World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Sichuan Water Supply and Sanitation PPP Project (P168025) EAST ASIA AND PACIFIC | China | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 2 | ARCHIVED on 17-Dec-2020 | ISR44744 | Public Disclosure Authorized Implementing Agencies: People's Republic of China, Jingyang Project Management Office Key Dates Key Project Dates Bank Approval Date: 03-Mar-2020 Effectiveness Date: -- Planned Mid Term Review Date: 30-Jun-2024 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2026 Revised Closing Date: 31-Dec-2026 pdoTable Project Development Objectives Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The objectives of the Project are to improve access to water supply and sanitation services and improve the quality and efficiency of water supply and sanitation service delivery in select peri-urban and rural areas of Jingyang District of Deyang City in Sichuan Province. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Institutional Strengthening and Infrastructure Investments to Improve WSS Services in Jingyang District:(Cost $153.40 M) Institutional Capacity Building and Technical Assistance (TA) for PPP Oversight, Project Management, and Public Disclosure Authorized Scale Up of the PPP Approach:(Cost $1.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The project was approved by the World Bank Board on March 3, 2020. The procurement of private water supply and sanitation operator is being processed. The project is expected to become effective when the private water supply and sanitation operator is procured. Public Disclosure Authorized 12/17/2020 Page 1 of 7 The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Low Low Low Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and High High High Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial Substantial Stakeholders Substantial Substantial Substantial Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes To improve access to WSS services in Jingyang District of Deyang City in Sichuan Province. IN00930681 ►Number of people benefiting from improved water supply services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 220,900.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 The number of people who previously did not have access to piped water supply, or had access to an Comments: unimproved piped water supply and who now do have access to an improved piped supply as a result of the project. Measured in the project areas. IN00930684 Female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 110,450.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 IN00930685 ►Number of people benefiting from safely managed sanitation services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 12/17/2020 Page 2 of 7 The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Value 0.00 0.00 0.00 199,750.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Safely managed sanitation services means access to (i) sewerage systems or (ii) septage collection, together with, in both cases, adequate treatment and disposal The number of people who previously did Comments: not have access to sewerage systems or septage collection together with adequate treatment and disposal and who now do have access as a result of the project. Measured in the project areas. IN00930686 Female (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 99,875.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 IN00930687 ►Percentage of customers satisfied with the services provided by the Project Company (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 85.00 Date 16-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 In the annual service satisfaction survey conducted by the Project Company, the percentage of users who Comments: chose “satisfactory” among the total number of user participant in the survey. IN00930688 Female (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 To improve the quality and efficiency of WSS service delivery IN00930682 ►Reduction in Non-Revenue Water Rate [NRW] (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 32.00 0.00 0.00 17.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Comments: Reduction of NRW in the service area of the Project Company IN00930683 ►Cost Recovery in water supply services (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 100.00 0.00 0.00 100.00 12/17/2020 Page 3 of 7 The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Total operating revenues (including tariffs and government subsidies), divided by total operating costs Comments: (excluding financing, assets, and depreciation costs). Intermediate Results Indicators by Components Project Company Performance IN00930695 ►Quality of water at tap meets quality standards (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value Yes Yes Yes Yes Date 18-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Comments: In compliance with GB 5749-2006, "Standards for Drinking Water Quality" IN00930698 ►Quality of effluent from wastewater treatment plants meets effluent standards (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value Yes Yes Yes Yes Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Treated sewerage complies with the "Water Pollutant Discharge Standards for Tuo and Min River Basins Comments: in Sichuan Province" as well as discharge standards for small-scale of WWTPs as specified in the Project EIA. IN00930699 ►Project company is in compliance with the key performance indicators