent. The tutor is inspirational. John Holland, United Biscuits ” “We have been really pleased with the service provided to us by CNWL. They provide us with up to date and timely information...the dedicated support we receive has been invaluable. Victoria Whyte, Hyder” Consulting Apprenticeships Every year, hundreds of employers across London and the south east region choose us to train their apprentices. We have apprentices in a range of sectors and provide specialist support that ensures high success rates and employer satisfaction. If you are considering taking on an Apprentice or are looking for an Apprentice to fill a job vacancy, we support the following sectors: • Accounting • Construction & Engineering including: • Please ask us if you have another Building Services Engineering; job role where an apprentice could Civil Engineering; Construction benefit your business! Operations; Building Crafts; Electrical; Plumbing; Refrigeration & Air Conditioning; Funded training Automotive Engineering We know that financing staff training • Health and Social Care can be challenging, particularly for • Childcare smaller companies.
    [Show full text]
  • The London Strategic Housing Land Availability Assessment 2017
    The London Strategic Housing Land Availability Assessment 2017 Part of the London Plan evidence base COPYRIGHT Greater London Authority November 2017 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 Copies of this report are available from www.london.gov.uk 2017 LONDON STRATEGIC HOUSING LAND AVAILABILITY ASSESSMENT Contents Chapter Page 0 Executive summary 1 to 7 1 Introduction 8 to 11 2 Large site assessment – methodology 12 to 52 3 Identifying large sites & the site assessment process 53 to 58 4 Results: large sites – phases one to five, 2017 to 2041 59 to 82 5 Results: large sites – phases two and three, 2019 to 2028 83 to 115 6 Small sites 116 to 145 7 Non self-contained accommodation 146 to 158 8 Crossrail 2 growth scenario 159 to 165 9 Conclusion 166 to 186 10 Appendix A – additional large site capacity information 187 to 197 11 Appendix B – additional housing stock and small sites 198 to 202 information 12 Appendix C - Mayoral development corporation capacity 203 to 205 assigned to boroughs 13 Planning approvals sites 206 to 231 14 Allocations sites 232 to 253 Executive summary 2017 LONDON STRATEGIC HOUSING LAND AVAILABILITY ASSESSMENT Executive summary 0.1 The SHLAA shows that London has capacity for 649,350 homes during the 10 year period covered by the London Plan housing targets (from 2019/20 to 2028/29). This equates to an average annualised capacity of 64,935 homes a year.
    [Show full text]
  • Decentralized Energy Master Planning
    Decentralized Energy Master Planning The London Borough of Brent An Interactive Qualifying Project Report submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the Degree of Bachelor of Science Submitted by Anthony Aldi Karen Anundson Andrew Bigelow Andrew Capulli Sponsoring Agency London Borough of Brent Planning Service Advisors Dominic Golding Ruth Smith Liaison Joyce Ip 29 April 2010 This report represents the work of four WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its web site without editorial or peer review. Abstract The London Borough of Brent aims to reduce its carbon emissions via implementation of decentralized energy schemes including combined heat and power systems. The objective of this project was to aid Brent in the early stages of its decentralized energy master planning. By examining policies of other boroughs and studying major development areas within Brent, the WPI project team has concluded that the council must actively facilitate the development of decentralized energy systems through the use of existing practices and development of well supported policies. i Authorship Page This report was developed through a collaborative effort by the project team: Anthony Aldi, Karen Anundson, Andrew Bigelow, and Andrew Capulli. All sections were developed as team with each member contributing equally. ii Acknowledgements The team would like to thank our advisors from Worcester Polytechnic Institute, Professor Dominic Golding and Professor Ruth Smith. The team would also like to thank the liaison Joyce Ip from the London Borough of Brent Planning Service and the entire Planning Service.
    [Show full text]
  • Brent Children & Families Information Service Brent Civic Centre
    Brent Children & Families Information Service Brent Civic Centre, Engineers Way, Wembley, HA9 0FJ Tel: 0208 937 3001 Special Needs Services 0 to 25 This list is updated regularly Call Brent CFIS on 020 8937 3001 for up to date information Open 9am to 5pm Monday to Friday I am worried about my child’s development – what can I do? Many children will have special educational needs at some time during their education. For most of them this will be a short-term need that can be met through the expertise and resources of their nursery, school or college, or with advice and support from outside professionals. Very few children will have needs that are long-term or a disability or medical condition that significantly affects their learning. In these cases an education, health and care plan may be required. What are special educational needs and disabilities (SEND)? Children and young people with SEND have learning difficulties or disabilities that make it harder for them to learn than most other children and young people of the same age. Children may have additional needs if they have difficulties with: reading, writing, number work or understanding information expressing themselves or understanding what others are saying making friends or relating to adults understanding and following rules and routines organising themselves a medical condition which impedes learning a sensory or physical need which may affect them in school. Who can I talk to about my concerns? It is very important that children with SEND are identified as early as possible to ensure they start to get the support they need.
