I I R 8 2 2 I IN.UT 8 5 I I Repor mission o t Uttao t 3 nr1 Pradesh (UP-13) I I Sector: Rural Water Supply Purpose Progres— : s evaluatio f rurano l water supply projects under I Sub-Projects I and III — Final appraisa f recaslo t water supply schemes I r Sub-Projecfo V I t Commissioned by: Development Co-operation Department Asia (DAD I of the Netherlands Ministry of Foreign Affairs I I I I I

I water supply I I October 1985 I I I I I 1 I I I I 1 I 1 I I I 1 1 1 1 Compositio f missiono -13P nU : I R. Trietsch - DHV Consulting Engineers, leader of the mission m A.K. Ghosh - Asstt. Adviser (PHE), CPHEEO - RWS J.A. Speets - Water Supply Coordinator, Royal Netherlands Embassy 1 I I I I I INDIA Repor mission o tUtta o t 3 rn1 Pradesh (Ur~1o) I

I

§ Sector: Rural Water Supply Purpose: — Progress evaluation of rural water supply projects under • Sub-Projects I and III * — Final appraisal of recast water supply schemes r Sub-Projecfo V I t I Commissioned by: Development Co-operation Department Asia (DAL) Netherlande th f o s Ministr Foreigf yo n Affairsf|

I I I

. I I I _ October 1985 I

jf Edite: dby R. Trietsch — DHV Consulting Engineers — Amersfoort, The Netherlands I 1 I I I I I TABLE OF CONTENTS PAGE I LIST OF RURAL WATER SUPPLY REPORTS, 4 5 1 LIS ABBREVIATIONF TO S 0 1 1. INTRODUCTIO SUMMARD NAN Y

I 2. SUB-PROJECT I (UP EAST) 13 2.1. Physical progress 13 I 2.1.1. General aspects 13 2.1.2. Progress of schemes in Rae Bareli District 14 2.1.3. Progres schemef so Allahaban si 5 1 d District 2.1.4. Progres schemef so Varanasn si 5 1 i District I 2.2. Public standpost privatd san e 6 connection1 s 2.2.1. 6 Publi1 c standposts realized 2.2.2. Type constructiod san publif no c standpost0 2 s I 2.2.3. Privat1 2 e connections realized 2.2.4. Income generation from private connections 25 7 2 2.2.5. Conclusions 2.3. Power supply 28 I 2.40 3 . Operatio maintenancd nan e 2.4.1. Supply hours 30 2.4.2. Monitorin0 3 schemf go e operation I 2.5. Project duration 32 2.6. Project costs 33

I 3. SUB-PROJECT III (HAND PUMP SCHEMES) 35 I 6 3 4. SUB-PROJEC P EAST(U V )TI 4.1. Appraisal Report 36 6 3 4.1.1. General I 4.1.27 3 . Population projections 4.1.3. Public standposts 38 4.1.49 .3 Implementation schedule I 4.2. Addendum to Appraisal Report 40 I 1 4 5. FINANCIAL PROCEDURES 1I I I I I

ANNEXES: I A. Term Referencf so Revier efo w Mission UP-1 Uttao 3t r Pradesh B. Itinerary of mission C. List of authorities visited/senior staff involved in imple- mentatio schemee th f no s I D. Conclusion Recommendationd san Indo-Dutce th f so h Review Mission of October 1985 to Uttar Pradesh (UP-13) E. Scheme-wise summary of data (Sub-Project East-I) I F. Short histor f Sub-Projectyo , IIIV II I , , sI I G. Salient features of schemes proposed for Sub-Project IV I I1 I I I I I I I f I I I 1 1 1 4 1 LIS RURAF TO L WATER SUPPLY REPORTS, UTTAR PRADESH Report Dated Subject Sub-Project f No. UP-1 November 1978 Appraisal East-I 1 UP-2 March 1979 Appraisal West- I UP-3 November 1979 Reappraisal East-I I UP-4 April 1981 Progress evaluation East-I Reappraisal West-I 1 UP-5 December 1981 Progress evaluation East-I Reappraisal East-II

UP-6 March 1982 Hydro-geological appraisal 2, I Preliminary Report, West-I UP-7 May 1982 Progress evaluation East-I, -II f UP-8 February 1983 Comprehensive revied wan East-I, -II appraisal West-II ,-I 1 UP-9 October 1983 Progress evaluation East-I UP-10 October 1984 Progress evaluation East-I, -II, -III I West UP-11 March 1985 Work plan for sanitation, East-I, -III, -IV drainage and health 1 activities UP- 12 May 1985 Progress evaluation East-I 1 Appraisal East-Ill, -IV UP-13 October 1985 Progress evaluation East-I, -III 1 Re-appraisal East IV 1 1 1 1 1 I i

LIS ABBREVIATIONF TO S

AC asbestos cement AE assistant engineer CE chief engineer CI cast iron CPHEEO Central Public Health & Environmental Engineering Organization DCP Dutch Credit Progamme EE executive engineer E&M electrical and mechanical ESR elevated service reservoir Gol Governmen Indif to a HC house connection HOPE high-density polyethylene Ipcd litres per capita and per day O&M operation and maintenance PA personal assistant PHC Public Health Circle PHE Public Health Engineering PHMechC Public Health Mechanical Circle PHPC Public Health Project Circle PHSSubDiv Public Health Sanitary Sub-Division PHWDiv Public Health Works Division PPRD Project Preparation, Research and Development PR public relations RCC reinforced (cement) concrete SC/ST scheduled castes/scheduled tribes SE superintending engineer SEB State Electricity Board TW tubewell UP Uttar Pradesh UPJN Uttar Pradesh Jal Nigam V.P. ' vandal-proof VT vertical turbine UP'. 3

,-. UTTAR KASHI I . •—k \

- •. TEHRI | CHAMOLI

MELRUT i 1 x \MORADA /RAM ,—r- «. .,.J BAD /PUR/ ?

, (GORAKHf yBASTI •

"""^ x GARH PALLIA GARH >JAUNV

ALLAHABAD RAE BARELI DISTRICT

1 ToSultanpur

ASHRAFPUR

GOVINDPUR

BHOJPUR To Pratapgarh

X

FEROJPUR

Rural Water Supply Projects in Rae Bareli District Illllllllllllllllll Sub-projectI c f::::';:SS'j Other schemes I/O DISTRICT

PRATAPPUR GHURDAULI

00

Rural Water Supply Project Allahaban si d District ^ -^

Sub-project I Sub-project IV Other schemes

c DISTRICT

"""\ \

HATHIBARNI "'"*• BIRAONKOT

HARHUA

SEWAPURI VARANASI

MIRZAMURAD

MAHADAPUR

Rural Water Supply Projects in

Sub-project I Sub-project IV Other schemes

c IP u I I I 10 I 1. INTRODUCTIO SUMMARD NAN Y I In October 1985 the Indo-Dutch Review Mission UP-13 visited the State of Uttar Pradesh firse .th Thits visiswa reviea f o t w mission aftee rth reorganizatio Ministre th f no Workf yo Housingd san , whereby this swa I divided into separate department urbar srurafo d nan l development- ,un der different ministries. As a result of this, a new representative of CPHEEO participate missione th n di , viz A.K. .Mr . Ghosh, Assistan- tAd viser CPHEEO-RWS. The other mission members were: Mr. J.A. Speets, Water I Supply Coordinato Royae th lt ra Netherland sTrietsc. R Embassy . Mr hd ,an of DHV Consulting Engineers missios ,a n leader. I The mission had the following main tasks (see Annex A, Terms of Refer- detailea ence r ,fo d description): revieo T physicae 1.wth l progres Sub-Projecf so (East)I t , with em- I phasis on the following aspects: - implementation of public standposts - policy regarding house connections vs. public standposts 1 - financial procedures regarding financin projece th f go t revieo T progrese wth . 2 Sub-Projecf so (hanI II t d pump schemes) 3. To check the project reports on the revised projects under Sub- I Project IV After its arrival in the mission had extensive discussions with the Chairman and senior staff of the Uttar Pradesh Jal Nigam. In addi- I tion, discussions were held wit Ministee hth Statf ro Housinr efo d gan Urban Development, Mrs. Padma Seth wit d Secretare an ,hth Governo yt - ment, Housin Urbag& n Development Kama. ,Mr l Pandey. I Thereafter, the mission visited the three Districts involved: Rae Bare- li, Allahaba Varanasd dan i (fo mission'e rth s itinerar Annee yse . xB) Becaus numbea f eo holidaysf ro missioreturt e no ,th Lucknoo d nt n di w I directly afte fiele rth d trip missioe .Th n leader therefor sepaa d -eha rate session with the Managing Director and senior staff of the U.P. Jal Niga Lucknown i m discuso ,t mission'e sth s "Conclusion Recomd san - I mendations", after his participation in a mission to Gujarat. maie Th n conclusion missio e summarizee b th y f so nma followss da : I 1. Progres Sub-Projecf so (EasttI ) Progres especialln si Barele yRa i Distric s sufferetha d badly from combinatioa thref no e factors: I a. severe drought b. severe floods c. unprecedented shortage of funds available to the Uttar Pradesh I State Government As a result of these, a shortage developed in manpower and funds r carryin ongoine fo th t gou activities Barele Ra avail e n th I i. - I able capacity was concentrated on the Udari scheme, which had the I I I I I 11 I most severe backlogscheme e Districe th th t orden n si i ,ge to rt 1 at approximatel same yth e leve f completiono l . Allahabae Ith n Varanasd dan i Districts almos schemel al t s have I been commissione meantimee th n i d . 2. Public standposts I requiree Mosth f to d numbe publif ro c standposts (or: taps) have been constructed, especiall Allahabae th n i yd Varanas dan i Dis- tricts, but their designs were found to be different in each of the Districts publie th s c.A standpost mose th t e importansar t I means of direct contact between the consumer and the water supply undertaking, they should be of a very durable construction, and preferably tamper-proof opinioe th missioe f o .Th n s thanwa t more I attention should be paid to the structural aspects and standard- izatiopublie th f cno standpostsschemew ne e sth under .Fo r Sub- Project IV it was, therefore, recommended to have all cost cal- culations based on 'vandal-proof standposts in reinforced con- 1 crete, with adequate drainage facilities. Also for the ongoing schemes in Rae Bareli District the standposts that still have to be constructed simila a shoulf o e rdb design. I Jae lTh Nigam undertoo prepareo t k short ,a t notice tabl,a e show- plannee inth g d realizedan d number publif so c standposts wels ,a l as the present numbers of private connections, for each of the I hamlet villaged schemesan e th f so s under Sub-projec. I t In addition, field surveyse wilth o lt carriee havs b a o et t dou actual yiel publif do c standposts/taps actuad ,an l water consump- I tion per head, under field conditions. On the basis thereof, new requirement termn i s numberf so singlef so multiple-tar -o p stand- post establishede havy b sma o et actua e th d l ,an achievement s I checked against these. 3. Power supply I Barele InRa i District somo t ed exten,an t als Allahaban oi d Dis- trict, power that reaches the schemes through exempted feeders is not always of the correct voltage, so that the pumps cannot be op- I erated during part of the time that power is available. The mis- sion recommends tha thesn i t e schemes voltage stabilizer- in e sb stalle overcomo t d e this problem e cost.Th e s th involve n i e ar d I 50,00. orde Rs scheme r f 0ro pe . 4. Sub-Project III I missioe Th n informe U.P e Nigal dth .Ja m thaside th te letten ro this project had been exchanged. The U.P. Jal Nigam undertook to I start work on this Sub-Project immediately. I / I / I I

I 12 I I 5. || Sub-Project IV "' The mission checked the revised project reports on all schemes un- der this Sub-Project calculatioe .Th requiree th f no d numberf so public standpostse th needcorrectede case b r th o efo st s i s ,a I implementation schedule missioe .Th n therefore requeste Jae lth d Nigam to prepare an Addendum to the Appraisal Report on Sub- Project IV that would cover the following aspects: I - revised estimate of numbers of standposts revised unit cost per standpost, on the basis of a "vandal- proof desig reinforcen i n d concrete, with sufficient slab dimensions and drainage facilities I brief financial summary (one Sub-Projecte pageth f )o . In addition, the Jal Nigam undertook to present a more realistic I disbursement schedul thir efo s Sub-Project basie th Pertf so n , o - type diagrams for each of the schemes, preferably with the aid of the computer facilitie s availableha sw no tha t i t. This informa- tion should be available well in advance of the next mission to I Uttar Pradesh (expected in mid-April). Financial procedures I The financial situation regarding the D.C.P. schemes in Uttar Pradesh during the last 6 months illustrates the ease with which funds that hav^ been earmarke bilaterar dfo lo t project t pu e sar I othe rsole useth e t discretio,a State th ef no Government d ,an with potentially disastrous effectprogrese th o st sucf so h projects. opinioe th missioe f Th o n s thai n morta e direct relation between I bilaterae th th fiele d th wor dan n i kl financing, whereby funds iprovide bilaterar fo d l assistance project State th en si Pla n Funds lean be used for that purpose only, would be beneficial. It recom- I mends that the Ministry of Finance, Department of Economic Af- Governmene fairsth f ,o f Indito a stud mattee yth orden i r o rt I provide a solution to this problem. I I I I I I 13

2. SUB-PROJEC EASTP (U )TI 2.1. Physical progress 2.1.1. General aspects In April 1985, at the time of mission UP-12's visit, commissioning of the schemes in Rae Bareli was expected by July-September of 1985, except for the Udari scheme, which was expected to be ready by March 1986. For schemel ,al s were expecte reade b o July t dyb y 1985, except for the exempted feeder to Pratappur, and for Varanasi Dis- tric schemel al t s shoul reade db Septembey yb r 1985 (provided that con- structio remainine th f no g standposts could start forthwith). This target realize e b coulresule t combinatioa th dno f s to da f no three factors: a. unprecedented drought conditions in part of the State b. unprecedented floods in part of the State, especially the area of BarelLucknoe Ra d iw an Distric t unprecedenten a c. d shortag fundf eo Statt sa e level, causen a y db overdraf approxf to 2,00. .Rs 0 millio Centraf no l Govt. funds. firse effece factorso th Th tw tf to , viz draia . manpowen no fundsd ran , noState t th generaln onlei r yfo mort ,bu e specificall Jae lth r yfo Nigam, was thus compounded by the fact that at State level funds were re-directed to combat the effects of the drought and floods, later fol- almosn lowea y db t complet fundsl eal dryin f .o p gu This situation has effectively hampered progress during most of the 6- month period since the visit of mission UP-12, especially in Rae Bareli District divisioa meagre s .A th f eno resources oveongoinl ral g pro- jects would have had little effect, it was decided to concentrate on the scheme with the most severe backlog, i.e. the Udari scheme, to get the D.C.P. schemes in the district more on one line. Consequently, what little progress there has been in Rae Bareli, has Udare th bee in i notheschemee th r .Fo schemedistrict e th - ex n si e th , pected month of commissioning has been effectively delayed by 6 months. Since these factors were completely beyon controe implemente dth th f o l - ing organization, it is the mission's opinion that the earlier recommen- dation mad missioy eb n UP-12reimburso t t ,no e project expenditurer sfo works executed afte Januarr1 y 1986 reconsideree ,b Netherlande th y db s Government. A time expansion of 6 months should be granted. In Allahabad Distric schemel tal s have either been commissioned wilr ,o l yeare th Varanasn .I f bo e d beforen i e Districeth schemel tal s have been commissioned, basie albeirevisea th f so n o t d estimat ree -th f eo quired numbers of public standposts. This will be dealt with in more detai chapten li r 2.2. 14

2.1.2. Progres schemef Barelse o Ra n si District missioe Th n visite D.C.Pe th d . schemes Thulendi, Ashrafpur, Udard an i Jagatpur selectio,a n thabases wa t d mostl accessibilityn yo parts ,a s of the rural areas could not be reached because of the floods (which had only just started to recede).

scheme e Barele th Non Ra bee s f n eo sha i n finally commissioned yet, be- cause eithe requiree rth d numbe publif ro c standpost beet no n s sha achieved, or other parts of the schemes are still under construction. In 5 schemes the overhead tank is still under construction: in Bannamau and Behtakalafinishedt bu l al tanke ,e nth sar wherea Udarin si , Ashraf- pur and Thulendi the progress is between 35 and 60 percent. In Thulendi (progress: 60* contractoe )th virtualld rha y stoppet dno workins ha d gan even given the final payment to the local population that was hired as labourers contrace beew .Th no n s rescindedtha wore th k d wil,an l con- tinue departmentally, as is the case in all other schemes. In Govindpu Bhojpud ran requiree rth d number publif so c standposts have been constructed eithet t finishe ,bu ye tubewelle t rth no d e (Govindsar - pur d r tubewel3 :operationalt ye t lno distributioe th parr )o f to n sys- tem is still missing (Bhojpur: 1.3 km of pipeline still to be laid). In Jagatpur the 3rd tubewell is not yet operational either, as is the cas Behtakalann ei . totae th lf O requiremen 185f o t 9 public standposts, 1312 (or: 71%) have been constructed, whereas Yl% of the planned number of private connec- tions (1155 out of 6943) have been realized. Except for Udari, where the required downpayment still has to be depos- ited exemptel al , d feeders have been commissioned powee .Th r suppls i y still not reliable, however, because of voltage fluctuations that regu- larly render the operation of pumps impossible even though power is present. It is therefore recommended that all schemes in Rae Bareli, and possibly also in Allahabad, are equipped with voltage stabilizers. These are expected to cost approx. Rs. 20,000 apiece. The mission recommends that the public standposts that still have to be constructed, are equipped with a reinforced concrete slab and adequate drainage facilities, in the same way as is recommended for Sub-Project IV (see paragraph 2.2.2.). It is also recommended that the planned in- spection bungalo Barele Ra constructee t iwb a d accordin stande th o -gt ards that have been used e.g constructinn .i Publie gth c Works guest house providee thereb d ,an d wit least ha suitest3 . The Superintending Engineer in charge of the works in Rae Bareli has un- dertaken to try and finalize the schemes, including the provision of voltage stabilizers and enhanced public standposts, within the available budget missioe .Th n request Netherlande sth s Governmen allocato t - ead ditional fund casn si e these measures would resul cosa n ti t overrun, 15

however Jae .Th l Nigam will presen estimatn a tcoste th sf eo involved . Final commissioning of the schemes in Rae Bareli District is expected by December 198 schemes7 5( Marcd )an h 198 schemes)2 6( Udare .Th i scheme is now expected to be commissioned by June 1986. It is not yet clear, however, whether the exempted feeder to Udari will be ready by that time.