set out in PPP Agreement (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 16-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Comments: The percentage of KPIs meet that meets the targets as included in the PPP Agreement Community Engagement and Gender Inclusion IN00930689 ►Percentage of communities (village committees) having provided feedback on the WSS services provided by the Project Company (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 12/17/2020 Page 4 of 7 The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Percentage of communities participating in the service satisfaction survey conducted by the Project Comments: Company IN00930692 ►Percentage of women in the communities participating in the community feedback meetings on WSS service quality (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 40.00 Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Comments: The percentage of women who participate in the community meetings. IN00930696 ►Percentage of female members on the village service quality monitoring groups (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 18-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 Village committees under the project are to be composed of at least five people in each village. This Comments: indicator relates to the percentage of village committee members who are women. Infrastructure IN00930690 ►Number of households connected to improved piped water system (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 86,310.00 Date 05-Mar-2020 28-May-2020 28-May-2020 31-Oct-2025 The number of households that previously were not previously connected to improved piped water supply Comments: that are now connected to an improved piped supply as a result of the project. Measured in the project areas. IN00930693 ►Number of new households connected to wastewater system (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 53,374.00 Date 05-Mar-2020 28-May-2020 28-May-2020 31-Oct-2025 The number of households that previously were not connected to the wastewater system that now do Comments: have access to the wastewater system as a result of the project. Measured in the project areas. IN00930697 ►Number of households with improved septic tank and collection and septage removal (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6,712.00 12/17/2020 Page 5 of 7 The World Bank Implementation Status & Results Report Sichuan Water Supply and Sanitation PPP Project (P168025) Date 17-Oct-2019 28-May-2020 28-May-2020 31-Dec-2025 The number of households that previously did not have an improved septic tank with collection, septage Comments: removal and treatment that now have such a system as a result of the project.
Recommended publications
  • World Bank Document
    CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 7616-CN Loan Agreement Public Disclosure Authorized (Wenchuan Earthquake Recovery Project) between PEOPLE’S REPUBLIC OF CHINA Public Disclosure Authorized and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated March 20, 2009 Public Disclosure Authorized LOAN AGREEMENT AGREEMENT dated March 20, 2009, between PEOPLE’S REPUBLIC OF CHINA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”). The Borrower and the Bank hereby agree as follows: ARTICLE I – GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Loan Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II – LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, an amount equal to seven hundred ten million Dollars ($710,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”), to assist in financing the project described in Schedule 1 to this Agreement (“Project”). 2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date.
    [Show full text]
  • Online Appendix (474.67
    How do Tax Incentives Aect Investment and Productivity? Firm-Level Evidence from China ONLINE APPENDIX Yongzheng Liu School of Finance Renmin University of China E-mail: [email protected] Jie Mao School of International Trade and Economics University of International Business and Economics E-mail: [email protected] 1 Appendix A: Supplementary Figures and Tables Figure A1: The Distribution of Estimates for the False VAT Reform Variable Panel A. ln(Investment) Panel B. ln(TFP, OP method) 15 50 40 10 30 20 5 Probabilitydensity Probability density 10 0 0 -0.10 0.00 0.10 0.384 -0.02 0.00 0.02 0.089 The simulated VAT reform estimate The simulated VAT reform estimate reference normal, mean .0016 sd .03144 reference normal, mean .00021 sd .00833 Notes: The gure plots the density of the estimated coecients of the false VAT reform variable from the 500 simulation tests using the specication in Column (3) of Table 2. The vertical red lines present the treatment eect estimates reported in Column (3) of Table 2. Source: Authors' calculations. 2 Table A1: Evolution of the VAT Reform in China Stage of the Reform Industries Covered (Industry Classication Regions Covered (Starting Codes) Time) Machine and equipment manufacturing (35, 36, 39, 40, 41, 42); Petroleum, chemical, and pharmaceutical manufacturing (25, 26, 27, 28, 29, 30); Ferrous and non-ferrous metallurgy (32, 33); The three North-eastern provinces: Liaoning (including 1 (July 2004) Agricultural product processing (13, 14, 15, 17, 18, 19, 20, 21, Dalian city), Jilin and Heilongjiang. 22); Shipbuilding (375); Automobile manufacturing (371, 372, 376, 379); Selected military and hi-tech products (a list of 249 rms, 62 of which are in our sample).
