UNIT 3.5 N M a N U a L Thanks for Buying a Harken Jib Reefing and Furling System

Total Page:16

File Type:pdf, Size:1020Kb

UNIT 3.5 N M a N U a L Thanks for Buying a Harken Jib Reefing and Furling System I N S T R U MKIII C Jib Reefing & T Furling Systems I O UNIT 3.5 N M A N U A L Thanks for buying a Harken Jib Reefing and Furling System. It will give you reliable service with minimal maintenance, but does require proper assembly and basic care. This manual is an important part of the total reefing system. Please take the time to read it carefully before assembling or using your furling system. These instructions may look intimidating, but they are very simple and use photos and drawings throughout to make assembly easy. Many sections will not apply to your boat or to your installation. If you have questions which cannot be answered by the manual or your dealer, please feel free to give us a call. We’ll be happy to do anything we can to make your sailing safer and more fun. 2 Unit 3.5 MKIII January 2007 Parts 6-7 Sailmaker Instructions 8 Preparation for Assembly 10 – 12 This section tells how to measure the headstay, prepare the wire and cut foil to length if they have not been supplied ready to assemble. Assembly 13 – 20 Assembly of the unit is explained in this section Commissioning 21 – 23 Commissioning covers how to install the assembled unit on the boat and make it operational. Operation 24 – 28 This section explains system use. It also discusses tensioning the headstay and converting to racing. Troubleshooting & Repair 29 – 30 The Assembly and Operation Trouble Shooting guides explain how to correct problems. Your seven-year limited warranty is explained on page 30. January 2007 Unit 3.5 MKIII 3 11 Threaded Stud Embout fileté à sertir Gewinde-Terminal Terminale filettato Espanõl 6 Line Guard Assembly 12 Torque Tube Guide antiusure de drosse Tube de torsion Leinen-Führung Mitnehmerhülse Guida per la scotta Tubo di torsione Espanõl Espanõl 7 Furling Drum 13 Bottom Foil Extrusion Tambour Profil inférieur standard Trommel Unterstes Profil Tamburo Estruso inferiore Part Descriptions Espanõl Espanõl Désignation 3 Locking Nut 8 Turnbuckle Assembly 14 Bottom Foil Connector Die Tiele Ecrou de blocage Ridoir Connecteur inférieur Descrizione Konter-Mutter Wirbeleinheit/Spanner Unterstes Verbinder Espanõl Dado di bloccaggio Sede dell'arridatoio Connettore inferiore Espanõl Espanõl Espanõl 1. Clevis Pin 4 Restraining Washer 9 Tack Swivel 15 Feeder Axe épaulé Rondelle plate Emerillon de point d'amure Engageur Toggelbolzen Unterlagscheibe Halswirbe Einfädler Perno Rondella Girella inferiore Feeder Espanõl Espanõl Espanõl Espanõl 2 Lower Stud with Toggle 5 Locking Washer 10 Locking Collar 16 Regular Foil Extrusion Chape articulée filetée inférieure Rondelle crantée Douille filetée de blocage Profil standard (2130 mm) Gewinde mit Toggel Zahnscheibe Klemmhülse Normales Profil Perno filettato inferiore con snodo Rondella di bloccaggio Manicotto di fermo Estruso Espanõl Espanõl Espanõl Espanõl 4 Unit 3.5 MKIII January 2007 Pivot 12" Point 7 305 mm 22 /8" Max 581 mm 20" Min 7 508 mm 11 /8" 1 302 mm 19 /2" Max 495 mm 5 16 /8" Min 422 mm ■ Sizing Check 7 1 8 8 1 Unit 3.5 is available with a / " (22.2mm), 1 / " (28.57 mm) clevis pin. 11 /2" 292 mm Max Clevis Pin 5 Make sure you have the correct size pin for your boat. Contact your 7 1 8 /8", 1 /8" 8 / " 218 mm Min dealer to exchange the lower toggle stud for the correct size. Harken (19 mm, does not recommend drilling the chainplate or the integral toggle. 