Ontario Energy Board Union Gas Limited
EB-2011-0040 Pagelof2 ONTARIO ENERGY BOARD IN THE MATTER OF The Ontario Energy Board Act, 1998, S.O. 1998, c.l5, Schedule B, and in particular, 5.90 thereof; AND IN THE MATTER OF an Application by Union Gas Limited for an Order granting leave to construct a natural gas pipeline and ancillary facilities in the Township ofEar Falls and the Municipality ofRed Lake, both in the District ofKenora UNION GAS LIMITED 1. Union Gas Limited (the '"Applicant") hereby applies to the Ontario Energy Board (the "Board"), pursuant to Section 90.(1) ofthe Ontario Energy Board Act (the "Act"), for an Order granting leave to construct a natural gas pipeline in order to serve the Balmer complex, the Cochenour complex and the Municipality ofRed Lake, all in the District ofKenora. 2. Attached hereto as Schedule "A" is a map showing the general location ofthe proposed pipeline and the municipalities, highways, railways, utility lines and navigable waters through, under, over, upon or across which the proposed pipeline will pass. 3. The construction ofthe proposed pipeline will allow the Applicant to transmit volumes of gas for the purpose ofdistribution to the Municipality ofRed Lake which is located in the District ofKenora. EB-2011-0040 Page 20[2 4. The Applicant now therefore applies to the Board for an Order granting leave to construct the proposed pipeline as described above. i-L\. Dated at Municipality ofChatham-Kent this ~ day ofFebruary, 2011. Per: Da ones, Assistant Ge ral Counsel for Union Gas Limited Comments respecting this Application should be directed to: Mark Murray Dan Jones Manager, Regulatory Projects & Lands Acquisition Assistant General Counsel Union Gas Limited Union Gas Limited 50 Keil Drive North 50 Keil Drive North Chatham, Ontario Chatham, Ontario N7M 5M1 N7M 5M1 Telephone: 519-436-4601 Telephone: 519-436-5396 Fax: 519-436-4641 Fax: 519-436-5218 Email: Email: mml-,rr~lv(~j'§~ctraencrg:y.com dxjoncs] ((uuniongas.com UN IONrcgulatorvproccedings(Zl/uniongas.com EB-2011-0040 Filed: 2011/02/1 0 Page 1 of 18 PROJECT SUMMARY 1.
[Show full text]