Detailed scheme-wise data on the progress of the schemes is given in An- nex E. The expected months of commissioning mentioned there refer to the complete schemes (unless otherwise indicated), witexceptioe hth e th f no private connections, however, since their realization is not entirely in Nigaml thJa e e hand.th f so 2.1.3. Progress of schemes in Allahabad District missioe Th n visite Nidure th dSaidabad aan d schemesdiscussiond ha d ,an s with the U.P.J.N. field staff on the progress of Sub-Project I as well as on the planned schemes for Sub-Project IV. schemee Th Allahaban si d District have been commissione rel -al n i d spects, witexceptioe th hPratappue th f no r scheme, wher requiree eth d number of public standposts has not yet been constructed. Also the ex- empted feeder to this scheme has not yet been realized, as the power sub-statio completedt ye t no s i n. Detailed scheme-wis eprogrese datth schemee n th a o - f gives o An i s n i n nex E. 2.1.4. Progres schemef so Varanasn i s i District In Varanasi District D.C.Pe th s . schemes Rohani Kandwd aan a were visit- ed, the progress of the ongoing schemes was discussed, and the project reportschemee th n proposes o sa Sub-Projecr dfo werV I t e studiey db the mission. All scheme Varanasn si i District have been commissione meantimee th n i d , whereb numbee th y standpostf ro bees sha noriginae baseth n do l require- ments, but with a deduction for the number of private connections that have been realized. A total of 1539 standposts, with 1782 taps, have been constructed, against a required number of taps of 1762. This will be discussed in more detail in chapter 2.2.

All exempted feeders have been commissioned, whereby it should be noted that the originally planned exempted feeder for Vyasnagar has been re- place connectioa y db regulae th o nt r feeder. This shows hardly yan power interruptio allt na , becaus feedt ei slocaa l fertilizer plant. As a railway crossing would be involved in providing an exempted feeder here, witinherene th h t time-consuming proces obtaininf so g permission frorailwae th m y authorities s decidewa t ,i aboliso dt a plane hr th sfo separate feeder e troubl.Th e wit exemptee hth d feede Mirzamuran i r d (dacoit-infested area) is continuing. 16

Detailed scheme-wis eprogrese schemedate th th n a o - f gives o An si n i n nex E.

2.2. Public standposts and private connections The implementation of the required numbers of public standposts, of good quality, remains one of the major concerns of the mission. This subject, whic s beehha n discussed extensivel evert ya ymissione visith f o tn i , th U.P.J.Ne th fiel t wela s d a . s l a headquarter Lucknown si theres ,i - fore dealt with in detail also in this report. 2.2.1. Public standposts realized Table 2.1. (column througs1 show) targettee h11 th s actuad dan l numbers publif o c standposts distinctio.A mads i n e between 'normal d 'v.p.'an ' ('vandal-proof') standposts, whereb lattee yth r type shoul thae db s a t recommended by earlier missions: constructed in reinforced concrete, with the piping fully enclosed in the concrete, with Jayson-type waste- jipt valve sufficienf so t capacity witd ,an h adequate drainage facili- ties7~~A~l though not all these specifications have always~been met, the 'vandal-proof type as found in the field is undoubtedly superior to the 'normal' d therefortypeha t I . e been agreed earlien upona t ,a r stage, that whenever major repairs would be required for 'normal' public stand- posts, these would be replaced by the 'vandal-proof type. The summary given in Table 2.1. is a preliminary one, however, as it was not always clear whether standposts were of the 'vandal-proof type or not. Compared wit requiree hth d number publif so c standposts coverage ,th s ei highes Varanasn i t i (87%), followe Allahabay db dBarele (76%Ra d i)an (71%). It is noted, however, that the coverage was not calculated in the (same way for the different districts: for Rae Bareli the number of standpost bees sha n used Allahabar ,fo numbee r th d fo tapsf ro d ,an Varanas numbee th i tapf ro s while taking into account reduced targets |because of the coverage by private connections. cleas Ii t r thatotae th t l numbe tapf ro s rather thanumbee th n f ro standposts is important, as a 2-tap public standpost obviously has a higher capacity than a 1-tap one. For that reason also the numbers of jtaps have been displayed (column 10). Comparing this number of taps witrequiree th h d number standpostf so s (assumin caten ca p rgta thae on t for a maximum of 250 persons, so that the number of taps may be sub- stituted for the required number of public standposts, the following picture emerges (see columtablf o 1 e1 n 2.1): Rae Bareli % coverag 8 9 f eo Allahabad coverage of 94 % Varanasi coverage of 101 % orover-aln a : l coverag. % 9 9 f eo Table 2.1. Situation of public staadposts and private connections

Nuibe f publio r c standposts realized Standposts Taps S.P. Taps Schete single single double total total TOTAL Target coiple- Total coiple- Old People/ People/ Hen Coipl.Coapl. House connections naie: norial v.p. v.p. norial v.p. ALL tion (!) tio) (Z n target S.P. H.C) .(Z targe ) (Z t Target Actua) (Z l ______1 234567 3 9 10 11 12 13 14 15 16 17 13 19 20

3 6 5 1 3 4 Ferozpu 5 1 r 8 4 4 12 511 73 63Z 124 136 10 113 Z 5639 Z 69 0 Z15 0 33 Ralpur S5 35 35 35 120 201 60Z 155 77Z.201 112 10 133 641 33Z S36 148 23Z 2 11 2 3 0 Govindpu8 2 r3 30 112 100Z 14 6 4 10 106 0 Z1291 136Z 1 Z18 112 Z 24 5 11 6 47 . flhojpur 34 40 34 40 124 124 100 3 Z 10 1204 16 0 Z1 132 159Z 1 19 4 12 Z 72 0 40 556 Thulend0 10 i5 5 3 3 65 65 Z 54 6 18 : 73 Z 54 13 4 5 18 0 1 73Z 7 12 186 751 25 3Z 1 19 1 9 0 10 Jagatpu 0 3 r 1 1 0 10 265 72Z 271 102Z 265 113 10 257 74Z 105Z 735 90 12Z Ashrafpur 60 2 25 60 27 37 130 481 Z 49 63Z11 7 2 17 0 1 62Z 4 13 180 633 45 7Z 0 Udar4 i 5 5 1 1 25 25 204 20t Z 27 55 204 97 10 204 20Z 27Z 687 2 OZ Bannanau 111 6 129 111 135 246 0 24 103Z 375 156Z 240 153 10 234 105Z 9 Z 2 1609 Z 4 98 Behtakalan 122 6 101 122 107 229 223 103 8 Z 21 1050 33 0 Z1 143 Z152 7 Z16 3 22 Z 7 8 3 1205

7 50 131 20 RA78 E BAREL 7 I50 5 2 780 1859 71ZZ 98 1819 1359 139 10 1783 74Z 102Z 6943 1155 17Z

Saidabad 79 46 79 46 125 Z 74 169 171 1011 169 161 10 141 39Z 122Z 3 45 331367 Z 1 11 4 3 7 7 Nidur 4 3 a 7 7 145 77Z- 145 100Z 145 131 10 122 91Z 119Z 300 410 137Z Pratappur 133 133 0 133 173 771 133 77Z 173 183 10 165 811 Z 8136 Z 0 15 416 7 12 5 3 2 Uiw9 a 5 3 92 162 731 162 101: 162 143 10 134 95Z 121Z 290 403 139Z

ALLAHABAD 381 0 115 381 115 496 649 76Z Z 94 611 649 167 10 562 331 109Z 1343 1421 106Z

1 5 193 7 Mirzasura14 1 3 d 0 2 147 229 36Z 229 100Z 266 162 10 230 86Z 100Z 9 58 102530 Z 9 13 7 4 2 likr14 i 6 2 1 2 142 215 33Z 215 lOOZ 209 229 10 137 101Z 115X 410 495 121Z Sewapuri 60 17 21 60 33 93 119 32Z 119 100Z 117 197 10 108 91Z Z 11136 Z 5 18 215 Harhua 23t> 236 0 235 216 109 4 Z20 1166 23 10 1 109116Z Z9 13 6 23 5 60 110 0 Z55 Biraonkot 202 12 25 202 37 239 264 91Z 264 100Z 264 173 10 241 99Z 110Z 600 416 69Z 3 Vyasnaga15 3 3 r 5 3 7 2 7650 Z 72 3 21 213 1001 226 211 10 203 761 105Z 550 332 &9Z Rohania 106 20 39 106 59 Z 31 165 4 20 204 100Z 234 207 10 199 83Z 103 1 73 Z122 0 Z60 Kan'ina 194 21 41 194 62 256 297 861 297 100Z 323 W 10 274 Z 3561 Z 99 1 Z34 5 55

VARANAS 3 I24 116 3 24 15324 13 11692 1762 371 1732 101Z 1375 136 10 1676 92Z 106Z 4060 Z 92 3744

TOTAL 5 5 36 23286 334: 37 9 15 2323 4270 73Z 4213 99Z 4333 165 10 4020 33Z 105Z ! 12346 6320 51Z

Note: 1. v.p. = 'vandal-proof 2. H.C. = house connection/private connection . 3 S.P. = public standpost 18

The above comparison raise followine sth g question, however: may the number of taps indeed be substituted for the number of public standposts: ,or 1. is the capacity of one tap sufficient to cater for 250 persons? 2. I are the multiple-tap standposts located in such a way that I they can replace more than one standpost, or would the walking distance becom long/woulo eto d people from different hamlets or different section populatioe th f so same th e ne havus o et standpost, contrary to the original set-up? Capacit standposf yo t taps The capacity per tap is obviously important, as the number of public standpost determines i s d partlcriterioe th y yb n tha moro n t e tha0 25 n people should havstandposte relon o e t n yo . capitr Witpe ha a consump- tion of 40 litres per day, any standpost should thus be able to provide 10,000 litres per day at the actual supply pressure. Assuming a total numbe supplf ro ydayr hour pe standpos a , 8 betweef so d an n6 t should I thus be able to supply an average of between 20 and 30 litres per minute^ 'under maximumrload conditions. Earlier calculations (see repor misf o t - sion UP-12, pages llTancTTT)" show that the average number of people per public standpost is only between 120 and 160, so that the required sup- ply capacity coul proportionalle db y lower: betwee 0 litre2 n d r 10^san pe minute. During the field visit of mission UP-13 to Varanasi District several spot checks were carried out on the actual supply capacity of public standpost d privatsan e connections that .A ts foun timwa t di e thae th t supply capacity per tap ranged from 12 to 14 1/min for public standposts and 6 - 8_l/min for private connections. It was also found, however,that the use of two taps of one standpost drastically reduced the output per tap: whereas in one case a single tap provided 12 1/min, opening the sgcon reducep dta d 7 1/minthi o t s . thus resultin totaa n i gl supplf yo 1/min4 1 , onlhighe% y17 r than before. Based on admittedly meagre data, the first impression would thus be that the average supply capacity per tap is only barely sufficient, and that _ a double-tap standpost yields hardly more than a single^tap one. It was found, however, that most standpost providee sar d with some kin ferf o d - rul reduco t e outflowe eth . This coul modi_fied_qe db r .removed, _toallow a_ higher capacity per tap. Nd~~hardTHata"is available on this subject^ however, and the U.P. Jal Nigam is requested to provide additional in- formation in this respect, to allow a determination of the actual capa- city of the standposts as used in jhe field. Location of multiple-tap standposts Even if the capacity of standpost taps were to prove sufficient to cater normae th r l fo demand, wit withour ho t modifications additionae ,th l numbers of taps could only be taken into account when the originally re- quired number of standposts would be in the same locality, catering for I I I 19 I the same section of the population (i.e. either SC/ST or the remaining population). Even in that situation, using one multiple-tap standpost I rather than a number of single-tap standposts would only be warranted when this would not result in a walking distance in excess of 150 m, as bees ha n agreed upon earlier. These aspects will checke e havb o r et dfo I the ongoing projects under Sub-Project I (East), and the Jal Nigam has been requeste e missioth y db o provid nt e updated version e listth I sf so with population data per hamlet and village, upon which the calculations of the required numbers of public standposts have been based. These I lists would hav shoo actuae t th w l number singlef so multiple-tad -an p standposts provided in each locality, together with the actual number privatf o e connections, agai r localitynpe . Taking into accoun nume th t - I ber of people supplied through these private connections, the actually required numbe standpostf ro s could the checkede nb .

In Table 2.1 requiree .th d number publif so c standpost showe sar n i n I column 8. As has been mentioned above, for Rae Bareli this target has been used for determining the degree of coverage, which is shown in Allahabar columFo . n9 d Distric requiree th t d numbe standpostf ro s swa I determined on the basis that each tap could provide 250 persons as a maximum, in fact translating 'standpost' by 'tap'. The resulting cover- almoss i e tag 100%, excep Pratappurr fo t . Woul same th de metho ape db - I Barelie Ra plie degree r th ,fo d completiof eo n there woul 98%e db . r VaranasFo i Distric numbere th t peoplf so e thasuppliee ar t d through >j . private connections have been taken into account. Whereas according to .. I locae th l field staff the actual numbe peoplf ro e supplie privatr dpe e 0- connection^sL-JP-the .order .of J.5., ~the"'t'abrle~is~ basen a"veraga n do e of_10 person privatr spe e connection allowable .Th e reductio requiree th f no d number of public standposts has been based furthermore on the average I numbe peoplf ro publir epe c standpos followins ta g frocalculatione th m s mentione reporn i d t tablee UP-12s showa th e column d f i n.Th o ,an 3 1 n revised number of required public standposts is given in column 15. I Column 16 shows the coverage in case only the number of standposts is taken into account, whereas column 17 shows the coverage in case each tap is assumed to be able to replace one public standpost according to I the original criteria. The over-all coverage in the first case is 83%, in the latter case: 105%. For Varanasi the latter approach has been followed, and the infor- mation to be provided by the Jal Nigam will have to indicate whether I this approac justifieds hi , especially regardin aspecte gth geof so - I graphical distribution of the standposts and supply capacity per tap. A summary of the degree of coverage according to the 3 methods described above (compared with numbe standpostsf ro , numbe tapsf ro reducer ,o d number of taps after subtracting people with private connections) is I give Tabln i n e 2.2.: I I I I I I 20 I I Table 2.2. Meeting of standpost targets, different methods District Degre completiof eo basie th : sof n no I Modified Modified Numbe f ro Numbe f ro numbe f rnumbeo f o r I standposts taps standposts taps Rae Bareli 71 % 98 % 74 * 102 % Allahabad 76 * 94 % 88 % 109 % I Varan as i 87 % 101 * 92 % 106 % I TOTAL 78 * 99 % 83 % 105 %