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Annex 1 Hong Kong Special Administrative Region Government
    Annex 1 Hong Kong Special Administrative Region Government Pre-selected Post-Sichuan Earthquake Restoration and Reconstruction Projects (First Batch) Duration Estimated Item Location Project Title Project Cost (month) (RMB 100m) Infrastructure Sub-total = 7.6560 A section of 303 Provincial Wenchuan County, 1 Road from Yingxiu to 24 7.6560 Aba Prefecture Wolong Education facilities Sub-total = 4.0981 Wenchuan County, Shuimo Secondary School 2 24 0.5570 Aba Prefecture in Wenchuan Cangxi County, Sichuan Cangxi Secondary 3 24 0.6523 Guangyuan School Santai County, Number 1 Secondary 4 24 0.7737 Mianyang School in Santai Jingyang District, Number 1 Primary School 5 24 0.1481 Deyang in Deyang Jingyang District, Huashan Road Primary 6 24 0.1604 Deyang School in Deyang Number 5 Secondary Jingyang District, 7 School Senior Secondary 24 1.8066 Deyang Section in Deyang Integrated social welfare facilities Sub-total = 1.3826 Chaotian District, Integrated social welfare 8 24 0.3384 Guangyuan services centre in Chaotian Yuanba District, Integrated social welfare 9 24 0.3168 Guangyuan services centre in Yuanba Youxian District, Integrated social welfare 10 24 0.2554 Mianyang services centre in Youxian Jingyang District, Integrated social welfare 11 24 0.4720 Deyang services centre in Deyang Duration Estimated Item Location Project Title Project Cost (month) (RMB 100m) Integrated social welfare facilities (cont.) Sub-total = 1.0269 Integrated social welfare Wangcang County, 12 services centre in 24 0.3744 Guangyuan Wangcang Cangxi County, Integrated
    [Show full text]
  • Pdf | 699.87 Kb
    EARTHQUAKE CHINA Latest Report: 4th July 2008 Habitat’s Response China: Earthquake Epicentre Magnitude: 8.0 Qinghai Date: 12 May 2008 “Habitat for Humanity has Time: 2:28 (local time) launched an initial US$5 million Shaanxi campaign for the first-phase of a Beichuan long-term and sustained recon- Wenchuan Beijing struction effort to rebuild homes Jingyang and lives following the 12th May Chengdu earthquake in China.” Xizang Chongqing “Habitat is planning a pilot project to assist 100 families in CHINA Jingyang, northeast of Chengdu, the capital of Sichuan province.” Yunnan Guizhou “Donors are invited to support TOP LINE the first phase with its goal of The scale and extent of the calamity is enormous; as is the assisting 1,000 families, includ- • ing those in Jingyang, and in- response of the Chinese authorities. vesting in the capacity to assist • The government is forging ahead with a program to build thousands more.” one million temporary homes. • A high level government group is planning resettlement and “Habitat for Humanity has reconstruction. considerable experience rebuild- • Habitat has identifi ed the location for a pilot project. ing communities after natural disasters, but it is a long-term process. Rebuilding takes many, RECENT DEVELOPMENTS Casualties: Government fi gures released at the end of June indicate more many years.” than 69,000 people died in the earthquake and from aftershocks, with 374,000 injured and 18,400 people still listed as missing. Most of the confi rmed Rick Hathaway deaths – 68,600 – were in Sichuan province. 00000000000000000000000000 Vice President, Asia-Pacific Habitat for Humanity Extent: The disaster area covers 440,000 sq.
