Improved Rural Connectivity Project

Total Page:16

File Type:pdf, Size:1020Kb

Improved Rural Connectivity Project Public Disclosure Authorized Public Disclosure Authorized Improved Rural Connectivity Project REHABILITATION OF PRIMARY FEEDER ROADS IN NORTHERN PROVINCE Public Disclosure Authorized ABBREVIATED RESETTLEMENT ACTION PLAN FOR PACKAGE II EASTCONSULT/DASAN CONSULT - JV Public Disclosure Authorized EXECUTIVE SUMMARY INTRODUCTION The Government of the Republic of Zambia (GRZ) has received financing from the World Bank (WB) towards the cost of implementing the Improved Rural Connectivity Project (IRCP) for the six (6) provinces of Zambia. The financing of the remaining four (4) provinces will come from GRZ. The project will be implemented for a period of five (5) years from 2017 to 2021 using the Output and Performance Road Contract (OPRC) approach. Under the OPRC concept, the service provider is paid not for ‘inputs’ but rather for the results of the work executed under the contract i.e. the service provider’s performance under the contract. GRZ is thus seeking to increase efficiency and effectiveness of the management and maintenance of the of the Primary Feeder Roads (PFR) network. Brief Description of the Project Thus, the OPRC has been designed to provide emphasis on the rehabilitation and maintenance of gravel roads which hitherto remain unpaved due to very low traffic volume and/or lack of funds to adequately improve the sub- grade and base. The roads earmarked for rehabilitation are currently being used. However, due to lack of maintenance and repair, the unpaved roads are potholed, embankments eroded away, rattling in a number of places, drainages eroded or blocked with sand. In some instances, the roads are inaccessible. During the construction period, much of the work will include rehabilitation while during the operational period, focus will be on maintenance. Rehabilitation is the work performed on the road which extends beyond routine maintenance. Generally, this involves loosening of a significant amount of material and changing part of, or much of the geometry of the roadway including fore-slopes and ditches. Maintenance is the work done routinely on a road surface, generally no more than light shaping to keep the road smooth, removing slight defects and making sure the crown is maintained to allow water to flow off the driving surface. Project IRCP Objective The overall objective of the project is to improve rural accessibility for communities in the selected areas. Project Area, Cost and Implementation Date The rehabilitation of Package II PFR of total length 159km in Mbala and Senga Hill Districts of Northern Province, is estimated to cost US$6.36million. Civil works will commence once ZEMA approval has been obtained. iv Improved Rural Connectivity Project ARAP for Road Package II – Northern Province Improved Rural Connectivity Project – Prioritised road in Northern Province – Package II SN Road No District(s) Length (Km) 1 U006 Mbala 61 2 RD004 Senga Hill 48.3 3 RO61 Senga Hill 49.7 Total 159 Rationale for Preparation of Abbreviated Resettlement Action Plan The rural roads are planned to have a right-of-way (ROW) of 18m width and a carriageway width of 5.5m. It was observed that the 6.25m width (road reserve) on either side of the road has been encroached in a few selected sections by trading facilities, residences or agricultural fields. Objective of the ARAP To ensure that all the persons affected by land acquisition are properly consulted, made available to affordable and accessible grievance mechanisms and are timely compensated at replacement cost their lost assets. Scope of the ARAP This abbreviated plan covers the following minimum elements:1 ▪ identification of project impacts and affected populations; ▪ a legal framework for land acquisition and compensation; ▪ a compensation framework; ▪ a description of resettlement assistance and restoration of livelihood activities; ▪ a detailed budget; ▪ an implementation schedule; ▪ a description of organizational responsibilities; ▪ a framework for public consultation, participation, and development planning; ▪ a description of provisions for redress of grievances; and ▪ a framework for monitoring, evaluation, and reporting. POLICY, LEGAL AND INSTITUTIONAL FRAMEWORK Institutional Framework ▪ The President ▪ Cabinet 1 In case some of the displaced persons lose more than 10% of their productive assets or require physical relocation, the plan also covers a socioeconomic survey and income restoration measures. v Improved Rural Connectivity Project ARAP for Road Package II – Northern Province ▪ Parliament ▪ Office of the Vice President – Disaster Management and Mitigation Unit ▪ Government Valuation Department ▪ Office of the District Commissioner ▪ The Local Authority ▪ The Zambia Environmental Management Agency ▪ Public Social Welfare