Stable Range to South Side of Boarbank Farm

Total Page:16

File Type:pdf, Size:1020Kb

Stable Range to South Side of Boarbank Farm Heritage Statement Incorporating Design And Access Statement - July 2020 Clock Tower 3 Boarbank Farm Allithwaite Grange-over-Sands Cumbria LA11 7QU Front facing view with access to Boarbank Lane Rear facing view with access to Templand Lane TYPE OF APPLICATION This statement is in addition to a Listed Buildings Consent application for the proposed garden works at Clock Tower 3 Boarbank Farm Allithwaite LA11 7QU. LOCATION Clock Tower forms the central section of the Grade 11 Listed Stable Range of Boarbank Farm, located in the village of Allithwaite. LIST ENTRY STABLE RANGE TO SOUTH SIDE OF BOARBANK FARM List Entry Summary This building is listed under the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended for its special architectural or historic interest. Name: STABLE RANGE TO SOUTH SIDE OF BOARBANK FARM List entry Number: 1087188 Location STABLE RANGE TO SOUTH SIDE OF BOARBANK FARM, BOARBANK LANE The building may lie within the boundary of more than one authority. County: Cumbria District: South Lakeland District Type: District Authority Parish: Lower Allithwaite National Park: Not applicable to this List entry. Grade: II Date first listed: 15-Feb-1989 Date of most recent amendment: Not applicable to this List entry. Legacy System Information The contents of this record have been generated from a legacy data system. Legacy System: LBS UID: 76950 Asset Groupings This list entry does not comprise part of an Asset Grouping. Asset Groupings are not part of the official record but are added later for information. List entry Description Summary of Building Legacy Record - This information may be included in the List Entry Details. Reasons for Designation Legacy Record - This information may be included in the List Entry Details. History Legacy Record - This information may be included in the List Entry Details. Details LOWER ALLITHWAITE BOARBANK LANE SD 37 NE (North side) Allithwaite 5/38 Stable range to south side of Boarbank Farm II Stable range. Dated 1878. Rock-faced limestone with rock-faced sandstone dressings and slate roof.2 storeys, 7 bays; 2 bays to each end project under gable; central bay projects as clock tower. Quoins. Ground floor windows have rusticated jambs and square ventilation grilles above; small-paned iron glazing. 3 windows to each end and paired window to 3rd bay; 5th bay has later lean-to garage. 1st floor has round- headed windows with rusticated jambs and small-paned fixed iron glazing to each end, with keyed in glazed pitching holes to gables and 3rd and 5th bays. Tower has segmental-headed entrance to throughway with iron gates and lateral buttresses. 1st floor segmental-headed loading door has key and hood band continued as impost band. Top stage has segmental-headed datestone; each face has clock face on raised panel with shaped base, and gable, 2 with remaining anthemions. Pavilion roof has open timber cupola with lead-clad domical vault and weather vane. Rear similar, but windows etc lack rusticated jambs. 2 wings have stable doors with over lights and ventilation grilles, similar windows with iron glazing, and segmental- headed loading doors. Re-entrant flying stair with iron handrail leads to granary door. Centre has windows as above; one casement window inserted, and lateral stack. Left return has 2 windows, entrance and remains of later lean-to addition. Right return has low wing now a house and so altered as to be of no special interest. The building is a prominent landmark in the area; probably built for Boarbank Hall. Listing NGR: SD3800676725 Selected Sources Legacy Record - This information may be included in the List Entry Details National Grid Reference: SD 38006 76725 Map DESCRIPTION OF PROPOSED WORKS Erect a 1 metre high picket fence along a 10 metre length of the edge of the lawn with a picket style garden gate for access to the garden and a picket style driveway gate across a section of our driveway which no neighbouring property has right of access. ASSESSMENT OF HERITAGE SIGNIFICANCE Boarbank Farm dates from 1878 and is situated to the north east of Boarbank Hall. The Stable Range was thought to be built for Boarbank Hall. The significance of the heritage asset is mainly due to it’s scale and use of local materials and of course the Clock Tower. It is a prominent landmark within the village. JUSTIFICATION AND MITIGATION STRATEGY It is accepted that for the LPA to consider this application, it is necessary to provide a detailed description and justification of the works. BACKGROUND The proposed