    [Show full text]
  • New Office Accommodation for OPDC at Brent Civic Centre, Wembley
    CEO DECISION – CD159 Title: New Office Accommodation for OPDC at Brent Civic Centre, Wembley Executive summary This decision seeks approval for OPDC to secure alternative office accommodation within Brent Civic Centre, Wembley. The need to relocate, away from OPDC’s current base a 169 Union Street, has arisen as a result of the GLA’s relocation from City Hall to the Crystal, Royal Docks; no fixed office or ‘anchor’ provision will be available to OPDC beyond July 2021. Officers have therefore been engaged in an exercise to identify and assess potential options for a new base. This exercise has now concluded, and the preferred option is a relocation to Brent Civic Centre, Wembley. This decision follows on from the Chief Executive Officer’s report to Board in March 2021. Section 10 of that report set out the broad requirements for any new space and the emerging options. It also provided for a delegation to the CEO, to be exercised in consultation with the Chair, to secure new office space. Decision That the Chief Executive, having consulted with OPDC’s Chair: i. approves Brent Civic Centre as OPDC’s preferred relocation option and authorises Officers to enter into a 24-month licence agreement (with a break option at month 12) along with any other commitments necessary to secure the accommodation ii. approves expenditure of up to £125,000 p.a. for rent, service charge and Business Rates, noting that future annual approvals will be granted through the Corporation’s budget setting process iii. approves one-off expenditure of up to £30,000 for anticipated IT infrastructure and/or office set up costs iv.
    [Show full text]
  • Brent Year 4 Reshaping Tomorrow Project Impact Review
    BRENT YEAR 4 RESHAPING TOMORROW PROJECT IMPACT REVIEW Above all, it’s about people wates.co.uk Reshaping Tomorrow Project Impact Review 1 Wates Living Space is a company with a single minded commitment to delivering the highest “quality for our customers while making a lasting difference to the communities in which we work. When we started this project, we promised to make a lasting difference in Brent. This report demonstrates“ how we are working to meet this challenge and deliver on our promises. I hope you enjoy reading what we have done and how the team enjoyed being part of creating something special. Have you read Communities Count: A practical guide to David Morgan embedding social value or Communities Count: Four steps Managing Director, Wates Living Space to unlocking social value? Visit www.wates.co.uk Above all, it’s about people wates.co.uk 2 Wates Living Space Reshaping Tomorrow Project Impact Review Reshaping Tomorrow Project Impact Review 3 Client: Communities Count Brent Council It is critical that every penny of the money invested in housing is spent effectively and in Value: a way that delivers the most benefit to people, their communities and society as a whole. Circa £15m (Year 4) In 2017, Wates Living Space together with Social Enterprise UK, PWC, Orbit Group and the Chartered Institute of Housing conducted the most comprehensive piece of research Duration: into the Public Services (Social Value) Act and how housing associations and local authorities This 10 year contract was launched in July 2014. This report includes are seeking to create social value.
    [Show full text]
  • Wembley Area Action Plan
    Wembley Area Action Plan Contents . FOREWORD 8 1. INTRODUCTION 10 2. STRATEGIC PLANNING CONTEXT 12 3. VISION AND OBJECTIVES FOR WEMBLEY 17 4. URBAN DESIGN & PLACE MAKING 19 5. BUSINESS, INDUSTRY AND WASTE 46 6. TRANSPORT 51 7. HOUSING 67 Wembley Area Action Plan Contents 8. TOWN CENTRES, SHOPPING, LEISURE AND 75 TOURISM 9. SOCIAL INFRASTRUCTURE 82 10. RESPONSE TO CLIMATE CHANGE 85 11. OPEN SPACE, SPORTS AND WILDLIFE 91 12. WEMBLEY HIGH ROAD 100 13. COMPREHENSIVE DEVELOPMENT AREA 106 14. WEMBLEY PARK/EMPIRE WAY CORRIDOR 119 15. WEMBLEY EASTERN LANDS 123 Wembley Area Action Plan Contents 16. WEMBLEY INDUSTRIAL ESTATES 128 17. DELIVERY AND MONITORING 131 18. APPENDIX A: SUPERSEDED POLICIES 139 19. APPENDIX B: GLOSSARY 140 20. APPENDIX C: LAND TAKE MAPS 144 21. CHANGES TO POLICIES MAP 155 LIST OF POLICIES WEM 1 Urban Form 31 WEM 2 Gateways to Wembley 34 WEM 3 Public Realm 36 WEM 4 Public Art 37 WEM 5 Tall Buildings 38 Wembley Area Action Plan Contents WEM 6 Protection of Stadium Views 40 WEM 7 Character of Olympic Way 43 WEM 8 Securing Design Quality 44 WEM 9 Offices 49 WEM 10 Low-cost Business Start-up Space 50 WEM 11 Protected Rail Sidings 50 WEM 12 Road and Junction Improvements to Stadium Access Corridor 55 and Western Access Corridor WEM 13 Western Highway Corridor 56 WEM 14 Car Parking Strategy 57 WEM 15 Car parking standards 58 WEM 16 Walking and Cycling 63 WEM 17 Event Related Transport 64 WEM 18 Housing Mix 69 WEM 19 Family Housing 70 WEM 20 Extra Care Housing 71 WEM 21 Wheelchair Housing and Supported Housing 71 WEM 22 Private Rented
    [Show full text]
  • Tokyngton Wards Are Major Destinations in Themselves in Addition to Being Residential Areas