Assistance Scheme ▪ Non-Governmental Organisations Policy Framework ▪ Vision 2030 ▪ The National Policy on Environment, 2008 ▪ Involuntary Resettlement Guidelines from the OVP Legal Framework ▪ The Constitution of Zambia (Amendment), 2016 ▪ The Lands Acquisition Act, No. 13 of 1994 ▪ The Urban and Regional Planning Act, No. 3 of 2015 ▪ The Lands Act, No. 13 of 1994 ▪ The Local Government Act, No. 2 of 2019 ▪ The Land Survey Act, No. 13 of 1994 ▪ The Environmental Management Act (EMA), No. 12 2011 ▪ The Environmental Impact Assessment (EIA) Regulations, SI 28 of 1997 ▪ Arbitration Act, No. 19 of 2000 International Standards ▪ World Bank Resettlement Guidelines ▪ International Finance Corporation Guidelines METHODOLOGY The following activities formed the methodology that was used to prepare the ARAP: ▪ Inventory and identification of affected assets ▪ Census survey of affected PAPs − Enumeration and Registration − Identification of Affected Land Users − Beneficiary Capping vi Improved Rural Connectivity Project ARAP for Road Package II – Northern Province ▪ Data analysis The completion of the census represented a provisional cut-off date for eligibility for resettlement assistance. The cut-off date is the date of completion of the census and assets inventory of persons affected by the project. The inventory was completed on 21 March 2019 and was thus set as the cut-off date. PROJECT IMPACTS The identified impacts are summarised in the table below: Summary of project impacts Impact Total Number Road side shop 1 Sign post 1 Crop fields 3 The amount of land that will be acquired totals 0.121Ha. The owners of the crops will be allowed to harvest before construction works can begin. The relocation of the road side shop will be avoided by realigning the road to the other side. The sign post will be avoided by confining the civil works to within the ROW. RESETTLEMENT BUDGET AND SCHEDULE The summary Resettlement Implementation Budget is presented below. The budget to implement the ARAP is K4,400.00. The budget is for loss of business arising from business interruption due to the carrying out of civil works and for the relocation of the sign post. CONCLUSION This Abbreviated Resettlement Action Plan has detailed the potential impacts of the road upgrade project on the affected communities and presents a mitigation plan for the economic and physical displacement caused by the project. RDA has committed to implementing this Plan according to its internal procedures and within the budget that has been allocated for this project. ________________________________________________ Chief Executive Officer Roads Development Agency v Improved Rural Connectivity Project ARAP for Road Package II – Northern Province Table of Contents EXECUTIVE SUMMARY .................................................................................................................. IV LIST OF ABBREVIATIONS AND ACRONYMS ......................................................................... XII GLOSSARY OF TERMS ................................................................................................................. XIII 1 INTRODUCTION ...................................................................................................................... 16 1.1 Background ....................................................................................................................................... 16 1.2 The Oprc Concept .............................................................................................................................. 17 1.3 Improved Rural Connectivity Project ................................................................................................. 17 1.4 Project Objective ............................................................................................................................... 18 1.5 Project Justification ........................................................................................................................... 19 1.6 The Project Proponent ...................................................................................................................... 20 1.7 Project Location ................................................................................................................................ 20 1.8 Rationale for Preparation of Abbreviated Resettlement Action Plan ................................................ 22 1.9 Objectives of the ARAP ..................................................................................................................... 22 1.10 Scope of the ARAP ............................................................................................................................. 22 1.11 Policy and Principles .........................................................................................................................