28.57 mm) Check to make sure the lower drum assembly will fit inside the bow pulpit. If there is an anchor locker, check to see if the drum assembly will clear. If necessary, use a toggle or link plates to raise the unit. See page 8. ■ Connector Bore Unit 3.5 connectors are available with either a large bore or a small bore hole depending on headstay diameter. Make sure you have the correct size connectors to match the headstay. Headstay Size Connector inside Diameter 5 /8", 16 mm wire, -48 Rod .719" (18.25 mm) 19 mm wire .812" (21 mm) ■ Rod Nosepiece/Coldhead Type Two types of rod adapter nosepieces are available for the #3.5. Check to make sure you have the correct part to fit either Navtec or Riggarna. Rod Type Designation/Nosepiece Navtec 48 Riggarna 143 17 Connector 19 Connector Screws 21 Top Foil Extrusion 23 Top Foil Trim Cap Connecteur Vis pour connecteurs Profil plastique pour connecteurs Capuchon plastique supérieur Verbinder Schrauben für Verbinder Top Profil Topkappe Connettore Viti di bloccaggio connettori Estruso superiore Cappuccio per estruso superiore Espanõl Espanõl Espanõl Espanõl 18 Connector Locking Wedges 20 Halyard Swivel 22 Connector 24 Upper Swage Eye Cales plastiques pour connecteurs Emérillon de drisse Connecteur Embout serti supérieur à œil Kunststoff Keile Fallwirbel Verbinder Oberes Augterminal Piastrine di bloccaggio connettori Girella superiore (Drizza) Connettore Terminale ad occhio pressato Espanõl Espanõl Espanõl Espanõl January 2007 Unit 3.5 MKIII 5 Parts You should have at least two boxes: a long box with foils and a rectangular box containing the drum and miscellaneous components. You may also have a third box containing the headstay. ■ The foil box contains: (8) 9' (2.74 m) Foil Extrusions. A standard kit has 8 foils, but one may have been cut for use as your top foil. If your headstay is longer than 76'10" (23.42 m) you should order one extra foil extrusion, Part 1079. If your headstay is over 85'16" (26.16 m) order two extras. (1) 24" (610 mm) Special Bottom Foil Extrusion. ■ The main components box contains parts packaged on the display card plus a smaller parts box. Main Components Halyard Swivel Emérillon de drisse Fallwirbel Girella Superiore Torque Tube Tube de Torsion Mitnehmerhülse Tubo di Torsione Feeder Engageur Einfädler Feeder Drum Assembly Ensemble Panier et Chape Articulée Trommeleinheit Tamburo Completo 6 Unit 3.5 MKIII January 2007 Parts Foil Connector Prefeeder Wedges Top Foil Trim Cap Torque Tube Spare Foil Screws Screws Screws Allen Wrenches Locking Collar Bottom Regular Connectors Connector Blue Loctite® Instant Red Loctite® Adhesive Rigger Components These parts are placed on the headstay before assem- bly and may be "missing" as the parts may have been placed on your headstay in advance. Miscellaneous Parts 7 1 4 /8" (124 mm) Top Bushing/Trim Cap 1 1 Bag of 26 Connector Wedges, 9 Extra Wedges 1 13 /2" (343 mm) Bottom Connector 1 Prefeeder with line 7 10" (254 mm) Regular Connectors 1 Bag of 69 Foil Screws. Contains 20 extra screws 1 Bag of four Torque Tube Screws 1 Bag of Spare Screws. Contains one spare screw for every application. They are not required for installation 1 6 mm Allen Wrench 1 8 mm Allen Wrench 1 10 mm Allen Wrench 1 Locking Collar 1 Loctite® (Blue) 1 Loctite® (Red) 1 Feeder with screw Furling Line Line is not included with furling unit. Purchase 7/16" (12 mm) low stretch Dacron double braid. The length of the line should be equal to the length of the boat plus the length of the foot of the largest genoa plus 6’ (2 m) January 2007 Unit 3.5 MKIII 7 Sailmaker Instructions Luff Tape • Tack and Head Shackles • Suncover ■ Sail