Map of Major City-Wide Cycling Routes

Total Page:16

File Type:pdf, Size:1020Kb

Map of Major City-Wide Cycling Routes Attachment 2 - Updated Major City-Wide Cycling Routes IE6.11 Attachment 2 CITY OF CITY OF Major City-Wide VAUGHAN MARKHAM Cycling Routes Steeles Ave E Steeles Ave W Steeles Ave W Steeles Ave E Finch Corridor Trail Status of Routes Finch Corridor Trail Kipling Ave Kipling Finch Ave W Martin Grove Rd Rd Grove Martin Finch Ave E Keele St Jane St C2 Beecroft Rd Brimley Rd Rd Brimley Midland Ave Midland Weston Rd C1 Wilmington Ave Ave Wilmington Warden Ave Warden Sheppard Ave E A1 A2 Sheppard Ave E B1 B2 Conlins Rd Humber River Trail Wilson Ave Leslie St The Meadoway Ellesmere Rd Port Union Rd Rd Union Port ve Kingston Rd Yonge St Dufferin St F1 F2 Lawson Rd Lawrence Ave W Rd Avenue Don Mills Trail Warden Hydro Corridor Hydro Warden Lawrence Ave E Morningside A Waterfront Trail The Westway Martin Grove Rd Rd Grove Martin D2 D1 Gatineau Corridor Trail D3 Don Mills Rd Eglinton Ave W Eglinton Ave E Kingston Rd Eglinton Ave E Eglinton Ave W Humber River Trail Brimley Rd Rd Brimley Midland Ave Ave Midland Mt Pleasant Rd Winona Dr Lower Don Trail Avenue Park Victoria Waterfront Trail Bloor St W Bloor St W Bloor St W Danforth Ave ve College St West Toronto Rail Path Path Rail Toronto West Shaw St Shaw Yonge StYonge University A University Waterfront Trail Richmond/Adelaide St Sherbourne Eastern Ave Martin Goodman Trail CITY OF Kipling Ave Kipling MISSISSAUGA Line Brown’s Lake Shore Blvd W Bloor St W Danforth Ave E2 College St E1 Yonge St Yonge ve Shaw St Shaw Dundas St W Bay St Bay Sherbourne St St Sherbourne Data Source: City of Toronto University A University Lower Don Trail Projection: NAD 1927 MTM 3 Sudbury St Richmond St W Richmond St E Eastern Ave Cartography: City of Toronto LAKE Adelaide St W Adelaide St E ± ONTARIO Martin Goodman Trail Date: June 2019 0 2.5 5 10 Km .
Recommended publications
  • Tommy Thompson Park Update
    Attachment 3: City of Toronto Report for Action REPORT FOR ACTION Tommy Thompson Park Update Date: May 10, 2021 To: Infrastructure and Environment Committee From: Chief Planner and Executive Director, City Planning General Manager, Parks, Forestry and Recreation Wards: Ward 14 - Toronto-Danforth SUMMARY Tommy Thompson Park (the Park) is the largest component of the broader Leslie Street Spit (the Spit), located at the base of Leslie Street where it meets the shore of Lake Ontario; all components of the Spit will ultimately be consolidated as Tommy Thompson Park (see Attachment 1). The Park is designated in the Official Plan as an Environmentally Significant Area and is recognized internationally as a Canadian Important Bird Area for supporting the conservation of birds and their habitat. The Park is owned by Toronto and Region Conservation Authority (TRCA) and managed in partnership between TRCA and the City of Toronto. The Park demonstrates that nature can flourish in cities and contribute to the well-being of city residents; only minutes from downtown, the Park is an escape from the city, and a place to marvel at the force of nature. It is a pet-free urban wilderness that exists as the result of decades of careful management and stewardship of natural succession and habitat restoration processes by TRCA with the support of the City, community groups, and other partners. Its significant and diverse aquatic and terrestrial environments provide habitat for at-risk species who are otherwise challenged by the interrelated impacts of habitat loss, habitat fragmentation, urbanization and climate change. The Park's evolution into an urban wilderness can also be attributed to the work of advocacy groups like the Friends of the Spit, founded in 1977 by naturalists advocating for the Spit to grow naturally, without development and the privatization of uses.