Recommended publications
  • REPORT of the AUDITOR – GENERAL on the ACCOUNTS
    REPORT of the AUDITOR – GENERAL ON THE ACCOUNTS FOR THE FINANCIAL YEAR ENDED 31st DECEMBER 2007 2 TABLE OF CONTENTS Page Introduction..................................................................................................... 1 Audit Scope and Methodology....................................................................... 1 Institutional Development.............................................................................. 1 International Co-operation............................................................................ 1 Accountability of Public Funds...................................................................... 2 Limitation of Scope....................................................................................... 2 Outturn and Appropriation Accounts............................................................ 2 General Revenues.......................................................................................... 3 Zambia Revenue Authority........................................................................... 3 Exceptional Revenue – Ministry of Energy and Water Development........... 6 Fees and Fines – Ministry of Homes Affairs – Police ................................. 7 Exceptional Revenue – Ministry of Agriculture and Cooperatives.............. 9 Fees and Fines - Ministry of Energy and Water – Water Board.................. 9 Fees and Fines – Ministry of Mines and Mineral Development.................. 10 Fees and Fines – Ministry of Home Affairs – Immigration....................... 12 Fees and
    [Show full text]
  • The Coincidence of Ecological Opportunity with Hybridization Explains Rapid Adaptive Radiation in Lake Mweru Cichlid fishes
    ARTICLE https://doi.org/10.1038/s41467-019-13278-z OPEN The coincidence of ecological opportunity with hybridization explains rapid adaptive radiation in Lake Mweru cichlid fishes Joana I. Meier 1,2,3,4, Rike B. Stelkens 1,2,5, Domino A. Joyce 6, Salome Mwaiko 1,2, Numel Phiri7, Ulrich K. Schliewen8, Oliver M. Selz 1,2, Catherine E. Wagner 1,2,9, Cyprian Katongo7 & Ole Seehausen 1,2* 1234567890():,; The process of adaptive radiation was classically hypothesized to require isolation of a lineage from its source (no gene flow) and from related species (no competition). Alternatively, hybridization between species may generate genetic variation that facilitates adaptive radiation. Here we study haplochromine cichlid assemblages in two African Great Lakes to test these hypotheses. Greater biotic isolation (fewer lineages) predicts fewer constraints by competition and hence more ecological opportunity in Lake Bangweulu, whereas opportunity for hybridization predicts increased genetic potential in Lake Mweru. In Lake Bangweulu, we find no evidence for hybridization but also no adaptive radiation. We show that the Bangweulu lineages also colonized Lake Mweru, where they hybridized with Congolese lineages and then underwent multiple adaptive radiations that are strikingly complementary in ecology and morphology. Our data suggest that the presence of several related lineages does not necessarily prevent adaptive radiation, although it constrains the trajectories of morphological diversification. It might instead facilitate adaptive radiation when hybridization generates genetic variation, without which radiation may start much later, progress more slowly or never occur. 1 Division of Aquatic Ecology & Evolution, Institute of Ecology and Evolution,UniversityofBern,Baltzerstr.6,CH-3012Bern,Switzerland.2 Department of Fish Ecology and Evolution, Centre of Ecology, Evolution and Biogeochemistry (CEEB), Eawag Swiss Federal Institute of Aquatic Science and Technology, Seestrasse 79, CH-6047 Kastanienbaum, Switzerland.
    [Show full text]
  • 05 February 2021
