Revision Write-Up
Total Page:16
File Type:pdf, Size:1020Kb
REVISION WRITE-UP Reason for Issue Date Addendum 1 October 7th, 2019 Project Information NORR Project No. WSU State Hall Elevator Modernization JCDT18-0229 Phase 1 Wayne State University Project No. Intent This TRANSMITTAL is issued to provide new and/or updated project documents. Letters: Request for Proposal Addendum #2 Points of Clarification Reports: 05-04-11 State Hall Full Building Asbestos Survey Specifications: The following SPECIFICATIONS accompany and form a part of this TRANSMITTAL. 09 9123 – Interior Painting 23 0913 – Instrumentation and Control Devices for HVAC 23 2300 – Refrigerant Piping 23 3100 – HVAC Ducts and Casings 23 3300 – Air Duct Accessories 23 3700 – Air Outlets and Inlets 23 8126.13 – Small Capacity 25 0500 – Common Work Results for Integrated Automation 25 3513 – Integrated Automation Actuators and Operators 25 3519 – Integrated Automation Control Valves 25 3523 – Integrated Automation Control Dampers 26 0505 – Selective Demolition for Electrical 26 0519 – Low-Voltage Electrical Power Conductors and Cable 26 0526 – Grounding and Bonding for Electrical Systems 26 0529 – Hangers and Supports for Electrical Systems 26 0533.13 – Conduit for Electrical Systems 26 0533.16 – Boxes for Electrical Systems Printed: Last printed 07/10/2019 4:05 PM (DOI: 04.04.2005) REVISION WRITE-UP (Continued) Page 2 26 0553 – Identification for Electrical Systems 26 0923 – Lighting Control Devices 26 2416 - Panelboards 26 2726 – Wiring Devices 26 2813 - Fuses 26 2816.13 – Enclosed Circuit Breakers 26 2816.16 – Enclosed Switches 26 5100 – Interior Lighting 28 4600 – Fire Detection and Alarm Drawings The following DRAWINGS accompany and form a part of this TRANSMITTAL. ARCHITECTURE Revised Drawings: None MECHANICAL Revised Drawings: None ELECTRICAL Revised Drawings: None Printed: Last printed 07/10/2019 4:05 PM (DOI: 04.04.2005) SECTION 00 0101 PROJECT TITLE PAGE PROJECT MANUAL WAYNE STATE UNIVERSITY - STATE HALL MODERNIZATION PHASES 1 & 2 PHASE 1: ELEVATOR MODERNIZATION PHASE 2: NEW ADA ELEVATOR OWNER’S PROJECT NUMBER: 16-327661 ARCHITECT’S PROJECT NUMBER: JCDT18-0229 WAYNE STATE UNIVERSITY STATE HALL 5143 CASS AVENUE DETROIT, MI 48202 PREPARED BY: NORR END OF SECTION 00 0101 JCDT18-0229 / Wayne State 00 0101 - 1 PROJECT TITLE PAGE University - State Hall Modernization Phase 1 JCDT18-0229 / Wayne State 00 0101 - 2 PROJECT TITLE PAGE University - State Hall Modernization Phase 1 SECTION 00 0110 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0110 - Table of Contents SPECIFICATIONS 2.01 DIVISION 01 -- GENERAL REQUIREMENTS A. 01 1000 - Summary B. 01 2300 - Alternates C. 01 2500 - Substitution Procedures D. 01 5000 - Temporary Facilities and Controls E. 01 6000 - Product Requirements F. 01 7000 - Execution and Closeout Requirements G. 01 7800 - Closeout Submittals 2.02 DIVISION 02 -- EXISTING CONDITIONS A. 02 4100 - Demolition 2.03 DIVISION 03 -- CONCRETE A. 03 3000 - Cast-in-Place Concrete 2.04 DIVISION 04 -- MASONRY A. 04 2000 - Unit Masonry 2.05 DIVISION 05 -- METALS A. 05 1200 - Structural Steel Framing B. 05 3100 - Steel Decking C. 05 5000 - Metal Fabrications 2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES A. 06 1000 - Rough Carpentry 2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION A. 07 2100 - Thermal Insulation B. 07 2500 - Weather Barriers C. 07 4616 - Aluminum Siding D. 07 5423 - Thermoplastic-Polyolefin Roofing (TPO) - Firestone E. 07 6200 - Sheet Metal Flashing and Trim F. 07 8400 - Firestopping G. 07 9200 - Joint Sealants 2.08 DIVISION 08 -- OPENINGS A. 08 0671 - Door Hardware Schedule B. 08 1113 - Hollow Metal Doors and Frames C. 08 7100 - Door Hardware 2.09 DIVISION 09 -- FINISHES A. 09 2116 - Gypsum Board Assemblies JCDT18-0229 / Wayne State 00 0110 - 1 TABLE OF CONTENTS University - State Hall Modernization Phase 2 B. 09 5100 - Acoustical Ceilings C. 09 9123 - Interior Painting 2.10 DIVISION 10 -- SPECIALTIES A. 10 4400 - Fire Protection Specialties 2.11 DIVISION 11 -- EQUIPMENT 2.12 DIVISION 12 -- FURNISHINGS 2.13 DIVISION 13 -- SPECIAL CONSTRUCTION 2.14 DIVISION 14 -- CONVEYING EQUIPMENT 14 2100 - Electric Traction Elevators 2.15 DIVISION 21 -- FIRE SUPPRESSION A. 21 0500 - Common Work Results for Fire Suppression B. 21 0523 - General-Duty Valves for Water-Based Fire-Suppression Piping C. 21 0553 - Identification for Fire Suppression Piping and Equipment D. 21 1300 - Fire-Suppression Sprinkler Systems 2.16 DIVISION 22 -- PLUMBING A. 22 0513 - Common Motor Requirements for Plumbing Equipment B. 22 0516 - Expansion Fittings and Loops for Plumbing Piping C. 22 0517 - Sleeves and Sleeve Seals for Plumbing Piping D. 22 0523 - General-Duty Valves for Plumbing Piping E. 22 0529 - Hangers and Supports for Plumbing Piping and Equipment F. 22 0719 - Plumbing Piping Insulation G. 22 1005 - Plumbing Piping H. 22 3000 - Plumbing Equipment 2.17 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) A. 23 0513 - Common Motor Requirements