Technical Review of Options September 2013
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
56 & 56A Park Lane, Fen Drayton
56 & 56A PARK LANE, FEN DRAYTON A rare opportunity to acquire a substantial bungalow situated at the end of a private road within delightful established gardens of approximately 0.80 of an acre. Cambridge 9.5 miles, Huntingdon 8.5 miles (London's King's Cross 50 minutes), St Ives 4 miles, A14 1 mile (distances are approximate). Property Summary • Kitchen/Sitting Room, Conservatory/Dining Room, Garden Room, Family Room, Kitchenette, 2 Bedrooms, 2 Bath/Shower Rooms (1 En Suite), Cloakroom. • Outside: Covered Log Store, Parking Area, Workshop, Utility Room, Large Mature Garden. Please read Important Notice on floor plan page 56 & 56A PARK LANE, FEN DRAYTON, CB24 4SW £500,000 (GUIDE PRICE) Description 56/56a Park Lane occupies a superb location at the end of a private road. Converted in 2011 to an individual design, the property is constructed with brick and weatherboard clad elevations under a tiled roof. Originally designed as 2 holiday lets, change of use to residential was granted in August 2016 on the provision that they remained as 2 separate dwellings. In March 2017 change of use to form one dwelling was granted by South Cambridge District Council Ref: S/3565/16/FL. A copy of the planning decision is available from Bidwells or can be viewed within the planning section at South Cambridgeshire District Council. http://www.scambs.gov.uk Outside The property is approached over a gravel driveway leading to a parking area for several vehicles and a Covered Log Store. There is a side access to the rear garden which is mainly laid to lawn bordered by a variety of established shrub beds and mature trees, as well as a Utility Room and Workshop 15' 5" x 8' 8" (4.69m x 2.64m). -
Landscape Character Assessment
OUSE WASHES Landscape Character Assessment Kite aerial photography by Bill Blake Heritage Documentation THE OUSE WASHES CONTENTS 04 Introduction Annexes 05 Context Landscape character areas mapping at 06 Study area 1:25,000 08 Structure of the report Note: this is provided as a separate document 09 ‘Fen islands’ and roddons Evolution of the landscape adjacent to the Ouse Washes 010 Physical influences 020 Human influences 033 Biodiversity 035 Landscape change 040 Guidance for managing landscape change 047 Landscape character The pattern of arable fields, 048 Overview of landscape character types shelterbelts and dykes has a and landscape character areas striking geometry 052 Landscape character areas 053 i Denver 059 ii Nordelph to 10 Mile Bank 067 iii Old Croft River 076 iv. Pymoor 082 v Manea to Langwood Fen 089 vi Fen Isles 098 vii Meadland to Lower Delphs Reeds, wet meadows and wetlands at the Welney 105 viii Ouse Valley Wetlands Wildlife Trust Reserve 116 ix Ouse Washes 03 THE OUSE WASHES INTRODUCTION Introduction Context Sets the scene Objectives Purpose of the study Study area Rationale for the Landscape Partnership area boundary A unique archaeological landscape Structure of the report Kite aerial photography by Bill Blake Heritage Documentation THE OUSE WASHES INTRODUCTION Introduction Contains Ordnance Survey data © Crown copyright and database right 2013 Context Ouse Washes LP boundary Wisbech County boundary This landscape character assessment (LCA) was District boundary A Road commissioned in 2013 by Cambridgeshire ACRE Downham as part of the suite of documents required for B Road Market a Landscape Partnership (LP) Heritage Lottery Railway Nordelph Fund bid entitled ‘Ouse Washes: The Heart of River Denver the Fens.’ However, it is intended to be a stand- Water bodies alone report which describes the distinctive March Hilgay character of this part of the Fen Basin that Lincolnshire Whittlesea contains the Ouse Washes and supports the South Holland District Welney positive management of the area. -
Suffolk County Council
