Cardinal Creek Village Community Transportation Study
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Appendix 5 Station Descriptions And
Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint. -
1009 Trim Road
1009 Trim Road Planning Rationale + Design Brief Official Plan Amendment + Zoning By-law Amendment Applications September 14, 2020 Prepared for 9378-0633 Quebec Inc. Prepared by Fotenn Planning + Design 396 Cooper Street, Suite 300 Ottawa, ON K2P 2H7 September 2020 © Fotenn The information contained in this document produced by Fotenn is solely for the use of the Client identified above for the purpose for which it has been prepared and Fotenn undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. 1.0 Introduction 1 1.1 Supporting Material 2 2.0 Site Context and Surrounding Area 3 2.1 Subject Property 3 2.2 Surrounding Area 4 2.3 Amenities 5 2.4 Transportation Network 6 Road Network 6 Rapid Transit Network 8 Cycling Network 9 3.0 Proposed Development 10 4.0 Policy & Regulatory Framework 18 4.1 Provincial Policy Statement (2020) 18 4.2 City of Ottawa Official Plan (2003, as amended) 20 Land Use Designations 20 Urban Natural Features Designation 21 Urban Employment Area Designation 21 City-wide Employment Area Policies (Section 2.2.3) 22 General Urban Area Designation (Section 3.6.1) 23 Mixed Use Centre designation (Section 3.6.2) 25 Collaborative Community Building and Secondary Planning Processes (Section 2.5.6) 25 Designing Ottawa (Section 2.5.1) 27 Urban Design and Compatibility (Section 4.11) 28 4.3 New City of Ottawa Official Plan (ongoing) 32 Industrial and Logistics Lands Strategy 34 4.4 Orléans Corridor Secondary Plan Study (ongoing) 34 4.5 Vacant Industrial and Business Park Lands -
Light Rail Transit in Ottawa
Light Rail Transit in Ottawa January 30, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 Agenda • Background • Stage 1 Project • Stage 2 Project Ottawa’s Transit Challenge BRT to LRT Conversion Stage 1 Project Confederation Line Alignment Project Overview Stage 1 Confederation Line • Conversion of the existing bus “Transitway” to a 12.5km dedicated light rail transit line running • 2.5km tunnel through the downtown core • 13 stations including 3 downtown underground stations • A new Maintenance and Storage Facility where the light rail vehicles will be assembled, maintained and stored • 30 year maintenance concession period Procurement Approach Project Solutions Affordability RFP Bundled Hwy 417 Provided station Cap Innovations Expansion “innovation Project zones” Defined Service Geotechnical risk Proven Vehicle ladder and System Flexibility in Operations construction & Bundled cash Matters tunnel allowance excavation projects methodology Energy Matters Mobility Matters Rideau Transit Group (RTG) • Design Build Finance Maintain • Owned and operated by the City of Ottawa • $2.1B project including $300M in private financing • 30-year maintenance term with performance incentives • Rideau Transit Group (RTG): Design Challenges • System had to be designed to allow for long term capacity needs: 18,000 pphpd by 2031; Ultimate ridership 24,000 pphpd. • System had to designed to be fully accessible, include public art, address the need of stakeholders and include cycling/pedestrian connections. • Design consideration had -
City of Ottawa Stage II Light Rail Program
2/6/2020 Light Rail Transit in Ottawa January 28, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 1 Stage 1 2 2/6/2020 Confederation Line Alignment 3 Tunney’s Pasture Station 4 2/6/2020 Lyon Station 5 Rideau Station 6 2/6/2020 St-Laurent Station 7 Light Rail Vehicles 8 2/6/2020 Stage 2 Project Progress 9 Stage 2 Rail Network 10 2/6/2020 Stage 2: Trillium Line Design Build Finance Maintain (DBFM) Procurement: • 16 km of new track and eight new stations • Rail link from South Keys to E&Y Centre and Airport Station • Seven (7) Stadler FLIRT vehicles added to fleet of vehicles • Purpose built Walkley Storage & Maintenance Facility • Extensive safety and reliability enhancements 11 Stage 2: Trillium Line Safety Enhancements: • Signal system to provide continuous speed control • Grade separation of Ellwood diamond (interface with VIA) • Rail Control (dispatch) to be run out of Transit Control Center providing access to resources and technology to manage incidents • Dow’s Lake Tunnel to be fully equipped with new tunnel ventilation system, upgraded to meet NFPA standards, and will include full radio coverage for emergency responders • Stadler FLIRT vehicles equipped with crash energy management 12 2/6/2020 Walkley Yard 13 Limebank Station 14 2/6/2020 Bowesville Station 15 Uplands Station 16 2/6/2020 Airport Station 17 Gladstone Station 18 2/6/2020 Stadler Vehicle • Seven (7) Additional Stadler Vehicles • Tier IV Final Emissions Standards (latest EPA standard); • Increased door count for efficient passenger flow as compared -
Project Synopsis
Final Draft Transportation Master Plan Update Study Rapid Transit and Transit Priority Development Report Submitted to City of Ottawa by IBI Group in association with Morrison Hershfield September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 2 2. Policy Guidance and Context .............................................................. 3 2.1 Transit Facility Types ......................................................................................... 3 2.2 Implications of Time Savings ............................................................................ 7 2.2.1 Mode Choice and Land Use ................................................................................. 7 2.2.2 Operating Costs .................................................................................................... 8 3. Modelling the Transit Network ............................................................ 9 3.1 Land Use .............................................................................................................. 9 3.2 Operating Speed ............................................................................................... 10 3.3 Service Headway .............................................................................................. -