I Even though this table indicates thatargete th t s would have been reachemodifiebasie e h th f so n do d numbe tapf ro s required (takine gth t doubtfuDistrictye s a whole)a ls s i sa whethe t ,i r this methoy dma indee usede db additionn I . situatioe ,th r individuanpe l schemy ema I differ from the over-all result, as is shown in Table 2.1. For that reasorecommendes i t ni d thaconstructioe th t publif no c stan.dr I Barele postRa n i s District continues on^the requiree basith f so d num- \\ hestandpostf ro s rather than taps, unless^Tt can~be proven that vising multiple-tap standposts would fulfil originae th l l criteri termn ai f so supply capacity, separate standpost varioue th r ssfo social grougsd ,an I walking distance. othee th Alsrr Districtsofo ,justificatioa calculatioe th f no n method I used will have to be provided by the U.P. Jal Nigam. I 2.2.2. Types and construction of public standposts Various type publif so c standposts have bee pastne eved th use ,an n n i d during the execution of the D.C.P. schemes the type of standpost to be I usebees dha n modifie w timesfe da . Wit presene hth t e set-uth f po schemes, with their large numbers of public standposts, these consti- tutmose eth t importan watete th par rf o tsuppl e th ys a schemes r fa s ,a consumers are concerned. With a design life of 30 years for the scheme I as a whole, also the structural aspects of the individual public stand- posts shoul suce db h tha lona t gguaranteede b lifn eca almoss i t .I t certai e 'normalth n cas e r thath efo 't t typno thi standpostsf s eo i s , which still account for 69 % of all standposts that have so far been I constructed in the D.C.P. schemes. For that reason it was agreed ear- lier that whenever major repairs would be required for the 'normal' type of public standpost, these would not be carried out, but the standpost I would be replaced by one of the so-called 'vandal-proof types. I I I I I 21 I Design r 'vandal-proosfo f standposts have been discusse earliey db r missions varioud ,an s modification thesf so e have beee n th use n i d I field, as is illustrated on pages 22 through 24. A 'vandal-proof standpost should conforfollowine th o t m g specifica- I tions: piping completely embedded in (reinforced) concrete - provided with tamper-proof taps of sufficient capacity to sup- ply water to a maximum of 250 people at the normal number of I supply hours per day (e.g. Jayson-type taps) - provided wit reinforceha d concrete slab (base plate suff )o - ficient dimensions (e.g. 2 m x 2 m), with a rim or gutter I around it for channelling waste water to the drain - provided with adequate drainage facilities, e.g. an open drain of at least 10 m length, leading to an area where the surplus dischargee b wate n rca d without endangerin environmente th g / I resultin pooln gi muddr so y places, etc. J. e type Th f 'vandal-prooso f standposts that have been constructer fa o ds I meet these requirements only partly. Especiall slabe oftee th y s- ar nra ther small, and never of reinforced concrete, while drainage facilities grossle ar y inadequat casese th mosn ei f .o t After discussion thesn so e aspect U.Pe sth . Jal Nigam agree construco dt remainine th t g standposts I Barele inRa i accordin specificatione th o t g s mentioned abov alsd ean o for the new Sub-Project IV these specifications would be used, to deter- I mine revised project costs (see chapter 4.2.). 2.2.3. Private connections realized The targetted and realized jrumbers of private connections are shown in I columns 18^ throug Tablf o 0 eh2 2.f.T£"~is clear that therdireca s i e t connection between the degree of completion of the individual schemes degree anth d realizatiof eo targee th f tno numbe privatf ro e connec- tions: especiall scheme e Barele yth Ra n si thabehing la t implemenn i d - I tation shonumberw wlo privatf so e connections, wherea resulte sth n si the Districts Allahabad and Varanasi are much better. Over-all, the rea- lizatio targettee th f o n d numbers_of private connectionn i % onls i s7 1 y I Rae Bareli Allahaban in_VaranasiT% i 2 % compares 9 , a 6 d 10 an d o t d " Especially after water has become regularly available in a particular scheme, requests for private connections are received in numbers, as is I shown in the example of the Saidabad scheme in Allahabad (present cover- \1 age approx. 136 %j: I 1982/83 88 private connections o//il A_ 1983/84 162 private connections t" 1984/85 384 private connections I present 458 private connections I I I 22

Thulendi scheme; ' vandal-proof public standpost note identifi- cation number

Thulendi scheme; ' Vandal-proof public standpost

Thulendi scheme; ' vandal-proof public standpost 23 ll

Ashrafpur scheme; stock prefabof public staadposts

I

)

Saidabad scheme; 'vandal-proof public standpost

Kandwa scheme; public standpost

} I Ii

I 24 I I I I I I I Jagatpw scheme; Rohania scheme; I overhead tank entrance overheadto tank restrictedto I waterworks staff I I I I I I

I scheme; checking Kandwa scheme; private connection st I yield of public standpost supply up to 1 floor! I I I I 25 I I 2.2.4. Income generation from private connections reasone th f Jal. o sP e mentione. U NigaOn e mth stafy d b advocatinr ffo g private connection s thasi facn tQnle i theth te y yar source f revenuso e rurae ith n l water supply schemes, thereby ensurin financiallga y more I or less viable operatio maintenancd an n schemese requesth e th f eo t .A t of the mission, figures relating to the actual income from these connections, as well as actual O&M expenditure have been collected by I the U.P. Jal Nigam s illustrate,a Tabln i d e 2.3. (next page). This table clearly illustrate relativele th s y higher income from private connection Allahaban si s comparea d Varanasio t d , explaine e whicb n hca d I e facbth yt tha Allahaban i t schemel al d s have been supplying water (first through direct pumping severar )fo l years already, wherean si Varanasi most schemes have been commissioned in the course of this year I only. In Allahabad District the actual income from_pri_vat:_e_cpnn_ections amounts K°_^ET-l^i™-^ely _one-third of the actual expenses; the remainder of the I M cost O& State borns si th ey eb Government alss i ot I .obviou s than i t the case of Pratappur the lower income is caused at least partly by the fact that the exempted feeder has not yet been commissioned, thus reduc- ing the incentive for the local population to apply for private connec- t tions. Whereas the over-all income for the Allahabad schemes amounts to 28 % of I the O&M costs, this figure is only 17 % in Varanasi, for the reasons as explained earlier. The actual consumption of water through private connections in the Mir- I zamurad and Sewapuri schemes in Varanasi District is as follows: I Table 2.4. Water consumption through private connections Scheme name: Mirzamurad Sewapuri I .i*~ Minimum billed water consumption 3 I (m /month per private connection) : 13.42 13.42 I Total numbe privatf o r e connections billed 245 118 No. with less than min. consumption 102 50 No. with minimum consumption 77 46 I No. with higher than min. cons. 66 22 of which: 25 - 40 m3/2 months *) 21 11 m3/0 5 2 - month 0 4 s *) 19 5 50 - 100 ma/2 months *) 20 4 I 100 - 140 m3/2 months *) 6 2

I Note: *) range approximatee sar ; slightly differen schemr tpe e I I I I

I 26 I I Table 2.3. Expenditure/revenues, rural water supply schemes UP-EAST I I. ALLAHABAD DISTRICT No. Naae of the scheae Present No. of No. of Actual expendi- Actual incoae Water produc- Average population H.C. up stand tur n lasei 6 t in last six tio an n i i 3 cost of \\c I (1985) 9/8o t 5 posts sooths aonths in last six produc- (4/8 5- 9/85 ) (4/8 5- 9/85 ) mnths tion t (4/3 5- 9/85 ) (Rs/s3!

I 1 Saidaba scheaS dH/ e 25,854 450 169 49,511.32 16,205.10 238,360 0.17— 2 Nidur scheaS aH/ e 23,865 410 145 40,896.00 15,289.00 255,060 0.16 — 3 Pratappu ScheaS H/ ) e (6 r30,58 4 150 133 43,300.00 4,303.40 210,900 0.23 _ I 4 UrwscheaS aH/ e 17,252 403 151 42,119.53 13,915.50 268,950 0.16 - 1 boy I Note: H.C - hous. e connection I . II VARANASI DISTRICT

No. Naae of the scheae Present f o . No No. of Actual expendi- Actual incense Hater produc- Average Average I population H.C. stand ture per aonth per sontn tion in s3 cost of consunp- (1985) nont198p r Se Aug/Sepe 5 h - g p 198Au pSe 5produc- postg Au -s tion 1985 p '35Se Au g- tion (Ipcd) I (Rs/a3) I 10 1 Hirzaaura scheaS dH/ e 42,615 577 179 15,182.38 3,323.00 44,000 0.34 34 _t)_loi 2 Tikri H/S scheae 45,264 495 145 15,703.68 2,851.00 32,000 0.19 59 __ 121 I J5) ra 3 Sewapuri H/S scheae 37,737 183 68 12,875.60 1,051.00 70,100 0.18 61 o *y 4 Bfraonkot U/S scheae 46,479 413 206 14,311.15 2,376.00 97,250 0.15 69 —— 6

At the prevailing water rates (Rs. 8 per month, per private connection I , with a rebate of 10 % in case of timely payment), the actual costs per private connection are not covered only in those cases wher monthle eth y consumptio mors i n0 m 4 e3 ,- tha dependin0 3 n e th n go i actual cost mr 3 Tablss .pe A e 2.4. shows, such high consumptio mors i n e or less exceptional (Mirzamurad: approx. 20 % of the total jiumber of private connections; Sewapuri: approx %)0 1 .. This means that even i n the flaa cas f teo rate system private ,th e connection groua y s sa ppa § more than their~s~Eare, as has been the intention from the start. For those schemes with water meters (which e installehavb o t e aln i dl D.C.P. schemes, according to the project set-up) the rate i § 3 per m whic, h is- -more, than _suffi.cien.t coveo _ t actuae rth l costs, which range from Rs. 0.14 to Rs. O.SB^per cubic metre, as shown in Table 2.3. i 2.2.5. Conclusions i From the preceding paragraphs the following conclusions can be drawn: a. New standposts will have to be of an even better design, to guar- antee a sufficiently long useful life and prevent unhygienic situa- tions from developing around them; & b. The fulfilment of the required numbers of standposts will have to geographicae checkee basib e th th f so n d o l distributioe th f no standposts oveschemese rth , their coverag varioue th f eo s groups i of the population, the resulting maximum walking distances, the ac- tual water consumption per head at the public standposts, and the actual supply capacit standposr ype t and/o tapr rpe ; c. The ferrules found in most public standposts may have to be removed i or exchanged, to meet the objectives; alternatively, the number of supply hours may have to be increased; d. Water_meters will_haye_t e installeob l privatal n i de connections, as agreed upon at the time the schemes were originally appraised; i e. When the abovementioned requirements are met, the private connec- tions certainly contribut meetino et O&e Mgth expenses, also ot fa i least a par:t of the public standposts. shortago t e missioe Du th timf e o f relation o e ni complexite th o nt f yo the subject regarding higher capital investment for private house con- nections schemes s indicate,a Annen i d x A :_ Term Referencef so ^ item 2^2. § (c) , the mission, could npt_. tackle this issue to a satisfactory exteirt,. s recommendeii t o includdt e this socio-economic stude topith yn i co f t design feature initiates sa reporn i d t UP-12, pag. e8 i i i i I 1 t 28 I I 2.3. Power supply Exempted feeders have been commissioned in all but 4 of the D.C.P. schemes under Sub-Project I. In Udari (Rae Bareli) the required downpay- ment still has to be deposited (commissioning of the project is not ex- I pected before June 1986) Pratappun ,i r (Allahabad requiree )th d sub-sta- tio stils i n l unde ro remainin constructiontw e th gn i scheme d ,an n i s Varanasi other solutions have been found: in Harhua a generating set has I been installed; in Vyasnagar the reliability of the power supply via the regular feeder is such (almost 24 hours/day) that no additional measures are necessary. I In Rae Bareli District, and probably also in Allahabad District, the power, even when obtained throug n exempteha d feederalwayt no s si , suitabl r drivinefo g pumps overs ,a under-voltaged -an occuro sd . For that reaso missioe nth n agree voltagf o recommeno t de us e e stath d - 1 bilizers in all D.C.P. schemes in Rae Bareli and Allahabad. According to the information supplied by the Varanasi field staff, no such prob- I lems do occur there. The cost per voltage stabilizer is estimated at Rs. 15,000 - 20,000. In principle the U.P. Jal Nigam will try to meet these extra costs from contingencies, but a cost estimate (including other additional costs) t wil e preparelb d submittean d r approva Governmentfo de th y lb f Indio s a and The Netherlands, in case the contingencies prove to be inadequate. I During its field visit, the mission checked the power availability at a number of schemes. With hardly any exception, power was available at the time of the mission's visit. Excerpts from log books kept at the scheme I headworks givfollowine th e g picture: Ashrafpur I Exempted feeder suffered break-dow heavo t e y ndu floods approachins .A g the are nexs i ao impossible t t , repair d carriee b an st t ye coulou d t no d power is obtained from the rural feeder. I perioe Ith n d fro Octobe1 m Octobe7 1 o t r r 1985, powe bees ha rn com- pletely absent for 2 days; for the remaining days power has been avail- able between 2.45 hour d 10.4san 0 hour dayr spe , wit averagn a h f eo approx. 6.30 hours/day. Though far from being acceptable as a rule, this situation is reasonable in view of the existing emergency situation be- cause of the floods. t Saidabad July: average : 11.36 hours of power per day I : 5.5minimu0 houry mpoweda f s o r rpe 21.4: maximu0 houry mda powef so r rpe maximum voltage : 460 V minimum voltagV V e0 0 :38 38 § average number of pumping hours: 11.13 hours/day I I I I t 29 f August: average 14.23 hours of power per day I minimum 4.20 hours of power per day maximum 21.20 hours of power per day maximum voltage 460 V minimum voltage 380 V I average numbe pumpinf ro g hours: 13.49 hours/day September: average : 15.11 houry da powef so r rpe I : 4.0minimu5 houry mda powef so r rpe maximum : 21.15 hours of power per day maximum V voltag 0 46 : e minimum voltage : 380 V I average number of pumping hours: 13.51 hours/day Accordin U.Pe th . o Jagt l Nigam field staff sub-statioe ,th n that feeds the exempted feeder often does not get power continuously itself. This i situatio obviousls i n y undesirable d contrar ,an vere th y o t yessenc f eo an exempted feeder. The U.P. Jal Nigam is therefore requested to again contac counterparts it t U.Pe th . f sStato e Electricity- Boardre d an , ques uninterrupten ta d suppl thesn yo e exempted feeders.

In case such a guarantee cannot be obtained, the matter of power supply to the schemes may have to be re-examined, especially for schemes that t still have to be built, or for which the exempted feeder still has to be i installed. i i i i t i i t i 30

2.4. Operatio maintenancd nan e w thaNo 1 t most schemes have bee wilr no l commissioned withi nshora t '/ I time, the aspect of operation and maintenance merits special attention. Aspects that need special emphasis are the matter of the supply hours, monitorine anth d functionine th f worke go th totaln si f go . 2.4.1. Supply hours The D.C.P. schemes have been designed on the basis of a maximum of 16 hours' pumpin tubewellr gpe continuoud an , s suppl watef yo r throughout the day. In practice the first is not yet required, and the latter is not realized,as the number of supply hours is purposely restricted. This is done partl reduco t y e operational expenses partld ,an reduco t y e wastag watef eo publit ra c standposts. According to the field staff, the local population will not collect wa- ter for long periods of the day, as they are engaged in agricultural ac- tivities. A_block supply of water__wQu_ld_thus_also_s.uij: the population, apart from the other reasons for deciding on such a supply. consequencee Th decidinf so operationan a n go l schedule that clearly differs from tha tdesigne practicn i th use n e i d,ar reductioa e n i n available capacity jaecause actual peak loads are higher than those taken into account at the time of designing the scheme. This matter has been dealt with in more detail in report UP-8 (pages 19 and further). An additional problee facth t s i thame reductio th t numben i n supplf o r y hours jeopardize supple consumere sth th o t y ssense th als en i otha e th t Pjiblj1£_standposts may_no ae b t 1 e to^ope with the^ieman limitee th n i dd time that water is supplied. The calculation given in paragraph 2.2. clearly shows that at a total of suppl8 capacite o th t y publir 6 hourda ype r cspe standpos becomy tma e insufficient. Whe!f~confrented with Nigal thiJa sm. P problem . U e th , field staff mentioned tha casn capacite i t publie th th f cyo standposts really would be inadequate, this would be indicated by long queues of people waiting for their turn. Though this situation was not encountered by the mission, it cannot be construed as proof that the present ar- rangement is indeed adequate. The U.P. Jal Nigam is therefore requested to check the actual consumption of the rural population, in terms of litre r capitpe s a and_p_er .day, y fiel,b d observation numbea t ,a f o r standposts. The results of such spot checks could later be used to decid whao t e t exten reducea t d numbe supplf o r y hour indees i s d accept- able. 2.4.2. Monitorin schemf go e operation

One of the most direct ways of checking that the schemes are operating to the satisfaction of the local population, is to have the operation monitored on a very regular basis. This implies that not only the field I staff in charge of operating the headworks and maintaining the distribu- I I I I t 31 I tion system should regularly check the situation in all villages under the scheme, but also U.P. Jal Nigam staff of a higher level will have to I monitor the performance of their subordinate staff, by carrying out spot physicae checkth n so l appearance, supply pressur wated ean r qualitf o y the public standposts and other parts of the distribution system in the I various schemes, whenever they are on inspection visits. It is recom- mended, therefore, that such staff be equipped with residual chlorine comparators, to perform spot checks on the level of chlorination. I In some cases action has already been taken to this effect, but a stric- mord tean r e general enforcemen e requiredb y tma , possibly linked with an incentive driv upgrado t e appearance eth d operatioean ruraf o n- lwa I ter supply systems in general. A bonus system for well-operated schemes may also prove beneficia over-ale th o t l l watee effecth rf to supply . The mission noted that in several schemes the public standposts had been I given identification numbers, which facilitates reporting malfunctions and reporting on the situation of individual standposts (see also page recommendes i 22) t .I d that thischemel dons al i s n ei s unde Dutce th r h I Credit Programme. Checking the water quality, other than the residual chlorine level, on a regular basis, will e institutionalizedhavb o et . Regional laboratories I are being constructed under Sub-Projects I and IV of the D.C.P. pro- gramme, and it is important that they are made operational within as short a period as possible. No final dates for commissioning of these I laboratorie sgivene b coul t d,ye however. I I I I I t I I I I I I 32 I 2.5. Project duration I In chapter 2.1 physicae .th l progres schemee th f so s under Sub-ProjecI t has been described, as well as the reasons for delays in commissioning. Apart from the question whether the calculation of the revised standpost I targets will prove to be acceptable, all schemes in varanasi and all but one schemes in Allahabad have been commissioned, whereas commissioning schemee Barele th Ra f n o si will Jun o t tak ep u e1986 . I Table 2.5. indicate presentle sth y expected month commissioningf so :

I Table Estimated2.5 commissioning POPof schemes Probable month of commissioning as estimated per: I District Scheme Original Oct.'84 Apr.'85 Oct.'85

I E BARELRA I Ferozpur 3-82 3-85 7-85 12-85 Ralpur 3-82 3-85 7-85 12-85 Govindpur 3-82 3-85 7-85 12-85 Bhojpur 3-82 3-85 7-85 12-85 I Thulendi 3-82 3-85 9-85 3-86 Jagatpur 3-82 3-85 7-85 12-85 Ashrafpur 3-82 3-85 9-85 3-86 I Udari 3-82 9-85 3-86 6-86 Bannamau 3-82 3-85 5-85 12-85 Behtakalan 3-82 3-85 6-85 12-85 I ALLAHABAD Saidabad 3-82 3-85 7-85 READY Nidura 3-82 3-85 7-85 READY Pratappur 3-82 3-85 7-85 11-85 I Urwa 3-82 3-85 7-85 READY VARANASI Mirzamurad 3-82 3-85 9-85 READY Tikri 3-82 3-85 9-85 READY I Sewapuri 3-82 3-85 9-85 READY Harhua 3-82 3-85 9-85 READY Biraonkot 3-82 3-85 9-85 READY I Vyasnagar 3-82 3-85 9-85 READY Rohania 3-82 3-85 9-85 READY f Kandwa 3-82 3-85 9-85 READY The indicated months of commissioning refer to the completion of the schemes including the required numbers of public standposts (with the provisions as mentioned in paragraph 2.2.), but excluding the private t connections, regional laboratories, and possibly the exempted feeder. i i i I I I 33 I I 2.6. Project costs Table 2.6. shows the expenditures for Sub-project I. As the reimburse- ment claim oveperioe th r d ending Jun availablt e no 198e s th 5wa o t e mission, the expenditures over that quarter are approximate only, as are I the anticipated further expenditures e expenditure.Th s oveprojece th r t perio graphicalle ar d y represente Fign i d . 2.1.