Type The Harken furler will work with conventional sails or ® sails with built in shaping devices such as Aeroluff , Actual Size Pirini Luff or foam luff. Echelle 1 Tatsächliche Grösse ■ Luff Length Dimensioni Reali Espanõl Note offsets above and below the sail. Foil Profil A shorter luff may be required if a halyard restrainer is Profil necessary (page 23) or a toggle or link plates are used Estruso Espanõl below the furler to raise the drum. If the luff of the sail is not long enough to put the halyard swivel near the top of the headstay foil, make sure a pendant is added, see page 23. Halyard Shackle ■ Tack Setback Manille de Drisse Fall-Schäkel Grillo Drizza Note setback for the tack shackle and cut the sail Espanõl accordingly. 18" ■ Luff Tape Size 457 mm 6 Unit 3.5 requires number 6 ( /32" or 5 mm) 1 13 /4" luff tape. 337 mm ■ Luff Tape Length 9" Cut off the top of the luff tape so it is 24 to 36" (610 to 229 mm 915 mm) below the head of the sail. This will allow the head to lag behind the rest of the sail to help flatten Head Shackle the sail. It will also help the head to roll more smoothly. Manille de Tétière Kopf Schäkel Grillo Penna Note feeder height and extend the bottom of the luff Espanõl Feeder Entrance tape downwards so it is below the feeder. This will pre- Engougure Einfädler Öffnung vent the luff tape from catching in the feeder as the sail Feeder Espanõl is lowered. ■ Tack and Head Shackles 2" 1 Make sure tack and head shackles fit the sail rings. 51 mm 56 /2" Max 1435 mm The minimum inside dimensions of the standard 1 shackles are: 50 /2" Min 1283 mm Tack Shackle Manille d’Amure D Fuss-Schäkel Grillo Mura Espanõl Head—D Shackle (12mm): 12" 5 (A) 1 /8" (41 mm) 305 mm Pivot Point Point de Pivot Dreh-punkt (B) 1" (25 mm) Snodo Espanõl Tack— Bow Shackle (10mm): 13 7 22 /8" Max (A) 1 /16" (49 mm) 7 581 mm (B) /8" (22 mm) A Bow 20" Min 7 11 /8" 508 mm 302 mm 1 19 /2" Max 495 mm ■ Suncover B 5 16 /8" Min Suncovers may be installed on either side of the sail. 422 mm However, make sure you match other sails in the cus- tomer's inventory.
Recommended publications
  • Armed Sloop Welcome Crew Training Manual
    HMAS WELCOME ARMED SLOOP WELCOME CREW TRAINING MANUAL Discovery Center ~ Great Lakes 13268 S. West Bayshore Drive Traverse City, Michigan 49684 231-946-2647 [email protected] (c) Maritime Heritage Alliance 2011 1 1770's WELCOME History of the 1770's British Armed Sloop, WELCOME About mid 1700’s John Askin came over from Ireland to fight for the British in the American Colonies during the French and Indian War (in Europe known as the Seven Years War). When the war ended he had an opportunity to go back to Ireland, but stayed here and set up his own business. He and a partner formed a trading company that eventually went bankrupt and Askin spent over 10 years paying off his debt. He then formed a new company called the Southwest Fur Trading Company; his territory was from Montreal on the east to Minnesota on the west including all of the Northern Great Lakes. He had three boats built: Welcome, Felicity and Archange. Welcome is believed to be the first vessel he had constructed for his fur trade. Felicity and Archange were named after his daughter and wife. The origin of Welcome’s name is not known. He had two wives, a European wife in Detroit and an Indian wife up in the Straits. His wife in Detroit knew about the Indian wife and had accepted this and in turn she also made sure that all the children of his Indian wife received schooling. Felicity married a man by the name of Brush (Brush Street in Detroit is named after him).
