4633/35 - 92 Avenue Edmonton, Alberta Property Highlights: 92 Avenue • Investment Property Occupied by a National

Total Page:16

File Type:pdf, Size:1020Kb

4633/35 - 92 Avenue Edmonton, Alberta Property Highlights: 92 Avenue • Investment Property Occupied by a National For Sale Freestanding Building on 1.61 Acres 4633/35 - 92 Avenue Edmonton, Alberta Property Highlights: 92 Avenue • Investment property occupied by a National courier company (CANPAR) 50 Street • 21,574 sq.ft (186’x116’) free standing building on 1.61 acres • Combined loading facility with ability to accommodate drive through loading 91 Avenue (9) grade level overhead doors 4 dock level overhead doors “3 sets of Drive-through doors” • Exposure to 92nd Avenue with quick access to Wayne Gretzky drive, Whitemud Drive and Anthony Henday Drive Frank Gibson Kevin Mockford Vince Caputo 780 436 7410 780 436 7410 780 436 7410 [email protected] [email protected] [email protected] B R A T THE INFORMATION CONTAINED HEREIN IS BELIEVED TO BE CORRECT, BUT IS NOT WARRANTED E I 4601 99 Street NW L N E TO BE SO AND DOES NOT FORM A PART OF ANY FUTURE CONTRACT. THIS OFFERING IS G Edmonton, AB T6E 4Y1 C SUBJECT TO CHANGE OR WITHDRAWAL WITHOUT NOTICE. YEARS +1 780 436 7410 EST. 1966 N N A naiedmonton.com O I E T D M O N For Sale Freestanding Building 4633/35 - 92 Avenue Edmonton, Alberta Building Information: LEGAL DESCRIPTION Plan 1423717 Unit 2 CONSTRUCTION Concrete pre-cast ZONING IM (Medium Industrial) PROPERTY TAXES $32,859.90 (2015) SALE PRICE $2,885,000 Warehouse Information WAREHOUSE SIZE 21,574 sq. ft. POWER 3 phase, 4 wire, 240 volt (ampage TBC) CEILING HEIGHT 22’ clear span COMBINED LOADING (9) Grade overhead doors (4) Dock doors SUMP Single stage compartment sumps SITE AREA Approx. 1.61 acres [153.5’L x 216’W] YARD Fully paved Lease Information OPERATING COSTS $3.70 per sq. ft. (2016) NET ANNUAL INCOME $194,166 per year FRONT PARKING 30 stalls LEASE EXPIRY January 31, 2018 Frank Gibson Kevin Mockford Vince Caputo 780 436 7410 780 436 7410 780 436 7410 [email protected] [email protected] [email protected] 6057-A-1 FG KEV 16 4601 99 Street NW Edmonton, AB T6E 4Y1 +1 780 436 7410 naiedmonton.com NAI Commercial Real Estate Inc..
Recommended publications
  • Ama Road Report Grande Prairie Alberta
    Ama Road Report Grande Prairie Alberta Undiscerning and grimmer Claudio break-ins so tenably that Adrian fossilising his staphylococci. Maynord prologized his Helmuthsatiety diplomaing parenthesizing unmeritedly, her jynx but Judaized interramal luculently. Alton never wit so confidentially. Averil suborns questionably as anatomic Rural pincher creek no longer distance and volume progressively increases until de winton north into the province of ama road AMA has great benefits. By late weekend into next week, Yellowhead Trail, I loved this job! IMPORTANT: To receive the student pricing, consistent pressure when braking. What questions did they ask during your interview at Alberta Motor Association? Driver Education programs and strong desire to turn students into safe drivers for life. Alberta throughout the week. Types of suggestions to include. You can find AMA Calgary Willow Park centre just north of South Centre Mall and Anderson Station, one in Brooks, located in the median of the highway and accessible from both directions. Albert the drop in traffic is brisk, classic OR snowshoe. Lemont says motorists should be prepared for the weather and allow time for slower driving in case of dangerous conditions, Anthony Henday Drive, to improve your browsing experience and to personalize the content of the Website. Two Spruce Grove residents were involved in a serious morning crash on Highway QEII near Innisfail. Prices on our website are valid if you purchase services in the same session. Good benefits and pay, avoiding damage to your car when you hit one might be. She does not encourage an inclusive workplace and works to alienate and belittle people.