    [Show full text]
  • The Physical Plan and Its Implications for Active Transportation
    The Physical Plan and Its Implications for Active Transportation BY JEFFREY WARD, MCIP, LPP above, left and right: Parts of Don Mills’ trails seems virtually indistinguishable from . the Imkerspad in Houten. below, left and right: Shopping in Houten remains small in scale, while Don Mills retailing is focused on the region. SUMMARY In Canada, we build tens of thousands of new homes—detached, semi- Denmark is impractical, since there are detached and low rise apartments—in subdivisions across the land. At best, in our vast cultural diff erences between North planning documents we only pay lip service to the concept of human-powered transpor- Americans and Europeans and that there tation. Few if any examples of suburban land developments show any attempt to are longstanding histories of cycling use in address active transportation (AT) as a real and viable alternative transportation mode. Europe. While it is true that cycling is an We have plenty of trails, but few destinations. We seem to view trails as recreational old tradition there, it is also true that as assets; nothing more. In this article, I’ll compare the Dutch new town of Houten with a recently as the 1970s, bicycling as a travel model suburban Canadian community of about the same mid-20th century vintage— mode was endangered in many European Don Mills, Ontario—Canada’s most famous and infl uential planned community. I’ll cities that are now seen as cycling havens: compare the approach taken towards the physical plan specifi cally as it relates to AT— cars had overrun many urban centres.
    [Show full text]
  • Exhibition Place Master Plan – Phase 1 Proposals Report
    Acknowledgments The site of Exhibition Place has had a long tradition as a gathering place. Given its location on the water, these lands would have attracted Indigenous populations before recorded history. We acknowledge that the land occupied by Exhibition Place is the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and Metis peoples. We also acknowledge that Toronto is covered by Treaty 13 with the Mississaugas of the Credit, and the Williams Treaties signed with multiple Mississaugas and Chippewa bands. Figure 1. Moccasin Identifier engraving at Toronto Trillium Park The study team would like to thank City Planning Division Study Team Exhibition Place Lynda Macdonald, Director Don Boyle, Chief Executive Officer Nasim Adab Gilles Bouchard Tamara Anson-Cartwright Catherine de Nobriga Juliana Azem Ribeiro de Almeida Mark Goss Bryan Bowen Hardat Persaud David Brutto Tony Porter Brent Fairbairn Laura Purdy Christian Giles Debbie Sanderson Kevin Lee Kelvin Seow Liz McFarland Svetlana Lavrentieva Board of Governors Melanie Melnyk Tenants, Clients and Operators Dan Nicholson James Parakh David Stonehouse Brad Sunderland Nigel Tahair Alison Torrie-Lapaire 4 - PHASE 1 PROPOSALS REPORT FOR EXHIBITION PLACE Local Advisory Committee Technical Advisory Committee Bathurst Quay Neighbourhood Association Michelle Berquist - Transportation Planning The Bentway Swinzle Chauhan – Transportation Services
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Publications (Annual Reports, Brochures)
    Local Planning Appeal Tribunal Tribunal d’appel de l’aménagement local ISSUE DATE: December 04, 2020 CASE NO(S).: PL190242 The Ontario Municipal Board (the “OMB”) is continued under the name Local Planning Appeal Tribunal (the “Tribunal”), and any reference to the Ontario Municipal Board or Board in any publication of the Tribunal is deemed to be a reference to the Tribunal. PROCEEDING COMMENCED UNDER subsection 17(24) of the Planning Act, R.S.O. 1990, c. P.13, as amended Appellant: Damis Properties Limited Appellant: Loblaws Properties Ltd. Subject: Proposed Official Plan Amendment No. OPA 404 Municipality: City of Toronto LPAT Case No.: PL190242 LPAT File No.: PL190242 LPAT Case Name: Damis Properties Limited v. Toronto (City) Heard: November 24, 2020 by Video Hearing APPEARANCES: Parties Counsel City of Toronto Jessica Braun and Michael Mahoney Loblaws Properties Ltd. Patrick Harrington Damis Properties Limited Matthew Lakatos-Hayward for Max Laskin The Independent Order of Michael Cara Foresters MEMORANDUM OF ORAL DECISION DELIVERED BY JATINDER BHULLAR ON NOVEMBER 24, 2020 AND ORDER OF THE TRIBUNAL 2 PL190242 [1] This is a decision based on a settlement hearing on consent of the parties. The parties seek final approval of the policies, maps and appendices in the City’s Official Plan Amendment No. 404 (“OPA 404”). In a previous decision dated June 25, 2020, the Tribunal approved OPA 404 in part. The OPA 404 creates the Don Mills Crossing Secondary Plan, which applies to an area generally surrounding the intersection of Don Mills Road and Eglinton Avenue East. [2] Loblaws Properties Ltd. (“Loblaws”) and Damis Properties Limited (“Damis”) had filed appeals of OPA 404 to the Tribunal.