    [Show full text]
  • The Overall Planning for Post Wenchuan Earthquake
    Supplementary Appendix A 1 The Overall Planning for Post-Wenchuan Earthquake Restoration and Reconstruction Compilation Basis: Law of the People’s Republic of China on Protecting against and Mitigating Earthquake Disasters Regulations on Post-Wenchuan Earthquake Restoration and Reconstruction (the State Council No. 526) Guiding Opinions of the State Council on Post-Wenchuan Earthquake Restoration and Reconstruction (NDRC [2008] No.22) Compiling Units: Planning Group of Post-Wenchuan Earthquake Restoration and Reconstruction of the Earthquake Relief Headquarters under the Sate Council Group Leader: National Development and Reform Committee (NDRC) Co-leader: The People’s Government of Sichuan Province, Ministry of Housing and Urban-Rural Development (MOHURD) Group Members: The People’s Government of Shaanxi Province, People’s Government of Gansu Province, Ministry of Education, Ministry of Science and Technology, Ministry of Industry and Information Technology, State Ethnic Affairs Commission, Ministry of Public Security, Ministry of Civil Affairs, Ministry of Finance, Ministry of Human Resources and Social Security, Ministry of Land and Resources, Ministry of Environmental Protection, Ministry of Transport, Ministry of Railways, Ministry of Water Resources, Ministry of Agriculture, Ministry of Commerce, Ministry of Culture, Ministry of Health, National Population and Family Planning Commission, People’s Bank of China, State-owned Assets Supervision and Administration Commission, State Administration of Taxation, State Administration of
    [Show full text]
  • Annual Report 2019 Annual Report
    Annual Report 2019 Annual Report 2019 For more information, please refer to : CONTENTS DEFINITIONS 2 Section I Important Notes 5 Section II Company Profile and Major Financial Information 6 Section III Company Business Overview 18 Section IV Discussion and Analysis on Operation 22 Section V Directors’ Report 61 Section VI Other Significant Events 76 Section VII Changes in Shares and Information on Shareholders 93 Section VIII Directors, Supervisors, Senior Management and Staff 99 Section IX Corporate Governance Report 119 Section X Independent Auditor’s Report 145 Section XI Consolidated Financial Statements 151 Appendix I Information on Securities Branches 276 Appendix II Information on Branch Offices 306 China Galaxy Securities Co., Ltd. Annual Report 2019 1 DEFINITIONS “A Share(s)” domestic shares in the share capital of the Company with a nominal value of RMB1.00 each, which is (are) listed on the SSE, subscribed for and traded in Renminbi “Articles of Association” the articles of association of the Company (as amended from time to time) “Board” or “Board of Directors” the board of Directors of the Company “CG Code” Corporate Governance Code and Corporate Governance Report set out in Appendix 14 to the Stock Exchange Listing Rules “Company”, “we” or “us” China Galaxy Securities Co., Ltd.(中國銀河證券股份有限公司), a joint stock limited company incorporated in the PRC on 26 January 2007, whose H Shares are listed on the Hong Kong Stock Exchange (Stock Code: 06881), the A Shares of which are listed on the SSE (Stock Code: 601881) “Company Law”
    [Show full text]
  • Early Essential Newborn Care Is Associated with Increased Breastfeeding: a Quasi-Experiment Study from Sichuan Province of Western China
    Early essential newborn care is associated with increased breastfeeding: a quasi-experiment study from Sichuan Province of western China Chenran Wang China CDC Xiayun Li Beijing Fengtai District Maternal and Child Health Hospital Lin Zhang Save the Children China Program Linman Wu Save the Children China Program Ling Tan Sichuan Maternal and Child Health Hospital Fei Yuan Mianyang Maternal and Child Health Family Planning Service Center Yao Guo Deyang Jingyang District Family Planning Service Center Sarah Williams Save the Children Tao Xu ( [email protected] ) China CDC Research Keywords: Early Essential Newborn Care, Breastfeeding, western China Posted Date: March 12th, 2020 DOI: https://doi.org/10.21203/rs.3.rs-16985/v1 License: This work is licensed under a Creative Commons Attribution 4.0 International License. Read Full License Version of Record: A version of this preprint was published on November 23rd, 2020. See the published version at https://doi.org/10.1186/s13006-020-00343-3. Early essential newborn care is associated with increased breastfeeding: a quasi-experiment study from Sichuan Province of western China Chen-ran Wang#,1, Xia-yun Li#,2, Lin Zhang3, Lin-man Wu3, Ling Tan4, Fei Yuan5, Yao Guo6, Sarah Williams7 and Tao Xu*,1 1National Center for Women and Children’s Health, Chinese Center for Disease Control and Prevention, Beijing, China. 2Beijing Fengtai District Maternal and Child Health Hospital, Beijing, China. 3Save the Children China Program, Chengdu, China. 4Sichuan Maternal and Child Health Hospital, Chengdu, China. 5Mianyang Maternal and Child Health Family Planning Service Center, Mianyang, China. 6Deyang Jingyang District Family Planning Service Center, Deyang, China.