    [Show full text]
  • SUN CAT DAYSAILER 2018.Xlsx
    1195 Kapp Dr Clearwater, FL 33765 Phone (727) 443-4408 Fax (727) 443-1088 www.Com-PacYachts.com [email protected] Dear Com-Pac Yacht owners: The following is a list of frequently requested spare parts and model update parts for Com-Pac Yachts. These parts may be ordered from Hutchins Company by calling 727-443-4408, emailing [email protected] or faxing to 727-443-1088. We take MasterCard/Visa, or can ship UPS/COD . All orders will have shipping and handling charges added. We are pleased to handle custom and/or non-stock orders. There will be a 25% non- refundable fee for custom and/or non-stock orders. There will be a $25 returned check fee. Products returned solely due to the ordering errors by the customer may be charged a 10% re-stocking fee and will not be reimbursed for shipping costs. Remember, your boat may have been customized after leaving the factory. Hutchins Company can not be held responsible for any parts not fitting due to customizing. Please allow four to six weeks for delivery. Prices may have changed. Please call our office about any questions you have concerning your order or about any parts you do not see on the list. Thank you, Hutchins Company, Inc. COM-PAC YACHTS 1 SUN CAT DAYSAILER PARTS JULY 2018 Item Number Description Price IN00B0030 BILGE DISCHARGE ASSEMBLY $14.00 EA. IN00B0035 BOWEYE BLOCK $3.00 EA. IN00C0047 CENTERBOARD BLOCK SUN CAT $35.00 EA. IN00G0060 GALLOWS WOOD, ALL CATBOATS $162.00 EA. IN00G0080 GAS LOCKER DROP BOARDS, SUN CAT $147.00 EA.
    [Show full text]
  • Mast Furling Installation Guide
    NORTH SAILS MAST FURLING INSTALLATION GUIDE Congratulations on purchasing your new North Mast Furling Mainsail. This guide is intended to help better understand the key construction elements, usage and installation of your sail. If you have any questions after reading this document and before installing your sail, please contact your North Sails representative. It is best to have two people installing the sail which can be accomplished in less than one hour. Your boat needs facing directly into the wind and ideally the wind speed should be less than 8 knots. Step 1 Unpack your Sail Begin by removing your North Sails Purchasers Pack including your Quality Control and Warranty information. Reserve for future reference. Locate and identify the battens (if any) and reserve for installation later. Step 2 Attach the Mainsail Tack Begin by unrolling your mainsail on the side deck from luff to leech. Lift the mainsail tack area and attach to your tack fitting. Your new Mast Furling mainsail incorporates a North Sails exclusive Rope Tack. This feature is designed to provide a soft and easily furled corner attachment. The sail has less patching the normal corner, but has the Spectra/Dyneema rope splayed and sewn into the sail to proved strength. Please ensure the tack rope is connected to a smooth hook or shackle to ensure durability and that no chafing occurs. NOTE: If your mainsail has a Crab Claw Cutaway and two webbing attachment points – Please read the Stowaway Mast Furling Mainsail installation guide. Step 2 www.northsails.com Step 3 Attach the Mainsail Clew Lift the mainsail clew to the end of the boom and run the outhaul line through the clew block.
    [Show full text]
  • December 2007 Crew Journal of the Barque James Craig
    December 2007 Crew journal of the barque James Craig Full & By December 2007 Full & By The crew journal of the barque James Craig http://www.australianheritagefleet.com.au/JCraig/JCraig.html Compiled by Peter Davey [email protected] Production and photos by John Spiers All crew and others associated with the James Craig are very welcome to submit material. The opinions expressed in this journal may not necessarily be the viewpoint of the Sydney Maritime Museum, the Sydney Heritage Fleet or the crew of the James Craig or its officers. 2 December 2007 Full & By APEC parade of sail - Windeward Bound, New Endeavour, James Craig, Endeavour replica, One and All Full & By December 2007 December 2007 Full & By Full & By December 2007 December 2007 Full & By Full & By December 2007 7 Radio procedures on James Craig adio procedures being used onboard discomfort. Effective communication Rare from professional to appalling relies on message being concise and clear. - mostly on the appalling side. The radio Consider carefully what is to be said before intercoms are not mobile phones. beginning to transmit. Other operators may The ship, and the ship’s company are be waiting to use the network. judged by our appearance and our radio procedures. Remember you may have Some standard words and phases. to justify your transmission to a marine Affirm - Yes, or correct, or that is cor- court of inquiry. All radio transmissions rect. or I agree on VHF Port working frequencies are Negative - No, or this is incorrect or monitored and tape recorded by the Port Permission not granted.