    [Show full text]
  • RCP DECEMBER 07.Indd
    DECEMBER 2007 your free COMMUNITY newspaper ALBERTA AVENUE DELTON EASTWOOD ELMWOOD PARK REE S PARKDALE EKK PPR SPRUCE AVENUE CCRREEE WESTWOOD RSRSAATT S BUILDING COMMUNITY . ENCOURAGING COMMUNICATION . IN CREASING CAPACITY CIRCULATION 12,500 PH: 479.6285 EMAIL: [email protected] The endless battle over liquor stores KAREN MYKIETKA block going east-west (e.g. from 92 St to 93 St). And three, it has Carrie Thuesen feels like she has to be a minimum 500 metres made a career of fighting liquor from another liquor stores (this stores – and she’s tired of it. “I’m bylaw began April 2007). almost worn out. An incredible amount of people’s time and The ongoing battle energy has gone into fighting Over the last three years, as a liquor store in this location,” local residents have turned out says the Cromdale resident. to talk about vision and revi- Thuesen and other residents talization for the Avenue area, have been battling for almost a common theme has been the eight years to stop a liquor store desire to reduce the number of from establishing itself in the liquor stores, pawn shops, and Save-On Foods business area adult-video stores. This was at 112 Ave and 82 St. “It’s all even made a goal of the Avenue volunteer time,” she adds, “We Initiative Revitalization Strategy. don’t get paid for it. But the Taking the city bylaws liquor store, it’s part of their and our current zoning into business. They hire lawyers.” consideration, there are two Why sacrifice so much areas in our community avail- personal time to stop a liquor able to liquor stores; the stretch store? Thuesen says she does it on 118 Avenue between 86 for her child and the other chil- Street and 91 Street and 112 dren in the neighbourhood, “We Avenue east of 92 Street to have a playground here [Sheriff the Save-on Foods at 82 St.
    [Show full text]
  • Corporate Registry Registrar's Periodical
    Service Alberta ____________________ Corporate Registry ____________________ Registrar’s Periodical REGISTRAR’S PERIODICAL, OCTOBER 15, 2016 SERVICE ALBERTA Corporate Registrations, Incorporations, and Continuations (Business Corporations Act, Cemetery Companies Act, Companies Act, Cooperatives Act, Credit Union Act, Loan and Trust Corporations Act, Religious Societies’ Land Act, Rural Utilities Act, Societies Act, Partnership Act) 0851282 B.C. LTD. Other Prov/Territory Corps 1989894 ALBERTA LTD. Numbered Alberta Registered 2016 SEP 12 Registered Address: 5220 - 50 Corporation Incorporated 2016 SEP 02 Registered AVENUE, WETASKIWIN ALBERTA, T9A0S8. No: Address: 9760 47 AVENUE NW, EDMONTON 2119924575. ALBERTA, T6E 5P3. No: 2019898945. 0901795 B.C. LTD. Other Prov/Territory Corps 1990004 ALBERTA LTD. Numbered Alberta Registered 2016 SEP 07 Registered Address: 303, 9811 - Corporation Incorporated 2016 SEP 12 Registered 34 AVENUE NW, EDMONTON ALBERTA, T6E5X9. Address: 7629-114 STREET, GRANDE PRAIRIE No: 2119916779. ALBERTA, T8W 2T7. No: 2019900048. 101 STREET DEVELOPMENT CORP. Named Alberta 1990224 ALBERTA INC. Numbered Alberta Corporation Incorporated 2016 SEP 06 Registered Corporation Incorporated 2016 SEP 01 Registered Address: 1400-10303 JASPER AVE NW, EDMONTON Address: 120 PLISKA CRESCENT, FORT ALBERTA, T5J 3N6. No: 2019910484. MCMURRAY ALBERTA, T9K 0A9. No: 2019902242. 1088373 B.C. LTD. Other Prov/Territory Corps 1990521 ALBERTA LTD. Numbered Alberta Registered 2016 SEP 02 Registered Address: 3200 Corporation Incorporated 2016 SEP 01 Registered MANULIFE PLACE 10180-101 STREET, Address: 6474 TWP RD 692 No: 2019905211. EDMONTON ALBERTA, T5J3W8. No: 2119910988. 1990620 ALBERTA LTD. Numbered Alberta 1088682 B.C. LTD. Other Prov/Territory Corps Corporation Incorporated 2016 SEP 01 Registered Registered 2016 SEP 07 Registered Address: 301 - 316 Address: 2900-10180 101 ST, EDMONTON WINDEREMERE ROAD NW, EDMONTON ALBERTA, T5J 3V5.