    [Show full text]
  • World Bank Document
    The World Bank Public-private Partnership Project for Water Supply and Sanitation in Sichuan Province (P168025) Public Disclosure Authorized For Official Use Only Environmental and Social Review Summary Public Disclosure Authorized Concept Stage (ESRS Concept Stage) Date Prepared/Updated: 04/14/2019 | Report No: ESRSC00267 Public Disclosure Public Disclosure Authorized Public Disclosure Authorized Apr 23, 2019 Page 1 of 10 The World Bank Public-private Partnership Project for Water Supply and Sanitation in Sichuan Province (P168025) BASIC INFORMATION A. Basic Project Data Country Region Project ID Parent Project ID (if any) China EAST ASIA AND PACIFIC P168025 Project Name Public-private Partnership Project for Water Supply and Sanitation in Sichuan Province Practice Area (Lead) Financing Instrument Estimated Appraisal Date Estimated Board Date Water Investment Project 10/29/2019 3/16/2020 Financing For Official Use Only Borrower(s) Implementing Agency(ies) Jingyang Project Management Office Proposed Development Objective(s) The project development objective is to improve water supply and sanitation services through a public private partnership in selected areas of Deyang Municipality. Financing (in USD Million) Amount Public Disclosure Total Project Cost 200.00 B. Is the project being prepared in a Situation of Urgent Need of Assistance or Capacity Constraints, as per Bank IPF Policy, para. 12? No C. Summary Description of Proposed Project [including overview of Country, Sectoral & Institutional Contexts and Relationship to CPF] This project will be the first water sector PPP project supported by the World Bank Group in China. The approach developed under this project is intended to be replicated throughout China. The project will support the design and implementation of a PPP that establishes a modern utility in Jingyang that delivers a full range of WWS services, increases household connections for water supply and improved sanitation and reduces effluent pollution to the surrounding water courses.
    [Show full text]
  • Source Identification of Cd and Pb in Typical Farmland Topsoil In
    sustainability Article Source Identification of Cd and Pb in Typical Farmland Topsoil in the Southwest of China: A Case Study Junji Zhang 1 , Zeming Shi 1,2,*, Shijun Ni 1,2, Xinyu Wang 1,2,*, Chao Liao 1 and Fei Wei 1 1 College of Earth Science, Chengdu University of Technology, Chengdu 610059, China; [email protected] (J.Z.); [email protected] (S.N.); [email protected] (C.L.); [email protected] (F.W.) 2 Sichuan Province Key Laboratory of Nuclear Techniques in Geosciences, Chengdu 610059, China * Correspondence: [email protected] (Z.S.); [email protected] (X.W.) Abstract: Cd and Pb in farmland topsoil are controlled by many factors. To identify the source of potential toxic metals in the farmland topsoil around Mianyuan River, the chemical analysis and multivariate statistical analysis are performed in this study. The results indicate the following: (1) The concentration of Cd and Pb in soil exceed the background value of Chinese soil elements. (2) Cd is significantly enriched in the whole region and Pb is locally enriched, both of them are more or less influenced by human activities. (3) The contents of Cd and Pb increase significantly following the flow direction of river. (4) Pb isotope analysis indicates that the main source of Pb in the soil include the air dust, coal and phosphate plant, and the contribution of them decreases successively. (5) Linear correlation analysis and principal component analysis show that the main sources of Cd in the soil are mining phosphate rock, air dust, phosphate plant and coal mining. Keywords: farmland topsoil; Cd and Pb; Pb isotope; multivariate statistical analysis; source of pollution Citation: Zhang, J.; Shi, Z.; Ni, S.; Wang, X.; Liao, C.; Wei, F.