I Table 2.6. Expenditures Sub-Project I (East) Claim Claim Period Claimed Cumulative I dated No. ending (Rs.) (Rs.)

1 Dec'80 23,874,003.32 23,874,003.32 I 10/09/81 2 Mar'81 20,626,368.34 44,500,371.66 18/09/81 3 Jun'81 7,237,917.75 51,738,289.41 05/12/81 4 Sep'81 6,151,065.86 57,889,355.27 I 20/04/82 5 Dec'81 5,276,059.25 63,165,414.52 15/06/82 6 Mar'82 10,371,068.29 73,536,482.81 01/10/82 7 Jun'82 7,634,362.72 81,170,845.53 21/12/82 8 Sep'82 8,147,685.13 89,318,530.66 i 09/03/83 9 Dec'82 5,036,836.79 94,355,367.45 26/03/83 10 Feb'83 3,044,948.71 97,400,316.16 03/06/83 11 Mar'83 9,043,650.96 106,443,967.12 i 03/10/83 12 Jun'83 2,665,345.71 109,109,312.83 09/12/83 13 Sep'83 4,377,681.78 113,486,994.61 13/02/84 14 Dec'83 4,358,212.73 117,845,207.34 02/04/84 15 Feb'84 5,613,486.94 123,458,694.28 i 19/05/84 16 Mar'84 4,546,211.71 128,004,905.99 24/08/84 17 Jun'84 1,420,427.15 129,425,333.14 15/11/84 18 Sep'84 3,911,116.39 133,336,449.53 i 15/03/85 19 Dec'84 6,069,167.38 139,405,616.91 01/05/85 20 Mar'85 8,213,949.32 147,619,566.23 . ./. ./85 21 Jun'85 1,029,433.77 148,649,000.00 ../../.. 22 Sep'85 2,368,000.00 151,017,000.00 i ../../.. 23 Dec'85 2,500,000.00 153,517,000.00 i ../../.. 24 Mar'86 3,087,800.00 156,604,800.00 Note: the amounts of claims 22 and later are anticipated. To the total project cost according to the existing estimates, the cost i upgradinf o remainine th g g public standpost providinf o d san g voltage stabilizer e addedhavy b sma o caset n i , e these costs frot cannome m e tb the contingencies. A cost estimate will be prepared by the U.P. Jal i Nigam. i i i 1 1 mr 34 I i i i t

l 60 ~ -— ^ 150 - ^-~- — —• t ' ~ 140 - f| 13- 0 ^ -^"^ 120 | - f £i 11100 0- - ^—" ^/ £ 90 - X - 0 8 5 » I 70 - - 0 6 8 X " ^ I 1 50 ' /- ~ ^ 40 - - 0 3 0 _ / J 20 - 10 - J 1 " 1981 1982 1983 1984 1985 19!

Fig. 2.1. Expenditures Sub-project I (East), Uttar Pradesh (Expenditures after June 198 anticipatede 5ar ) I I I 35 I 3. SUB-PROJECT III (HAND PUMP SCHEMES) I The mission informed the U.P. Jal Nigam that the side letter on this Sub-Projec beed tha n exchanged U.Pe Nigal .Th .Ja m undertoo staro t k t activities on this project forthwith, including ordering the required I hand pumps. I f i i i i i i t i i i i i i I I t 36 I I 4. SUB-PROJECT IV (U.P. EAST) 4.1. Appraisal report 1 4.1.1. General In April 1985 mission UP-12 received a "Report for pre-appraisal of Sub- Projec (EastI I t ) (revised), Instalment- Varanasr Ifo Allahabad ian d I Districts" basie th thif so n .O s available reporth d an t e project docu- ments (those for the Mahadapur and Kosam Khiraz schemes were not avail- able at the time), the design criteria and other aspects of the schemes I were discussed. The schemes were set up according to the same, accepted, criteria that have been used for Sub-Project I. For that reason the mission could ac- I cepschemee th t principlen si wit t importano ,bu tw h t exceptions: desige th a.n population t implementatioe th b. n schedule. opinioe th missioe f Th o n s thapopulatioe nwa th t n growth rates wero eto locomparison i w n with those foun compariny db 197e gth 198d 1an 1 census data. In addition, the implementation schedule used was based on a com- mencemen activitief to Sub-Projecr fo s mid-1985n i V I t , whic cons hwa - sidered unrealistic. For that reason the U.P. Jal Nigam was asked to recast the project de- schemel al sign r ssfo except Bairibisa, Inargao Hathd nan i Barni, where the resulting design period (after taking into accoun mora t e realistic population growth s stil)wa l acceptable. projecte Th s have been adapted accordingly "Appraisan a d ,an l Report Sub-Project IV, Districts Allahabad and Varanasi" of June 1985 has been prepared by the U.P. Jal Nigam. However, at the time of mission UP-13's visit, onlrepresentative yth e fropossessioe th m n CPHEEi a s f no Owa copy of the report. Notwithstanding very specific promises given by the U.P. Jal Nigam earlier, no copies of the report had been sent to the Royal Netherlands Embassy. e resulTh thif s o twofoldt swa : durin bilaterae gth l negotiations between representatives from the Government Netherlandse Th f o f Indiso d aan har o - ,n in d formation was available on the projects under Sub-project IV, although these negotiations were meant to decide on new project includee b Dutce o th st hn i dassistanc e package. This rendered it impossible to have an appraisal carried out on be- half of the Netherlands Government, and resulted in an un- necessary delay in processing the proposed schemes. missioe possibilito n th d nha - studo yt appraisae th y l report on the revised projects until after sufficient copies had been made available, only just befor mission'e stare th eth f o t s I I f 37 I

field trip. I Als thin oi s case unnecessary resul e delayth thif e to sar s non-availabilit f informationyo . I This and earlier missions have repeatedly requested the U.P. Jal Nigam to send progress reports, appraisal reports, and other documents well in time, to give the Netherlands Government as well as appraisal missions the relevant information as early as possible, a situation that can only I furthee speeth p du r administrative processin projectse th f go . r reasonFo entirelt sno thae ar ty mission e cleath o U.Pe t rl th ,.Ja 1 Nigam has always been hesitant to send this kind of advance information. Although the mission agrees that the official channels have to be used in the final processing of the projects, advance information, sent di- rectly fro U.Pe Roya e l Nigath mth Ja .lo t mNetherland s Embassy, will I certainly speed up the process, as preparatory action can already have been momen e take th officiae t th tna l reports reac Embassye hth . This matter has been taken up also with the Joint Secretary, Ministry of I Agriculture and Rural Development, Mr. A.K. Rastogi, who fully endorsed the (unofficial) direct sending of reports etc. to the Royal Netherlands Embassy. The U.P. Jal Nigam is therefore requested to follow that course I futuree actiof o th n preveno i n,t t unnecessary delays. missioe Th s studienha Appraisae th d l recase Reporth n to t schemes under Sub-Projecgeneran i d an l , agreetIV s wit set-upe minohw th - fe ras .A pects will still coverede havb o et , which coul Addendun a done db n i e m 1 Appraisae tth o l Report submittee b o U.Pe t ,l Niga th Ja .y soos db a m n as possible. This wil deale lb t wit somn i h e detai paragrapn i l h 4.2. I maie Th n point r rejectiofo s originae th mosf no f o t l schemes, vize th . population projections and the implementation schedule, are discussed in the following paragraphs. I 4.1.2. Population projections Revised population projections have been made for all of the schemes I that had to be recast. The mission checked all project reports and found the new calculations acceptable. A summary of these new data, as well as revised cost estimates e give, ar Tabln i n e nexe 4.1th t . n o page . i More detailed descriptions of the newly recast schemes are given in An- I nex G to this report. I l i i I 1

I 38 I I Table 4.1. Stannary salientof features, Sub-ProjectIV I Scheme f o Desig. No n Nof o . Number f so People Capital name inhabit- scarcity popu- stand- privat r pe ecos t vild e - villages lation post connec- stand- (Rs. I lages 201tap9s tions post millions) 1 VARANASI Rohi 35 35 49,850 116 192 193 11.033 Kasidaha 11 11 45,400 86 164 222 8.939 Birampur 17 17 48,600 81 142 205 10.170 I Bairibisa 17 7 36,680 93 171 215 9.298 Inargaon 20 20 36,500 97 169 203 9.117 Mahadapur 13 13 21,520 63 115 213 7.416 I Awajapur 16 16 23,980 69 115 194 7.400 Hathi Barni 26 26 25,860 97 132 159 7.214 Jansa 21 21 31,270 84 137 190 7.766 I ALLAHABAD Chhekawa 11 8 30,810 83 240 199 10.556 I Kosam Khiraz 12 10 33,660 91 267 202 15.132 I TOTAL 199 184 384,000 960 1,844 199 104.041 4.1.3. Public standposts I missioe Th n checke numbere dth publif so c standpost mentiones sa e th n i d revised project documents d founan , d that the bee- d yto ha n e baseth n do ta| l populatio villager npe , rathe populatiore th tha n no eacr - nfo in h I 'dividual villag hamletr eo resula s .A thisf o ttotae th , l numbef ro standposts incorporated in the project reports is too low, in the opin- missione th iof no . After discussion thin so s aspect U.Pe th ,. Jal Nigam agree calculato dt requiree eth d number publif so c standpost exactln i s y I the same way as had been done for Sub-Project I, and to provide lists with a hamlet-wise breakdown of population and the resulting numbers of I public standposts. As preparing such lists is expected to take some time, which would again dela furthee th y r processin Sub-projecf go s agree wa t i d , thaIV t a t I calculation of the cost consequences would be based on the following: a. total required numbe publif ro c standpost determinee b o t s d publie basie on o nth f cso standpos persons0 15 r tpe , this I being the over-all ratio as calculated for Sub-Project I (see report UP-12, page 16). I I I I

I 39 I b. unit cost per public standpost to be based on the 'vandal- I proof desig discusses na paragrapn i d h 2.2.2. I 4.1.4. Implementation schedule The new implementation schedule assumes a start of the project per mid- 1986, and commissioning by the end of the year 1989. Although this ap- I pears to be a realistic time schedule, the mission stressed the impor- tanctigha f eo t monitorin progrese schemese th th f go f o spreveno t , t the delays that have plagued Sub-Project I from happening also in Sub- Project IV. The mission therefore recommended that the U.P. Jal Nigam prepare Pert-type diagram schemese e thes th r eacus sfo f ed ho dia,an - grams for monitoring purposes also. The use of the computer equipment l Nigaw availablJa no tha e ms i th theadquarter t ea s could facilitate I such monitoring enormously. e disbursemenTh t schedul eAppraisae giveth n i n l repor shows i t n graphi- I cally in Fig. 4.1. below. The figure illustrates that the assumed dis- bursement e almossar t linea n timeri , whic hardls i h y possible U.Pe Th .. Jal Niga s thereforwa m ePert-type requesteth e us eo t ddiagram s alsr fo o establishin morga e accurate disbursement schedule. Thiagrees swa - dup I on. I

I n . civi1 l works o . H&2 E 3. physical contingencies 1 4. engineering ri I 5. price contingencies £ 2 '•5 i c a aX>

I o 3 £ 3 I O I I 1986 I Fig. 4.1. Anticipated disbursement schedule Sub-ProjectIV I I I f 40 I I 4.2. Addendu Appraisao mt l Report As has been mentioned earlier, some additional information is required befor Appraisae eth l Repor Sub-Projecn to acceptee b n ca dV tI entirely . I The mission therefore agreed with the U.P. Jal Nigam that the latter would prepare an Addendum to the Appraisal Report, to be reviewed as one entity wit repore hth t itself, rather than prepar ecompletela w yne I report. The addendum should contain the following information: I 1. a corrected estimate of the required numbers of public standposts addendue th r .Fo m itself this coul done db n eo the basis of an over-all average of 150 people per public standpost. Later on, final calculations, based on a break- i down of actual population per village and hamlet would be required 2. revised unit costs per public standpost, on the basis of the enhanced "vandal-proof design mentione paragrapn i d h 2.2.2. I indication a plannee th . 3 f no d location inspectiof so n bun- galow d laboratoriesan s include Sub-projectn i d V I d an I s 4. a brief financial summary, based on the total cost of all I schemes together, taking into accoun additionae tth l costs becaus largee th f reo numbe standpostsf ro , with higher unit costs, according to the format shown in the addendum to the I mission's "Conclusion Recommendationsd san " (see Annex D). Note e 'AppraisaTh : l Report' referre repore aboveo dt th s ti , prepared by the Appraisal Cell of the Uttar Pradesh Jal Nigam, as the I resul theif o t r scrutinizin projece gth t documents submittey db the field staff. In addition separat,a e appraisa carriee behaln b o y t lf ma fdou o I the Netherlands authorities. I I I I I I I I I

I 41 I I 5. FINANCIAL PROCEDURES While describin progrese schemese th g th f o s , especially e thosRa n i e Bareli District mentiones wa t i , numbea do t thatreasonsf ro e ,du , funds that had been earmarked for the D.C.P. schemes where either in I fact not available or had been used for other purposes. However understandable rechannellin casn i gemergenf eo e fundb y sma - 1 cies face th ,t that drought d floodn almosa an s e star annually recurring phenomenon in Uttar Pradesh, renders this system a potentially severe constrain realizatioe th r D.C.Pe fo tth f .o n projects. I Especially the fact that the bilateral assistance funds are incorporated regulae ith n r Pla Statee n th Fund r ,fo srender s them liabl beino t e g user othefo d r purposes sole th e t discretioa , State th ef o nGovernment . As the donor agency only reimburses expenses on the basis of reimburse- 1 ment claims d eve,an n the Governmene n th onl o t y f Indiao t , thers i e hardly any directly visible link between the ongoing activities and the I bilateral financing. Even though ther s bee eha n improvemen a n sense th en i t tha D.C.Pe th t . have been removed from the District Plansj_ and put back in the State ;£IaaPl;Ke~mi5Sio'n~'is of ffie opinion that a more direct linking between I the allocatio fundf o n bilateray sb l donor agencieactuae th d l an sproj - ect beneficials i s . Preferabl systeya whereb, up m e t shoulyth se e b d funds that have been earmarked for bilateral asistance projects can be I used onlr thosfo y e projects, even when thee include regulae yar th n i dr State Plan Funds.

The Ministry of Finance, Department of Economic Affairs, of the Govern- I ment of India may look into this matter, to provide a solution to the I abovementioned problem. I I I I 1 I I I I I A - 1 I I ANNEX A TERM F REFERENCO S R REVIEFO E W MISSION UP-1 UTTAO T 3 R PRADESH

I 1. OBJECTIVE The mission is to evaluate and to report on the position of 1 the so-called 'Dutch Credit Programme Uttan i 1 r Pradesh. In particula e attentioth r e relatioth nn o wil ne b lbetwee n physical achievement e procesth d f providino an ss g fundo t s I the projects. . 2 TASKS I 2.1 General The description of the mission's task hereunder is to be regarded I as indicative and not exhaustive. Therefore the mission is expec- o teinitiatt d y relevanan e t subject deemed directly useful in the present context of the water supply programme. I 2.2 Detailed description I (a) Review the physical progress in the sub project East I. (b) With regard to the previous review/appraisal report no. UP- 12, the mission will discuss and come to a final agreement with the UP Jal Nigam management and field staff on the aspects of I e numberth , locatio d typ an f ndesigo e f publio n c standposts. e Thiinterrelateb so t issu s ha e d with recent development?n i " I the implementation of 'private connections'. (c) The mission will report on their own findings and the experience of the Jal Nigam field staff so far acquired, in execution of house connections, merits and de-merits will be described as I well as first impression as to the financial feasibility (higher investment cost against revenue to be collected) of the policy towards 'house connections'. I (dmissioe )Th n will evaluate existing financial procedureo t s a s the pre-financing of the projects on state level. Possible improvements and streamlining of these procedures may I be recommended in consultation(s) with the local administration and be specifically aimed at benefitting the newly proposed programme (vide report UP-12). I (e) Under the assumption that de side letter for the sub project III (handpumps) has been exchanged, the mission will provide a summary of activities taken up by the Jal Nigam for the start I of this project. n pursuancI ) (f ee initiativpth f a comprehensiv r fo e e studf o y design parameter r rurafo s l water suppl s briefla y y indicated I in report UP-12, page 8, the mission will have discussions with parties concerned (e.g. Ministry of Works & Housing, Jal Nigam I staff, other donors). I I I 2 - A (g) The mission will have a final check of the recast project reports I (11 projects) for the sub IV programme with regard to proper inclusio f desigo n n criteri s agreea a d upon durin e previouth g s mission's visit (UP-12, april 1985). I (h) Revie disbursemenf o w t claims sinc previoue th e s mission.