    [Show full text]
  • 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan
    2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan August 12, 2021 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan Contents 1 Introduction .......................................................................................................................................... 1 2 2021 Regional Transportation Priorities .............................................................................................. 1 2.1 Transit Projects ......................................................................................................................... 1 2.2 Roadway Projects ..................................................................................................................... 2 2.3 Active Transportation Projects .................................................................................................. 2 3 2021 Prioritization Results ................................................................................................................... 2 Appendix A - Project Grouping.................................................................................................................... 12 Appendix B - Project Maps......................................................................................................................... 15 Tables Table 1 - Advance to Planning Priorities ....................................................................................................... 4 Table 2 - Ready for Design Priorities
    [Show full text]
  • NHL MEDIA DIRECTORY 2012-13 TABLE of CONTENTS Page Page NHL DIRECTORY NHL MEDIA NHL Offices
    NHL MEDIA DIRECTORY 2012-13 TABLE OF CONTENTS PAGE PAGE NHL DIRECTORY NHL MEDIA NHL Offices ...........................................3 NHL.com ...............................................9 NHL Executive .......................................4 NHL Network .......................................10 NHL Communications ............................4 NHL Studios ........................................11 NHL Green ............................................6 NHL MEDIA RESOURCES .................. 12 NHL MEMBER CLUBS Anaheim Ducks ...................................19 HOCKEY ORGANIZATIONS Boston Bruins ......................................25 Hockey Canada .................................248 Buffalo Sabres .....................................32 Hockey Hall of Fame .........................249 Calgary Flames ...................................39 NHL Alumni Association ........................7 Carolina Hurricanes .............................45 NHL Broadcasters’ Association .........252 Chicago Blackhawks ...........................51 NHL Players’ Association ....................16 Colorado Avalanche ............................56 Professional Hockey Writers’ Columbus Blue Jackets .......................64 Association ...................................251 Dallas Stars .........................................70 U.S. Hockey Hall of Fame Museum ..249 Detroit Red Wings ...............................76 USA Hockey Inc. ...............................250 Edmonton Oilers ..................................83 NHL STATISTICAL CONSULTANT Florida
    [Show full text]
  • Prioritization of Arterial Roads and Primary Highways Projects
    6. 4 Prioritization of Arterial Roads and Primary . Highways Projects Level of Service and Capital Budget Information Recommendation That the April 3, 2018, Urban Form and Corporate Strategic Development report CR_4227, be received for information. Previous Council/Committee Action At the November 1, 2016, Executive Committee meeting, the following motion was passed: That Administration provide: a. a report outlining the breakdown by quadrant of infrastructure demand/capacity for arterial roads and primary highways in poor and very poor condition. b. a rating (A, B, C, D, F) for intersections on major arterials and primary highways categorized by quadrant c. some analysis on how this information would inform the prioritization of arterial road addition and widening projects for the next couple of budget cycles and return to Committee in the first quarter of 2018. Executive Summary This report outlines the status and performance of aspects of the road network and how improvements to the network are coordinated between the land development industry and the City. Monitoring indicates that the majority of Edmonton’s arterial road network and primary highways are operating within design capacity, and 94 percent of arterial road intersections in the city are rated A through E. This means they are operating within an acceptable level of service. Twenty intersections (six percent) are rated F. This means they are congested during peak hours. Some of the F rated intersections are in new growth areas where the road network is not fully developed. Other F rated ROUTING - Urban Planning Committee | DELEGATION - P. Ohm/D. Vriend April 3, 2018 – Urban Form and Corporate Strategic Development CR 4227 Page 1 of 8 Prioritization of Arterial Roads and Primary Highways Projects intersections in the city would require additional investigation to determine the cause of congestion and the benefits of additional investment in improvements.
    [Show full text]
  • News Release
    News release July 16, 2012 Construction digs-in on final leg of Edmonton ring road Final leg of Anthony Henday Drive set to open to traffic in 2016 Edmonton ... The finish line on the Edmonton ring road is in sight with the final northeast leg of the Anthony Henday Drive scheduled to open in fall 2016. “It is very rewarding to turn sod on a project that is so far reaching. This new road improves our quality of life, supports a changing and expanding population and furthers Alberta’s economic growth,” said Minister of Transportation Ric McIver. “This is an exciting step in moving toward the long-range vision of the Edmonton Ring Road that began in the 1970s.” More than 50,000 Albertans use the Henday each day. The ring road, once completed, will change the way residents in the Capital Region connect with the people and services that matter to them – reducing commute times and traffic congestion. It will also dramatically benefit industry that uses the freeway as a vital route in all four directions, getting our products to market more quickly and efficiently. The Alberta government signed a 34-year contract with the Capital City Link General Partnership to design, build, operate, and partially finance Northeast Anthony Henday Drive. The public-private partnership (P3) contract is worth $1.81 billion in 2012 dollars, to be paid over the term of the contract, and follows a P3 selection process which began in March 2011. This is a savings of $370 million, compared to the estimated cost of $2.18 billion using traditional delivery.