    [Show full text]
  • JIB REEFING & FURLING Unit 0
    MKIV OCEAN - JIB REEFING & FURLING Unit 0 Installation Manual – Intended for specialized personnel or expert users 5389 03/21 Preassembly Safety Precautions/Parts Description 2 Sizing Check 3 Parts 4 Rigging Parts Check/Tools 5 Dimensions/Sailmaker's Instructions 6 Toggle Deductions/Stay Into Foil Options 7 Top Foil Length 8 Short Top Foil 9 Confirm Foil Length 10 Assembly Foils/Connectors 11–14 Halyard Swivel and Drum Assembly 15 Rod Rigging 16 Turnbuckle/Toggle 17 Final/Feeder 18–19 Commissioning Turnbuckle 20 Lead Line to Cockpit 21 Halyard Wrap/Prevent Halyard Wrap 22 Pendant/Halyard Restrainer/ Halyard Tension 23 Operation Spinnaker Halyards/Headstay and Backstay Tension 24 Raise Sails 25 Furl/Reef 25–26 Secure Sail 26 Maintenance Clean/Inspect 27 Replace Line 27 Storage/Remove Furler 27 Troubleshooting/Warranty 28 Parts Lists 29-30 Contact Harken 32 Please read these instructions carefully before installing, servicing, or operating the equipment. This manual may be modified without notice. See: www.harken.com/en/support/manuals/ for updated versions. PLEASE SAVE THESE INSTRUCTIONS Safety Precautions/Parts Description Introduction This manual gives technical information on installation and service. This information is destined exclusively for specialized personnel or expert users. Installation, disassembling, and reassembling by personnel who are not experts may cause serious damage to property or injury to users and those in the vicinity of the product. If you do not understand an instruction contact Harken. The user must have appropriate training in order to use this product. Harken accepts no responsibility for damage or harm caused by not observing the safety requirements and instructions in this manual.
    [Show full text]
  • Rigging a Mooring Oh Let Us Count the Many, Many Ways
    The Price of Staying Put The standard mooring rig—and what it’ll cost you—for a 34-foot sloop in 20 feet of water. 3/4-inch three-strand nylon pendant, 10 feet ($15 and up) Buoy ($80-$300) 3/8-inch proof coil, 25 feet ($138) 5/8-inch swivel Dor-Mor shackle Mushroom Concrete Screw ($10-$35) block 5/8-inch proof coil, 25 feet ($300) 400- to 500-pound mushroom anchor ($390-$500) Prices refl ect the results of a limited PS market scan of gear required for mooring a 34-foot sailboat according to the typical setup outlined below. Rigging a mooring Oh let us count the many, many ways ... here are plenty of variations in the do away with the top chain altogether Tdetails of permanent ground tackle, and replace it with rope (this option has and PS has covered most. The standard been mentioned several times in PS, and rig is as follows: a mushroom anchor set will be mentioned again). Some use two well in the bottom (or a concrete block pendants. And so forth. or a screw-type anchor, which works well As for the length of the chains, opinion in hard bottoms), to which is shackled a varies. Mike Muessel, owner of Oldport length of heavy chain, then a swivel, then Marine in Rhode Island, has over 30 years a length of somewhat lighter chain, a of experience installing and maintain- shackle, and a rope pendant that goes to ing moorings. In the relatively deep and the bow cleat. (There are often anchorage crowded confi nes of Newport Harbor, he requirements for pendant length; for in- follows the town’s requirement, using a stance, twice the height of the freeboard total length of chain 2½ times the depth at the bow, plus the distance from chock of the water at high tide, divided equally to cleat.) A mooring buoy is shackled between the top and bottom chains.