I 3. ADDITIONAL REMARKS e definitio e missioTh th e task th r nfo sf o nunde r poin 2 doet s indicate that the main emphasis is focussed towards institutional I and design matters rather than to a detailed review of projects progress. It is therefore justified to reduce the timeconsuming I field visit minimua o t s e othen favoui mth rf o raspects . 4. TEAM COMPOSITION I Mr R. Trietsch - team leader, senior water supply engineer, DHV Consultants e Netherland,th s Mr A.K. Sen Gupta - assistant adviser CPHEEO (Ministry of I Works and Housing). e WateTh r Supply Coordinator residine Royath t la gNetherland s I Embassy in New Delhi, Mr J.A. Speets, will accompany the team on a part-time basis. The Water Supply Coordinator has to be consulted before additional expertise and/or services can be added to the mission, if so I required. I 5. TIMING Most likel e missioth y n start s activitieit s y Octobeb s r 7th, 1985 and will last approximately one week. Detailed data however I will have to be established yet, depending on the availability of the missionleader. Returning from Uttar Pradesh will not be later than 13th October, n ordei 198 o . enabl5t TrietscR r r M eo participatt h w fe a e I days as a senior adviser to the comprehensive evaluation appraisal I mission for the Gujarat Water Supply Programme. 6. REPORTING AND CONTACTS The mission will draft its main conclusions and recommendations I while in Uttar Pradesh and ascertain that the same is discussed with the competent authorities before leaving. De-briefing sessions with ministries involved and at the Royal Netherlands I w DelhEmbass Ne e e mission'pard ar parceth n ian i t y f o l s programme e maiTh .n report wil e constituteb l e Netherlandth n i d s and presented to the Development Cooperation Department Asia of the Ministry of Foreign Affairs in the Netherlands, not later I than six weeks after departure from India, whereafter the report can be submitted to the Government of India. It has to be observed by the mission that contacts with Governmen- tal organisations preferably be made through the Royal Netherlands I Embassy. I I I

I B - 1 I I ANNEXB ITINERARY OF MISSION I Monday Octobe.7 r 1985 Arrival of Mission leader, Mr. R. Trietsch, in India. Discussions at Royal Netherlands Embassy with Water Supply Coordinator, I Mr. J.A. Speets. Discussions at Rural Development Department, CPHEEO-RWS, with Messrs. V. Raghu, M.M. Datta, L.K. Bhargava, A.K. Ghosh and C. Ganapathy. Discussion Ministrt sa Financef yo , with Undersecretary, Departmenf to I Economic Affairs, Mr. Madhav Lal. I Tuesday. 8 October 1985 Discussions at Ministry of Agriculture & Rural Development, with Joint Secretar A.K. y.Mr Rastogi, Deputy Secretar Aja. yMr i Shankar othed ,an r senior officers. I Studying available reports and correspondence at Royal Netherlands Em- bassy. I Wednesday Octobe.9 Tuesdayr- Octobe5 .1 r 1985 Mission to Andhra Pradesh. I Wednesday Octobe6 .1 r 1985 Departure of Mission, consisting of Messrs. A.K. Ghosh, J.A. Speets and I R. Trietsch, by plane from New Delhi to Lucknow (Uttar Pradesh). Discussions with Chairman and senior staff of Uttar Pradesh Jal Nigam. Discussions with Ministe Statf ro Housinr efo Urbag& n Development, Mrs. Padma Seth. I Discussions with Secretary to Government, Housing & Urban Development, Mr. Kamal Pandey. I Thursday. 17 October 1985 Continuatio discussionf no s with UPJN staff. I Return of Mr. Speets to New Delhi. Friday. 18 October 1985

Departure by car for Rae Bareli and Allahabad, and discussions with UPJN I field staff. On the way, inspection of DCP schemes Thulendi, Ashrafpur, Udari and Jagatpur in Rae Bareli District, and Nidura (Allahabad Dis- I trict). I I I I I

I B - 2 I

I Saturday Octobe9 1 . r 1985 y inspectioVaranasir Departurwa fo e schemeP r th DC ca n f .O ny o es b Saidabad (Allahabad Rohanid )an a (Varanasi). I Return of Mr. Ghosh by plane to New Delhi. Inspectio publif no c standpost privatd san e connection villagen i s f so DCP scheme Kandwa I Discussions with UPJN field staff Varanasi. Sunday Octobe0 .2 r 1985 I Studying available project document Sub-Projecn so subsequentld an , IV t y discussions with UPJN staff in Varanasi. I Return by plane to New Delhi. Monday Octobe1 .2 r 1985 I Draftin Mission'f go s "Conclusion Recommendationsd san Missioy "b n mem- bers Ghosh and Trietsch. I Tuesday. 22 October 1985 Departure of Mr. R. Trietsch to Ahmedabad, for participation as 're- I source person' in Mission GU-13. Wednesday Octobe3 .2 r 1985 I Retur plany nb e from Ahmedaba w DelhiNe o dt . I Thursday. 24 October 1985 Departure of Mr. R. Trietsch by plane from New Delhi to Lucknow. Discus- sio Missiof no n UP-13's "Conclusion Recommendationsd san " with Managing Directo seniod ran r JastafP U l f fNigamo . I Return by plane to New Delhi. I Friday Octobe5 .2 r 1985 Discussion Worlt sa d Bank Agricultural Division Delhiw ,Ne , with Messrs. Richard G. Grimshaw, John Greenfield, Harbans Singh and N. Patnaik. Debriefing on missions to Andhra Pradesh and Uttar Pradesh at Ministry I Agriculturf o Rurad ean l Development, with Joint Secretar A.K. yMr . Rastogi, Deputy Adviser Raghu. (PHEV Assistand . ),an Mr t Advisers I (CPHEEO/RWS) Messrs. L.K. Bhargava and A.K. Ghosh . Saturday Octobe6 .2 r 1985 I Retur plany nb e frow Delh mNe Amsterdamo t i . I I I I

I 1 C- I I ANNEX C LIST OF AUTHORITIES VISITED/SENIOR STAFF INVOLVED IN IMPLEMENTATION OF THE SCHEMES I NEW DELHI

I Royal Netherlands Embassy Mr. H.M.S Bemmelen .va n - First Secretary I Mr. J.A. Speets Water Supply Coordinator Ministry of Agriculture and Rural Development I Mr. A.K. Rastogi Joint Secretary Mr. Ajai Shankar Deputy Secretary, Rural Water Supply Mr. Arvind Suri Undersecretary, Rural Water Supply Mr. V. Raghu Deputy Adviser (PHE), CPHEEO-RWS I Mr. M.M. Datta Deputy Adviser (PHE), CPHEEO-RWS Mr. L.K. Bhargava Assistant Adviser (PHE), CPHEEO-RWS Mr. A.K. Ghosh Assistant Adviser (PHE), CPHEEO-RWS I Mr. C. Ganapathy Assistant Adviser (PHE), CPHEEO-RWS Ministr Financf yo e I Dr. J.S. Brara Deputy Secretary, Departmenf o t Economic Affairs Mr. Madhav Lal Undersecretary, Departmenf to I Economic Affairs UTTAR PRADESH I Lucknow Mrs. Padma Seth Minister of State for Housing and Urban Development I Mr. Kamal Pandey Secretar Governmento yt , Housind gan Urban Development, Lucknow I Varanasi District Mr. D.S. Bagga Commissioner- , Varanasi Division

I Uttar Pradesh Jal Nigam I Lucknow Mr. Indra Mohan Sahai - Chairman Mr. S.K. Sharma - Managing Director I Mr. R.S. Singh - Chief Engineer (I) I I I I

I 2 C- I I Lucknow (continued)

Mr. Rajendra Dayal Chief Engineer (II) I Sing. L . hMr Chief Engineer (Appraisal) Mr. S.S. Shrivastava Zonal Chief Engineer (West) Mr. R.M. Nigam Zonal Chief Engineer (East) I Mr. D.P. Singhal Addtl.C.E. (PPRD) Mr. K.N. Khandelwal Finance Director Mr. S.C. Dangwal Chief Accounts Officer Mr. A. Tripathi Secretary (Administration) I . V.KMr . Gupta Secretary (Management) Mrs. Hira Sharma Manager Monitoring Mr. M.K. Chaturvedi Deputy Manager Appraisal I Mr. A.C. Nagar Deputy Manager Appraisal R.N. Mr . Gupta Manager Training Mr. A.K. Gupta Manager Appraisal I Mr. V.P. Jindal Manager Appraisal Rae Bareli

I Mr. S.H. Zaheer S.E. XX circle, Mr. N.C. Saxena E.E. I Constr.Div., Rae Bareli Mr. B.N. Saran E.E. II Constr.Div. Barele ,Ra i I Mr. S.K. Garg E.E. E&M Div., Rae Bareli Mr. A.L. Taneja E.E. II Constr.Div., Sultanpur (hand pump programme) I Allahabad

I Mr. S.R. Dikshit - S.E. II Circle, Allahabad Mr. D.C. Garg - S.E. Temp. Project Circle, Allahabad Mr. R.L. Shah - S.E. Mech. Circle, Allahabad Mr. Piyush Kumar - E.E. Constr. Division, Allahabad I Mr. A.C. Saxena - G.M. Ganga Action Unit, Allahabad Mr. S.C. Srivastava - E.E. VII Temp. Constr. Div. Allahabad Mr. M.P. Srivastava - A.E. VI Temp. Constr. Div., Allahabad I Mr. G.P. Gupta - A.E. Addl. Constr. Div., Allahabad I Varanasi Mr. S.R. Sharma S.E. XVI Circle (E&M), Varanasi Mr. B.P. Goel S.E. Project Circle, Varanasi I Mr. C.K. Nayak E.E. VI Constr. Div., Varanasi Mr. A.K. Srivastava E.E. IV Temp. Constr. Div., Varanasi Mr. A.K. Ghosal E.E. V Temp. Constr. Div., Varanasi Mr. A.K. Seth E.E. (E&M) ConstrI ,I . Div., Varanasi I Mr. V.P. Gupta E.E. III Temp. Constr. Div., Varanasi I I I I I 1 - D I ANNEX D I CONCLUSIONS AND RECOMMENDATIONS OF THE INDC-DUTCH REVIEW MISSION OF OCTOBER 198 UTTAO 5T R PRADESH (UP-13) I 1. SUB-PROJEC T(EastI ) 1.1. Progres schemee th f so s I The Missio informes nwa combinatioa o t de thadu unprecedentef t- no d flood unprecedente n wela s sa s la d total lac fundf o k s froState th m e Governmen almosr tfo t hal yearfa implementatioe ,th worke th sf no unde r I Sub-Projec beed ha n I tvirtuall y stopped. Aresultsa schemel ,al s under Sub-Projec Barele Ra n i DistricI t t will be commissioned approx. 6 months later than was anticipated in April 1985. I e scheme Allahabae Th th n si d Varanasdan i Districts have been (vir-- tually) completed, however. I 1.2. Public Standposts The Mission recommends that in Rae Bareli all public standposts that still constructede havb o et e provide,ar d wit apron ha reinforcef no d I concrete, rather than unreinforced concrete, along the lines as agreed upon for the standposts to be constructed under Sub-Project IV. Missioe Th n request JaP U l e Nigasth submio t m lisa t t showin breakga - dow bot f requireno e hth constructed dan d number standpostsf so r ,pe I villag hamletd ean , wit indication ha standpose th f no t type (vandal- proo notr fo ; singl doublf eo standpost)p eta . same Th e list should also indicat actuae eth l numbe privatf ro e con- I nections. 1.3. Voltage fluctuations I Missioe Th n recommends that voltage stabilizer providee sar thosn i d e DCP schemes where under over-voltagr -o e problem experiencede sar . I 1.4. Additional funds The UP Jal Nigam is requested to provide a cost estimate of the items mentioned under 1.d 23an above short ,a t notice. I Although the Mission was informed that most probably at least part of t frome thm e b contingencies cosn tca Governmene ,th Nethere th f o t- lands is recommended to allocate the necessary funds in case these con- I tingencie sufficiente b so t prov t eno . 1.5. Operation and Maintenance I The Mission recommends that each public standpost be given an identifi- cation number, and that all standposts are regularly checked on water pressure, physical appearanc wated ean r quality (residual chlorine con- I tent, etc.)recommendes i t .I d thar thafo tt purpos erostea f inspecro - I I I I I D - 2 I tion visits is prepared by the respective Superintending Engineer, and thabookg lo t s showin inspectioe gth n result scheme th kepe t sar ea t I headworks and at the Divisional headquarters of the UP Jal Nigam. I 2. SUB-PROJECT III The Mission informed the U.P. Jal Nigam that the side letter on Sub- beed Projecha n I exchangedII t l NigaJa me .Th undertoo staro t kime -th t I plementatio thif o n s Sub-Project forthwith. I 3. SUB-PROJECT IV 3.1. Appraisal report I Missioe Th n regrets that, firm commitmentl Ja P U se froth side f th meo Nigam notwithstanding, the project documents on the revised schemes un- der Sub-Project IV have not been submitted in time to either the Nether- lands Government or the Mission. As a result, considerable delays have I been incurred in the procedures required for sanctioning this Sub- Project. I 3.2. Addendu Appraisae th o mt l Report The Mission requests the UP Jal Nigam to prepare an addendum to the Ap- I praisal Report, wit followine hth g contents: correcteA . a d estimat requiree th f eo d number publif so c standposts, alon linee gth s followe Sub-Projer dfo . I t I o savT e time, this estimat y initiallema n baseover-ale a yb n o d l average of 150 persons per standpost for the intermediate (1989) situation. Eventually complet,a e break-dow villagr npe hamled ean t I will be required, however. b. Corrected unit costs for public standposts, based on the so-called 'vandal-proof design, but with reinforced concrete piatform/apron, I and wit averagn draif ha o m 0 standpost r 1 npe f eo . c. An indication of the numbers and locations of laboratories and in- I spection bungalows s include,a botn i d h Sub-Project. IV d an sI brieA d. f financial summary ,totae baseth schemel n o dal cos f o ts together d includin,an iteme th cose sf gth o t mentione d d undean . ra I b., accordin attachee th o gt d format. Nigal Ja requestes i mP U e Th submio dt t this addendum withi firse th n t hal Novembef fo r Appraisa e 1985th s ,a laddendue Reporth d an tm wile lb I taken into consideratio packagee on s na . I I I I I I D - 3 I 3.3. Project planning and monitoring I Nigal Ja mP U undertake e Th preparo st PERT-typea e diagra eacr fo f mho the schemes under Sub-Project IV, as well as an indication of cash flows, both per scheme and for the entire Sub-Project, based on these I PERT-type diagrams. Nigal Ja requestes i mP U e Th hav o abovde t eth e finalized wel timn li e before the Mission's next visit (probably mid-April 1986), and to espe- I cially investigate the possibilities of using its computer facilities for this purpose. I The Mission wishes to express its gratitude to the Government of Uttar Pradesh, and in particular to the Uttar Pradesh Jal Nigam, for its hospitality and co-operation in carrying out this mission. I The Indo-Dutch Review Mission (UP-13) I Lucknow, October 24, 1985. I I I I I I I I I I I I I UTTAR PRADESH RURAL WATER SUPPLY PROJECT

I DUTCH CREDIT PROGRAM I ALLAHABAD AND VARANASI DISTRICT SUBPRQJECV I T I SUMMAR F PR^TECTCOSO Y n lakhsi s (R )T

SUB TOTAL TOTAL I No . DESCRIPTION

I 1 2 3 k

I 1- PREPARATORY WORKS s it ecleaning , landacquisition , I access roads etc. ^

d m CIVIL WORKS I - Pumphouses incl. tubewells - Transmission mains - Distribution network I - Storage - Standposts I - Facilities I 3. MECHANICAL/ELECTRICAL WORKS - Pumps ets - Electrical provisions I - Equipment & Tools I h . PHYSICAL CONTINGENCIES I ;5. PRICE ESCALATION 6. ENGINEERING CONTINGENCIES - Design I \ i - Research & Development I - Constr. Supervision

i I 1 . GRAND TOTAL

ote: total projectcost base n assumptioo d n that works will stary b t I July, 1985. Any delay involves a price increase of appr. 10 perc. per I annum. 4 - D I I I E- 1 I ANNEX E I SCHEME-WISE SUMMAR DATF YO A (Sub-Project Eas) tI

