3 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

3 Bus Time Schedule & Line Route 3 bus time schedule & line map 3 Don Mills - Eb View In Website Mode The 3 bus line (Don Mills - Eb) has 4 routes. For regular weekdays, their operation hours are: (1) Don Mills - Eb: 4:56 AM - 9:51 PM (2) Drop Off Only - Eb: 10:41 PM (3) Pioneer Village Terminal - Wb: 5:41 AM - 8:44 PM (4) Yonge - Wb: 9:27 PM Use the Moovit App to ƒnd the closest 3 bus station near you and ƒnd out when is the next 3 bus arriving. Direction: Don Mills - Eb 3 bus Time Schedule 68 stops Don Mills - Eb Route Timetable: VIEW LINE SCHEDULE Sunday 9:45 AM - 9:28 PM Monday 4:56 AM - 9:51 PM Pioneer Village Station 50 Settler Road, Vaughan Tuesday 4:56 AM - 9:51 PM Steeles Av Stop # 3694 Wednesday 4:56 AM - 9:51 PM 2658 Steeles Avenue West, Toronto Thursday 4:56 AM - 9:51 PM Steeles Av / Founders Rd Friday 4:56 AM - 9:51 PM 2598 Steeles Avenue West, Toronto Saturday 8:24 AM - 9:38 PM Steeles Ave West at Keele St East Side 2879 Steeles Avenue West, Toronto Steeles Av / Petrolia Rd 2777 Steeles Avenue West, Toronto 3 bus Info Direction: Don Mills - Eb Steeles Av / Shale Gate Stops: 68 2655 Steeles Avenue West, Toronto Trip Duration: 54 min Line Summary: Pioneer Village Station, Steeles Av Steeles Av Stop # 3704 Stop # 3694, Steeles Av / Founders Rd, Steeles Ave 2497 Steeles Avenue West, Toronto West at Keele St East Side, Steeles Av / Petrolia Rd, Steeles Av / Shale Gate, Steeles Av Stop # 3704, Steeles Ave West at Alness St East Side Steeles Ave West at Alness St East Side, 2215 Steeles Ave West, Steeles Av / Gerry Fitzgerald Dr, Steeles 2215 Steeles Ave West Ave West at Dufferin St, Steeles Av / Hidden Trl, New Steeles Avenue West, York Westminster Dr / Conley St, New Westminster Dr / Mullen Dr, New Westminster Dr / Edgecroft Trl, New Steeles Av / Gerry Fitzgerald Dr Westminster Dr / Clark Av, New Westminster Dr / 2181 Steeles Avenue West, Toronto Brownridge Dr, New Westminster Dr / Centre St, Promenade Terminal, Centre St / New Westminster Steeles Ave West at Dufferin St Dr, New Westminster Dr / Katerina Av, New 1502 Steeles Avenue West, Vaughan Westminster Dr / Beverley Glen, New Westminster Dr Stop # 3380, New Westminster Dr / Bathurst St, Steeles Av / Hidden Trl Atkinson Av / Rosedale Heights Dr, Atkinson Av / 1755 Steeles Avenue West, Toronto Dundurn Cres, Atkinson Av / Dundurn Cres, Atkinson Av Stop # 3328, Atkinson Av / Rosedale Heights Dr, New Westminster Dr / Conley St Centre St / Atkinson Av, Centre St / Rose Green Dr, 225 Conley Street, Vaughan Centre St / Markwood Lane, Centre St / Oakbank Rd, Centre St / Brooke St, Centre St / Yonge St, Yonge / New Westminster Dr / Mullen Dr Royal Orchard, Royal Orchard Blvd / Inverlochy Blv, 233 New Westminster Drive, Vaughan Royal Orchard Blvd / Wild Cherry La, Royal Orchard Blvd / Bay Thorn Dr, Royal Orchard Blvd / Kirk Dr, New Westminster Dr / Edgecroft Trl Royal Orchard Blvd / Shady Lane Cre, Royal Orchard 375 New Westminster Drive, Vaughan Blvd / Blue Spruce La, Royal Orchard Blvd / Doral Gate, Royal Orchard Blvd / Bayview Av, Thornhill C.C. New Westminster Dr / Clark Av Stop # 5337, John St / Bayview Av, Bayview Av / 523 New Westminster Drive, Vaughan Green Lane, Bayview Av / Willowbrook Rd, Willowbrook Rd / Bayview Av, Willowbrook