Suffolk County Council Western Suffolk Employment Land Review Final Report May 2009 GVA Grimley Ltd 10 Stratton Street London W1J 8JR 0870 900 8990 www.gvagrimley.co.uk This report is designed to be printed double sided. Suffolk County Council Western Suffolk Employment Land Review Final Report May 2009 Reference: P:\PLANNING\621\Instruction\Clients\Suffolk County Council\Western Suffolk ELR\10.0 Reports\Final Report\Final\WesternSuffolkELRFinalReport090506.doc Contact: Michael Dall Tel: 020 7911 2127 Email: [email protected] www.gvagrimley.co.uk Suffolk County Council Western Suffolk Employment Land Review CONTENTS 1. INTRODUCTION........................................................................................................... 1 2. POLICY CONTEXT....................................................................................................... 5 3. COMMERCIAL PROPERTY MARKET ANALYSIS.................................................... 24 4. EMPLOYMENT LAND SUPPLY ANALYSIS.............................................................. 78 5. EMPLOYMENT FLOORSPACE PROJECTIONS..................................................... 107 6. BALANCING DEMAND AND SUPPLY .................................................................... 147 7. CONCLUSIONS AND RECOMMENDATIONS......................................................... 151 Suffolk County Council Western Suffolk Employment Land Review LIST OF FIGURES Figure 1 The Western Suffolk Study Area 5 Figure 2 Claydon Business Park, Claydon 26 Figure 3 Industrial Use in -
Welcome to This A14 Cambridge to Huntingdon Improvement Scheme Public Exhibition. This Exhibition Is About the Work We Are Doing
A14 Cambridge to Huntingdon improvement scheme A1 Welcome Alconbury D3 Woolley A141 S2 Huntingdon St Ives A14 Town centre improvements including removal of A14 viaduct Ellington D3 The Hemingfords Brampton D2 Existing A14 Godmanchester Fenstanton Fen Drayton Proposed A14 Swavesey Buckden D3 D3 D2 The Offords A1 Northstowe Hilton Conington New development S2 A1198 D3 Boxworth Lolworth Histon Bar Hill D4 Milton Girton A14 D3 M11 Routes for construction traffic East Coast Mainline railway Cambridge River Great Ouse A428 Huntingdon Southern Bypass S2 Single 2 lane carriageway A1 widening D2 Dual 2 lane carriageway A14 on-line improvements D3 Dual 3 lane carriageway Cambridge Northern Bypass D4 Dual 4 lane carriageway Local access roads © Crown copyright and database rights 2016 Ordnance Survey 100030649 Highways England, creative S160069 Welcome to this A14 Cambridge to Huntingdon improvement scheme public exhibition. This exhibition is about the work we are doing in Huntingdon as part of the A14 Cambridge to Huntingdon improvement scheme. Members of the project team are here to answer any questions you might have. Thank you Highways England – Creative BED19_0157 A14 Cambridge to Huntingdon improvement scheme Why is the scheme necessary? The A14 provides an east- west route linking the Midlands with East Anglia. It begins at Catthorpe near Rugby, where it connects with the M1 and M6 motorway, and continues east for approximately 130 miles to the port town of Felixstowe. It forms one of the UK’s strategic routes and is part of the Trans-European Transport Network. The A14 between Cambridge and Huntingdon serves an additional purpose, connecting the A1(M) motorway to the North The scheme will: of England with the M11 motorway � combat congestion, making the to London and the South East. -
Queens' College Back
PUBLIC TRANSPORT M11 NORTH- Cambridge A1307 London HUNTINGDON, A1, A14 DIRECTIONS By Rail, Cambridge Station. Newmarket M11 Situated on the south side of the city, has N Felixstowe A14 Leave the M11 motorway at Junction 12 and follow the signs for Cambridge A603; regular services to London (Kings Cross GET IN LANE Harwich * Follow this road, including a forced left-turn at traffic lights (at Grantchester Street) Ely (A10) and Liverpool Street) with a non stop N'market C'bridge until you reach a roundabout; journey time of approximately 55 minutes. M1 A14 A1307 * From 06:00 to 10:00 only, go straight across (first exit) into Newnham Road; For information on train times and * At traffic lights, turn right into Silver Street and pass through bollards: Queens' 1 31 operators call National Rail Enquiries on College entrances are on the left. 0845 7484950. * At other times, turn right (second exit) onto Fen Causeway, part of the Ring Road Cambridge Newmarket A1134; By Bus, Felixstowe A1307 Coach services run regularly from Stansted, A14 Harwich * At a mini-roundabout by the Royal Cambridge Hotel, turn left and keep in the left Heathrow and Gatwick Airports. A A14 lane; 13 Ely 0 * Go straight across an immediate second mini-roundabout (at Lensfield Road), to 7 (A10) By Air, Stansted Airport. 