works are to fence the garden to make it safe and secure for reasons which include: an enclosed area for my two Shih Tzu dogs to roam and to make it more private now that the neighbouring property 2 Boarbank Farm has become a holiday let, which increases the traffic down the drive significantly. EXTENT OF WORKS The proposed fence and gating of the garden will give us some privacy and a distinct boundary to our property where my dogs can play in the garden without them running down the drive to greet people coming to the properties at Boarbank Farm especially unsuspecting strangers arriving at the holiday let. The garden will be a safe enclosed space to be when friends and relatives visit with young children. ASSESSMENT The proposed fencing and gates are of low scale and will have a positive impact on the significance of the heritage asset. The classic victorian picket fence and gates will be in keeping with the property. ACCESS The garden works at the property will not change in terms of access to or from the site or within in the property itself. HISTORICAL INTEREST In years gone by when Boarbank Farm was a working farm the garden was in fact completely fenced and offered a grazing facility to a very nice horse. .
Recommended publications
  • Flookburgh - Cark Travellers Choice 531 / Stagecoach 530 É
    Grange - Kents Bank - Flookburgh - Cark Travellers Choice 531 / Stagecoach 530 é Monday to Fridays only Sch Hol Sch Hol 530 531 531 531 530 530 531 Grange, Rail Station - - 11:08 13:18 14:02 - 15:35 Grange Post Office - - 11:12 13:22 14:06 - 15:39 Kents Bank Station - - 11:18 13:28 14:14 - 15:45 Allithwaite Lane End - - R R 14:20 - R Allithwaite Yakkers - - 11:24 13:34 14:22 - 15:51 Flookburgh, Hope & Anchor - - 11:32 13:42 14:26 - 15:59 Ravenstown - - q 13:45 ê - 16:02 Cark, Bank Top Close - - 11:35 13:50 14:29 C - 16:07 Cark, Bank Top Close 09:35 09:30 11:37 13:50 - 14:40 16:07 Ravenstown ê 09:34 11:41 p - ê p Lakeland Leisure Park ê 09:41 11:48 13:58 - ê 16:15 Flookburgh, Hope & Anchor 09:39 09:47 11:54 14:04 - 14:44 16:21 Allithwaite Lane End 09:48 09:53 12:00 ê - 14:53 16:27 Allithwaite Yakkers 09:49 09:55 12:02 14:10 - 14:54 16:29 Kents Bank, Station 09:54 10:00 12:08 ê - 14:59 16:34 Grange St Pauls Church 10:04 10:08 12:16 14:16 - 15:09 16:42 Grange Rail Station 10:07K 10:10 12:18 14:18 - 15:12K 16:44 Grange - Higher Grange - Cartmel Travellers Choice 532 / Stagecoach 530 é Monday to Fridays only Sch Hol Sch Hol Sch Hol 530 530 532 532 530 532 530 532 Grange, Rail Station 09:12 - 10:40 12:48 14:02 14:18 - 14:48 Grange Post Office 09:16 - 10:44 12:52 14:06 14:22 - 14:52 Higher Grange ê - 10:46 12:54 ê 14:24 - 14:54 Cartmel, Clogger Beck 09:28 09:30 10:55 13:05 14:35 14:35 14:35 15:05 Higher Grange - ê 11:00 13:10 - 14:40 ê 15:10 Grange St Paul’s Church - 10:04 11:03 13:13 - 14:43 15:09 15:13 Grange, Rail Station - 10:07K 11:05 13:15
    [Show full text]
  • 2.0 Lower Allithwaite Neighbourhood Development Plan Vision and Objectives
    Lower Allithwaite Neighbourhood Development Plan to 2025 –Discussion Draft April 2016 2 Acknowledgements The Lower Allithwaite Neighbourhood Development Plan has been prepared by group of volunteers, with support from South Lakeland District Council, and Kirkwells Town Planning Consultants. The Parish Council would like to thank the following for their hard work and commitment in the preparation of this Plan: INSERT NAMES? Lower Allithwaite Neighbourhood Development Plan to 2025 –Discussion Draft April 2016 3 Table of Contents 1.0 Introduction and Background ................................................................................. 5 2.0 Lower Allithwaite Neighbourhood Development Plan Vision and Objectives ........... 7 3.0 History of Lower Allithwaite Parish ......................................................................... 9 4.0 Lower Allithwaite Parish Today ............................................................................ 11 5.0 Planning Policy Context ........................................................................................ 13 6.0 Neighbourhood Plan Policies ................................................................................ 15 6.1 Built Environment and Heritage Assets ........................................................................ 15 6.2 Green Infrastructure and Landscape Character ............................................................. 18 6.3 Transport including Pedestrian Safety and Countryside Access ..................................... 23 6.4 Housing......................................................................................................................