Rd / New Westminster Dr / Brownridge Dr Braeburn Dr, Willowbrook Rd / Trimble Crt, 735 New Westminster Drive, Vaughan Willowbrook Rd / Abraham Av, Willowbrook Rd / Charnwood Pl, Willowbrook Rd / Innisbrook Cres, New Westminster Dr / Centre St Willowbrook Rd / Breckonwood Cres, Willowbrook Rd 745 New Westminster Drive, Vaughan / Holm Cres, Green Lane / Aileen Av, Green Lane / Kings College Rd, Green Lane / Huntington Park Dr, Promenade Terminal Green Lane, Green Lane / Huntington Park Dr, Green 1 Promenade Circle, Vaughan Lane / Alexis Rd, Leslie St / 14th Lane, Leslie St / Tanglewood Trl, Leslie St / John St, Don Mills Rd / Centre St / New Westminster Dr Simonston Blvd, Don Mills Rd / Simonston Blvd, The 1028 Centre Street, Vaughan Shops on Steeles Stop # 4289 New Westminster Dr / Katerina Av 867 New Westminster Drive, Vaughan New Westminster Dr / Beverley Glen 999 New Westminster Drive, Vaughan New Westminster Dr Stop # 3380 73 Kingsbridge Circle, Vaughan New Westminster Dr / Bathurst St 8010 Bathurst Street, Vaughan Atkinson Av / Rosedale Heights Dr 301 Rosedale Heights Drive, Vaughan Atkinson Av / Dundurn Cres 100 Dundurn Crescent, York Atkinson Av / Dundurn Cres 2 Dundurn Crescent, York Atkinson Av Stop # 3328 215 Rose Green Drive, York Atkinson Av / Rosedale Heights Dr 300 Atkinson Avenue, Vaughan Centre St / Atkinson Av 172 Franklin Avenue, Vaughan Centre St / Rose Green Dr 6 Rose Green Drive, York Centre St / Markwood Lane 363 Centre Street, York Centre St / Oakbank Rd 271 Centre Street, York Centre St / Brooke St 109 Centre Street, York Centre St / Yonge St 12 Centre Street, Vaughan Yonge / Royal Orchard 1 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Inverlochy Blv 1 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Wild Cherry La 47 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Bay Thorn Dr 85 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Kirk Dr 128 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Shady Lane Cre 161 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Blue Spruce La 185 Royal Orchard Boulevard, York Royal Orchard Blvd / Doral Gate 191 Royal Orchard Boulevard, Markham Royal Orchard Blvd / Bayview Av 7750 Bayview Avenue, Markham Thornhill C.C. Stop # 5337 John St / Bayview Av 7755 Bayview Avenue, Markham Bayview Av / Green Lane 7801 Bayview Avenue, Markham Bayview Av / Willowbrook Rd 15 Willowbrook Road, Markham Willowbrook Rd / Bayview Av 187 Tamarack Drive, Markham Willowbrook Rd / Braeburn Dr 35 Willowbrook Road, Markham Willowbrook Rd / Trimble Crt 45 Willowbrook Road, Markham Willowbrook Rd / Abraham Av 69 Willowbrook Road, Markham Willowbrook Rd / Charnwood Pl 99 Willowbrook Road, Markham Willowbrook Rd / Innisbrook Cres 119 Willowbrook Road, Markham Willowbrook Rd / Breckonwood Cres 137 Willowbrook Road, Markham Willowbrook Rd / Holm Cres 167 Willowbrook Road, Markham Green Lane / Aileen Av 55 Aileen Road, York Green Lane / Kings College Rd 157 Green Lane, York Green Lane / Huntington Park Dr 247 Green Lane, York Green Lane 277 Green Lane, York Green Lane / Huntington Park Dr 299 Green Lane, York Green Lane / Alexis Rd 313 Green Lane, York Leslie St / 14th Lane 2 Alexis Road, York Leslie St / Tanglewood Trl 34 Tanglewood Trail, York Leslie St / John St Don Mills Road, York Don Mills Rd / Simonston Blvd 100 Simonston Boulevard, Markham Don Mills Rd / Simonston Blvd 21 Simonston Boulevard, Markham The Shops on Steeles Stop # 4289 Direction: Drop Off Only - Eb 3 bus Time Schedule 5 stops Drop Off Only - Eb Route Timetable: VIEW LINE SCHEDULE Sunday 10:19 PM Monday 10:41 PM The Shops on Steeles Stop # 4289 Tuesday 10:41 PM Simonston Blvd / German Mills Rd 86 Simonston Boulevard, Markham Wednesday 10:41 PM Simonston Blvd / Thurgate Cres Thursday 10:41 PM 2 Thurgate Crescent, Markham Friday 10:41 PM Simonston Blvd / Waggoners Wells La Saturday 10:28 PM 34 Simonston Boulevard, Markham Simonston Blvd / Don Mills Rd 2 Simonston Boulevard, Markham 3 bus Info Direction: Drop Off Only - Eb Stops: 5 Trip Duration: 6 min Line Summary: The Shops on Steeles Stop # 4289, Simonston Blvd / German Mills Rd, Simonston Blvd / Thurgate Cres, Simonston Blvd / Waggoners Wells La, Simonston Blvd / Don Mills Rd Direction: Pioneer Village Terminal - Wb 3 bus Time Schedule 71 stops Pioneer Village Terminal - Wb Route Timetable: VIEW LINE SCHEDULE Sunday 9:10 AM - 8:28 PM Monday 5:41 AM - 8:44 PM The Shops on Steeles Stop # 4289 Tuesday 5:41 AM - 8:44 PM Don Mills Rd / Steeles Av Don Mills Road, York Wednesday 5:41 AM - 8:44 PM Don Mills Rd / Simonston Blvd Thursday 5:41 AM - 8:44 PM 479 Simonston Boulevard, Markham Friday 5:41 AM - 8:44 PM Simonston Blvd / German Mills Rd Saturday 7:50 AM - 8:36 PM 86 Simonston Boulevard, Markham Simonston Blvd / Thurgate Cres 2 Thurgate Crescent, Markham 3 bus Info Simonston Blvd / Waggoners Wells La Direction: Pioneer Village Terminal - Wb 34 Simonston Boulevard, Markham Stops: 71 Trip Duration: 59 min Simonston Blvd / Don Mills Rd Line Summary: The Shops on Steeles Stop # 4289, 2 Simonston Boulevard, Markham Don Mills Rd / Steeles Av, Don Mills Rd / Simonston Blvd, Simonston Blvd / German Mills Rd, Simonston Simonston Blvd / Dersingham Cres Blvd / Thurgate Cres, Simonston Blvd / Waggoners 388 Simonston Boulevard, Markham Wells La, Simonston Blvd / Don Mills Rd, Simonston Blvd / Dersingham Cres, Simonston Blvd / Chumleigh Simonston Blvd / Chumleigh Cres Cres, Simonston Blvd / Chumleigh Cres, Simonston 286 Simonston Boulevard, Markham Blvd / Snowshoe Cres, Simonston Blvd / Flowervale Rd, Simonston Blvd / Don Mills Rd, Don Mills Rd / Simonston Blvd / Chumleigh Cres John St, Leslie St / Lyndhurst Dr, Leslie St / 14th 220 Simonston Boulevard, Markham Lane, Green Lane / Fallingbrooke Crt, Green Lane / Huntington Park Dr, Green Lane / Huntington Park Simonston Blvd / Snowshoe Cres Dr, Green Lane / Kings College Rd, Green Lane / 230 Snowshoe Crescent, Markham Willowbrook Rd, Willowbrook Rd / Holm Cres, Willowbrook Rd / Ravencliffe Rd, Willowbrook Rd / Simonston Blvd / Flowervale Rd Innisbrook Cres, Willowbrook Rd / Charnwood Pl, 119 Simonston Boulevard, Markham Willowbrook Rd / Abraham Av, Willowbrook Rd / Trimble Crt, Willowbrook Rd / Braeburn Dr, Simonston Blvd / Don Mills Rd Willowbrook Rd / Bayview Av, Bayview Av / Royal 2 Snowshoe Crescent, Markham Orchard Blvd, Thornhill C.C. Stop # 5337,
Recommended publications
  • ROUTE: 35 - JANE SERVICE: SATURDAY SCHEDULE NO: PAGE: 1 TORONTO TRANSIT COMMISSION DIVISION: ARRW REPLACES NO: EFFECTIVE: Jan 9, 2021