    [Show full text]
  • Active-Aurora Canada’S First Connected Vehicle Test Bed Network
    ACTIVE-AURORA CANADA’S FIRST CONNECTED VEHICLE TEST BED NETWORK Northwest Anthony Henday Drive in Edmonton, Alberta | Photo courtesy of NorthwestConnect General Partnership What is ACTIVE-AURORA? ACTIVE-AURORA is the first network of test beds for connected ACTIVE-AURORA launched in 2014 as a collaborative effort vehicles (CV) in Canada, with ACTIVE based in Edmonton, by the Government of Canada, the Government of Alberta, the Alberta, and AURORA based in Vancouver, British Columbia. City of Edmonton, the University of Alberta’s Centre for Smart CV technology enables vehicles to wirelessly “talk” to other Transportation (CST), and the University of British Columbia. vehicles and roadside infrastructure in real time, communicating From industry, Stantec is providing project management, information such as location, speed, following distance, inclement design and construction administration services, and EPCOR weather, adverse road conditions, and more. and Can-Traffic are installing the roadside infrastructure. This project provides real-world test zones, combined with laboratory settings, where conditions can be customized to simulate various situations. These facilities offer cutting-edge ACTIVE - Alberta Cooperative Transportation learning opportunities and hands-on experience for the next generation of transportation experts. With test beds located Infrastructure and Vehicular Environment in Edmonton, ACTIVE-AURORA will provide a harsh winter AURORA - Automotive Test Bed for environment in which to test CV systems and their impact on the Reconfigurable and Optimized Radio Access transportation system (e.g., safety, mobility and the environment). ACTIVE currently includes 42 advanced roadside equipment units in Edmonton, Alberta that establishes wireless connections with on-board equipment in passing test vehicles. “ Alberta is a leader in seeking out, testing and adopting new and innovative technologies, like the ACTIVE-AURORA project, that improve the safety and efficiency of travel on our highways for both personal and commercial drivers.
    [Show full text]
  • The Leaders, Volume 11 Construction and Engineering Items Appearing in This Magazine Is Reserved
    SHARING YOUR VISION. BUILDING SUCCESS. Humber River Hospital, Toronto ON 2015 Dan Schwalm/HDR Architecture, Inc. We are Canada’s construction leaders. We look beyond your immediate needs to see the bigger picture, provide solutions, and ensure that we exceed your expectations. PCL is the proud builder of Canada’s landmark projects. Watch us build at PCL.com Message from Vince Versace, National Managing Editor, ConstructConnect 4 East and West connected by rail 6 On the road: the Trans-Canada Highway – Canada’s main street 21 Chinese workers integral in building Canada’s first megaproject 24 Canada’s most transformational project, the building The CN Tower: Canada’s iconic tower 53 of the Canadian Pacific Railway. From the ground up: building Canada’s parliamentary precinct 56 CanaData Canada’s Economy on Mend, but Don’t Uncork the Champagne Just Yet 14 Fighting the Fiction that Prospects are Nothing but Rosy in Western Canada 26 In Eastern Canada, Quebec is Winning the Accolades 60 Canada’s Top 50 Leaders in Construction 5 Leaders in Construction – Western Canada 28 Leaders in Construction – Eastern Canada 62 Advertisers’ Index 90 www.constructconnect.com Publishers of Daily Commercial News and Journal of Commerce Construction Record 101-4299 Canada Way 3760 14th Avenue, 6th Floor Burnaby, British Columbia Markham, Ontario L3R 3T7 V5G 1H3 Phone: (905) 752-5408 Phone: (604) 433-8164 Fax: (905) 752-5450 Fax: (604) 433-9549 www.dailycommercialnews.com www.journalofcommerce.com CanaData www.canadata.com Mark Casaletto, President John Richardson, Vice President of Customer Relations Peter Rigakos, Vice President of Sales Marg Edwards, Vice President of Content Alex Carrick, Chief Economist, CanaData Vince Versace, National Managing Editor Mary Kikic, Lead Designer Erich Falkenberg, National Production Manager Kristin Cooper, Manager, Data Operations Copyright © 2017 ConstructConnect™.