    [Show full text]
  • Der Europäischen Gemeinschaften Nr
    26 . 3 . 84 Amtsblatt der Europäischen Gemeinschaften Nr . L 82 / 67 RICHTLINIE DES RATES vom 28 . Februar 1984 betreffend das Gemeinschaftsverzeichnis der benachteiligten landwirtschaftlichen Gebiete im Sinne der Richtlinie 75 /268 / EWG ( Vereinigtes Königreich ) ( 84 / 169 / EWG ) DER RAT DER EUROPAISCHEN GEMEINSCHAFTEN — Folgende Indexzahlen über schwach ertragsfähige Böden gemäß Artikel 3 Absatz 4 Buchstabe a ) der Richtlinie 75 / 268 / EWG wurden bei der Bestimmung gestützt auf den Vertrag zur Gründung der Euro­ jeder der betreffenden Zonen zugrunde gelegt : über päischen Wirtschaftsgemeinschaft , 70 % liegender Anteil des Grünlandes an der landwirt­ schaftlichen Nutzfläche , Besatzdichte unter 1 Groß­ vieheinheit ( GVE ) je Hektar Futterfläche und nicht über gestützt auf die Richtlinie 75 / 268 / EWG des Rates vom 65 % des nationalen Durchschnitts liegende Pachten . 28 . April 1975 über die Landwirtschaft in Berggebieten und in bestimmten benachteiligten Gebieten ( J ), zuletzt geändert durch die Richtlinie 82 / 786 / EWG ( 2 ), insbe­ Die deutlich hinter dem Durchschnitt zurückbleibenden sondere auf Artikel 2 Absatz 2 , Wirtschaftsergebnisse der Betriebe im Sinne von Arti­ kel 3 Absatz 4 Buchstabe b ) der Richtlinie 75 / 268 / EWG wurden durch die Tatsache belegt , daß das auf Vorschlag der Kommission , Arbeitseinkommen 80 % des nationalen Durchschnitts nicht übersteigt . nach Stellungnahme des Europäischen Parlaments ( 3 ), Zur Feststellung der in Artikel 3 Absatz 4 Buchstabe c ) der Richtlinie 75 / 268 / EWG genannten geringen Bevöl­ in Erwägung nachstehender Gründe : kerungsdichte wurde die Tatsache zugrunde gelegt, daß die Bevölkerungsdichte unter Ausschluß der Bevölke­ In der Richtlinie 75 / 276 / EWG ( 4 ) werden die Gebiete rung von Städten und Industriegebieten nicht über 55 Einwohner je qkm liegt ; die entsprechenden Durch­ des Vereinigten Königreichs bezeichnet , die in dem schnittszahlen für das Vereinigte Königreich und die Gemeinschaftsverzeichnis der benachteiligten Gebiete Gemeinschaft liegen bei 229 beziehungsweise 163 .