    ROUTE: 35 - JANE SERVICE: SATURDAY SCHEDULE NO: PAGE: 1 TORONTO TRANSIT COMMISSION DIVISION: ARRW REPLACES NO: EFFECTIVE: Jan 9, 2021 SERVICE PLANNING-RUN GUIDE SAFE OPERATION TAKES PRECEDENCE OVER TIMES SHOWN ON THIS SCHEDULE ------------------------------------------------------------------------------------------------------------------------------- DOWN FROM: -- PIONEER VILLAGE STATION MU MURRAY ROSS PKWY & STEELES AVE.W JS JANE ST. & STEELES AVE. W. SJ SHOREHAM DR. & JANE ST. FJ FINCH AVE. W. & JANE ST. SH SHEPPARD AVE. W. & JANE ST. LW LAWRENCE AVE. W. & JANE ST. ------------------------------------------------------------------------------------------------------------------------------- UP FROM: -- JANE STATION LW LAWRENCE AVE. W. & JANE ST. JA JANE ST. & WILSON AVE. SH SHEPPARD AVE. W. & JANE ST. FJ FINCH AVE. W. & JANE ST. SJ SHOREHAM DR. & JANE ST. PK PETER KAISER GT. & STEELES AVE.W JS JANE ST. & STEELES AVE. W. MU MURRAY ROSS PKWY & STEELES AVE.W ------------------------------------------------------------------------------------------------------------------------------- RUN | | | | | 4| 3| 4| 8| 5| 2| 2| 2| 6| 10| 2| @ |IM* 2|IM |AR | |TOTAL |DOWN | | | 427a| 555a| 728a| 859a|1039a|1231p| 231p| 431p| 631p| 817p|1006p|1140p| 112x| 119x| 248x| 302x| | 80 | UP | 414a| 424a| 512a| 646a| 816a| 947a|1137a| 135p| 335p| 535p| 725p| 910p|1056p|1230x| | 206x| | | |22:48 | |AR |PK | 2| 7| 4| 4| 6| 9| 9| 9| 2| 5| 7| 7| |JN 2| | | | -------------------------------------------------------------------------------------------------------------------------------
    [Show full text]
  • Postal Bulletin 22028 (7-13-00)
    PUBLISHED SINCE MARCH 4, 1880 PB 22028, July 13, 2000 Dear Fellow Postal Employee: I am pleased and proud to report the much-awaited launch of the new signature capture process and electronic record management system. The July 23 implementation of this program will allow the Postal Service to file delivery records electronically, much as other communication businesses do. This improvement in managing delivery records will provide opportunities to better meet customer needs for proof of delivery services, fraud reduction, and indemnity claim processing. With this new process, we can look up a delivery record from our intranet site in seconds rather than days. The process is simple — our existing handheld and POS ONE scanners will be used to link an article number from a mailpiece, such as Express Mail, certified mail, or insured mail, to a unique number on a delivery receipt signed by the recipient of the mailpiece. This information is stored in a national database, along with the signature information captured when the signed delivery receipt is optically scanned after delivery is complete. A simple, yet effective, way of managing over 400 million delivery records on a yearly basis. Inside this Postal Bulletin are three key articles concerning the new signature capture process. Additional information has been provided in previous Postal Bulletin articles, in communications from our area and district offices, and through other national communication media such as MARKETline and Postal Link. More information will follow. Each and every delivery employee must be provided the proper training and tools to make this program a success. Doing it right the first time, and every time, needs to remain a top priority.