I SCHEME NAME: FEROZPUR ( Rae Bareli District ) TARGET POPULATION: 20,600 TUBEWELLS : No.l: constructed I No.2: constructed PUMP HOUSES: No.l: constructed No.2: constructed I PUMPS : No.l pump/installeT V : d No.2 pump/installeT V : d CHLORINATORS : No.l: installed No.2: installed I RISING MAI: N 0 m tota a 50 0 m f f 50 o laido l t ,ou OVERHEAD TANK : volume: 350 m3 staging: 21 m I progress: 100 % (commissioned) DISTRIBUTION SYSTEM totaa f 51.51.f o laidm o l k 5t m 5k ,ou VILLAGES COVERE6 1 f Do :t ou 6 1 PUBLIC STANDPOSTS : 63 constructed, out of a total of 124: I single-ta8 4 p 15 double-tap, vandal-proof I PRIVATE CONNECTIONS 150 made, out of an estimated total of 380 CHLORINE DOSAG : E 0.8 mg/1 RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2-0.8 mg/1, depending on I distance between samlping point and headworks EXEMPTED FEEDER commissioned; voltage stabilizer required

I PROBABLE MONT FINAF HO L COMMISSIONING: December 1985 I (commissioned except for required number of public standposts) I I I I I I I I I E- 2 I SCHEME NAM: E Barele RALPURa i( RDistric ) t I TARGET POPULATION 32,000 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/installed No.2: submersible pump/instailed I CHLORINATORS : No.l: installed No.2: installed RISING MAI: N 5 m tota a 37 5 m f f 37 o laidlo t ,ou I OVERHEAD TANK : volume: 500 m3 stagingm 2 2 : progress: 100 * (completed) DISTRIBUTION SYSTEM totaa 88.f 88.f o laidm lo m 8k t 8k ,ou I VILLAGES COVERE: D 24 out of 24 PUBLIC STANDPOST: S constructed0 12 totaa f 201f o o l t :,ou single-ta5 8 p I 35 double-tap, vandal-proof PRIVATE CONNECTIONS 148 made, out of an estimated total of 536

CHLORINE DOSAGE : 0.8 mg/1 I RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2-0.8 mg/1, depending on distance between sampling point and headworks I EXEMPTED FEEDER commissioned; voltage stabilizer required PROBABLE MONTH OF FINAL COMMISSIONING: December 1985 I (commissioned excep r requirefo t d numbe publif ro c standposts) I I I I I I I I I I I E- 3 I SCHEME NAME : GOVINDPUR ( Rae Bareli District ) I TARGET POPULATION 29,890 TUBEWELLS : No.No.ll : constructed (discharge less than anticipated) I No. 2 constructed No. 3 constructed PUMP HOUSES: No.l constructed No. 2 constructed I No. 3 constructed PUMPS : No.l VT pump/installed No. 2 submersible pump/installed I No. 3 installed CHLORINATORS : No.l installed No. 2 installed No. 3 procured I RISING MAIN: m5 totaa 37 5 m f f o 37 laido l t ou , OVERHEAD TAN: K volume: 500 m3 staging: 20 m I progress: 100% (completed) DISTRIBUTION SYSTEM 82.5 km laid, out of a total of 82.5 km VILLAGES COVERE9 1 f : Do t ou 9 1 PUBLIC STANDPOSTS : 112 constructed, out of a total of 112: I single-ta0 8 p 32 double-tap, vandal-proof PRIVATE CONNECTION estimaten a S f madeo 5 11 t d,ou 6 tota47 f lo

CHLORINE DOSAGE : 0.8 mg/1 RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2 - 1.0 mg/1, depending on distance between sampling point and headworks

EXEMPTED FEEDER commissioned; voltage stabilizer required PROBABLE MONT FINAF HO L COMMISSIONING: December 1985 (commissioned except for 3rd tubewell pumping plant) I I I E- 4 I SCHEME NAME : BHOJPU Barele RRa i( Distric) t 1 TARGET POPULATION 30,547 TUBEWELIS : No.l: constructed No.2: constructed I PUMP HOUSES : No.1: constructed No.2: constructed PUMPS : No.l pump/installeT V : d I No.2: submersible pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAIN : m5 totaa 37 m5 f f o 37 laidlo t ,ou I OVERHEAD TAN: K volume: 500 m3 staging: 20 m progress: 100% DISTRIBUTION SYSTE totaa f 77.f Mo m m laidlo k k 3t 6 ,ou 7 I VILLAGES COVERE: D 34 out of 34 PUBLIC STANDPOSTS : 124 constructed, out of a total of 124: 84 single-tap I 40 double-tap, vandal-proof PRIVATE CONNECTION estimaten a S f 0 madeo 40 t d,ou 6 tota55 f o l CHLORINE DOSAGE : 0.8 mg/1 I RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.4 - 0.8 mg/1, depending on distance between sampling poin headworkd an t s I EXEMPTED FEEDER commissioned; voltage stabilizer required PROBABLE MONTH OF FINAL COMMISSIONING: December 1985 I (commissioned except for 1.3 km of pipeline) I I I I I I I I I I I E- 5 I SCHEME NAME : THULEND Barele IRa i( Distric) t I TARGET POPULATION 29,911 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.1: constructed No.2: constructed PUMPS : No.l: VT pump/installed No.2: submersible pump/installed i CH10RINATORS : No.l: installed No.2: installed RISING MAIN : m5 totaa 37 m5 f f o 37 laidlo t ,ou i OVERHEAD TANK : volume m0 3 50 : stagingm 1 2 : progress: 60 % (staging for tank wall under progress) i DISTRIBUTION SYSTEM 77 km laid, out of a total of 78.25 km VILLAGES COVERE: D 19 out of 19 PUBLIC STANDPOSTS : 100 constructed, out of a total of 186: i 65 single-tap 35 double-tap, vandal-proof PRIVATE CONNECTIONS 25 made, out of an estimated total of 751 i EXEMPTED FEEDER : commissioned; voltage stabilizer required i PROBABLE MONTH OF FINAL COMMISSIONING : March 1986 i i i i i i i i i I I I E- 6 I SCHEME NAM: E JAGATPU Barele RRa i( Distric) t I TARGET POPULATIO: N 35,800 TUBEWELLS : No.l: constructed No.2: constructed (further development test to be I carried out before final decission on possi- ble abandoning wil takene lb ) No.3: constructed PUMP HOUSES : No.l: constructed 1 No.2 :e constructe b wilt no l d No.3: under construction PUMPS : No VT pump/installed I No No procured CHLORINATORS : No installed No procured i No.3: procured RISING MAIN : 50 m laid, out of a total of 375 m OVERHEAD TANK : volume: 650 m3 I stagingm 0 2 : progress: 100* (completed) DISTRIBUTION SYSTEtotaa f f 136.1o m laido lM k t 8 m ou ,5k 12 VILLAGES COVERED : 32 out of 32 i PUBLIC STANDPOST: S 191 constructed, out of a total of 265: 100 single-tap, normal 11 single-tap, vandal-proof i double-tap0 8 , vandal-proof PRIVATE CONNECTIONS 90 made, out of an estimated total of 735

CHLORINE DOSAG : E 0.8 mg/1 i RESIDUAL CHLORIN DISTRIBUTION I E N SYSTE 0.: M 0.2- 6 mg/1, dependinn go distance between sampling poin headworkd an t s i EXEMPTED FEEDER commissioned; voltage stabilizer required PROBABLE MONT FINAF HO L COMMISSIONING: December 1985 i (commissioned excep r requirefo t d numbe publif ro c standposts) ii i i i i i I I I E- 7 I SCHEME NAM: E ASHRAFPU Barele Ra i( RDistric ) t I TARGET POPULATION 26,460 TUBEWELLS : No.l: constructed No.2: constructed t PUMP HOUSE: S No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/ installed No.2: submersible pump/ installed I CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 500 m laid, out of a total of 500 m I OVERHEAD TANK : volume m0 3 50 : staging: 21 m progress: 45 % (staging completed) DISTRIBUTIONm k SYSTE tota9 a 6 f f Mo m laidlo k t 5 ,ou 6 I VILLAGES COVERE0 2 f : Do t ou 0 2 PUBLIC STANDPOST: S 87 constructed, out of a total of 180: 0 single-tap6 , normal type I single-tap2 , vandal-proof 25 double-tap, vandal-proof PRIVATE CONNECTIONS 45 made, out of an estimnated total of 633 I EXEMPTED FEEDE: R commissioned; broken down due to heavy floods; approach difficult/impossible; power on rural i feeder onl night ya t PROBABLE MONT FINAF HO L COMMISSIONIN Marc: G h 1986 i (commissioned except for required number of public standposts] i I i I i i i i I i t E- 8 § SCHEME NAM: E UDARI ( Rae Bareli District ) I TARGET POPULATION 25,030 TUBEWELLS : No.l: constructed (cavity well) No.2: constructed (cavity well) i No.3: constructed (cavity well) PUMP HOUSES : No.l: constructed No.2: constructed No.3: constructed I PUMPS : No.l: submersible pump/ installed No.2: submersible pump/ installed No.3: submersible pump/ installed i CHLORINATORS : No.l: installed No.2: installed No.3: installed RISING MAI: N m 0 tota a 35 0 m f f 35 o laido l t ou , i OVERHEAD TANK volume: 500 m3 stagingm 0 2 : d n bracin2 o t progressp g (u % 5 :3 i DISTRIBUTION SYSTEM 65 km laid, out of a total of 91.5 km VILLAGES COVERE: D 16 out of 16 PUBLIC STANDPOST: S 0 constructed4 totaa f 204f o o l t :,ou 25 single-tap t 15 double—tap, vandal-proof PRIVATE CONNECTIONS 2 made, out of a total of 687 i CHLORIN 6 mg/E 0. DOSAG1 : E RESIDUAL CHLORIN DISTRIBUTION I E N SYSTE6 mg/0. : 1M

POWER SUPPLY : hrs/da6 y (rostered) through rural feeder I EXEMPTED FEEDER Amount yet to be deposited I PROBABLE MONTH OF FINAL COMMISSIONING : June 1986 i i I i § i i I I t E- 9 I SCHEME NAM: E BANNAMA Barele URa i( Distric) t I TARGET POPULATION 41,945 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/instailed No.2: submersible pump/installed I CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 400 m laid, out of a total of 400 m. I OVERHEAD TANK : volume m0 3 80 : stagingm 4 2 : progress: 95% (testing completed) DISTRIBUTION SYSTEM totaa 139. f f 139.m o laidl5o k t m 5,ou k i VILLAGES COVERED : 27 out of 27 PUBLIC STANDPOSTS': 246 constructed, out of a total of 240: 111 single-tap, normal type single-tap6 , vandal-proof I double-tap9 12 , vandal-proof PRIVATE CONNECTIONS 92 made, out of an estimated total of 984 I CHLORINE DOSAGE : 0.6 mg/1 RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.4 - 0.6 mg/1, depending on I distance between sampling point and headworks EXEMPTED FEEDER : commissioned; voltage stabilizer required i PROBABLE MONT FINAF HO L COMMISSIONIN Decembe: G r 1985 i I i i i i i i I I I E- 10 I SCHEME NAME : BEHTAKALAN ( Rae Bareli District ) I TARGET POPULATION : 45,600 TUBEWELLS : No.l: constructed (has been abandoned) No.2: constructed I No.3: constructed PUMP HOUSES : No.l: constructed (to be used as storage) No.2: constructed No.3: under construction I PUMPS : No.l: submersible pump/ remove used dan d elsewhere No.2: VT pump/installed No.3: yet procured I CHLORINATORS : No.l: not yet procured No.2: installed No.3: procured RISING MAIN : 400 m laid, out of a total of 400 m I OVERHEAD TAN: K volume m0 3 80 : stagingm 2 2 : progress: 90% (testing done) I DISTRIBUTION SYSTEM totaa 125. f f 125.o m laido l7 k t ou ,7m k VILLAGES COVERE4 3 f : Do t ou 4 3 PUBLIC STANDPOST: S 9 constructed22 totaa f 223f o o l t :,ou single-tap2 12 , normal type I single-tap6 , vandal-proof 101 double-tap, vandal-proof I PRIVATE CONNECTIONS 88 made, out of an estimated total of 1205 8 mg/CHLORIN0. 1o t 6 E0. DOSAG : E f EXEMPTED FEEDE : R commissioned; voltage stabilizer required i PROBABLE MONT FINAF HO L COMMISSIONIN Decembe: G r 1985 I i i t i t i 1 i i E- 11 i SCHEME NAM: E SAIDABAD ( Allahabad District ) i TARGET POPULATIO: N 23,600 TUBEWELLS : No.1: cons t ruct ed No.2: constructed under previous programme i PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/installed i No.2: submersible pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 423 m laid, out of a total of 423 m i OVERHEAD TANK : volume: 650 m3 staging: 16 m progress: 100 X (completed) DISTRIBUTION SYSTEM 72 km laid, out of a total of 65 km i VILLAGES COVERE9 1 f Do :t ou 9 1 PUBLIC STANDPOSTS : 169 constructed, out of a total of 169: 79 single-tap I 46 double-tap PRIVATE CONNECTIONS 458 made, out of an estimated total of 337 CHLORINE DOSAG: E 1.0 to 1.2 mg/1 i RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2 - 1.0 mg/1, depending on distance between sampling poin headworkd an t s I EXEMPTED FEEDER : commissioned; limited availability of power i COMM 10NES ZS D i i I i i i i 1 I I E- 11 I SCHEME NAM: E SAIDABAD ( Allahabad District ) I TARGET POPULATIO: N 23,600 TUBEWELLS : No.l: constructed No.2: constructed under previous programme I PUMP HOUSE: S No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/instailed No.2: submersible pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAI: N 423 m laid, out of a total of 423 m I OVERHEAD TAN: K volume: 650 m3 stagingm 6 1 : progress (completed* 0 10 : ) DISTRIBUTION SYSTEM 72 km laid, out of a total of 65 km I VILLAGES COVERE9 1 : f Do t ou 9 1 PUBLIC STANDPOSTS : 169 constructed, out of a total of 169: single-ta9 7 p I 46 double-tap PRIVATE CONNECTIONS 458 made, out of an estimated total of 337

CHLORINE DOSAGE : 1.0 to 1.2 mg/1 I RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2 - 1.0 mg/1, depending on distance between sampling point and headworks I EXEMPTED FEEDER : commissioned; limited availability of power I COMMI IONESS D

I i i i i i I I t E- 12 I SCHEME NAME : NIDURA ( Allahabad District ) TARGET POPULATION 20,400 TUBEWELLS : No.1: cons t ruct ed No.2: constructed f PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l: submersible pump/installed I No.2: submersible pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAIN : m 0 totaa 38 0 m f f 38 o laido l t ,ou I OVERHEAD TANK : volume m0 3 65 : staging: 20 m progress: 100 * (completed) DISTRIBUTION SYSTEM 66 km laid, out of a total of 53 km I VILLAGES COVERE0 2 f : Do t ou 0 2 PUBLIC STANDPOST: S 5 constructed14 totaa f 145f o o l t :,ou single-ta7 7 p I double-ta4 3 p PRIVATE CONNECTIONS 410 made, out of an estimated total of 300 CHLORINE DOSAGE : 0.8 mg/1 I RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.4-0.8 mg/1, depending on distance between sampling poin headworkd an t s I EXEMPTED FEEDER commissioned I COMMIS S ZONED I I I I I I I f I i t E- 13 I SCHEME NAME : PRATAPPUR (Ghurdauli Zone Allahaba)( d Distric) t TARGET POPULATION 24,200 TUBEWEILS : No. 1: cons t ruct ed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l pump/installeT :V d No.2: submersible pump/installed i CHLORINATORS : No.l: installed No.2: installed RISING MAI: N 0 m .tota a 36 m0 f f 36 o laidlo t ,ou t OVERHEAD TAN: K volume m0 3 80 : staging: 20 m progress (commissioned% 0 10 : ) DISTRIBUTION SYSTEM 105 km laid, out of a total of 104 km i VILLAGES COVERE: D 31 out of 31 PUBLIC STANDPOST: S 3 constructed13 3 totaa 17 f f o o l t ,ou i PRIVATE CONNECTIONS 150 made, out of an estimated total of 416 CHLORINE DOSAG: E mg/6 ) 0. (? 1 5- i RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2 - 0.6 mg/1, depending on distance between sampling point and headworks

POWER SUPPLY : average of 13 hrs/day § EXEMPTED FEEDE: R to be commissioned by mid-1986 ? (New sub-station not yet ready) PROBABLE MONT FINAF HO L COMMISSIONIN Novembe: G r 1985 i (excep exempter tfo d feeder) i i i I t i t i I i t E- 14 I SCHEME NAM: E URW Allahaba( A d Distric) t I TARGET POPULATIO: N 20,300 TUBEWELLS : No.1: constructed No. 2: constructed I PUMP HOUSE: S No.1: constructed No.2: constructed PUMPS : No.l: VT pump/installed I No.2: submersible pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 350 m laid, out of a total of 350 m I OVERHEAD TANK : volume m0 3 50 : stagingm 4 1 : progress: 100 % (completed) t DISTRIBUTIO. N km SYSTE 4 totaa 6 f f o Mlaidm o l k t 9 ,ou 6 VILLAGES COVERE: D 23 out of 23 PUBLIC STANDPOSTS : 162 constructed totaa f 162f o lo t : ,ou 92 single-tap I 35 double-tap PRIVATE CONNECTION estimaten a S f 3 madeo 40 t d,ou 0 tota29 f o l