    [Show full text]
  • A History of Kents Bank
    A History of Kents Bank. Kents Bank lies to the west of Grange over Sands and until the middle of the 19th century it comprised a few buildings on the shore where the cross bay route across Morecambe Bay met the land. Abbot Hall and Kents Bank House, then known as Kents Bank Hotel which was operating as a lodging house, stood on opposite sides of the road at the base of the hill now known as Kirkhead Road. A railway station had opened in August 1857 on the "Ulverstone to Lancaster" railway running along the edge of the shore. Part way up the hill on Kirkhead Road was Laneside Farm. Further along the coast, towards Grange, Guides Farm sat on the shore at the bottom of the road now known as Carter Road. Seawood House was above Guide Farm at the top of the steep hill with access from Carter Road. The two roads climbed northwards up the hill to join the main road linking Grange with Flookburgh. Kentsford Road, the connecting road between Kirkhead Road and Carter Road, did not exist. The land between Kirkhead Road, Carter Road and Allithwaite Road was farmland. Mary Lambert – Landowner. Mary Winfield Lambert owned all the land and buildings around Kirkhead Road including Laneside Farm which was the base for the agricultural operations on the land in Kents Bank. On her death in 1857 Mary Winfield Lambert lived at Boarbank House, Allithwaite. Miss Lambert’s estate stretching from Boarbank Hall in Allithwaite to Abbot Hall in Kents Bank was sold by auction in August 1858 to ‘capitalists from Manchester, Bury and Whitehaven’ (Westmorland Gazette Aug 28 1858).
    [Show full text]
  • Aldingham Parish Hall
    Contacts for Village Halls in South Lakeland Hall Location Website Contact Telephone Aldingham Parish Hall Scales LA12 0PF Mrs Sue Allen 01229 869596 Allithwaite Community Centre Allithwaite LA11 7QJ Mr Philip Wyatt 015395 32984 Allithwaite Institute Allithwaite LA11 7QG Mr Paul Brown 015395 36646 Argles Memorial Hall Crosthwaite Mrs Harrison 015395 68203 Arnside Educational Institute Arnside LA5 0DF www.arnsideeducationalinstitute.org Diane Pickles 01524 762828 Arnside WI and Village Hall Arnside LA5 4DP www.arnside.gov.uk Mrs J High 01524 762215 Ms Pam Athenaeum Leasgill LA7 7ET www.heversham.org Forrester 015395 62170 Barbon Village Hall Barbon LA6 2LL S Thornber 015242 76343 Bardsea Malt Kiln Village Hall Bardsea LA12 9QP http://themaltkiln.com/index.html Ms Dorothy Sen 01229 480211 Mrs Barbara Beck Community Centre Kendal LA9 7NZ beckcommunitycentre.co.uk Studholme 01539 720497 Blawith & Nibthwaite Village Hall Ulverston LA12 8DJ www.wateryeat.org.uk Mr James Wood 01229 885213 Bouth Village Hall Bouth M Lambert 01229 861456 Mrs Christine Broughton Mills Reading Room Broughton-in-Furness Eastham 01229 716666 www.communigate.co.uk/lakes/thebrycein Bryce Institute Burneside LA9 6QX stitute Ms Caroline Reid 01539 722008 Burton-in-Kendal Mrs Helen Burton Memorial Hall LA6 1NA Dawson 01524 782277 Mrs Helen Cartmel Fell Parish Hall Cartmel Fell LA11 6NY Caldwell 015395 68428 Mrs Angela Cartmel Village Hall Cartmel LA11 6QB Procter 015395 36205 Mrs Margaret Casterton Village Hall Casterton LA6 2SD Lakeland 015242 72035 Castle Street Community
    [Show full text]
  • A History of Allithwaite
    A History of Allithwaite. This short history pulls together pieces of research and information on the village of Allithwaite but will hopefully lead to more in depth research in the future. Allithwaite lies to the north of Morecambe Bay, south of the historic village of Cartmel and en route from Grange-over-Sands to Flookburgh. No river flows through the village but springs perculate through the limestone on which the village is built with a beck running out from the rock at the lowest point of the village and these water sources will have encouraged early settlements. The village is built on the lower slope of a hill called Templand. Earlier histories talk about the outlying areas such as Templand and Birkby, Applebury and Outerthwaite, Rosthwaite and Wraysholme but very little about the village itself and the growth of the village can be documented after the building of the church and school in 1865 and more dramatically in the 20th century. Early history Artefacts (stone blades) from Kirkhead cave on the southern outskirts of the village date to approximately 11000 to10000BC. The cave is one of the most northerly recorded Palaeolithic sites in the country (Lindale Low being the other site). Most recently, at the start of the 21st century, Bronze Age remains from between 1500-1000 BC have been found in the centre of the village. From this period into the Iron Age, archaeologists state there is a lack of settlement evidence in the area. Kirkhead may have played an important part in local history as it has been suggested by more than one historian that this was the place where the first chapel in the Cartmel area was built.