    ELECTORAL REVIEW OF THE LONDON BOROUGH OF BRENT WARDING PATTERN SUBMISSION BY THE BRENT CONSERVATIVE GROUP RESPONSE TO THE LGBCE CONSULTATION NOVEMBER 2018 1 | P a g e Introduction Why Brent? During the current London Government Boundary Commission Executive (LGBCE) review process, it has become clear to us that since the previous review in 2000, warding levels have developed out of balance. Brent Council meets the Commission’s criteria for electoral inequality with 7 wards having a variance outside 10%. The outliers are Brondesbury Park at -16% and Tokyngton at 28%. Electoral review process The electoral review will have two distinct parts: Council size – The Brent conservative group welcomes to reduce the number of councillors to 57 from current 63. We appreciate that this will require some existing wards to be redrawn, and recognise that this will represent an opportunity to examine whether the existing boundaries are an appropriate reflection of how Brent has developed since 2000. In addition, the establishment of new developments such as South Kilburn Regeneration, Wembley Regeneration, Alperton and Burnt Oak and Colindale area. Ward boundaries – The Commission will re-draw ward boundaries so that they meet their statutory criteria. Should the Commission require any further detail on our scheme we would be very happy to pass on additional information or to arrange a meeting with Commission members or officers to run through the proposals. 2 | P a g e Interests & identities of local communities The Commission will be looking for evidence on a range of issues to support our reasoning. The best evidence for community identity is normally a combination of factual information such as the existence of communication links, facilities and organisations along with an explanation of how local people use those facilities.
    [Show full text]
  • Brent Civic Centre
    Client Brent Council Location London, UK Brent Civic Centre Size / Cost 40,000 sqm NIA / £90 Million Team Architecture - Hopkins PROJECT PROFILE Structures - URS Corporation MEP - URS Corporation Cost - Turner & Townsend PM - Turner & Townsend Contractor - Skanska Awards BCO Corporate Workplace Award, London & South east RIBA Regional Award RIBA National Award SCALA Civic Building of the Year RICS London Award Design through innovation Civic Trust Award London Building Excellence Best Public Service Building onsarc were appointed as joint lead developed from an awareness of and Client and Architectural Advisors response to the sensitivity of customer Cto the London Borough of Brent on interfaces and the diversity of people the development of their new Civic Centre, and issues that come under the remit of catalyst of the regenerated Wembley customer care in the public sector. Masterplan. The new building needed to accommodate up to 3,000 employees from across the Borough into a single fully “All Consarc’s work led to accessible Civic Hub. We were involved our affordability argument, on the project from the strategic definition without which the project phase, continuing to work client side up would have been impossible” until the early construction stages. Initially Anna Woda, Project Director, Brent Council appointed to produce a comprehensive brief for their new Civic Centre and a feasibility study for the Brent Town Hall The concepts of a hierarchical zoning site, the role evolved to key advisor to for primary, secondary and tertiary the project board and leaders of the service enquiries were explored with Council. This included strategic advice adjacency diagrams and sketch plans.
    [Show full text]
  • West London Waste Plan Notice of Adoption of Local
    West London Waste Plan Regulation 26 Adoption of a Local Plan Town and Country Planning (Local Planning) (England) Regulations 2012 Notice of Adoption of Local Plan and Adoption Statement In accordance with the above Regulations, this Adoption Statement, dated 30 July 2015, gives notice that the six West London Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond upon Thames and the Old Oak and Park Royal Development Corporation (the Authorities) have formally adopted the West London Waste Plan (the Plan). The Plan sets out planning policies for the management of waste across the area of west London administered by the Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond upon Thames and those areas within Brent and Ealing administered, for planning purposes, by the Old Oak and Park Royal Development Corporation, to 2031. The Plan was examined by an independent Inspector and the Authorities consulted on a Main Modifications to the Plan between 7 November and 19 December 2014. The Inspector’s Report, including details of the Main Modifications, was issued on 16 March 2015 and can be viewed at the locations set out below and on the following website: www.wlwp.net. The adopted Plan incorporates the Main Modifications as well as a series of minor modifications. Copies of the Plan, the Sustainability Appraisal, SEA Adoption Statement and this Adoption Statement are available for inspection at Council Offices and Borough Libraries detailed below. A person aggrieved by the Plan may make an application to the High Court under section 113 of the Planning and Compulsory Purchase Act 2004 on the ground that– (a) the Plan is not within the appropriate power; (b) a procedural requirement has not been complied with.
    [Show full text]