for HVAC Equipment B. 23 0517 - Sleeves and Sleeve Seals for HVAC Piping C. 23 0529 - Hangers and Supports for HVAC Piping and Equipment D. 23 0553 - Identification for HVAC Piping and Equipment E. 23 0593 - Testing, Adjusting, and Balancing for HVAC F. 23 0713 - Duct Insulation G. 23 0719 - HVAC Piping Insulation H. 23 0913 - Instrumentation and Control Devices for HVAC I. 23 2300 - Refrigerant Piping J. 23 3100 - HVAC Ducts and Casings K. 23 3300 - Air Duct Accessories L. 23 3700 - Air Outlets and Inlets M. 23 8126.13 - Small-Capacity Split-System Air Conditioners 2.18 DIVISION 25 -- INTEGRATED AUTOMATION A. 25 0500 - Common Work Results for Integrated Automation B. 25 3513 - Integrated Automation Actuators and Operators C. 25 3519 - Integrated Automation Control Valves D. 25 3523 - Integrated Automation Control Dampers JCDT18-0229 / Wayne State 00 0110 - 2 TABLE OF CONTENTS University - State Hall Modernization Phase 2 2.19 DIVISION 26 -- ELECTRICAL A. 26 0505 - Selective Demolition for Electrical B. 26 0519 - Low-Voltage Electrical Power Conductors and Cables C. 26 0526 - Grounding and Bonding for Electrical Systems D. 26 0529 - Hangers and Supports for Electrical Systems E. 26 0533.13 - Conduit for Electrical Systems F. 26 0533.16 - Boxes for Electrical Systems G. 26 0553 - Identification for Electrical Systems H. 26 0923 - Lighting Control Devices I. 26 2416 - Panelboards J. 26 2726 - Wiring Devices K. 26 2813 - Fuses L. 26 2816.13 - Enclosed Circuit Breakers M. 26 2816.16 - Enclosed Switches N. 26 5100 - Interior Lighting 2.20 DIVISION 27 -- COMMUNICATIONS 2.21 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY A. 28 4600 - Fire Detection and Alarm 2.22 DIVISION 31 -- EARTHWORK 2.23 DIVISION 32 -- EXTERIOR IMPROVEMENTS 2.24 DIVISION 33 -- UTILITIES 2.25 DIVISION 46 -- WATER AND WASTEWATER EQUIPMENT END OF SECTION 00 0110 JCDT18-0229 / Wayne State 00 0110 - 3 TABLE OF CONTENTS University - State Hall Modernization Phase 2 SECTION 01 1000 SUMMARY PART 1 GENERAL 1.01 PROJECT A. Project Name: Wayne State University - State Hall Modernization Phases 1 & 2. B. Owner's Name: Wayne State University. C. Architect's Name: NORR, LLC. D. The Project consists of the alteration of existing passenger elevators & the installation of (1) new ADA compliant passenger elevator. 1.02 CONTRACT DESCRIPTION 1.03 DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Scope of alterations work is indicated on drawings. C. Renovate the following areas, complete including operational mechanical and electrical work and finishes: 1. Phase 1: Renovate existing elevator hoistway for passenger elevators 1 & 2, it's associated mechanical room, and penthouse as necessary for modernization work being carried out by Kone.. 2. Phase 2: Partial demolition of classroom and support spaces on floors 1-4, basement and roof for installation of ADA compliant passenger elevator serving all floors.. D. Refinish all surface areas of the following, as specified: 1. Phase 1: Limited refinish work limited to passenger elevators 1 & 2 floor base, paint touch up and repainting as outlined in Phase 1 Alternate #1. 2. Phase 2: All finishes impacted by scope of work to be replaced 1:1 to match existing finished demolished or damaged through performance of the work. E. Plumbing: Alter existing system and add new construction, keeping existing in operation. F. HVAC: Alter existing system and add new construction, keeping existing in operation. G. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation. H. Fire Suppression Sprinklers: Alter existing system and add new construction, keeping existing in operation. I. Fire Alarm: Alter existing system and add new construction, keeping existing in operation. J. Telephone: Alter existing system and add new construction, keeping existing in operation. K. Wayne State University will remove the following items before start of work: 1. Work associated with separate materials testing and abatement contract. L. Contractor shall remove and store the following prior to start of work, for later reinstallation by Contractor: 1. Existing sound attenuating panels located within classrooms as part of work associated with Phase 2. 2. Existing classroom doors to be uninstalled and reinstalled as part of work associated with Phase 2. 1.04 WORK BY OWNER A. Wayne State University has awarded a contract for Modernization of Existing Elevators 1 & 2 which will commence on 11-19-2019. B. Wayne State University will be awarding a contract for materials testing and abatement in areas of work at a date that is to be determined. JCDT18-0229 / Wayne State 01 1000 - 1 SUMMARY University - State Hall Modernization Phase 2 1.05 OWNER OCCUPANCY A. Wayne State University intends to occupy the Project upon Substantial Completion of Phase 1 to allow the Owner use of the existing modernized elevators and utilization of floors 2-4. B. Cooperate with Wayne State University to minimize conflict and to facilitate Wayne State University's operations.