City of san josÉ Trail network
Commuting Recreation Environment
Over 50% of bicyclists About 1,500 people use San José’s trail projects commute to north San trails through downtown mitigate and improve José employment centers San José each weekday quality of the riparian along the Guadalupe environment River Trail
Version: August 2016 San José’s Trail Network Twenty-four unique trail systems already provide over 57 miles of recreation and active transportation opportunities. The planned 100-mile network will provide pedestrian and bicycle access to every corner of the City via 35 inter-connected trail systems.
A B
C D
In 2000, residents of San José defined a A. Paved trails B. Festivals city-wide mission of developing a network of trails along waterways, utility corridors Hard surface trails are ideal for The city’s trail systems provide easy access to cultural and art festivals and highways. bicycle commuting, jogging and skating. Several “interim” trails held throughout the year. Linkages provide public access to gravel trails to public transportation and the on- San José’s climate is ideal for bicycling: until paving can occur. The trail street bikeways provides residents the average daily temperatures range from network supports citywide travel option to leave cars at home. January's 50° to July's 70°. through interconnections with the planned 400-mile on-street bikeway system. D. Parks and Employment The network’s 35 trail systems are in varying stages of development. Trail systems pass along parks and Ultimately, each trail will be defined by a C. Access to nature open space, while offering off-street 12’ wide paved asphalt concrete surface Most trail systems offer access to connections to major employment and follow natural riparian landscapes, quiet natural and landscaped areas. and residential centers throughout pass through parks or meander through the city. landscaped urban corridors.