Best Management Plan-IPSWICH
Total Page:16
File Type:pdf, Size:1020Kb
Commonwealth of Massachusetts STATE RECLAMATION AND MOSQUITO CONTROL BOARD NORTHEAST MASSACHUSETTS MOSQUITO CONTROL AND WETLANDS MANAGEMENT DISTRICT 118 Tenney Street Georgetown, MA 01833 Phone: (978) 352-2800 www.nemassmosquito.org Operations Commissioners William C. Mehaffey, Jr.: District Director John W. Morris, CHO: Chair Barry Noone: Operations Manager Vincent J. Russo, MD, MPH: Vice Chair Kimberly A. Foss.: Entomologist Paul Sevigny, RS, CHO Robyn A. Januszewski: GIS/Biologist Joseph T. Giarrusso, Conservation Officer Katelynn E. King: Wetlands Project Coordinator Rosemary Decie,RS 2021 Best Management Practice Plan Ipswich FY22 Percentage of assessment allocated to specific measures as prescribed by individual municipalities Best Management Practice (BMP) in the Town of Ipswich NEMMC is requesting a 3% increase above the FY 2021 certified assessment for a FY 2022 operational budget. During FY 2021 the District experienced numerous changes in staff and increase in prices of materials. The District was not able to make the vehicle purchases it had planned to keep on schedule with our vehicle and equipment replacement plan. Our FY 2022 budget addresses funding for management changes, allow for one vehicle replacement, and establishes a plan to replace one of our frontline heavy equipment pieces that is presently 23 years old. It is always a challenge to plan for a “normal” year of mosquito control, often dictated by the weather, mosquito populations, additional treatment for viruses and requests from member municipalities to deal with exceptional mosquito nuisance and health issues. We have been deemed “essential" during Covid-19 and will continue to provide our subscribing municipalities the highest possible level of service. Assessment: As estimated by the Massachusetts Department of Revenue, Division of Local Services, in accordance with Chapter 516 of the General Laws of the Commonwealth. The assessment formula is based on a regional concept, which considers square miles and evaluation. The District offers this breakdown as a general guide to how funds are allocated specific to your community. FY22 Estimated District Budget for the Town of Ipswich $ 116,359.00 FY22 State Reclamation and Mosquito Control Board $ 4,988.00 FY22 Total Estimated Assessment for the Town of Ipswich $ 121,347.00 -Committed to the principals of mosquito control and wetland management - 2021 Best Management Practice Plan: Ipswich District Control Measures specific to Ipswich General Operational Cost Share Regional Adult Mosquito Surveillance Program Regional Aerial Salt Marsh Larviciding Program Regional Vector / Virus Intervention Surveillance Ground Larviciding Catch Basin Treatments Manual Ditch Maintenance Adulticiding (Resident and/or Board of Health requests) Barrier Treatment (School officials and/or Board of Health requests) Ditch Maintenance / Wetlands Management Tire Recycling Program Property Inspections Mosquito Habitat Mitigation Research and Development Education and Outreach Social Media NOTE: Any adulticiding, larviciding or treatment of catch basins for mosquito control on public school property requires a current IPM (Integrated Pest Management) Plan. We are often asked by local Boards of Health and/or athletic directors to treat ball fields and/or parks that may be owned/used by the school departments, and without an IPM plan that includes our materials we may not be able to assist. Page 2 of 11 2021 Best Management Practice Plan: Ipswich Summary of NEMMC District Operations Completed in Ipswich during 2020 Date Activity Completed 1/8/2020 NEMMC attendance at MDPH Local Public Health 2020 EEE Planning Forum 1/14/2020 Liaison Meeting with Ipswich BOH 1/27/2020 2020 Integrated Pest and Vector Management Plan published to NEMMC website 1/29/2020 Meeting with Ipswich DPW re: future wetland project sites 1/31/2020 2020 Draft Best Management Plans (BMP) e-mailed to BOH for review 2/7/2020 Residential Pesticide Exclusions Received (1) 2/11/2020 Residential Pesticide Exclusions Received (1) 2/13/2020 Residential Pesticide Exclusions Received (1) 3/7/2020 Residential Pesticide Exclusions Received (1) 3/9/2020 Meeting with Ipswich BOH re: BMP 3/23/2020 2020 Final Best Management Plans (BMP) published to NEMMC website 4/17/2020 Hand Ditch Maintenance- Kimball Street 100 ft +1 culvert cleaned 4/20/2020 Residential Pesticide Exclusions Received (2) 4/21/2020 Residential Pesticide Exclusions Received (1) 4/27/2020 Habitat Site Inspections (1) 5/4/2020 Larviciding- Linebrook Road, Town Farm Road (0.66 lbs Vectobac-G) 5/4/2020 Habitat Site Inspections (7) 5/19/2020 Adult mosquito surveillance starts 5/21/2020 Residential Pesticide Exclusions Received (1) 5/21/2020 Salt marsh mosquito habitat