    [Show full text]
  • Pioneer Village Station Art Installation
    Report for Action with Confidential Attachment Pioneer Village Station Art Installation Date: January 18, 2018 To: TTC Board From: Head of Legal & General Counsel Reason for Confidential Information This report contains advice that is subject to solicitor-client privilege, including communications necessary for that purpose. Summary Prior to the public opening of Pioneer Village Station, staff elected not to activate the art installation as previous concerns with respect to the possible misuse of the messaging feature had not been addressed. The artwork included as part of Pioneer Village Station is entitled “LightSpell” and is an interactive installation consisting of a suspended array of 40 light elements. Each element is made of 16 individually controllable luminaries and can produce all letters of the alphabet, as well as special characters and numerals from 0 to 9. Touch-screen keyboards are located on the platform level and allow customers to type messages of up to eight characters in length using the letters of the alphabet, special characters or numerals, which messages become visible through the light display. The current installation allows customers on the subway platform to type in any eight- character message which message will then be broadly displayed for view to all other customers and employees on the platform level. There is a significant risk that the system could be misused to include hate messages or messages that target and/or discriminate against a specific individual or group of people. Such misuse will undermine the objective of creating a safe and welcoming environment, which environment is free from any form of discrimination or harassment.
    [Show full text]
  • Changes to TTC Bus Routes for Line 1 Extension
    STAFF REPORT ACTION REQUIRED Changes to TTC Bus Routes for Line 1 Extension Date: May 18, 2017 To: TTC Board From: Chief Executive Officer Summary Line 1 Extension, also known as the Toronto-York Spadina Subway Extension (TYSSE), is an 8.6 km rapid transit project that will extend the TTC’s Line 1 subway from Sheppard West (formerly Downsview) Station northwest to Vaughan Metropolitan Centre, with six new stations. The new stations are: • Downsview Park Station • Finch West Station • York University Station • Pioneer Village Station • Highway 407 Station • Vaughan Metropolitan Centre Station This report recommends changes to the existing bus routes near the new subway service in order to connect customers to the new rapid transit stations and improve their journey times. The subway extension is scheduled to open in December 2017. Bus routes along Sheppard Avenue West will have new on-street connections with Downsview Park Station. Bus routes in the Keele Avenue and Finch Avenue West area will provide new connections to the bus terminal at Finch West Station. The majority of TTC bus services at York Commons in York University will relocate to the bus terminal at Pioneer Village Station. Transit partners in York Region Transit/Viva, Brampton Transit, and GO Transit will provide new connections to the stations in York Region, at Pioneer Village Station, Highway 407 Station, and Vaughan Metropolitan Centre Station. The number of buses required to provide service to the residents in surrounding areas will be reduced by approximately 20 morning peak buses when the modified routes are introduced in December 2017.
    [Show full text]
  • Route Period / Service Old New Old New Old New Old
    Service Changes Effective Sunday, February 16, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled "recovery" time (layover) usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Davisville Station Construction Ends 11 Bayview Service returns to station loop. 14 Glencairn / 28 Bayview S Interline Ends AM Peak 14 Yonge to Caledonia 16' 60+4 4B 20' 40+0 2B 28 Yonge to Brickworks 16' 38=10 3B 20' 30+10 2B 14 Davisville Stn to Caledonia 16' 60+4 4B 20' 40+0 2B 28 Davisville Stn to Brickworks 20' 38+2 2B 30' 30+0 1B M-F Midday 14 Yonge to Caledonia 20' 52+8 3B 20' 45+5 2.5B 20' 40+0 2B 28 Yonge to Brickworks 20' 36+4 2B 20' 30+0 1.5B 20' 30+10 2B 14 Davisville Stn to Caledonia 27' 52+2 2B 24' 45+3 2B 20' 40+0 2B 28 Davisville Stn to Brickworks 20' 36+4 2B 30' 30+0 1B 30' 30+0 1B PM Peak 14 Yonge to Caledonia 16' 61+3 4B 20' 47+3 2.5B 20' 40+0 2B 28 Yonge to Brickworks 16' 38+10 3B 20' 30+0 1.5B 20' 30+10 2B 14 Davisville Stn to Caledonia 16' 61+3 4B 24' 47+1 2B 20' 40+0 2B 28 Davisville Stn to Brickworks 20' 38+2 2B 30' 30+0 1B 30' 30+0 1B Early Evening 14 Yonge to Caledonia 20' 46+4 2.5B 20' 40+0 2B 20' 40+0 2B 28 Yonge to Brickworks 20' 30 1.5B 20' 30+10 2B 20' 30+10 2B 14 Davisville Stn to Caledonia 24' 46+2 2B 20' 40+0 2B 20' 40+0 2B 28 Davisville Stn to Brickworks 30' 30+0 1B 30' 30+0 1B 30' 30+0 1B Late Evening 14 Yonge to Caledonia 20' 42+8 2.5B 20' 40+0 2B 20' 40+0 2B 28 Yonge to Brickworks 20' 30 1.5B 20' 30+10 2B 20' 30+10 2B 14 Davisville Stn to Caledonia 24' 42+6 2B 20' 40+0 2B 20' 40+0 2B 28 Davisville Stn to Brickworks 30' 30+0 1B 30' 30+0 1B 30' 30+0 1B 97 Yonge Service returns to station loop.