428 head north up Trumpington Street; A Is approximately a 40 minute journey by * Go straight past the Mill Lane/Pembroke Street junction; M11 car. Train services run from Stansted Airport * At Silver Street, take a forced left turn (King's Parade is closed to motor traffic); Junction 14 Ring road Ring road and run hourly (journey time 30 minutes). -
Fen Drayton Villa Investigations
Fen Drayton Villa Investigations Excavation Report No. 2 CAMBRIDGE ARCHAEOLOGICAL UNIT OUSE WASHLAND ARCHAEOLOGY Fen Drayton Villa Investigations (Excavation Report No. 2) Leanne Robinson Zeki, MPhil With contributions by Emma Beadsmoore, Chris Boulton, Vicki Herring, Andrew Hall, Francesca Mazzilli, Vida Rajkovaca, Val Fryer, Simon Timberlake Illustrations by Jon Moller and Andy Hall Principal photography by Dave Webb ©CAMBRIDGE ARCHAEOLOGICAL UNIT UNIVERSITY OF CAMBRIDGE March 2016/ Report No. 1333 HER Event Number: ECB4702 PROJECT SUMMARY An archaeological excavation was undertaken by volunteers and the Cambridge Archaeological Unit as a part of the Ouse Washes Landscape Partnership at the site of a possible Roman Villa at the RSPB’s Fen Drayton Lakes reserve, near Cambridge. The fieldwork comprised two 5m x 10m trenches, which were targeted to expose the northern extent of the proposed Roman Villa and southern extent of a potential bathhouse. Excavations revealed additional evidence of Roman occupation, indications of small industry and high-status artefacts. ACKNOWLEDGEMENTS The project was funded by the Ouse Washes Landscape Partnership Project via the Heritage Lottery Fund, for which particular thanks are conveyed to Mark Nokkert of Cambridge Acre. Permission to excavate on the land was provided by the land owner, the RSPB, which was principally overseen by Robin Standring, and the tenant farmer, Chris Wissen. The volunteering was coordinated by Rachael Brown of Cambridgeshire Acre with Grahame Appleby of the CAU. Dr Keith Haylock, University of Aberystwyth undertook the pXRF measurements. Figure 3’s photographs were produced by Emma Harper. Christopher Evans (CAU) was the Project Manager and work on site was completed by volunteers supervised by Jonathan Tabor, Leanne Robinson Zeki and Francesca Mazzilli of the CAU. -
2019 Annual Report Annual 2019
a force for good. 2019 ANNUAL REPORT ANNUAL 2019 1, cours Ferdinand de Lesseps 92851 Rueil Malmaison Cedex – France Tel.: +33 1 47 16 35 00 Fax: +33 1 47 51 91 02 www.vinci.com VINCI.Group 2019 ANNUAL REPORT VINCI @VINCI CONTENTS 1 P r o l e 2 Album 10 Interview with the Chairman and CEO 12 Corporate governance 14 Direction and strategy 18 Stock market and shareholder base 22 Sustainable development 32 CONCESSIONS 34 VINCI Autoroutes 48 VINCI Airports 62 Other concessions 64 – VINCI Highways 68 – VINCI Railways 70 – VINCI Stadium 72 CONTRACTING 74 VINCI Energies 88 Eurovia 102 VINCI Construction 118 VINCI Immobilier 121 GENERAL & FINANCIAL ELEMENTS 122 Report of the Board of Directors 270 Report of the Lead Director and the Vice-Chairman of the Board of Directors 272 Consolidated nancial statements This universal registration document was filed on 2 March 2020 with the Autorité des Marchés Financiers (AMF, the French securities regulator), as competent authority 349 Parent company nancial statements under Regulation (EU) 2017/1129, without prior approval pursuant to Article 9 of the 367 Special report of the Statutory Auditors on said regulation. The universal registration document may be used for the purposes of an offer to the regulated agreements public of securities or the admission of securities to trading on a regulated market if accompanied by a prospectus or securities note as well as a summary of all 368 Persons responsible for the universal registration document amendments, if any, made to the universal registration document. The set of documents thus formed is approved by the AMF in accordance with Regulation (EU) 2017/1129. -