    ZAMBIA COVID-19 SITUATION REPORT NO. 132 th th Disease Pandemic: COVID-19 Response start date: 30 January, 2020 Outbreak Declared:18 March, 2020 Report date: Friday 5th February 2021 Prepared by: MOH/ZNPHI/WHO Correspondence:[email protected] 1. SITUATION UPDATE This week (1st - 7th Feb) Cases 6,210 Deaths 65 Recoveries 4,045 1.1 CURRENT CASE NUMBERS (as of 09:00 hours CAT) • In the past 24 hrs, we recorded 1,424 new confirmed cases, 16 deaths and Global Numbers 740 recoveries. (Source: JHU) 104,886,168 Confirmed • Cumulative number of confirmed COVID-19 cases recorded to date is 60,427 2,284,686 Deaths (2.2% CFR) 58,322,664 Recoveries with 828 deaths (CFR=1.37%) and 52,045 recoveries (86.13% recovered). Africa Numbers • Of the 828 total deaths among the confirmed cases, 378 have been classified Source: Africa CDC) 3,626,960 Confirmed as COVID-19 deaths (CFR=0.63%) and 419 as associated deaths; 31 deaths 93,647 Deaths (2.6% CFR) are pending classification. See Annex 1 for definitions 3,128,534 Recoveries • There are currently 7,554 active cases: of these, 409 (5.4%) are hospitalised (with 285 on Oxygen therapy and 37 in critical condition); 7,145 patients are under community management. 2. EPIDEMIOLOGICAL HIGHLIGHTS 14000 12000 10000 8000 6000 Number Recorded Number 4000 2000 0 5-11Oct 1 -1Feb7 7-13Sep 3 -Aug39 2 -2Nov8 4 -410 Jan 19-25 Oct 12-18 Oct 13-19 Apr 20-26 Apr 21-27 Sep 9 -915Nov 15 15 -21Jun 6 -612 Apr 16-22 Mar 23-29 Mar 14 14 Sep-20 -713 Dec 1 - 17 Jun 13 13 July-19 8 -814 Jun 11 11 - 17 Jan 25 - 31 Jan 18 18 - 24 Jan
    [Show full text]
  • The Case of Honey in Zambia the Case
    Small-scale with outstanding economic potential enterprises woodland-based In some countries, honey and beeswax are so important the term ‘beekeeping’ appears in the titles of some government ministries. The significance of honey and beeswax in local livelihoods is nowhere more apparent than in the Miombo woodlands of southern Africa. Bee-keeping is a vital source of income for many poor and remote rural producers throughout the Miombo, often because it is highly suited to small scale farming. This detailed Non-Timber Forest Product study from Zambia examines beekeeping’s livelihood role from a range of perspectives, including market factors, production methods and measures for harnessing beekeeping to help reduce poverty. The caseThe in Zambia of honey ISBN 979-24-4673-7 Small-scale woodland-based enterprises with outstanding economic potential 9 789792 446739 The case of honey in Zambia G. Mickels-Kokwe G. Mickels-Kokwe Small-scale woodland-based enterprises with outstanding economic potential The case of honey in Zambia G. Mickels-Kokwe National Library of Indonesia Cataloging-in-Publication Data Mickels-Kokwe, G. Small-scale woodland-based enterprises with outstanding economic potential: the case of honey in Zambia/by G. Mickels-Kokwe. Bogor, Indonesia: Center for International Forestry Research (CIFOR), 2006. ISBN 979-24-4673-7 82p. CABI thesaurus: 1. small businesses 2. honey 3. beekeeping 4. commercial beekeeping 5. non- timber forest products 6. production 7. processing 8. trade 9.government policy 10. woodlands 11. case studies 12. Zambia I. Title © 2006 by CIFOR All rights reserved. Published in 2006 Printed by Subur Printing, Jakarta Design and Layout by Catur Wahyu and Eko Prianto Cover photo by Mercy Mwape of the Forestry Department of Zambia Published by Center for International Forestry Research Jl.
    [Show full text]
  • ZAMBIA Situation Report Last Updated: 15 Jun 2020
    ZAMBIA Situation Report Last updated: 15 Jun 2020 HIGHLIGHTS (15 Jun 2020) The first imported COVID-19 case was reported on 18 March 2020 and as of 08 June 1,200 cases have been confirmed, including ten deaths. Out of the country’s 119 districts, 27 have reported cases of COVID-19. Laboratory testing and reagents have been identified as key challenge. On 8 May, the Government withdrew some of the initial measures and recommended opening of schools for student examination years, restaurants and gyms. During a food distribution in Siakasipa FDP, Kazungula District, people wait to receive assistance maintaining social On 1 June, examination classes in both primary and distancing. Photo: World Vision secondary re-opened on condition that all public health guidelines and regulations are enforced. KEY FIGURES FUNDING CONTACTS Laura Hastings 10.1M 6.2M $132.9M $6.7M Humanitarian Affairs Officer, Zambia people in need people targeted requested (May-Oct received [email protected] 2020) Guiomar Pau Sole 27 Communications & Information partners operational 7.8% Management, Regional Office for funded Southern & Eastern Africa [email protected] BACKGROUND (15 Jun 2020) Situation Overview Zambia recorded its first case of COVID-19 on 18 March 2020 and, as 8 June, 1,200 cases had been confirmed and 10 deaths reported. Out of the 119 districts, 27 districts have reported COVID-19 cases. The Government of Zambia introduced a series of measures to mitigate against the spread of the virus including closure of regional airports, restrictions of public gatherings of more than 50 people, closures of religious institutes, bars and restaurants.