    [Show full text]
  • Attachment 1 Summary of Procurements.Pdf
    1 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Contingency Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Responded Procured Cost Revisions) Vendors (Responsible) Engineering services for slope stability, erosion Eldorado Court, risk assessment, and Grandravine Drive and AECOM CANADA Restoration and alternative conceptual $225,489.00 $22,548.90 $248,037.90 11 5 Ladyshot Crescent, in the LTD. Infrastructure design for forty‐five (45) City of Toronto properties in the City of Toronto. Fill Quality Control, Site Decommissioning and 2019 laboratory Restoration and ALS Canada Ltd $49,300.00 $4,930.00 $54,230.00 4 3 Environmental Monitoring analytical services. Infrastructure Programs Professional engineering services for preliminary AMTEC Engineering Wiley Bridge design, detailed design $36,325.00 $5,448.75 $41,773.75 17 3 Corporate Services Ltd. and contract administration services. Pre‐construction and Upper Highland Creek Pan post‐construction CCTV Restoration and Andrews Engineer $33,274.00 $12,000.00 $45,274.00 12 1 Am Path Connection inspection services of Infrastructure sanitary infrastructure. Newtonbrook Creek Engineering services for AQUAFOR BEECH Restoration and Bridge Replacement Slope detailed designs for $35,800.00 $3,580.00 $39,380.00 7 2 LIMITED Infrastructure Stabilization Project slope stabilization. 2 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Contingency Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Responded Procured Cost Revisions) Vendors (Responsible) Engineering services for Grey Abbey Ravine Slope AQUAFOR BEECH Restoration and development of detailed $59,160.00 $5,916.00 $65,076.00 5 1 Stabilization Project LIMITED Infrastructure designs.
    [Show full text]
  • Sugar Wharf Is a Community of Extraordinary Proportions
    A WHOLE NEW COMMUNITY From Humber Bay to the Eastern Beaches, Toronto’s magnificent waterfront spans 46 kms. Under the direction of Waterfront Toronto, this highly desirable section of the city is undergoing a sea change. Created by the federal and provincial government and the City of Toronto, Waterfront Toronto has the mandate to transform the area into a vibrant public and cultural space for all Torontonians. Unequalled in size, it’s one of the largest urban revitalization projects in the world. The total area for development is 800 hectars in size, and is one of the largest revitalization projects in the world! Collaborating with developers like Menkes, Waterfront Toronto aims to create 40,000 new residences and approximately 40,000 new jobs. With the introduction of mixed-used neighbourhoods, offices, expanding public transit, parks, and public spaces, the waterfront will be a coveted place to live, work, learn and play. By adopting an economically and environmentally sustainable design approach, this reimagination will change the face of Toronto and deliver a positive, meaningful relationship between the lake and the city. THE LAKE. THE LIFE. THE CITY. LAKE SHORE BLVD E NEW ST COOPER ST Rising on the shores of Toronto’s waterfront, Sugar Wharf is a community of extraordinary proportions. FREELAND ST Striking the perfect work-life balance, this exceptional development will be the future-forward ideal today’s urban population seeks. Home to 7,500 residents, and 4,000 HARBOUR ST office workers once completed, this 11.5-acre community RETAIL PROMENADE offers homes, offices, shops, restaurants, school, daycare, park and more.