inspections (dip stations) 5/30/2020 Greenhead traps out for season 5/30/2020 Greenhead traps out for season 6/4/2020 Greenhead traps out for season 6/5/2020 Greenhead traps out for season 6/22/2020 Salt marsh mosquito habitat inspections (dip stations) 6/23/2020 Contacted DPW for catch basin cleaning schedule and treatment notification 6/24/2020 (1) Mosquito batch sent to DPH for EEE/WNV testing- Negative 6/26/2020 Larviciding- Town Farm, Jeffries Neck, Greenwood Farm, Labor in Vain (8.71 lbs Vectobac-G) 6/26/2020 Salt marsh mosquito habitat inspections (dip stations) 6/30/2020 Larviciding- Labor in Vain (1.81 lbs Vectobac-G) 6/30/2020 Salt marsh mosquito habitat inspections (dip stations) 7/2/2020 Salt marsh mosquito habitat inspections (dip stations)- pre-aerial application 7/7/2020 Aerial operation larvicide salt marsh- 100 acres PRW Refuge + 640 acres other areas 7/8/2020 Larviciding- Fox Creek (5.69 lbs Vectobac-G) 7/8/2020 Salt marsh mosquito habitat inspections (dip stations)- post-aerial application 7/22/2020 Salt marsh mosquito habitat inspections (dip stations) 7/24/2020 Salt marsh mosquito habitat inspections (dip stations)- pre-aerial application 7/25/2020 Larviciding- Parker River Wildlife Refuge (3.3 lbs Vectobac-G) 7/27/2020 Aerial operation larvicide salt marsh- 120 acres PRW Refuge + 840 acres other areas 7/28/2020 Salt marsh mosquito habitat inspections (dip stations) post-aerial application Page 3 of 11 2021 Best Management Practice Plan: Ipswich 7/28/2020 Larviciding- Labor in Vain (1.08 lbs Vectobac-G) 7/28/2020 Catch basin larviciding (819 VectoMax WSP) - Ipswich HS (16 VectoMax WSP) 7/28/2020 Catch basin larviciding - County Road Children's Center (15 Fourstar 90-day) 7/29/2020 Catch basin larviciding (886 VectoMax WSP) - Paul F Doyon Mem, Winthrop School (4 VectoMax WSP) 7/29/2020 Total catch basins in Ipswich completed- 1,705 basins + 35 school basins 7/30/2020 Residential Adulticiding Requests completed (8) 8/5/2020 (1) Mosquito batch sent to DPH for EEE/WNV testing- Negative 8/6/2020 Residential Adulticiding Requests completed (5) 8/6/2020 Resident Request Site Inspection- Argilla Road 8/6/2020 BOH Barrier Adulticiding Request completed - Ipswich HS, Winthrop , Doyon (10.5 oz Suspend Polyzone) 8/12/2020 (1) Mosquito batches sent to DPH for EEE/WNV testing- Negative 8/13/2020 Residential Adulticiding Requests completed (5) 8/13/2020 BOH Barrier Adulticiding Request completed -Town Hall Fields, Miles Lane Fields (6.0 oz Suspend Polyzone) 8/19/2020 Larviciding- PRWR (1.62 lbs Vectobac-G) 8/20/2020 Salt marsh mosquito habitat inspections (dip stations)-pre-aerial application 8/20/2020 Residential Adulticiding Requests completed (5) 8/25/2020 Salt marsh mosquito habitat inspections (dip stations)-post-aerial application 8/26/2020 (1) Mosquito batch sent to DPH for EEE/WNV testing- Negative 8/27/2020 Residential Adulticiding Requests (4) Cancelled due to rain 9/2/2020 (1) Mosquito batch sent to DPH for EEE/WNV testing- Negative 9/3/2020 Residential Adulticiding Requests completed (4) 9/9/2020 Greenhead traps in for season 9/10/2020 Residential Adulticiding Requests (3) Cancelled due to rain 9/14/2020 Residential Pesticide Exclusion Received (1) 9/15/2020 Larviciding- Fox Creek, Argilla Road, bus stop (5.56 lbs Vectobac-G) 9/17/2020 Residential Adulticiding Requests completed (2) 9/17/2020 Greenhead traps in for season 8/23 & Aerial operation larvicide salt marsh- 100 acres PRW Refuge + 900 acres other areas 8/24/2020 • 36 residential adulticide (ULV) service requests • 5 Board of Health adulticide service requests (combined ULV and barrier treatments) • 1 residential property inspection service request, down from 2 in 2019 Informing residents that they can contact the District to inspect for standing water and help identify new breeding areas can help reduce mosquito populations. • 8 mosquito habitat site inspections • Catch basin larviciding was completed on 7/29/2020: 1,740 total basins were treated (1,705 municipal + 35 school) • 9 Residential pesticide exclusions were filed with the District this year from Ipswich • 100 feet of stormwater ditches and 1 culvert was cleared of debris Page 4 of 11 2021 Best Management Practice Plan: Ipswich 2020 Ipswich Mosquito & Arbovirus Surveillance Summary There were no WNV/EEE mosquito isolations, human or animal cases in Ipswich in 2020. At the end of 2020, the arboviral risk level for Ipswich remained at LOW for EEE and LOW for WNV. Risk Categories are described in Table 2 of the 2020 MDPH Surveillance and Response Plan. Massachusetts DPH assesses arboviral risk levels based on many factors including but not limited to mosquito isolations, locations of acquired veterinary and human infections, virus history locally and in bordering states, weather conditions present and predictions,