EXEMPTED FEEDER : because of power availability of 20 - 24 hrs/day I no exempted feeder applier fo d i COMMISSIONED I I I I I t I I I i t E- 15 I SCHEME NAME : MIRZAMURAD ( Varanasi District ) I TARGET POPULATION : 57,920 TUBEWELLS : No.l: constructed No.: 2 constructed I PUMP HOUSE: S No..1: constructed No..2: constructed PUMPS : No.,1: submersible pump/installed I No..2: submersible pump/installed CHLORINATORS : No.,1: installed No..2: installed RISING MAIN : 380 m laid, out of a total of 380 m t OVERHEAD TANK : volume: 1000 m3 staging: 22 m progress: 100* (commissioned) I DISTRIBUTION SYSTEM 100.6 km laid, out of a total of 100.3 km VILLAGES COVERED0 5 :f o t 50ou PUBLIC STANDPOSTS : 9 constructed22 totaa f 229*f o o l t ),ou (266) I PRIVATE CONNECTIONS 589 made, out of an estimated total of 580 CHLORINE DOSAGE : 0.8 mg/1 RESIDUAL CHLORIN DISTRIBUTION EI N SYSTEM : 0.2-0.4 mg/1, dependinn go I distance between sampling poin headworkd an t s POWER SUPPLY : approx 5 hrs/da.4- ruran yo l feeder EXEMPTED FEEDER re-commissioned by December 1984; trouble con- I tinues (dacoit-infested area) t CO MM ISSIEONED *) revised requirement, taking into accoun taveragn a tha s a t5 e1 persons are served per house connection; figure between brackets I refers to original estimate of required number of public taps. I I I I I I E- 16

SCHEME NAM: E TIKR Varanas( I i Distric) t TARGET POPULATION 61,560

TUBEWELLS : No.l: constructed No. 2: cons t ructd e PUMP HOUSE: S No.l: constructed No.2: cons t ruct ed PUMPS : pump/installeT No.lV : d No.2 pump/installeT V : d CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 235 m laid, out of a total of 235 m OVERHEAD TAN: K volume: 1200 m3 stagingm 2 2 : progress: 1003. (commissioned) DISTRIBUTION SYSTE: M 61.4 km laid, out of a total of 61.4 km VILLAGES COVERE7 2 f : Do t ou 7 2 PUBLIC STANDPOST: S constructed5 21 totaa f 215*f o o l t ),ou (209) PRIVATE CONNECTION estimaten a S f 5 :madeo 49 t d,ou 0 tota41 f o l

CHLORINE DOSAG: E 0.6 mg/1 RESIDUAL CHLORINN EI DISTRIBUTION SYSTEM : 0.2 - 0.6 mg/1, depending on distance between sampling point and headworks

POWER SUPPLY: 18-20 hrs/day EXEMPTED FEEDER commissioned

C OI O 1SS M T ES M DI

*) revised requirement, taking into account that as an average 15 persons are served per house connection; figure between brackets refers to original estimate of required number of public taps. I I I E- 17 I SCHEME NAM: E SEWAPURI ( Varanasi District ) I TARGET POPULATION 32,200 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.lpump/installeT V : d I No.2: VT pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAI: N m0 totaa 25 f f o laidm lo t 0 ,ou 25 I OVERHEAD TANK : volume m0 3 60 : staging: 16 m progress: 10035 (completed) I DISTRIBUTION SYSTEM totaa 46. f 46.f o laidm o l5 k t m 5k ,ou VILLAGES COVERE: D 30 out of 30 PUBLIC STANDPOST: S constructed9 11 totaa f 119*f o o l t ),ou (117) I PRIVATE CONNECTION estimaten a S f 5 madeo 18 t ,dou 5 tota21 f o l CHLORINE DOSAGE : 0.8 mg/1 RESIDUAL CHLORIN DISTRIBUTION EI N SYSTE 0.2-0.: M 5 mg/1, dependinn go I distance between sampling point and headworks POWER SUPPLY : 18-20 hrs/day I EXEMPTED FEEDER commissione Januarn i d y 1984 COMMIS S ZONED

I *) revised requirement, taking into accoun taveragn a tha s a t5 1 e persons are served per house connection; figure between brackets I refers to original estimate of required number of public taps. I I 1 I I I f I I

I E- 18 I SCHEME NAM: E HARHUA ( Varanasi District ) I TARGET POPULATION 57,585 TUBEWELLS : No.,1: constructed No..2: constructed I PUMP HOUSES : No..1: constructed No..2: constructed PUMPS : No.,1: submersible pump/installed i No..2: VT pump/installed CHLORINATORS : No.1: installed No..2: installed RISING MAI: N 350 m laid, out of a total of 350 m i OVERHEAD TANK : volume: 1000 m3 stagingm 8 1 : progress: 100% (commissioned) i DISTRIBUTION SYSTEM totaa 129. f 129.f o laidm o l 2k t . 5ou ,km VILLAGES COVERE5 7 f : Do t ou 5 7 PUBLIC STANDPOST: S 216 constructed, out of a total of 216*) (236) i PRIVATE CONNECTIONS 605 made, out of an estimated total of 550 CHLORINE DOSAG : E mg/ 8 0. 1 6- RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2 - 0.6 mg/1, depending on i distance between sampling point and headworks POWER SUPPL: Y Generator set installed and commissioned i (Averag hours6 f eo ' suppl ruran yo l feeder) COMMISS ZONED i *) revised requirement, taking into account that as an average 15 person servee sar housr dpe e connection; figure between brackets i refer originao st l estimat f requireeo d numbe publif ro c taps. i i i i i i i I I

I E- 19 I SCHEME NAME : BIRAONKOT Varanas( i Distric) t I TARGET POPULATION 63,130 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSE: S No. 1: cons t ruct ed No.2: constructed PUMPS : No.l: submersible pump/installed I No.2: VT pump/installed CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 370 m laid, out of a total of 380 m I OVERHEAD TAN: K volume: 1000 m3 staging: 18 m progress: 100% (commissioned) I DISTRIBUTION SYSTEM totaa 132. f 132.f o laidm o l 4k t m ou 4,k VILLAGES COVERE6 4 f : Do t ou 6 4 PUBLIC STANDPOSTS : 4 constructed26 4 totaa 26 f f o lo t ,ou I PRIVATE CONNECTIONS 416 made, out of an estimated total of 600 CHLORINE DOSAGE : 0.4 - 0.8 mg/1 RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.1 - 0.3 mg/1, depending on e distance between sampling point and headworks POWER SUPPLY : 12-14 hrs/day i EXEMPTED FEEDER re-commissioned I COMMIS S ZONE D i i i i E- 20

SCHEME NAME : VYASNAGAR Varanas( i Distric) t TARGET POPULATION 61,238

TUBEWELLS : No.1: cons t ructd e No.2: constructed PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l pump/installeT V : d No.2 pump/installeT V : d CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 1300 totaa m f 130f o laido l t 0,ou (350 ) m. OVERHEAD TANK : volume: 1000 m3 stagingm 8 1 : progress: 100 % (completed) DISTRIBUTION . SYSTEkm 0 totaa 9 M f f o laidm o l k t 86.8ou , VILLAGES COVERE: D 52 out of 52 PUBLIC STANDPOST: S 218 constructed, out of a total of 218*) (226) PRIVATE CONNECTION estimaten a S f made2 o 38 t d,ou 0 tota55 f o l CHLORINE DOSAG : E mg/9 0. 1 7- RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.1-0.7 tag/1, depending on distance between sampling point and headworks POWER SUPPL: Y 6 hrs/day (I); 18-20 hrs/day (II) EXEMPTED FEEDER connecte1 . TWNo samo dt e ; feede2 . Ts rWNo a alread2 . Tpowed WNo approxr yha fo r 0 2 . hrs/davicinito t e ydu fertilizef yo r factory

COMMIS S ZONED

*) revised requirement, taking into account that as an average 15 persons are served per house connection; figure between brackets refers to original estimate of required number of public taps. I I I E- 21 I SCHEME NAME : ROHANIA ( Varanasi District ) I TARGET POPULATION 62,507 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: constructed PUMPS : No.l pump/installeT V : d No.2: VT pump/procured I CHLORINATORS : No.l: installed No.2: procured RISING MAIN 0 m:totaa 25 f f o laido lD I t ou ,0 25 I OVERHEAD TANK : volume: 1000 m3 staging: 18 m progress % (completed 0 10 : ) DISTRIBUTION SYSTEM 89.1 km laid, out of a total of 89.1 km I VILLAGES COVERE1 4 f Do t : ou 1 4 PUBLIC STANDPOST: S constructed4 20 totaa f 204*f o o l t ),ou (234) I PRIVATE CONNECTIONS 731 made, out of an estimated total of 600 CHLORINE DOSAGE : 0.8 mg/1 RESIDUAL CHLOEIN DISTRIBUTION EI N SYSTE 0.2-0.: M 6 mg/1, dependinn o g fi distance between sampling poin headworkd an t s POWER SUPPLY : 22-24 hrs/day I EXEMPTED FEEDER commissioned COMMIS S ZONED

I *) revised requirement, taking into account that as an average 15 persons are served per house connection; figure between brackets I refer originao st l estimat f requireeo d numbe publif o r c taps. f I I I I I I I I I E- 22 I SCHEME NAME : KANDWA ( Varanasi District ) I TARGET POPULATION 57,255 TUBEWELLS : No.l: constructed No.2: constructed I PUMP HOUSES : No.l: constructed No.2: cons t ructd e PUMPS : No.l: VT pump/installed No.2: VT pump/installed I CHLORINATORS : No.l: installed No.2: installed RISING MAIN : 300 ID laid, out of a total of 350 m I OVERHEAD TAN: K volume: 1000 m3 stagingm 8 1 : progress: 100% (commissioned) DISTRIBUTIOm Nk SYSTE0 totaa 11 f f o Mm laido l k t 1 ou ,9 I VILLAGES COVERE: D 48 out of 48 PUBLIC STANDPOSTS : 297 constructed, out of a total of 297*) (323) I PRIVATE CONNECTION estimaten a S f madeo 1 34 t d,ou 5 tota55 f o l CHLORINE DOSAG : E 0.8 mg/1 RESIDUAL CHLORINE IN DISTRIBUTION SYSTEM : 0.2-0.6 mg/1, depending on 1 distance between sampling point and headworks EXEMPTED FEEDER commissioned 1 COMMISS ZONED

*) revised requirement, taking into accoun taveragn a tha s a t5 1 e I person servee sar housr dpe e connection; figure between brackets I refers to original estimate of required number of public taps. I I I I I I I I 1 I F - 1 I ANNEX F SHORT HISTORY OF SUB-PROJECTS I, II, III, IV I (as derived from Appraisal Report Sub-Project IV, Chapter I) I 1. INTRODUCTION Uttar Pradesh, with a present population of about 11.986 millions, is the most populous State of India. It extends over an area of 295,000 sq km whic abous hi percent9 totae th lf o tare Indiaf ao . Nearl per2 y8 - I State'e th cen f o ts population reside 112,56n i s 1 villages, while th e remainin percen8 populatioe g1 th f o t 9 65 n 9 f townsliveo 65 t n i s.Ou towns of the State, 82 towns have a population less than 5000, 510 towns I between remainin500e 50,00d th 0 an d 0an town7 g6 s hav populatioea n more than 50,000. Till now about 88.8% of the urban population have been served with safe drinking water supply coverage rurae ,th th lf eo sid e I beet no n s verha y significant. Out of 57 administrative districts of U.P. 18 districts suffer from scarcity of drinking water. It is proposed to supply adequate potable I wate abouo rt 5 town t23 28,50d san 0 village scarcite th n d i shard yan - ship area durin nexe year0 th g1 t s (1981-90) Internationae ,th l Water Supply and Sanitation Decade. It is anticipated that more than Rs. 1000 crores shall be required to implement this proposed programme. Seeing I the limitatio availablf no e financial resources possibll ,al e potential resources, incline promoto dt programme e mobilisede eth b o t e ,ar . i On the request of Govt. of India, the Govt. of The Netherlands has agree provido t d e financial assistanc rurar efo l water supply projects of some problem villages of Uttar Pradesh; consequently an agreement was entered between the Government of India and the Dutch Govt. The Govern- I ment of The Netherlands has agreed to provide Dfl. 57 million (Rs. 24.15 crores above th s gran) a er purposfo t lettea d thio ean t r s effecs twa received on 27th November 1978. Representatives of the Netherlands Govt, i identified the problem villages in the Districts of Allahabad, Varanasi and RaeBarel eastern i n U.P. Districtd ,an Agraf so , Mathur Etawad aan h in western U.P. During various Dutcvisite th hf so Mission viewe th , s were exchanged from time to time and were recorded in Mission reports 1 i . Accordinglyt10 o schemee th , r thessfo e areas were submitted undee th r Dutch credit programme as Sub-Project I, II (East), Sub-Project I, II i (West Sub-Projecd )an (EasI II t West)t+ , respectively. 2. THE SUB-PROJECTS i 2.1. Sub-Pro.iec (EastI t ) A sub-project comprising 22 schemes, amounting to Rs. 10.70 crores and coverin 4 villageg72 Allahabadn i s , RaeBarel d Varanasian i Districts, i was submitted to the Govt. of The Netherlands in April 1979, which was late approven ro Dutce th hy db Govt cose thif Th .to s sub-projecs twa revised five variou o t time e sdu s reasons, suc delas ha executionn i y , i price escalation, non-availability of materials in time, and inclusion i i F - 2

of additional items of works. The Sub-Project revised cost (Vth revi- sion) is Rs. /I5.66) crores. 2.2. Sub-Project II (East) & Sub-Project II (West) 5 schemes covering 137 villages of District Allahabad, and costing Rs. 3.40 crores, were suEmitted to the Dutch Govt. in April 1981 under Sub- Projec (East)I scheme9 tI 1 d ,an s covering 126 village Districtn i s s , and Etawah, and amounting to Rs. 6.23 crores, were sub- mitted to the Dutch Govt. in October 1981 under Sub-project II (West).

In January 1982, as per latest directions of the Government of India, the proposals were reconsidere s decidewa t i instalo t dd dan l hand pumps, wherever feasible placn ,i f pipeeo d water supply schemes. Con- sequently, original proposal Wesd werI an Easr I t s fo I eI t recasted dan wherever possible, the piped water supply schemes were transformed to hand pump schemes and included in Sub-Project III. Accordingly, under revised proposals of East II only one piped water supply scheme of Allahabad District, covering 25 villages, and 2^ schemes of , coverin villages8 g2 , were included. Sub^Project II (West) includes only J piped water supply schemes of , covering 14 villages, and 4. schemes of , covering 19 villages. These proposals are still under consideration by the Dutch Govt. However, for reasons of urgency, these schemes have been executed 1 under_o_ther_progrannnes_of Govt f Indi.o d Govtaan f U.£o . . During the discussions with mission-10 (U.P.) at Lucknow on October 10th & llth, agrees 198wa 4t di upon that U.P. Jal Niga sommp u wilet lpu fresh proposals under Sub-Project IV (East) to an amount of the same or- deoriginalls ra y propose Sub-projecr dfo (SeI I t e Mission report UP-10, page 22). 2.3. Sub-Pro.iect III meetine Ith n g hel Delht da 3.2.8n io connection 2i n witInternae th h - tional Water Suppl Sanitatiod yan n Decade programme (1981-90 whicn )i h Chief Engineer Secretaried san Statf so e took s decidepartwa t i , d that spot source scarcitn si y village providee sb d with hand pumps. Onln i y case where hand pumps are not successful, piped water supply be provid- e questioTh . revisinf ed no g schemes unde Dutce th r h Credit programme was referred to the Govt. of India and a meeting was held at Delhi in this connection. The decision was confirmed by the letter No. 3575/East Dutch/23 dated 30.12.82 from Sri S.K. Sharma, the then Chief Engineer (Projec Planningt& ) addresse V.Ni Sr .o lyert d , Deputy Secretary (U.P.) Govt. of India. Accordingly, as per directions of the Govt. of India, piped water supply schemes were recasted and included in Sub-Project East III, together with other newly proposed hand pump schemes. All hand pump schemes in U.P. East III and West III combined in one as Sub-Project III (East and West) cover only problem villages as identified in 1972. These revised proposals, including/bSTjvillages of Allahabad, Agra, Mathura and Etawah I I I F - 3

I y Districts, costing Rs.(j>_.j54^crores, were frame instalo t d l 3,172 India I Mar hanI I k d pumps approvae Dutc.e Th th hf o lGovt stils i . l awaited. Later on during bilateral consultations of June 1983 the project fund s reallocatewa P forU. almosd dan t doubleoriginalle th f do y submitted I Sub-Project II (East & West), viz. Rs. 10 to Rs. 12 crores (Dfl. 30 to 36 million) as also confirmed by Mr. J.A. Speets, Water Supply Coor- dinator, Royal Netherlands Embassy, vide letter No. 133/J.S./him Dt. 4.1.85. It was also decided to prepare and submit the water supply I schemes of district Varanasi and Allahabad in two lots. The first was to include 9 schemes of Varanasi and 2 schemes of Allah- abad Districts, costing Rs«^7J3i...l-(? crores approximately, and covering I 202 villages (179 villages in Varanasi and 23 villages in Allahabad proposeDistrict)e th f o dt Sub-Projec.Ou 8(EastI , I tI scheme t )lo f so Varanasi and 1 scheme of Allahabad District was prepared and~submitted to Dutch Mission-12 (U.P. perusar )fo discussiod lan n from 16 Aprio t l I 23 April 1985. After the discussion it was decideth d that the Sub-Project II (East) should now be named as Sub-project IV. The criteria for the projection of the design population, execution period of the proposed I works, provision of public standposts, etc. were also decided. Accordingly ,schemef o firs t lo ts comprising of jLschemes fromjyaranasi Distric scheme2 d an t s from Allahabad District, "costin (10.404J. gRs ) I crores, have been preparebeine ar gd dan include thin i d s Sub^Project IV. The second lot shall follow as Sub-Project V in due course of time. I alreads A y agreed upon assistance ,th e wil made lb e available th y eb Government of The Nethetlands to the Government of India, who will pass it on to the Government of Uttar Pradesh as part of the Government of India Plan resources allocation. The Government of Uttar Pradesh will I transfe sectoe rth r allocation unde plae rth n including this assistance to the Uttar Pradesh Jal Nigam.