    [Show full text]
  • Lower Allithwaite Draft Neighbourhood Plan
    Lower Allithwaite Neighbourhood Development Plan Pre-Submission Draft 2018-2026 Lower Allithwaite Parish Council Neighbourhood Development Plan 2016 - 2026 Pre-Submission Draft MCL Nov 18 v.3 1 Lower Allithwaite Neighbourhood Development Plan Pre-Submission Draft 2018-2026 NEIGHBOURHOOD PLAN - CONTENTS Section Subject Page 1 Introduction 4 1.1 Background 4 1.2 Planning Policy Context 5 1.3 Lower Allithwaite Neighbourhood Plan Vision and Objectives 5 1.4 Neighbourhood Plan Objectives 6 1.5 Lower Allithwaite Parish 7 2 Neighbourhood Plan - Policies 9 2.1 Built Environment and Heritage Assets – Objective 1 9 3 LANP 1 - Design Principles 11 4 LANP 2 - Cartmel Conservation area and its setting 12 5 Green Infrastructure / Characteristics – Objectives 2 and 3 13 6 LANP – 3 – Protecting Green Spaces 14 7 Lower Allithwaite Green Spaces / Assets 16 8 LANP 4 – Protecting and enhancing Green infrastructure and 18 Biodiversity 9 LANP 5 - Protecting and enhancing landscape character around 18 Lower Allithwaite 10 LANP 6 – Dark Skies 19 11 LANP 7 – Equestrian related development 19 12 Active Travel – Objectives 4 and 5 20 13 LANP 8 – Improving Pedestrian movements 20 14 Future Developments – Objectives 6,7,8 and 9 21 15 LANP 9 – New Housing in Lower Allithwaite 22 16 LANP 10 – Principle Residence requirement 23 17 LANP 11 – Caravans and Chalet Parks 25 18 A Vibrant Community – Objectives 10,11 and 12 26 19 LANP 12 - Maintaining and Enhancing Community 27 Facilities/Infrastructure 2 Lower Allithwaite Neighbourhood Development Plan Pre-Submission Draft
    [Show full text]
  • North West Cheshire
    Archaeological Investigations Project 2008 Post-determination/Research North West Cheshire Chester (E.13.2751/2008) SJ49906820 Parish: Ashton Postal Code: CH3 8DJ LAND AT TARVIN SANDS FISHERY, TARVIN Land at Tarvin Sands Fishery, Tarvin, Cheshire. Archaeological Watching Brief Frost, P Pontesbury : Castlering Archaeology, 2008, 9pp, colour pls, figs, refs Work undertaken by: Castlering Archaeology The watching brief comprised the monitoring of the initial topsoil strip of the pond area. No evidence of the Roman road or any features associated with this period were recovered. There was also no evidence for fragments of the road surface. [Au(adp)] SMR primary record number: R2818 OASIS ID: no (E.13.2752/2008) SJ39956607 Parish: Bache Postal Code: BT236AZ CHESTER RACECOURSE: OWNERS AND TRAINERS PAVILION Chester Racecourse Owners and Trainers Pavilion. Archaeological Watching Brief Webster, T Chester : Gifford, Report: 14427/96.R03 2008, 60pp, colour pls, figs, tabs, refs Work undertaken by: Gifford A watching brief found no archaeological deposits dating to the period prior to the 18th century. The earlier deposits were possibly sealed by silt. The watching brief identified remains of late post-medieval features associated with temporary structures erected during fairs, circuses and race meetings, as shown in a mid-19th century illustration of the race course. This included 54 post holes, eight ditches/gullies, eight pits, seven floor surfaces and two possible wall structures. [Au(adp)] SMR primary record number: 339 Archaeological periods represented: PM OASIS ID: no (E.13.2753/2008) SJ53805920 Parish: Beeston Postal Code: CW6 9UA BEESTON CASTLE, NEAR BUNBURY Beeston Castle, Near Bunbury, Cheshire. Archaeological Watching Brief (Trackway Earthworks) Fletcher, M Manchester : Matrix Archaeology, Report: 2008-10 2008, 15pp, colour pls, figs, refs Work undertaken by: Matrix Archaeology The three cuttings, WB2, WB23 and WB5 threw some light upon the nature of the scarp slope.