A428 Black Cat to Caxton Gibbet Improvements
A428 Black Cat to Caxton Gibbet improvements TR010044 Volume 6 6.8 First Iteration Environmental Management Plan Planning Act 2008 Regulation 5(2)(a) Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 26 February 2021 A428 Black Cat to Caxton Gibbet improvements First Iteration Environmental Management Plan Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 A428 Black Cat to Caxton Gibbet improvements Development Consent Order 202[ ] First Iteration Environmental Management Plan Regulation Reference: Regulation 5(2)(a) Planning Inspectorate Scheme TR010044 Reference Application Document Reference TR010044/APP/) 6.8 Author A428 Black Cat to Caxton Gibbet improvements Project Team, Highways England Version Date Status of Version Rev 1 26 February 2021 DCO Application Planning Inspectorate Scheme Ref: TR010044 Application Document Ref: TR010044/APP/6.8 A428 Black Cat to Caxton Gibbet improvements Environmental Statement – First Iteration Environmental Management Plan Table of contents Chapter Pages 1 Introduction and background to the Scheme 1 1.1 Purpose of the Environmental Management Plan 1 1.2 The Scheme 4 1.3 Scheme Objectives 7 2 Project team roles and responsibilities 9 2.1 Site roles and responsibilities 9 3 Environmental actions and commitments 15 3.1 Introduction 15 3.2 Guide to the REAC tables 15 4 Consents and permissions 35 4.1 Consents and Agreements Position Statement 35 5 Environmental asset data and as -
Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways &
Transport Research & Information Note Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 Transportation Research & Information Notes Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs March 2012 This document is available to download at www.nra.ie/publications/trin For further queries please contact: Strategic Planning Unit National Roads Authority St Martin’s House Waterloo Road Dublin 4 Tel: (01) 660-2511 Email: [email protected] Web: www.nra.ie Prepared on behalf of the National Roads Authority by The AECOM Consortium Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways & Hubs Contents 1. Introduction ........................................................................................................ 1 2. Accessibility, Effective Density & Productivity ................................................... 1 3. Methodology ...................................................................................................... 6 4. Accessibility to Employment & Population 2006 ................................................ 9 5. The Impact on Accessibility to Employment & Economic Productivity............. 15 6. Implications for Roads Policy, Planning and Research ................................... 23 Impact of Improvements in the Road Network on the Accessibility & Economic Potential of Counties, Urban Areas, Gateways -
Evolution of Ubiquitous Computing with Sensor Networks in Urban Environments
Evolution of Ubiquitous Computing with Sensor Networks in Urban Environments Eiko Yoneki University of Cambridge Computer Laboratory Cambridge CB3 0FD, United Kingdom [email protected] ABSTRACT of smart WSNs with a bigger network such as the Internet A significant increase in real world event monitoring capability increases the coverage area and application domain of the with wireless sensor networks will lead to a further evolution of ad hoc network. Based on such a technological vision, new ubiquitous computing. This paper describes this evolution, lead- types of applications will rely on ad hoc connections between ing to humans being connected to the real world via comput- nearby nodes to establish multi-hop dynamic routes in order ers without awareness. We address an ad hoc communication to propagate