    [Show full text]
  • Bus Lane Implementation Plan
    2045.5 For Action Bus Lane Implementation Plan Date: July 14, 2020 To: TTC Board From: Chief Strategy & Customer Officer Summary The COVID-19 pandemic has shown that the TTC is a vital service in Toronto providing transportation to essential destinations including employment, healthcare, groceries and pharmacies. Although TTC ridership may be down to 22% of pre-pandemic levels, the TTC continues to serve hundreds of thousands of customer-trips on a daily basis. We also have learned through this pandemic, that bus customers have relied on our services the most - 36% of the customers that used buses prior to COVID-19 are still using the system as compared to 19% of subway customers, as of the week ending June 26. As the city and GTHA re-opens and recovery begins, it is expected that people who have the resources and option to, will return to private vehicles, taxis or private transportation companies (PTCs) more quickly than to transit in order to maintain physical distance from others. The TTC’s surface transit network plays a critical role in moving people around Toronto and we must enhance its attractiveness to ensure it continues to provide a viable alternative to the automobile. A key initiative to achieve this is the implementation of bus transit lanes, which will provide customers with a safe, reliable and fast service. The TTC’s 5-Year Service Plan & 10-Year Outlook identified a 20-point action plan including Action 4.1 Explore Bus Transit Lanes. The TTC has worked with partner divisions at the City to develop the following prioritization and implementation plan for the five corridors identified in the Plan.
    [Show full text]
  • Traffic and Parking Regulations - Pioneer Village Station (Toronto-York Spadina Subway Extension)
    REPORT FOR ACTION Traffic and Parking Regulations - Pioneer Village Station (Toronto-York Spadina Subway Extension) Date: October 23, 2017 To: North York Community Council From: Acting Director, Transportation Services, North York District Wards: Ward 8 - York West SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Steeles Avenue West and is scheduled to operate a transit service on the newly constructed Howard Moscoe Way, City Council approval of this report is required. Transportation Services is requesting approval for the installation of traffic control signals and accompanying traffic regulations in connection with the Toronto-York Spadina Subway Extension (TYSSE) site at the Pioneer Village Station. Traffic control signals have been planned and designed for the intersections of Steeles Avenue West at Northwest Gate, Steeles Avenue West at Howard Moscoe Way, Northwest Gate at the TTC Bus Terminal access, and Howard Moscoe Way at the TTC Bus Terminal access 190 metres south of Steeles Avenue West. The installation of these traffic control signals will facilitate efficient bus movements and will enhance safety for pedestrians, cyclists, motorists and transit operations at the Pioneer Village Station. In addition, a recommendation is required to designate the southbound left-turn lane from Northwest Gate to the Bus Terminal Entrance, the northbound left-turn lane from Howard Moscoe Way to Steeles Avenue West, and the westbound left-turn lane from Steeles Avenue West to Howard Moscoe Way as bus only lanes. A westbound stop control on Howard Moscoe Way at its intersection with Northwest Gate is also proposed to clearly establish right-of-way and enhance pedestrian, cyclist and vehicular safety.