    [Show full text]
  • Planning Enforcement Progress Report REF NO
    SOUTH LAKELAND DISTRICT COUNCIL Planning Committee Date of Meeting: 25September 2008 Part I Report From: Strategic Director (Customer Services) Agenda 7 Report Author: Mark Balderson Item No: Planning Enforcement Officer Report Title: A Report on Enforcement Activity from 28 July to 22 August 2008 Summary To inform Members about enforcement activity between 28 July and 22 August 2008. This report aims to provide a brief and informative insight into current enforcement cases. If there are any specific enforcement cases that Members would like to be updated on at the next Planning Committee meeting, please contact Mark Balderson, Enforcement Officer or Simon Fawcett, Enforcement Assistant. Recommendations That Members note this report. Report 1. Enforcement Cases which have been resolved 55 outstanding cases from the enforcement caseload have been resolved between 28 July and 22 August 2008. 2. New Enforcement Cases Between 28 July and 22 August 2008, 37 complaints have been recorded and are presently being investigated. 17 of these cases have been resolved. 3. Enforcement Cases for which Committee consideration is sought None. 4. An Update on Enforcement Cases involving formal action An update on those cases involving formal enforcement action is attached as Appendix A for Members’ information. Alternative Options Not Applicable Material Considerations Finance The recommendations in this report do not have any cost implications. Risk Risk Consequence Controls required The failure to have an Result in inappropriate forms of To maintain sufficient effective planning development which would have resources in planning enforcement system. an adverse impact on the enforcement and prioritise and character and appearance of the co-ordinate the investigation of District’s rural landscape.
    [Show full text]
  • Community Plan
    Lindale High Newton and Low Newton Community Plan Parish sketch map Not to scale Allithwaite Upper Civil Parish Community Plan Steering Group 2008 Allithwaite Upper Community Plan 2008 CONTENTS PAGE Foreword by Tim Farron MP 2 INTRODUCTION 1. Background to the Plan 3 2. Portrait of the Parish 5 3. Community Life 11 4. Community Plan Process 15 5. Overview of results 17 The Tow Top Crossroads THE MAIN ISSUES 6. Business and Employment: 18 Economic Issues 7. Green Villages: 19 Environmental Issues 8. Services and Housing: 24 Social Issues 9. Traffic and Safety: 27 Transport Issues ACTION PLANS after page 32 The Parish across the Sands CONCLUSIONS 10. A Parish Vision 33 11. Next Steps 34 APPENDICES A. Division of responsibilities 35 B. 1992 Appraisal summary 35 C. Historic Environment Record 36 D. 2006 Community Survey results 37 E. 2007 Business Survey results 39 12. Acknowledgements and Glossary 41 Towards Castle Head and Ingleborough 1 Allithwaite Upper Community Plan 2008 Tim Farron MP at the opening of the Village Visions Exhibition in June 2007 Foreword From Tim Farron MP Westmorland and Lonsdale I am very pleased to be asked to write a foreword for Allithwaite Upper Community Plan. I have followed progress with interest, having formally opened the very successful Village Visions event in June 2007. The event attracted over 170 people, and I was particularly pleased to see activities for children so that adults had time to study the displays and ideas for the Plan, derived from your previous survey. At the event I was not surprised to hear the concerns expressed about high lev- els of second home ownership in some parts of the parish.