Volume 1 Environmental Project Report Confederation Line East Extension (Blair Station to Trim Road) Planning and Environmental Assessment Study
Volume 1 Environmental Project Report Confederation Line East Extension (Blair Station to Trim Road) Planning and Environmental Assessment Study Prepared by: AECOM 302 – 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com In Association with: Parsons Houle Chevrier Engineering Ltd. and MMM Group Project Number: 60323982 Date: March 2016 Environmental Project Report Confederation Line East Extension (Blair Station to Trim Road) Planning and Environmental Assessment Study Statement of Qualifications and Limitations The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“AECOM”) for the benefit of the Client (“Client”) in accordance with the agreement between AECOM and Client, including the scope of work detailed therein (the “Agreement”). The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”): • is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the “Limitations”); • represents AECOM’s professional judgement in light of the Limitations and industry standards for the preparation of similar reports; • may be based on information provided to AECOM which has not been independently verified; • has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and circumstances in which it was collected, processed, made or issued; • must be read as a whole and sections thereof should not be read out of such context; • was prepared for the specific purposes described in the Report and the Agreement; and • in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time. -
Stage 2 LRT Implementation Report
1 Report to Rapport au: Finance and Economic Development Committee Comité des finances et du développement économique 24 February 2017 / 24 février 2017 and Council et au Conseil 8 March 2017 / 8 mars 2017 Submitted on February 17, 2017 Soumis le 17 février 2017 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services / Direction générale des transports Contact Person Personne ressource: Chris Swail Director / Directeur, O-Train Planning / Planification du O-Train 613-580-2424 ext./poste 12408, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2017-TSD-OTP-0001 VILLE SUBJECT: STAGE 2 LIGHT RAIL TRANSIT IMPLEMENTATION – PROJECT DEFINITION AND PROCUREMENT PLAN OBJET: MISE EN ŒUVRE DE L'ÉTAPE 2 DU TRAIN LÉGER SUR RAIL - DÉFINITION DU PROJET ET PLAN D'APPROVISIONNEMENT 2 REPORT RECOMMENDATIONS That the Finance and Economic Development Committee recommend Council approve the implementation of the Stage 2 Light Rail Transit Project and related projects as outlined in this report and as follows: 1. Approve that the following be incorporated into the procurement process for the Stage 2 Light Rail Transit Project: a. The alignment changes and other refinements to the functional design for the Stage 2 Light Rail Transit Project, as described in this report, and as follows: i. The Confederation Line West Extension, as follows: 1. Alignment Improvement at Richmond Road; 2. Alignment Improvement and Station Shift at Lincoln Fields; 3. Pinecrest Creek Re-alignment at Iris Station; 4. Bayshore Station Shift; 5. Goldenrod Bridge Connection. ii. The Trillium Line South Extension, as follows: 1. -
Stage 2 LRT Report, Titled 106
1 Report to Rapport au: Council Conseil 27 February 2019 / 27 février 2019 Submitted on February 22, 2019 Soumis le 22 février 2019 Submitted by Soumis par : John Manconi, General Manager/Directeur général, Transportation Services Department/Direction générale des transports Contact Person Personne ressource: Chris Swail, Director/Directeur, O-Train Planning/Planification du O-Train 613-580-2424 ext./poste 12408, [email protected] Ward :CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-OTP-0001 VILLE SUBJECT: Contract Award of Ottawa’s Stage 2 Light Rail Transit Projects and Related Matters OBJET: Attribution du contrat de l’Étape 2 des projets de train léger sur rail d’Ottawa et questions connexes REPORT RECOMMENDATIONS 1. That City Council receive and table the “Contract Award of Ottawa’s Stage 2 Light Rail Transit Projects and Related Matters” report at its Special meeting of February 27, 2019, for subsequent consideration by Council at its regular meeting of March 6, 2019; 2. That, at its regular meeting of March 6, 2019, City Council: a. Receive the results of the Request for Proposals (RFP) for the Stage 2 Ottawa Light Rail Transit project, as described in this report and as overseen by a Fairness Commissioner, and related matters, including the status associated with the Environmental Assessments and approvals, and the progress achieved to date through the Memorandum of Understanding related to vehicles and maintenance for the Confederation Line East and West, as described in this report; 2 b. Approve the selection of TransitNEXT as the Preferred Proponent to design, build, finance and maintain the Trillium Line Extension Project, including the bundled projects and civic works, in the manner described in this report, including as follows: i. -