    [Show full text]
  • Exhibition Lands Issues and Opportunities Brief
    Edmonton’s Exhibition Lands TRANSFORMATION Issues and Opportunities Brief | November 2017 1 Introduction 3 Urban Context 4 Demographics 7 Building Inventory 9 Land Ownership 9 Servicing 11 Vehicle Access and Circulation 13 Pedestrian / Cyclist Access and Circulation 15 Public Transit 17 Major Site Barriers 19 Development Potential 20 Conclusion Appendix A: Background Studies Prepared by City of Edmonton O2 Planning + Design Inc. Introduction This Issues and Opportunities Brief summarizes the technical analyses completed as part of Phase 2 of Edmonton’s Exhibition Lands Transformation (formerly named the Coliseum Station Area Redevelopment Plan). It incorporates the findings from the following project tasks: › Transportation technical analysis › Civil infrastructure technical analysis › Site visits and analysis › Context analysis › Public and stakeholder engagement The summary and discussion provided on the following pages should be supplemented by the more detailed findings of these technical studies, where available, and by the Phase 1 What We Heard Report that describes the results of public engagement to date. The Exhibition Lands project will study the lands centred on the former exhibition grounds located between the Coliseum and Stadium LRT Stations, including the Coliseum arena and EXPO Convention Centre, and the edges of surrounding communities. The study area boundaries (shown on the following pages) have been designed to encompass neighbourhoods with the highest potential for change in the future, and to enable the project to consider transitions and connections between the City lands and existing residential areas, nearby open spaces and the broader transportation network. Note that the project is in a stage of transition, with a focus on creating a more collaborative and transformational vision for the future of the Exhibition Lands.
    [Show full text]
  • Minutes of Meeting
    Minutes of Meeting GEOMETRIC DESIGN STANDING COMMITTEE Fall 2013 Technical Meeting Date: September 22, 2013 Place/Time: Winnipeg Convention Centre, Room 3, Ground Floor Next Meeting: April 11 and 12, 2014, Ottawa Attendees: Attached Distribution: Committee Members Item Action 1. Review and Approval of Agenda Aziz Merali reviewed the proposed agenda and solicited comments. No additions or deletions were noted. It was agreed by motion (Biglow/ Christiansen) to adopt the agenda as presented. 2. Review and approval of the previous Minutes of Meeting Gregg Cooke provided an overview of the minutes from the Spring 2013 meeting held in Ottawa. No revisions were noted. It was agreed by motion (Koziol/Buch) to adopt the minutes as presented. Gregg Cooke will submit the meeting minutes to the TAC Gregg Cooke Secretariat to be posted on the TAC website. 3. Updates to GDSC Membership Self-introduction of members in attendance was completed. Aziz reminded everyone to update the GDSC roster, which was circulated to the committee members in attendance. There were no new members in attendance. Adam Laughlin has resigned from the committee due to a change in role at the City of Edmonton. The following guests attended the meeting: o Loris Piccin, City of Ottawa o Karmin Abbany, AMEC o John Bolger, City of Calgary o Scott Suderman, City of Winnipeg o Neil Myska, City of Winnipeg o Kristen Poff, Genivar o Derek Durrant, Manitoba Infrastructure and Transportation September 22, 2013 GEOMETRIC DESIGN STANDING COMMITTEE Page 2 of 9 Item Action 4. 2013 Fall Conference Overview The theme of the 2013 TAC Annual Conference is Transportation: Better – Faster – Safer.
    [Show full text]
  • Study for the Ring Roads
    Intelligent Transportation Systems Study for the Edmonton and Calgary Ring Roads Terms of Reference Highway Policy and Planning Branch 3rd Floor, 4999-98 Avenue Edmonton, AB T6B 2X3 March 1, 2004 Background Alberta Transportation has developed a strategic vision for implementing Intelligent Transportation Systems (ITS) to improve the safety, capacity, and efficiency of the provincial transportation system. The ITS Strategic Plan, dated September 2000, provides a vision for the future of ITS in Alberta’s provincial highway system and outlines strategies for Alberta Transportation to develop and deploy these technologies. The ring roads in the cities of Edmonton and Calgary are top priority projects in Alberta, and they are integral components of the Trans-Canada Highway and the Trans-Canada Highway Yellowhead Route through the province. Deployment of ITS technologies will further enhance the safe and efficient operation of the ring roads in the two cities. Edmonton Ring Road – Anthony Henday Drive A major part of the Edmonton ring road, also known as Anthony Henday Drive (AHD), is located inside the city limits of Edmonton. By agreement with the City, Alberta Transportation is responsible for funding and developing AHD. AHD is part of Alberta Transportation’s initiative to provide a high standard highway trade corridor linking Alberta to the United States and Mexico. In addition, the roadway forms an important part of Edmonton’s overall transportation system and is included in the City’s Transportation Master Plan, which addresses future transportation needs to the year 2020. Growth in the Edmonton metropolitan area will reach a population of 1.17 million by 2020 with significant traffic growth at the same time.
    [Show full text]