    [Show full text]
  • Walney Island, Cumbria/Sunderland DISTANCE: 166 Miles (Official Route 151 Miles) PICTURES: Alamy and Paul Gillingham Walney to Wear in Winter | GREAT RIDES
    WHERE: Northern England, Irish Sea to the North Sea START/FINISH: Walney Island, Cumbria/Sunderland DISTANCE: 166 miles (official route 151 miles) PICTURES: Alamy and Paul Gillingham WALNEY TO WEAR IN WINTER | GREAT RIDES GREAT RIDES WALNEY TO Wear IN wiNter December days are short. This didn’t deter CTC member Paul Gillingham, son Joseph and friend John from attempting a coast to coast tour inter tours in the UK carry we picked out a pebble each to toss into the risks. Days are short, colds North Sea, in the hope that we’d get there. W and ’flu are rampant, and Just beyond Barrow-in-Furness, we the weather can be appalling. So, on the paused to admire the sandstone ruins face of it, a trip across the North of England of Furness Abbey, said to be the second from the Irish to the North Seas in the first richest abbey in England after Fountains. week in December seemed a daft idea. But We had two punctures in the first ten miles, winter riding has benefits that summer lacks: and feeling nervous we bought an extra tourism is nonexistent, smaller roads are innertube each at Gills, a bike shop in the empty, fields are newly ploughed, leafless pretty village of Ulverston. Round the corner trees reveal their architectural beauty, winter from the shop, we were surprised to pass DO IT YOURSELF light can be stunning, and you don’t always a sign for the Laurel and Hardy Museum: We took a morning train from ride in wind, hail or heavy rain.
    [Show full text]
  • A590 High and Low Newton Bypass Report
    Safe roads, reliable journeys, informed travellers Post Opening Project Evaluation A590 High and Low Newton Bypass Five Years After Study June 2014 Notice This document and its contents have been prepared and are intended solely for the Highways Agency’s information and use in relation to the Post Opening Project Evaluation of Major Schemes. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. An executive agency of the Department for Transport Post Opening Project Evaluation A590 High and Low Newton Bypass: Five Years After Study Table of contents Chapter Pages Executive Summary 4 1. Introduction 7 Background 7 Scheme Context 7 Problems Prior to the Scheme 8 Post Opening Project Evaluation (POPE) 10 2. Traffic Impact Evaluation 12 Introduction 12 Background Changes in Traffic 12 Traffic Volume Analysis 15 Data Sources 15 Forecast vs. Outturn Traffic Flows 17 Journey Time Analysis 20 Journey Time Reliability 24 3. Safety Evaluation 27 Introduction 27 Data Sources 27 Collisions 28 Fatalities and Weighted Injuries 36 Personal Security 36 4. Economy 38 Introduction 38 Transport Economic Efficiency 38 Evaluation of Safety Benefits 39 Present Value Benefits 39 Scheme Costs 40 Indirect Taxation 40 Benefit Cost Ratio 41 Wider Economic Impacts 42 5. Environment 44 Introduction 44 Methodology 45 Data Collection 45 Site Visit 45 Consultation 46 An executive agency of the Department for Transport Post Opening Project Evaluation A590 High and Low Newton Bypass: Five Years After Study Areas of environmental interest 47 Traffic Forecast Evaluation 49 Five Years After Assessment 50 Noise 50 Local Air Quality 51 Greenhouse Gases 52 Landscape and Townscape 53 Heritage 58 Biodiversity 59 Water Quality and Drainage 63 Physical Fitness 66 Journey Ambiance 67 6.
    [Show full text]