    [Show full text]
  • USAID/Zambia Partners in Development Book
    PARTNERS IN DEVELOPMENT July 2018 Partners in Zambia’s Development Handbook July 2018 United States Agency for International Development Embassy of the United States of America Subdivision 694 / Stand 100 Ibex Hill Road P.O. Box 320373 Lusaka, Zambia 10101 Cover Photo: As part of a private -sector and youth-engagement outreach partnership, media entrepreneur and UNAIDS Ambassador Lulu Haangala Wood (l), musician and entrepreneur Pompi (c), and Film and TV producer Yoweli Chungu (r) lend their voices to help draw attention to USAID development programs. (Photo Credit: Chando Mapoma / USAID Zambia) Our Mission On behalf of the American People, we promote and demonstrate democratic values abroad, and advance a free, peaceful, and prosperous world. In support of America's foreign policy, the U.S. Agency for International Development leads the U.S. Government's international development and disaster assistance through partnerships and investments that save lives, reduce poverty, strengthen democratic governance, and help people emerge from humanitarian crises and progress beyond assistance. Our Interagency Initiatives USAID/Zambia Partners In Development 1 The United States Agency for International Development (USAID) is the lead U.S. Government agency that works to end extreme global poverty and enable resilient, democratic societies to realize their potential. Currently active in over 100 countries worldwide, USAID was born out of a spirit of progress and innovation, reflecting American values and character, motivated by a fundamental belief in helping others. USAID provides development and humanitarian assistance in Africa, Asia and the Near East, Latin America and the Caribbean, and Europe. Headquartered in Washington, D.C., USAID retains field missions around the world.
    [Show full text]
  • Concept-Project-Information-Document-Integrated-Safeguards-Data-Sheet.Pdf
    The World Bank Lake Tanganyika Transport Program - SOP1 Tanzania Phase (P165113) Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage | Date Prepared/Updated: 07-Mar-2018 | Report No: PIDISDSC23776 Public Disclosure Authorized Public Disclosure Authorized January 8, 2018 Page 1 of 19 The World Bank Lake Tanganyika Transport Program - SOP1 Tanzania Phase (P165113) BASIC INFORMATION A. Basic Project Data OPS TABLE Country Project ID Parent Project ID (if any) Project Name Africa P165113 Lake Tanganyika Transport Program - SOP1 Tanzania Phase (P165113) Region Estimated Appraisal Date Estimated Board Date Practice Area (Lead) AFRICA Apr 01, 2019 May 30, 2019 Transport & Digital Development Financing Instrument Borrower(s) Implementing Agency Investment Project Financing Ministry of Finance TANROADS, Tanzania Port Authority, Central Corridor Transit Transport Facilitation Agency, East Africa Community Proposed Development Objective(s) The program development objective for the Lake Tanganyika Transport Program has been identified as the following: to facilitate the sustainable movement of goods and people to and across Lake Tanganyika, whilst strengthening the institutional framework for navigation and maritime safety. Financing (in USD Million) FIN_SUMM_PUB_TBL SUMMARY Total Project Cost 203.00 Total Financing 203.00 Financing Gap 0.00 DETAILS-NewFin3 Total World Bank Group Financing 203.00 World Bank Lending 203.00 January 8, 2018 Page 2 of 19 The World Bank Lake Tanganyika Transport Program - SOP1 Tanzania Phase (P165113) Environmental Assessment Category Concept Review Decision A-Full Assessment Track II-The review did authorize the preparation to continue Other Decision (as needed) B. Introduction and Context Regional Context 1. The economic performance of the East African Community (EAC) member countries—Burundi, Kenya, Rwanda, Tanzania and Uganda—has been impressive over the last decade.