Confederation Line East Functional Design Report (Blair Station to Trim Road) on 25 May 2011, Council Approved a Motion and Key Components Are Summarized Below
1 Document 2 Recommended Plan – Confederation Line East Functional Design Report (Blair Station to Trim Road) On 25 May 2011, Council approved a motion and key components are summarized below: In partnership with the United Counties of Prescott and Russell, the City will jointly undertake an environmental assessment study for the Ottawa Road 174 and County Road 17 between Highway 417/Split to Landry Road in Clarence- Rockland. The environmental assessment study is to be provincially funded. Following this motion, on 1 February 2012, Transportation Committee approved the statement of work for Highway 174 and County Road 17 Environmental Assessment Study (ACS2012-ICS-PGM-0014). With provincial funding, the United Counties of Prescott Russell, in partnership with the City of Ottawa are completing a multi- jurisdictional Class Environmental Assessment (EA) Schedule C study for improvements to the Highway 174 (Hwy174) and County Road 17 (CR17). Figure 1 illustrates the study limits, extending from Highway 417/Split in Ottawa to Landry Road, in the United Counties of Prescott and Russell (UCPR), a distance of approximately 34 kilometres. 2 Figure 1: Highway 174/County Road 17 EA Study Limits On 26 November 2013, Council unanimously approved the 2013 Transportation Master Plan (TMP), that included the Stage 2 rail proposal to extend rail farther east (Confederation Line East extension), west (Confederation Line West extension) and south (Trillium Line extension) of the City. The Confederation Line East extension limits extend from Blair Station to Place d’Orléans Station, and on 5 February 2014, Transportation Committee approved the statement of work for the Planning and Environmental Assessment Study (ACS2014-PAI-PGM-0015). -
Light Rail Transit in Ottawa: Innovation Through Procurement
Light Rail Transit in Ottawa: Innovation through Procurement Michael Morgan Director, Rail Construction Program June 24, 2019 1 Agenda • Background • Stage 1 Procurement & Lessons Learned • Stage 2 Procurement Ottawa’s Transit Challenge O-Train Network Confederation Line Stage 1 Project Overview Stage 1 Confederation Line • Conversion of the existing bus “Transitway” to a 12.5km dedicated light rail transit line running; • 2.5km tunnel through the downtown core; • 13 stations including 3 downtown underground stations; • A new Maintenance and Storage Facility where the light rail vehicles will be assembled, maintained and stored; and, • 30 year maintenance concession period. Procurement Approach Project Solutions Affordability RFP Bundled Hwy 417 Provided station Cap Innovations Expansion “innovation Project zones” Defined Service Geotechnical risk Proven Vehicle ladder and System Flexibility in Operations construction & Bundled cash Matters tunnel allowance excavation projects methodology Energy Matters Mobility Matters Rideau Transit Group (RTG) • Design Build Finance Maintain • Owned and operated by the City of Ottawa • $2.1B project including $300M in private financing • 30-year maintenance term with performance incentives • Rideau Transit Group (RTG): Tunney’s Pasture Station Pimisi Station Lyon Station Lees Station Hurdman Station Stage 1 Lessons Learned Extensive analysis of the execution of Stage 1 and a comprehensive “lesson learned” report was prepared in advance of Stage 2 procurement. Major takeaways from Stage 1 that were applied -
Key Facts: Stage 2 LRT Contract Award
February 2019 Key Facts: Stage 2 LRT Contract Award Key Facts institutions, shopping and recreation destinations, arts and cultural hotspots. • Stage 2 will change the way we move around Ottawa providing shorter commutes, • The rail network will be fully integrated with cleaner air, and a stronger economy. the communities it serves and will include cycling and pedestrian facilities to encourage • The $4.66 billion Stage 2 LRT project is a sustainable transportation such as bike package of three extensions – south, east, parking, multi-use pathways, and new and west - totalling 44 kilometres of new rail pedestrian bridges. and 24 new LRT stations. • When Stage 2 is complete, commuting in o To the south, Trillium Line will be Ottawa will forever change with 77 per cent extended from Greenboro Station to of the Ottawa’s population living within five Limebank Station, with a link to the kilometres of light rail. Ottawa International Airport, totaling 16 kilometres of new rail and 8 new Funding & Procurement stations • Stage 2 is funded by each level of o To the east, Confederation Line will government and full funding for the links to be extended from Blair Station to Trim Trim Road and the Ottawa Macdonald- Station adding 12.5 kilometres of new Cartier International Airport provided by the rail and 5 new stations. provincial and federal governments o To the west, Confederation Line will • The City has implemented an innovative be extended from Tunney's Pasture three-pronged procurement approach for the Station to Moodie Station and Stage 2 LRT Project that is based on a southwest to Baseline Station adding Public – Private Partnership (P3). -
(LRT) Stations Will Follow the Same Standards, Design Principles, and Connectivity and Mobility Requirements As Stage 1 Confederation Line
Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.