data and messages between out-of-range nodes. paradigm, a data-centric approach, and a middleware’s task, to Sensors could be attached to any object, which may move understand the ultimate goal of this new world. We also briefly around, or be placed stationally. Furthermore sensors could explain our upcoming new traffic monitoring project in the city be attached to the human body creating Personal Area Net- of Cambridge. work (PAN). The communication among objects, humans, and computers happens at home, at an office, on a street, at EMERGENCE OF WIRELESS SENSOR NET- the train station, in a car, in a restaurant, or in other places at any time. Fig.1 shows application spaces for ubiquitous WORKS computing with WSNs. Ubiquitous Computing opens com- The evolution of cyber space started from mainframe com- munications over tiny sensor networks through Internet scale puters and moved to PCs. -
Mill Pond, High Street, Fen Drayton, Cambridge, CB24 4SJ
Floor plan Selling homes in and around Cambridge since 1885 Recommmended by word of mouth as an established, traditional estate agency. Bedroom 1 26.4m narrowing to 17m X 12.2m 10’ X 9’2” Kitchen / dining 23’8” x 9’8” L shaped 27’10” x 12’2” 9’11” x12’2” 10’1” x 8’4” 12’ x 22’2” 9’1” x 6’6” 10’ X 9’2” A family home renovated to a very high standard, situated Entrance hall 23’8” into dining within the conservation area of this beautiful Cambridgeshire 11’10” x 16’6” village, just a short walk from a thatched pub and nature reserve. The property offers impressive accommodation of approximately 2775sq ft and benefits from being in the Swavesey 16’3” x 16’2” Village College school catchment and convenient access into Cambridge via the guided busway. 16’3” x 9’10” Mill Pond, High Street, Fen Drayton, Cambridge, CB24 4SJ 23 Church Street Willingham Cambridgeshire CB24 5HS IMPORTANT: Hockeys estate agents for themselves and for the vendors or lessors of this property whose agents they are give notice that the particulars are produced in good faith and are set out as a general guide only and do not constitute any part of a contract and no person in the employment of Hockeys estate agents ltd has any authority to make or give any representation or warranty in relation to this property. 01954 260940 Exclusive_property_Mill_Pond_2.indd 1 18/09/2018 14:12 Ground Floor The two-storey entrance hall is a wonderful welcome with stunning glass and oak staircase. -
A14 Cambridge to Huntingdon Improvement Scheme
A14 CAMBRIDGE TO HUNTINGDON IMPROVEMENT SCHEME DEVELOPMENT CONSENT ORDER - EXAMINATION Representation on Local Traffic Impacts By Cambridgeshire County Council Shire Hall, Castle Hill, Cambridge, CB3 0AP 2 September 2015 A14 Cambridge to Huntingdon Development Consent Order Written Representation on Local Traffic for Deadline 8 CONTENTS CONTENTS 2 1. INTRODUCTION 3 2. CHARM TRAFFIC MODEL 4 3. LOCAL TRAFFIC IMPACTS 6 3.2 Local Impact Report 7 4. SPECIFIC ISSUES 8 4.2 B1514 Brampton Road 8 4.3 Hinchingbrooke 8 4.4 Spittals 9 4.5 Galley Hill 9 5. ADDITIONAL WORK 10 6. MONITORING 12 7. INTERACTION WITH OTHER DEVELOPMENTS 13 7.1 Northstowe 13 7.2 A428 13 APPENDIX A - EXISTING NORTHSTOWE MONITORING 16 APPENDIX B – ADDITIONAL MONITORING LOCATIONS 18 APPENDIX C – ROAD CLOSURE GUIDELINES 19 APPENDIX D – SYSTRA REPORT 25 Page 2 A14 Cambridge to Huntingdon Development Consent Order Written Representation on Local Traffic for Deadline 8 1. INTRODUCTION 1.1.1 This Written Representation is in respect of Local Traffic Impacts and supersedes Chapter 10 of the County Council’s previous written representation (REP3-006) 1.1.2 This Written Representation, in respect of the A14 Cambridge to Huntingdon Improvement Scheme (the Scheme) Development Consent Order (the Order or DCO), is made in accordance with the Infrastructure Planning (Examination Procedure) Rules 2010, Rule 10. It must be read in conjunction with the Local Impact Report submitted for Deadline 8. 1.1.3 The Local Impact Report presents local traffic impacts and recommendations for mitigation. Information in the Local Impact Report is generally not repeated in this document.