    [Show full text]
  • Results Announcement for the Year Ended December 31, 2020
    B_table indent_3.5 mm N_table indent_3 mm Hong Kong Exchanges and Clearing Limited, The Stock Exchange of Hong Kong Limited and Hong Kong Securities Clearing Company Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. (A joint stock company incorporated in the People’s Republic of China with limited liability under the Chinese corporate name “東方證券股份有限公司” and carrying on business in Hong Kong as “東方證券” (in Chinese) and “DFZQ” (in English)) (Stock Code: 03958) RESULTS ANNOUNCEMENT FOR THE YEAR ENDED DECEMBER 31, 2020 The board of directors (the “Board”) of 東方證券股份有限公司 (the “Company”) hereby announces the audited results of the Company and its subsidiaries (the “Group”) for the year ended December 31, 2020. This announcement, containing the full text of the 2020 annual report of the Company, complies with the relevant requirements of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited in relation to information to accompany preliminary announcement of annual results. The Group’s final results for the year ended December 31, 2020 have been reviewed by the audit committee of the Company. PUBLICATION OF ANNUAL RESULTS ANNOUNCEMENT AND ANNUAL REPORT This results announcement will be published on the website of The Stock Exchange of Hong Kong Limited (www.hkexnews.hk) and the Company’s website (www.dfzq.com.cn). The Company’s 2020 annual report will be despatched to holders of H shares and published on the websites of the Company and The Stock Exchange of Hong Kong Limited in due course.
    [Show full text]
  • Sanctioned Entities Name of Firm & Address Date of Imposition of Sanction Sanction Imposed Grounds China Railway Constructio
    Sanctioned Entities Name of Firm & Address Date of Imposition of Sanction Sanction Imposed Grounds China Railway Construction Corporation Limited Procurement Guidelines, (中国铁建股份有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway 23rd Bureau Group Co., Ltd. Procurement Guidelines, (中铁二十三局集团有限公司)*38 March 4, 2020 - March 3, 2022 Conditional Non-debarment 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China China Railway Construction Corporation (International) Limited Procurement Guidelines, March 4, 2020 - March 3, 2022 Conditional Non-debarment (中国铁建国际集团有限公司)*38 1.16(a)(ii) No. 40, Fuxing Road, Beijing 100855, China *38 This sanction is the result of a Settlement Agreement. China Railway Construction Corporation Ltd. (“CRCC”) and its wholly-owned subsidiaries, China Railway 23rd Bureau Group Co., Ltd. (“CR23”) and China Railway Construction Corporation (International) Limited (“CRCC International”), are debarred for 9 months, to be followed by a 24- month period of conditional non-debarment. This period of sanction extends to all affiliates that CRCC, CR23, and/or CRCC International directly or indirectly control, with the exception of China Railway 20th Bureau Group Co. and its controlled affiliates, which are exempted. If, at the end of the period of sanction, CRCC, CR23, CRCC International, and their affiliates have (a) met the corporate compliance conditions to the satisfaction of the Bank’s Integrity Compliance Officer (ICO); (b) fully cooperated with the Bank; and (c) otherwise complied fully with the terms and conditions of the Settlement Agreement, then they will be released from conditional non-debarment. If they do not meet these obligations by the end of the period of sanction, their conditional non-debarment will automatically convert to debarment with conditional release until the obligations are met.
    [Show full text]