    [Show full text]
  • Familiarisation Tour of Mpulungu, Zambia
    THE ENVIRONMENTAL COUNCIL OF ZAMBIA Pollution Control and Other Measures to protect Biodiversity in Lake Tanganyika (RAF/92/G32) FAMILIARISATION TOUR OF MPULUNGU A COMBINED SOCIO-ECONO0MICS AND ENVIRONMNETAL EDUCATION TOUR CONDUCTED FROM 2/2/99 TO 3/3/99 Munshimbwe Chitalu Assistant National Co-ordinator Socio-economics Co-ordinator National Coordination Office LUSAKA ZAMBIA July 2000 M p u l u n g u Vi s i t R e p o r t , So c i o - E c o n o m i c s / E n v i r o n m e n t a l Ed u c a t i o n Contents List of Acronyms ii Foreword iii Executive summary iv 1 HIGHLIGHTS 1 1 Environmental Education Activities 1 2 Conservation and Development Committees 1 3 Activities of CDCs 2 4 National Project coordination 3 5 The team 3 6 Approach and salutations 3 2 THE TOUR IN MORE DETAIL 4 1 The Aim 4 2 Specific Objectives 4 3 Findings 4 3.1 Community Development Officer (CDO) 4 3.2 Department of Fisheries (DoF) 5 3.3 Immigration Department 7 3.4 Mpulungu District Council 7 3.5 Mpulungu Harbor Corporation Limited 8 3.6 Mr. Mugala 8 3.7 The Provincial Agricultural Co-ordination Office (PACO) 9 3.8 Police Service 9 3.9 Senior Chief Tafuna 9 3.10 Stratum 2 CDC 9 3.11 Village CDCs 10 3 CONCLUSIONS AND RECOMMENDATIONS 12 4 PROPOSED IMMEDIATE ACTIONS 14 Appendix I: Institutions and individuals visited 15 Appendix II: Itinerary 17 Appendix III: Resources 18 P A G E I M p u l u n g u Vi s i t R e p o r t , So c i o - E c o n o m i c s / E n v i r o n m e n t a l Ed u c a t i o n List of Acronyms AMIS Association of Micro-finance Institutions of Zambia ANSEC
    [Show full text]
  • Towards a Regional Information Base for Lake Tanganyika Research
    RESEARCH FOR THE MANAGEMENT OF THE FISHERIES ON LAKE GCP/RAF/271/FIN-TD/Ol(En) TANGANYIKA GCP/RAF/271/FIN-TD/01 (En) January 1992 TOWARDS A REGIONAL INFORMATION BASE FOR LAKE TANGANYIKA RESEARCH by J. Eric Reynolds FINNISH INTERNATIONAL DEVELOPMENT AGENCY FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Bujumbura, January 1992 The conclusions and recommendations given in this and other reports in the Research for the Management of the Fisheries on Lake Tanganyika Project series are those considered appropriate at the time of preparation. They may be modified in the light of further knowledge gained at subsequent stages of the Project. The designations employed and the presentation of material in this publication do not imply the expression of any opinion on the part of FAO or FINNIDA concerning the legal status of any country, territory, city or area, or concerning the determination of its frontiers or boundaries. PREFACE The Research for the Management of the Fisheries on Lake Tanganyika project (Tanganyika Research) became fully operational in January 1992. It is executed by the Food and Agriculture organization of the United Nations (FAO) and funded by the Finnish International Development Agency (FINNIDA). This project aims at the determination of the biological basis for fish production on Lake Tanganyika, in order to permit the formulation of a coherent lake-wide fisheries management policy for the four riparian States (Burundi, Tanzania, Zaïre and Zambia). Particular attention will be also given to the reinforcement of the skills and physical facilities of the fisheries research units in all four beneficiary countries as well as to the buildup of effective coordination mechanisms to ensure full collaboration between the Governments concerned.