    [Show full text]
  • Mitigation Measures
    WELCOME RELIEF LINE TRANSIT PROJECT ASSESSMENT PROCESS PUBLIC INFORMATION CENTRE The Relief Line is an Important Part of the City’s Future Rapid Transit Network The City of Toronto, TTC and Metrolinx are working together to bring more transit to communities across the city. One of the most important rapid transit projects underway is the Relief Line, which will relieve crowding on Line 1 Yonge-University and provide more travel options to transit riders throughout Toronto. The Relief Line is being studied in two parts – Relief Line South and Relief Line North*. Our Rapid Transit Network Today • Parts of the city’s transit network are over capacity today and struggling to meet demand. There are billions of dollars of transit invest- ment committed, new vehicles entering service, and construction underway to expand the rapid transit network and add capacity to the subways, streetcars and GO rail system. • Even with these improvements in place, the Relief Line will still be needed as an important piece of the transit network. Future Rapid Transit Network • Relief Line South is a 7.5 km long subway line with 8 stations that would connect Line 1 Yonge-University downtown to Line 2 Bloor-Danforth at Pape. • The Relief Line South will help to relieve crowding on Line 1 Yonge-University south of Bloor, at the Bloor-Yonge Station, and on the surface transit routes coming in and out of downtown. * For information on Relief Line North please visit www.relieflinenorth.ca What We’ve Heard 38 3,000+ 3,300 84,000 Public and People People on Unique Visits Stakeholder Attended the the Project to the Project Meetings Held Meetings Mailing List Website 2014-2017 Key Messages From Public And Stakeholders • There is overall support for the results of the evaluation process that has resulted in the preferred corridor and station locations.
    [Show full text]
  • TYSSE 2015 Construction Year in Review
    York University Sheppard West Downsview (currently Downsview) Park Vaughan Metropolitan Highway 407 Finch West 2015 Centre Pioneer Village CONSTRUCTION YEAR IN REVIEW This has been an exciting year for the project as entrance buildings at all six stations have emerged from the ground. This is a review of some key achievements from 2015. VMC Power Sub-Station Escalators at Downsview Park Station VMC Electrical Room Transformers at Downsview Park Station 26 m Escalator at Highway 407 Station Power Up of Sub-Stations Escalator Installations Two of the four power sub-stations have been energized and All escalators are installed in the stations; four remain to go into are ready to deliver power to the stations at Downsview Park bus terminals. The first operating escalator is located at Downsview and Vaughan Metropolitan Centre and to rail beyond. Park Station and one of the longest escalators (26 metres) ever installed by TTC can be found at Highway 407 Station. Progress by Station 87% Downsview Park Station 63% York University Station 79% Highway 407 Station 81% Finch West Station 85% Pioneer Village Station 83% Vaughan Metropolitan Centre Station Entrances During 2015 distinctive entrance structures emerged at the stations. Entrance structures will be fitted with bird-friendly fritted glass, will have green or cool roofs and are designed to allow daylight to penetrate deep into most of the stations. Finch West Station Entrance Building Downsview Park Station East Entrance Building York University Station Entrance Building Pioneer Village Station South Entrance Building Highway 407 Station and GO/YRT Bus Terminal Vaughan Metropolitan Centre Station Entrance Building Major Concrete Pours Two very large concrete pours closed in key station roof sections at VMC and York University stations.