    [Show full text]
  • Sailing Course Materials Overview
    SAILING COURSE MATERIALS OVERVIEW INTRODUCTION The NCSC has an unusual ownership arrangement -- almost unique in the USA. You sail a boat jointly owned by all members of the club. The club thus has an interest in how you sail. We don't want you to crack up our boats. The club is also concerned about your safety. We have a good reputation as competent, safe sailors. We don't want you to spoil that record. Before we started this training course we had many incidents. Some examples: Ran aground in New Jersey. Stuck in the mud. Another grounding; broke the tiller. Two boats collided under the bridge. One demasted. Boats often stalled in foul current, and had to be towed in. Since we started the course the number of incidents has been significantly reduced. SAILING COURSE ARRANGEMENT This is only an elementary course in sailing. There is much to learn. We give you enough so that you can sail safely near New Castle. Sailing instruction is also provided during the sailing season on Saturdays and Sundays without appointment and in the week by appointment. This instruction is done by skippers who have agreed to be available at these times to instruct any unkeyed member who desires instruction. CHECK-OUT PROCEDURE When you "check-out" we give you a key to the sail house, and you are then free to sail at any time. No reservation is needed. But you must know how to sail before you get that key. We start with a written examination, open book, that you take at home.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Tips of the Trade
    Sail Handling and Neil Pryde Custom Fittings he following are some of the special Neil Pryde fittings which every boat owner should be Tfamiliar with. Genoa Sausage Bags Neil Pryde Race and Premier Series sails are supplied with genoa sausage bags as standard. These bags make repacking easier and quicker. The bags have 2 full-length zips on top of the bag which run forward and aft from the clew to the tack. Before you attempt to put the sail in the Figure 11 bag make sure both sliders are at one end of the bag. Then pack the sail inside and slide one zip from one end to the other. Do not take it off the end of the bag. You can then throw the bag around quite freely and it will not come undone. When you wish to hoist, place the bag on the foredeck and run the zipper off at the front. The whole zip will then break open freely and the sail will be in position on the foredeck ready for use. (figure 11) Dousing Sock The dousing sock can be used with either a asymmetric spinnaker or a regular spinnaker. To hoist the sail, attach the halyard to the head ring on the sail and attach the tack downhaul line to the tack ring. It should then be passed through a turning block on the deck near the bow, and then to a cleat or winch somewhere near the cockpit. The tack will initially fly approximately five feet above the deck, so allow this amount of slack in the line.
    [Show full text]
  • Forestay Fittings and Halyard Routing Cutter Stay on Masthead Rigs
    Forestay fittings and halyard routing Cutter stay on masthead rigs On fractional rigs the forestay fitting is either fitted directly on to the mast or combined with the halyard box (Seldén combi boxes). The forestay is often attached to the fitting with a toggle. The stainless strap of the combi box wraps around the whole box and serves as a reinforcement that takes up the loads from the forestay. It also locks the sheave axles in the right position. The combi box penetrates deep inside the mast, allowing the spinnaker halyard to run freely past the genoa halyard. This solution substantially increases the durability and service life of the halyards. See illustration on page 21. Art. No. 505-067-10. Art. No. 505-018-03. Triple combi box Combi box Separate genoa box Pin Wire Combi box Max rope dia. Genoa box Genoa box Max dia., mm dia. Art. No. mm single double rope/wire, mm Art. No. Art. No. (only rope) Spinn. halyard 6 505-052-01 16 505-067-10 505-053-01 10/5 7 505-052-02 16 R190, R213: Halyard lead for Furlex 505-040-10 (12) 8 505-052-03* 16 505-037-01 505-059-01 14/7 Genoa halyard 10 505-058-01 20 505-041-01 (16) * Bushing for clevis pin, Art. No. 306-577 (in case you drop it). 505-018 Triple combi boxes Wire Triple Characteristics Max Max genoa Furlex Furlex halyard Furlex halyard Max. dia., mm dia. combi box spinnaker halyard dia., mm halyard lead box, single box, double rope/wire mm Art.