——T. I The Uttar Pradesh Jal Nigam was established on 18.8.1975 as autonomous ,' corporatio e developmentth r fo n , monitorin d regulatiogan f wateo n r \ suppl seweragd yan e secto Uttan i r r Pradesh Nigae .Th responsibls i m e e constructionth r fo , reorganisatio d expansioan n f wateno r suppl d ; an y I sewerage systems in the rural areas. It also maintains and operates j water supply system sucn si h area notifies s a State th ey db Governmen t I for this purpose. J I i I I I I 1 I G - 1 I ANNEX G I SALIENT FEATURES OF SCHEMES PROPOSED FOR SUB-PROJECT IV I Scheme name : ROHI Block : Gyanpur Tehsil : Gyanpur District : Varanasi I No. of villages inhabite5 3 : uninhabite5 d+ d 12 scarcity +• 23 scarcity!'84)* ) I Population 12,61: 19751 census 1981 census : 17,635 initial stage (1989) : 22,350 intermediate stage (2004): 33,650 I final stage (2019) : 49,850 Rate of water supplyy : 0 litreda 7 r capitr pe spe d aan Nature of source : groundwater I Source : tubewell Treatment : safety chlorination (bleaching powder solution) -dosing capacity: minimum 0.5 mg/1 maximum 2.0 mg/1 I Overhead tank: material: reinforced concrete capacity: 1250 m3 m stagin0 2 : g I Distribution system: peak demand 4 timerat2. : es average demand terminal pressuret:: minimuin: 6.00 m Public standposts (1989): single-ta—tap Nos6 8 . I doubles-tap 15 Nos. Private connections (target: ) 1989 192 Nos.

Estimated capital cost: Rs. 11.033 million I : r capitPe a cost 1989 Rs. 494 2004 Rs. 328 2019 Rs1 .22 I Annual maintenance costs 1989 Rs. 161,200 2004 Rs. 235,300 2019 Rs. 322,500 Per capita maintenance costs 1989 Rs. 7.2 annur 1pe m I 2004 Rs. 6.99 per annum 2019 Rs. 6.47 per annum Cos watef o tr 100 rpe 0 litres 1989 Rs. 0.38 I 2004 Rs. 0.36 2019 Rs. 0.34 Note ) (*84* : ) refer liso st t with additional scarcity villagess ,a I prepare 198n i d 4 I I I I I I G - 2 I I Scheme name : KASIDAHA Block : Gyanpur Tehsil : Gyanpur District : Varanasi I No. of villages 1 inhabited1 : whichf o , : 11 scarcity

Population 10,26: 19771 census I 1981 census : 14,774 initial stage (1989) : 19,075 intermediate stage (2004): 29,630 I final stage (2017) : 45,400 Rate of water supply 70 litres per capita and per day Natur sourcf eo e groundwater Source : tubewell I Treatment : safety chlorination (bleaching powder solution) dosing capacity: minimum 0.5 mg/1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 1000 m staging : 20 m Distribution system: I peak demand rate : 2.4 times average demand terminal pressure: minimuin: 6.00m Public standposts (1989): single-tap Nos0 5 . I double-tap Nos8 1 . Private connections (target) : 1989 164 Nos. Estimated capital cost: Rs. 8.939 million I Per capita cost : 1989 Rs. 469 2004 2 Rs30 . : 2019 Rs. 197 Annual maintenanc e198: cost9 s Rs. 135,200 I 2004 Rs. 200,100 2019 Rs. 270,700 Per capita maintenance costs : 1989 Rs . 7.09 per annum I 2004 Rs. 6.7 annur 5pe m 2019 Rs . 5 .annur 96pe m Cost of water per 1000 litres : 1989 Rs. 0.37 2004 Rs. 0.35 I 2019 Rs. 0.31 I I I I I I I I 3 - G I Scheme name : BIRAMPUR I Block : Gyanpu d Suriyawaran n Tehsil : Gyanpur District : Varanasi I Novillagef .o s : 17 inhabited, of which: 17 scarcity Population 1971 census : 7,702 I 12,12: 1989 1 census initial stage (1989) : 16,565 intermediate stage (2004): 28,400 I final stage (2017) : 48,600 Rate of water supplyy : 0 litreda 7 r r capitpe spe d aan Nature of source : groundwater Source : tubewell I Treatment : safety chlorination (bleaching powder solution) dosing capacity: minimu mg/5 0. m1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 1250 m staging : 20 m Distribution system: I peak demand rate : 2.4 times average demand terminal pressure:: minimum: 6.00 m Public standposts (1989): single-ta>-tap Nos3 6 . I dot s-tap 9 Nos. Private connections (target) 1989 Nos2 14 . Estimated capital cost: Rs. 10,170 million I Per capita cost 1989 Rs. 614 2004 8 Rs35 . 2019 Rs. 209 Annual maintenance costs 1989 Rs. 119,000 I 2004 Rs. 183,900 2019 Rs. 26,400. Per capita maintenance costs 1989 Rs. 7.18 per annum I 2004 Rs. 6.4r 7pe annum 2019 Rs. 5.48 per annum Cos watef o t100r rpe 0 litres 1989 Rs. 0.37 2004 Rs. 0.34 I 2019 Rs. 0.29 I I I I I I I I G - 4 I Scheme name : BAIRIBISA I Block : Deegh Tehsil : Gyanpur District : Varanasi I No. of villages 7 inhabite1 : d 8 uninhabited 7 scarcity 10 non-scarcity Population 1971 census : 12,946 I 1981 census : 16,611 initial stage (1989) : 19,960 intermediate stage (2004): 28,320 I final stage 36,68 : (20170) Rate of water supply: 70 litres per capita and per day Natur f sourceo : e groundwater Source : tubewell I Treatment : safety chlorination (bleaching powder solution) dosing capacity: minimum 0.5 mg/1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 1000 m m stagin 0 2 g: Distribution system: I peak demand rate : 2.4 times average demand terminal pressure: minimum: 6.00m Public standposts (1989): single-tap 71 Nos. I double-tap 11 Nos. Private connections (target) : 1989 171 Nos. Estimated capital cost: Rs. 9.298 million I Per capita cost : 1989 6 Rs.46 2004 Rs. 328 : 2019 Rs. 253 Annual maintenance costs : 1989 Rs. 141,700 I 2004 Rs. 201,400 2019 Rs. 257,400 Per capita maintenance cost 198: s 9 Rs. 7.1 annur 0pe m I 2004 Rs. 7.1annur pe 1 m 2019 Rs. 7.0 annur 2pe m Cos watef o t100r rpe 0 litre 198: s 9 Rs. 0.37 2004 Rs. 0.37 I 2019 Rs. 0.36 I I I I I I I I G - 5 I Scheme name : INARGAON (BERWAN PAHARPUR) I Tehsil Gyanpur District Varanasi Novillagef o . s 20 inhabited uninhabite6 1 d I 16 scarcity 4 scarcity ('84)*) Population 12,37: 19741 census 16,39: 19831 census I initial stage (198919,70: )0 intermediate stage (2004): 28,000 final stage (2017) : 36,500 I Rat watef eo r supply: 70 litres per capita and per day Natur sourcf eo : e groundwater Source : tubewell Treatment : safety cblorination (bleaching powder solution) I dosing capacity: minimum 0.5 mg/1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I capacity: 1000 m3 m stagin0 2 : g Distribution system: peak demand rate : 2.4 times average demand I terminal pressure: minimum: 6.00m Public standposts (1989): single-ta—tap Nos9 5 . dot -tap 19 Nos. I Private connections (target) 1989 Nos9 .16 Estimated capital cost: Rs. 9.107 million Per capita cost 1989 Rs. 462 I 2004 Rs. 325 2019 Rs0 .25 Annual maintenance costs 1989 Rs. 141,600 I 2004 Rs. 199,400 2019 Rs. 249,500 Per capita maintenance costs 1989 7.1. annur Rs 9pe m 2004 Rs . 7.12 per annum I 2019 Rs. 6.8 annur 4pe m Cos watef o t100r rpe 0 litres 1989 Rs. 0.38 2004 Rs. 0.37 I 2019 Rs. 0.36 Note ) ('84* : ) refer liso st t with additional scarcity villagess ,a I prepare 198n i d 4 I I I I I I I G - 6 I Scheme name : MAHADAPUR I Block : Niymatbad Tehsil : District : Varanasi I No. of villages : 13 inhabited 13 scarcity Population 1971 census : 9,701 I 1981 census : 11,693 initial stage (198913,43: )0 intermediate stage (2004): 17,120 I final stage 21,52 : (20170) Rate of water supplyy 0 litreda 7 r capitr pe spe d aan Natur sourcf eo e groundwater Source tubewell I Treatment safety chlorination (bleaching powder solution) dosing capacity: minimu mg/5 0. m1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 500 m m stagin0 2 : g Distribution system: I peak demand rate : 2.4 times average demand terminal0 pressure: minimum: 6.00 m Public standposts (1989): single-taNos7 4 . p I double-taNos6 . p Private connections (target) : 1989 115 Nos. Estimated capital cost: Rs. 7.416 million I Per capita cost : 1989 Rs. 552 2004 3 Rs43 . : 2019 Rs. 345 I Annual maintenance costs : 1989 Rs. 112,700 2004 Rs. 152,000 2019 Rs. 194,100 Per capita maintenance costs : 1989 Rs. 8.3 annur 9pe m I 2004 Rs. 8.88 per annum 2019 Rs. 9.02 per annum Cos watef o t100r rpe 0 litre 198: s 9 Rs. 0.44 2004 Rs. 0.46 I 2019 Rs. 0.47 I I I I I I I I 7 G- I Scheme name : AWAJAPUR I : Dhanapur Block Tehsil : : Varanasi I Novillagef .o s inhabite6 1 : d 1 uninhabited 16 scarcity

Population 1971 census : 8,884 I 11,25: 1988 1 census initial stage (198913,38: )0 intermediate stage (2004): 18,060 I final stage (2017) : 23,980 Rat watef eo r supply y 0 litreda 7 r capitr pe spe d aan Nature of source groundwater Source tubewell I Treatment safety chlorination (bleaching powder solution) dosing capacity: minimum 0.5 mg/1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 650 m staging : 18 m Distribution system: I peak demand rate : 2.4 times average demand terminal pressure: minimum: 6.00m Public standposts (1989): single-tap 37 Nos. I double-tap 16 Nos. Private connections (target) : 1989 115 Nos.

Estimated capital cost: Rs. 7.400 million I Per capita cost : 1989 Rs. 553 2004 Rs. 410 : 2019 Rs. 309 I Annual maintenance costs : 1989 Rs. 120,900 2004 Rs. 165,800 2019 Rs. 206,200 Per capita maintenance costs : 1989 Rs. 9.04 per annum I 2004 Rs. 9.18 per annum 2019 Rs. 8.60 per annum Cost of water per 1000 litres : 1989 Rs. 0.47 2004 Rs. 0.48 I 2019 Rs. 0.45 I I I I I I I I G - 8 I Scheme name HATHI BARNI I Block Sewapuri Tehsil Varanasi District Varanasi I villagef o . No s 26 inhabited + 2 uninhabited 26 scarcity Population 10,59: 19771 census 13,29: 19841 census I initial stage (198915,40: )0 intermediate stage (2004): 20,630 final stage 25,86 : (20170 ) I Rat watef eo r supplyy 0 litreda 7 : r capitr pe spe d aan Nature of source : groundwater Source : tubewell Treatment safet: y chlorination (bleaching powder solution) I dosing capacity: minimum 0.5 mg/1 maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I capacity m0 3 65 : staging : 18 m Distribution system: peak demand rat: e 2.4 times average demand I terminal pressure: minimum: 6.00 m Public standposts (1989): single-tap Nos9 6 . double-tap 14 Nos. I Private connections (target) : 1989 132 Nos. Estimated capital cost: Rs. 7.214 million Per capita cost : 1989 Rs. 468 I 2004 Rs. 350 : 2019 Rs. 279 Annual maintenance costs : 1989 Rs. 113,300 2004 Rs. 157,100 I 2019 Rs. 191,600 capitr Pe a maintenance cost 198: s 9 Rs. 7.35 per annum 2004 Rs. 7.6 annur 0pe m I 2019 Rs. 7.4 annur 1pe m Cost of water per 1000 litres : 1989 Rs. 0.38 2004 Rs. 0.40 I 2019 Rs. 0.39 I I I I I I I I 9 G- I Scheme name JANSA I Block Sewapuri Tehsil Varanasi District Varanasi I Novillagef o . s 1 inhabite2 d uninhabite3 d 21 scarcity Population : 1971 census 9,900 1981 census 13,057 I initial stage (1989) 15,965 intermediate stage (2004) 22,535 final stage ; (2017) 31,270 I Rate of water supplyy : 0 litreda 7 r capitr pe spe d aan Nature of source : groundwater Source : tubewell Treatment : safety chlorination (bleaching powder solution) I dosing capacity: minimu 5 mg/m0. i maximum 1.0 mg/1 Overhead tank: material: reinforced concrete I capacity m0 3 80 : m stagin8 1 : g Distribution system: peak demand rate : 2.4 times average demand I terminal pressure: minimuin: 6.00 m Public standposts (1989): single-tap Nos0 6 . double- tap 12 Nos. I Private connections (target) : 1989 137 Nos. Estimated capital cost: Rs. 7.766 million Per capita cost : 1989 Rs. 486 I 2004 5 Rs34 . : 2019 8 Rs.24 Annual maintenance costs : 1989 Rs. 121,000 I 2004 Rs. 169,000 2019 Rs. 216,000 Per capita maintenance cost 198: s 9 Rs. 7.58 per annum 2004 Rs. 7.5 annur 0pe m I 2019 Rs. 6.9 annur 0pe m Cos watef o t100r rpe 0 litre 198: s 9 Rs. 0.40 2004 Rs. 0.39 I 2019 Rs. 0.36 I I I I I I I I 0 1 G- I I Scheme name : KOSAM KHIRAZ Block : Kaushamb i Tehsil : Manihanpur District : Allahabad I No. of villages inhabited2 1 : whichf ,o : 10 scarcit non-scarcit2 + y y Population 1971 census : 12,036 I 15,39: 19811 census initial stage (1989) : 18,405 intermediate stage (2004): 25,100 I final stage (2017) : 33,660 Rat watef eo r supply 70 litres per capita and per day Natur sourcf eo e groundwater Source : tubewell I Treatment : safety chlorination (bleaching powder solution) dosing capacity: minimum 0.5 mg/1 maximum 2.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity: 800 m staginm 8 g1 : Distribution system: I peak demand rate : 2.4 times average demand terminal pressure: minimum: 6.00 m Public standposts (1989) Nos1 9 . I Private connections (target) : 1989 7 Nos26 . Estimated capital cost: Rs. 15,132 million r capitPe a cost : 1989 Rs. 822 I 2004 3 Rs.60 : 2019 Rs. 450 Annual maintenance costs : 1989 Rs. 148,000 I 2004 Rs. 206,000 2019 Rs. 260,000 Per capita maintenance costs : 1989 Rs. 8.0 annur 4pe m 2004 Rs. 8.21 per annum I 2019 Rs. 7.7 annur 2pe m Cos watef o t100r rpe 0 litres : 1989 Rs. 0.31 2004 Rs. 0.32 I 2019 Rs. 0.30 I I I I I I I I G - 11 I I Scheme name : CHHEKAWA Block : Kaushambi Tehsil : Manihanpur District : Allahabad I Novillagef o . s inhabited1 1 : whichf ,o : scarcit8 non-scarcit3 + y y I Population 10,65: 19781 census 1981 census : 13,746 initial stage (1989) : 16,532 intermediate stage (2004): 22,762 I final stage (2017) : 30,810 Rat watef eo r supply y 0 litreda 7 r capitr pe spe d aan Natur sourcf eo e groundwater Source : tubewell I Treatment : safety chlorination (bleaching powder solution) dosing capacity: minimum 0.5 mg/1 maximum 2.0 mg/1 Overhead tank: material: reinforced concrete I 3 capacity m0 80 : staging : 18 m Distribution system: I peak demand 4 timerat2. : es average demand terminal pressure: minimum: 6.00 m Public standposts (1989): single-ta—tap 53 Nos. I dov !-tap 15 Nos. Private connections (target) 1989 244 Nos. Estimated capital cost: Rs. 10,556 million I capitr Pe a cost 1989 9 Rs63 . 2004 Rs. 464 2019 3 Rs34 . I Annual maintenance costs 1989 Rs. 125,000 2004 Rs. 174,200 2019 Rs. 221,000 Per capita maintenance costs 1989 Rs . 7.5annur 6pe m I 2004 Rs . 7 . 65 per annum 2019 Rs . 7.1annur 7pe m Cost of water per 1000 litres 1989 Rs. 0.30 I 2004 Rs. 0.30 I 2019 Rs. 0.28 I I I I