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]
  • High Park to the Evergreen Brickworks High Park to the Evergreen Brickworks
    High Park to the Evergreen Brickworks High Park to the Evergreen Brickworks 0. ⚑ Start of route 0.0 0.1 17. ↑ pedestrian overpass 6.7 0.4 1. ↑ Continue straight onto 0.1 0.6 18. ← L onto McRoberts Ave 7.0 0.2 Centre Rd 19. → R onto Rogers Rd 7.3 0.2 2. → Slight R onto Spring Rd 0.6 0.0 20. ← L 7.4 0.9 3. ← L onto High Park Blvd 0.7 0.6 21. → R 8.3 0.1 4. ← L onto Sunnyside Ave 1.3 0.1 22. ← L 8.4 0.5 5. → R onto Westminster Ave 1.4 0.6 23. ← L 8.9 0.0 6. ← L onto Sorauren Ave 2.0 0.3 24. → R onto Eglinton Ave W 8.9 0.1 7. → R onto Dundas St W 2.3 0.2 25. ← L onto Little Blvd 9.0 0.2 8. ← L onto Sterling Rd 2.5 0.0 26. ← L onto Bowie Ave 9.2 0.5 9. ← L onto W Toronto 2.6 2.2 Railpath 27. ↑ Continue onto York 9.7 1.1 Beltline Trail 10. → R onto Cariboo Ave 4.7 0.0 28. ↑ Continue straight to stay 10.8 0.9 11. ← L onto Osler St 4.8 0.1 on York Beltline Trail 12. → R onto Pelham Ave 4.9 0.2 29. → R onto Roselawn Ave 11.8 0.5 13. ← L onto Uxbridge Ave 5.1 0.9 30. ↑ Continue onto Elm 12.2 0.2 Ridge Dr 14.
    [Show full text]
  • Best Outdoor Activities in Toronto"
    "Best Outdoor Activities in Toronto" Created by: Cityseeker 7 Locations Bookmarked Toronto Bicycle Tours "Peddle All the Way" To know any city inside out, you need to wander through its lanes and absorb experiences. And what could be more enriching than viewing any city on a bicycle? If you are an outdoor enthusiast and love to explore new places, then the Toronto Bicycle Tours will be the right choice for your tours in the city. With locals and expert guides on board, you can hop on by brigachtal to your bicycle and roam around getting to know the city better. Tours are open for all ages, and private tours can also be arranged by contacting ahead. +1 416 477 2184 torontobicycletours.com/ contact@torontobicycletou 275 Dundas Street West, rs.com Toronto ON Beltline Trail "Peaceful and Quiet Railroad Park" The Kay Gardner Beltline Park is characterized by the Beltline Trail that was established way back in 1892. Although the railroad functioned only till 1894, the railroad has escaped any major redevelopment even today. Passing over the infamous Yonge Street, this defunct railway route offers many inspiring panoramas that are extremely different from typical by Loozrboy Toronto scenes in general. Peaceful and quiet, the park makes for a great intimate lunch spot. Kay Gardner Beltline Trail, Toronto ON Ashbridge's Bay Park "Day at the Beach" Located in the Beaches area, the Ashbridge's Bay Park is one of the most beautiful outdoor spaces within the city limits. Known for its beaches and boardwalk, this is the place summertime was made for.
    [Show full text]
  • STAFF REPORT ACTION REQUIRED Cycling Network Plan Update
    IE6.11 STAFF REPORT ACTION REQUIRED Cycling Network Plan Update Date: June 13, 2019 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards: All SUMMARY The purpose of this report is to provide an update on the implementation progress for the City's Cycling Network Plan, establish a priority framework for Major City-Wide Cycling Routes, and share next steps for effective implementation of proposed cycling infrastructure. The Cycling Network Plan, alongside the draft Official Plan cycling policies currently under review, present a strong vision for improving cycling across the city. More people are riding bicycles in Toronto than ever before, especially where new or improved cycling infrastructure has been provided. In some Toronto neighbourhoods, the cycling mode share is now over 20%. Demand for safe, connected cycling routes throughout the city is on the rise, and recent polls demonstrate the majority of residents support protected bike lanes. This report provides information requested by City Council as part of a two year review of the Ten Year Cycling Network Plan (2016), including status, changes to project timing, and recommendations for the initiation of major studies. This updated Cycling Network Plan also reflects enhanced analyses and lessons from implementation challenges to date. Moving forward, the Cycling Network Plan will consist of two components: a near-term capital implementation program for cycling infrastructure (currently 2019 to 2021), and an overall proposed network (currently 2022+). The Cycling Network Plan Update maintains the originally established goals of Connect, Grow, and Renew, with newly articulated objectives and measures that correspond to each of the three overarching goals, providing additional clarity and indicators for evaluating success.
    [Show full text]
  • 130 Queens Quay E 1,915 SF for Sale: Office
    Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop
    [Show full text]