    [Show full text]
  • Setting, Dousing and Furling Sails the Perception of Risk Is Very Important, Even Essential, to Organization the Sense of Adventure and the Success of Our Program
    Setting, Dousing and Furling Sails The perception of risk is very important, even essential, to Organization the sense of adventure and the success of our program. The When at sea the organization for setting and assurance of safety is essential dousing sails will be determined by the Captain to the survival of our program and the First Mate. With a large and well- and organization. The trained crew, the crew may be able to be broken balancing of these seemingly into two groups, one for the foremast and one conflicting needs is one of the for the mainmast. With small crews, it will most difficult and demanding become necessary for everyone to know and tasks you will have in working work all of the lines anywhere on the ship. In with this program. any event, particularly if watches are being set, it becomes imperative that everyone have a good understanding of all lines and maneuvers the ship may be asked to perform. Safety Sailing the brigantines safely is our primary goal and the Los Angeles Maritime Institute has an enviable safety record. We should stress, however, that these ships are NOT rides at Disneyland. These are large and powerful sailing vessels and you can be injured, or even killed, if proper procedures are not followed in a safe, orderly, and controlled fashion. As a crewmember you have as much responsibility for the safe running of these vessels as any member of the crew, including the ship’s officers. 1. When laying aloft, crewmembers should always climb and descend on the weather side of the shrouds and the bowsprit.
    [Show full text]
  • HUNTER 38 FURL STANDING RIGGING ITEM QTY WIRE SIZE FITTINGS OVERALL LENGTH 1 D3 2 5/16" 8 Mm T-TERMINAL 308-326 15Ft
    HUNTER 38 CONVENTIONAL RUNNING RIGGING SPECIFICATIONS Selden Mast #: RRIG-0056S OPT/STD ITEM QTY Line Size Line Type Color End 1 Length End 2 1 STD MAIN HALYARD 1 12mm (1/2") 32/3 pl BLUE 307-047 SHACKLE /KNOT 39 m 128 ft BARE 2 STD JIB HALYARD 1 12mm (1/2") 32/3 pl RED 307-021 SHACKLE /KNOT 37 m 121 ft BARE 3 STD MAIN TRAVELER LINE 2 10mm (5/16") 16/16 pl WHITE SMALL EYE 7.9 m 26 ft BARE 4 STD MAINSHEET 1 12mm (1/2") 16/16 pl BLUE SMALL EYE 26 m 85 ft BARE 5 STD REEFING LINE #1 1 12mm (1/2") 16/16 pl GREEN BARE 25.9 m 85 ft BARE 6 STD REEFING LINE #2 1 12mm (1/2") 16/16 pl RED BARE 33.5 m 110 ft BARE 7 STD JIB SHEET 2 12mm (1/2") 16/16 pl RED BARE 14.5 m 48 ft BARE 8 OPT CRUISING SPINN. SHEET 2 10mm (3/8") 32/3 pl WHITE BARE 24 m 79 ft BARE 9 OPT SPINNAKER HALYARD 1 12mm (1/2") 16/16 pl RED 307-338 SHACKLE /KNOT 36 m 121ft BARE 10 OPT RODKICKER TACKLE 1 12mm (1/2") 16/16 pl WHITE SMALL EYE 9 m 30 ft BARE PLASTIC 307-015 SHACKLE Thimble Block 11 STD LAZY JACK WIRE 2 4 MM (5/32) WHITE 5.5 m 18 ft COATED 7X7 12 STD FIXED LAZY JACK LINE 2 10mm (3/8) 16/16 pl WHITE BARE 6 m 20 ft.
    [Show full text]