    [Show full text]
  • Fishing Life in the Bangweulu Swamps (2): an Analysis of Catch and Seasonal Emigration of the Fishermen in Zambia
    African Stud)' Monographs, Supplementary Issue 6: 33-G3, March 1987 33 Fishing Life in the Bangweulu Swamps (2): An Analysis of Catch and Seasonal Emigration of the Fishermen in Zambia. lchiro IMAI (Research Affiliate of I. A. S.) The Institute for African Studies, University of Zambia Hirosaki University. Japan ABSTRACT The aim of this paper is to describe and characterize the swamp fishing in the Bangweulu Swamps, Zambia. The fish catch by the several fishing methods are analy­ sed after these methods are outlined. As a result of the analysis, it is indicated that each production unit chooses a fishing method to catch a particular group of fish, such as "-1or­ myridae or Cichlidae fish. The types of fishing activity among the lishermen are divided into three classes in terms of their fishing seasons and methods. These types of fishing differ from each other as to how far their villages are from the swamps and what time schedules of agriculture are made according to the limits of the season or the period of fishing in the swamps. By ana­ lysing these types alloted to different ethnic groups, it is clarified how the swamp area is actually utilized by the several ethnic groups from different areas. I\fost of the fishermen in the Bangweulu Swamps are the part-time fishermen who are also engaged in cultivation to a considerable extent. It is discussed why these essentially agriculturalists carry on fishing for themselves without making symbiotic relationships with other fishing specialists. They can get a good cash income by selling the catch.
    [Show full text]
  • Full Text Document (Pdf)
    Kent Academic Repository Full text document (pdf) Citation for published version Macola, Giacomo (2006) “It Means as If We Are Excluded from the Good Freedom”: Thwarted Expectations of Independence in the Luapula Province of Zambia, 1964-1967. Journal of African History, 47 (1). pp. 43-56. ISSN 0021-8537. DOI https://doi.org/10.1017/S0021853705000848 Link to record in KAR https://kar.kent.ac.uk/7559/ Document Version UNSPECIFIED Copyright & reuse Content in the Kent Academic Repository is made available for research purposes. Unless otherwise stated all content is protected by copyright and in the absence of an open licence (eg Creative Commons), permissions for further reuse of content should be sought from the publisher, author or other copyright holder. Versions of research The version in the Kent Academic Repository may differ from the final published version. Users are advised to check http://kar.kent.ac.uk for the status of the paper. Users should always cite the published version of record. Enquiries For any further enquiries regarding the licence status of this document, please contact: [email protected] If you believe this document infringes copyright then please contact the KAR admin team with the take-down information provided at http://kar.kent.ac.uk/contact.html ‘IT MEANS AS IF WE ARE EXCLUDED FROM THE GOOD FREEDOM’: THWARTED EXPECTATIONS OF INDEPENDENCE IN THE LUAPULA PROVINCE OF ZAMBIA, 1964-1966* BY GIACOMO MACOLA Centre of African Studies, University of Cambridge ABSTRACT: Based on a close reading of new archival material, this article makes a case for the adoption of an empirical, ‘sub-systemic’ approach to the study of nationalist and post- colonial politics in Zambia.
    [Show full text]
  • FORM #3 Grants Solicitation and Management Quarterly
    FORM #3 Grants Solicitation and Management Quarterly Progress Report Grantee Name: Maternal and Child Survival Program Grant Number: # AID-OAA-A-14-00028 Primary contact person regarding this report: Mira Thompson ([email protected]) Reporting for the quarter Period: Year 3, Quarter 1 (October –December 2018) 1. Briefly describe any significant highlights/accomplishments that took place during this reporting period. Please limit your comments to a maximum of 4 to 6 sentences. During this reporting period, MCSP Zambia: Supported MOH to conduct a data quality assessment to identify and address data quality gaps that some districts have been recording due to inability to correctly interpret data elements in HMIS tools. Some districts lacked the revised registers as well. Collected data on Phase 2 of the TA study looking at the acceptability, level of influence, and results of MCSP’s TA model that supports the G2G granting mechanism. Data collection included interviews with 53 MOH staff from 4 provinces, 20 districts and 20 health facilities. Supported 16 districts in mentorship and service quality assessment (SQA) to support planning and decision-making. In the period under review, MCSP established that multidisciplinary mentorship teams in 10 districts in Luapula Province were functional. Continued with the eIMCI/EPI course orientation in all Provinces. By the end of the quarter under review, in Muchinga 26 HCWs had completed the course, increasing the number of HCWs who improved EPI knowledge and can manage children using IMNCI Guidelines. In Southern Province, 19 mentors from 4 districts were oriented through the electronic EPI/IMNCI interactive learning and had the software installed on their computers.
    [Show full text]