    [Show full text]
  • Black Creek Pioneer Village Directions
    Black Creek Pioneer Village Directions Gearard remains paradigmatic after Garwin ruralise effervescingly or distance any electroencephalogram. Hapless Brad debone touchily, he jiggled his Euglena very provocatively. Nevil still sunburns militarily while sec Reza rechristens that hagglers. Files a lovely spinning star coaster for natural, it overlooks black creek pioneer village The main visitors centre building is completely barrier free. For directions and to your ticket either express approval to black creek pioneer village directions from scarborough waterfront park offer a variety of your total for. The directions in close to black creek pioneer village directions in impacts that no major retrofit initiatives. Please add your vehicle and black creek pioneer village directions of food. Other great lakes offshore services on the capital campaign undertaken to black creek pioneer village by respective owners clean drinking room settings panel provided recommendations or black creek pioneer village! Fishing was nothing important chief of life in each area and a public factory shows us where workers canned clams, lobster, and herring. To certain end, TRCA will assist municipal partners in the development of greenspace network that maximizes community wellbeing and local ecosystem protection. Funding funding pressures were cooking creative exhibits in black creek pioneer village at black smiths, circulate proposals ranging from canada? Enter without a unesco world and black creek pioneer village directions to log house and opportunities for rehabilitation of building, until creamy and readily scalable as the scenery and wait. This policy salaries to! If it makes a rough noise, most likely plays! Whitburn Crescent, Davpart Inc. High impact recreation opportunities.
    [Show full text]
  • 1 Subway Time Schedule & Line Route
    1 subway time schedule & line map YONGE - UNIVERSITY View In Website Mode The 1 subway line (YONGE - UNIVERSITY) has 2 routes. For regular weekdays, their operation hours are: (1) Vaughan Metropolitan Centre: 12:00 AM - 11:55 PM (2) Finch: 12:04 AM - 11:59 PM Use the Moovit App to ƒnd the closest 1 subway station near you and ƒnd out when is the next 1 subway arriving. Direction: Vaughan Metropolitan Centre 1 subway Time Schedule 38 stops Vaughan Metropolitan Centre Route Timetable: VIEW LINE SCHEDULE Sunday 12:01 AM - 11:54 PM Monday 12:01 AM - 11:55 PM Finch 5695 Yonge Street, Toronto Tuesday 12:00 AM - 11:55 PM North York Centre Wednesday 12:00 AM - 11:55 PM 5145 Yonge Street, Toronto Thursday 12:00 AM - 11:55 PM Sheppard - Yonge Friday 12:00 AM - 11:55 PM 20 Sheppard Avenue West, Toronto Saturday 12:00 AM - 11:54 PM York Mills 4025 Yonge Street, Toronto Lawrence Yonge Street, Toronto 1 subway Info Direction: Vaughan Metropolitan Centre Eglinton Stops: 38 2200 Yonge St, Toronto Trip Duration: 74 min Line Summary: Finch, North York Centre, Sheppard - Davisville Yonge, York Mills, Lawrence, Eglinton, Davisville, St- 1900 Yonge St, Toronto Clair, Summerhill, Rosedale, Bloor, Wellesley, College, Dundas, Queen, King, Union, St.Andrew, Osgoode, St- St-Clair Patrick, Queen's Park, Museum, St-George, Spadina, 2 St. Clair Avenue East, Toronto Dupont, St-Clair West, Eglinton West, Glencairn, Lawrence West, Yorkdale, Wilson, Sheppard West, Summerhill Downsview Park Station, Finch West Station, York 16 Shaftesbury Ave, Toronto University, Pioneer
    [Show full text]
  • Route Period / Service Old New Old New Old New Old New Old New Old New Old New Old New Old New 1 Yonge-University-Spadina 501 Qu
    Service Changes Effective Sunday, August 1, 2021 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Subway Service Change 1 Yonge-University-Spadina Sunday service will operate with one person train crews between Vaughan Centre and St. George Station. Two person crews will operate on the remainder of the line. King-Queen-Queensway-Roncesvalles Project 501 Queen The shift in routes at King-Queen-Queensway-Roncesvalles described here has been deferred because phase 1 of the work will not be completed as expected on July 21. Schedules and routes shown below will be implemented when the project reaches the state 501/301 Queen Rolling street closures will be in place between Bay and Fennings (east of Dovercourt) for water main, track and streetscape work effective the week of July 12. 501 buses will divert to parallel streets as needed. When the KQQR project shifts to phase 2, 501/301 buses will operate directly along Queen rather than diverting to King Street west of Dufferin. 504/304 King When the KQQR project shifts to phase 2, bus service on the west end of 504 King will be consolidated as one route between Dundas West Station and Princes Gate Loop.
    [Show full text]