Republic of Rwanda
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Rwanda Irrigation Master Plan
Rwanda Irrigation Master Plan The Government of Rwanda, Ministry of Agriculture & Animal Resources Ebony Enterprises Ltd The World Agroforestry Centre (ICRAF) Rwanda Irrigation Master Plan The Government of Rwanda, Ministry of Agriculture & Animal Resources Ebony Enterprises Limited The World Agroforestry Centre (ICRAF) i Rwanda Irrigation Master Plan The Government of Rwanda, Ministry of Agriculture & Animal Resources Ebony Enterprises Limited The World Agroforestry Centre (ICRAF) Coordinators of IMP Study: NGABONZIZA Prime MAIMBO Mabanga Malesu Supervisor of IMP study: DVOSKIN Dan Authors: MAIMBO Mabanga Malesu ODUOR Alex Raymonds KIPRUTO Cherogony NYOLEI Douglas GACHENE Charles BIAMAH Elijah Kipngetich O’NEIL Mick MIYUKI Ilyama JEPHINE Mogoi Steering Committee Members: SENDEGE Norbert NGABONZIZA Prime NZEYIMANA Innocent MUSABYIMANA Innocent MUSABYIMANA J. Claude AZENE BEKELE Tesemma KAGABO Desire HARINDINTWALI Reverien BAYOULI Amor MOULAYE Abdou Enterprises Ltd. Republic of Rwanda Ministry of Agriculture and Animal Resources, MINAGRI ii Acknowledgement The World Agroforestry Centre greatly appreciates the opportunity accorded by the Managing Director of Ebony Enterprises Limited, Brigadier General (Rtd) Danny Kassif, to participate in the Rwanda Irrigation Master Plan through a sub-contractual agreement signed in March 2009. Upon inception of Phase I study, a number of Ebony personnel provided administrative and logistical support which cannot go unrecognized. These include Pini Moria, Ram Lustgarten, Arik Almog, Adina Avisar and Avi Evron. Cognizance is also extended to the Ministry of Agriculture and Animal Resources for providing technical backstopping and logistical support while carrying out the study in Rwanda. The following Officers are highly appreciated for their contributions to ensuring that Phase I of the study was a success: The Permanent Secretary – MINAGRI, Mr. -
Rwanda LAND Report: Access to the Land Tenure Administration
STUDY ON ACCESS TO THE LAND TENURE ADMINISTRATION SYSTEM IN RWANDA AND THE OUTCOMES OF THE SYSTEM ON ORDINARY CITIZENS FINAL REPORT July 2015` This report is made possible by the support of the American People through the United States Agency for International Development (USAID) Written by: INES - Ruhengeri CONTACT INFORMATION: LAND Project Nyarutarama, Kigali Tel: +250 786 689 685 [email protected] STUDY ON ACCESS TO THE LAND TENURE ADMINISTRATION SYSTEM IN RWANDA AND THE OUTCOMES OF THE SYSTEM ON ORDINARY CITIZENS FINAL REPORT Subcontract No. AID=696-C-12-00002-INES-10 Chemonics International Recommended Citation: BIRARO, Mireille; KHAN, Selina; KONGUKA, George; NGABO, Valence; KANYIGINYA, Violet; TUMUSHERURE, Wilson and JOSSAM, Potel; 2015. Final Report of Study on the access to the land tenure administration system in Rwanda and the outcomes of the system on ordinary citizens. Kigali, Rwanda: USAID | LAND Project. September, 2015 The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. CONTENTS LIST OF FIGURES .............................................................................................................................. 5 LIST OF TABLES ................................................................................................................................ 7 LIST OF ACRONYMS ....................................................................................................................... -
Resettlement Action Plan Estimates/ Budget
Resettlement Action Plan For Selected Feeder Roads in the District of Karongi in Rwanda - Project ID: P 126498 REPUBLIC OF RWANDA Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES (MINAGRI) RWANDA FEEDER ROADS DEVELOPMENT PROJECT (RFRDP) FINAL REPORT Public Disclosure Authorized UPDATED RESETTLEMENT ACTION PLAN FOR SELECTED FEEDER ROADS OF KARONGI DISTRICT Prepared in November 2013 and Revised in February 2017 Public Disclosure Authorized | P a g e PROJECT BASIC DATA No Description Impacts in Quantity 1 District Karongi 2 Province Western Province Construction/Rehabilitation/upgr ading of Roads, Drainage and 3 Planned Civil works Bridges 4 Cost of Civil works (priority roads for 72.25 km) 6,816,881 million $ 5 Cost by km 92,495 USD 6 Cost of RAP 151,534,305 Frw 7 Number of households to be physically displaced 38 8 Private fences affected in meters 13,094 9 Number of institutional buildings affected fully 1 10 Number of institutional buildings affected partially No 11 Number of institutional fences in meters No Loss of agricultural lands permanently in 22.41 12 hectares* 13 Loss of Crops and trees in hectares 19.99 14 settlements in Hectares 2.42 15 Number of households who lose strips of lands in 1,021 RoW 16 Loss of trees in Number 30,000 17 Loss of telephone line affected in meters No 18 Public water taps 2 19 Cemeteries No 20 Partially affected households 983 21 Total number of project affected households 1,021 22 Project Affected Persons (PAPs) 5,105 2 | P a g e EXECUTIVE SUMMARY Rwanda has four provinces (East, West, North and South) and Kigali City1. -
Rwanda Economic Activity and Opportunity for Refugee Inclusion
Report No: AUS0000807 . Rwanda Public Disclosure Authorized Economic Activity and Opportunity for Refugee Inclusion . Public Disclosure Authorized May 23, 2019 . URS . Public Disclosure Authorized Public Disclosure Authorized . © 2019 The World Bank 1818 H Street NW, Washington DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved This work is a product of the staff of The World Bank. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Attribution—Please cite the work as follows: “World Bank (2019) Rwanda: Economic Activity and Opportunity for Refugee Inclusion. © World Bank.” All queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected]. 2 Rwanda: Economic Activity and Opportunity for Refugee Inclusion (P169985) Ministry in Charge of Emergency Management World Bank May 2019 3 Acknowledgements This report was prepared by joint team from the Government of Rwanda’s Ministry in Charge of Emergency Management (MINEMA) and the World Bank. -
UNHCR Rwanda Refugee Bulletin Issue No. 5
Refugee Bulle n Issue number V March - May 2012 (N)CR RWANDA A refugee mother feeds her baby inside the laiterie , a disused milk factory serving as temporary shelter near the overflowing Nkamira Transit Centre IN,IDE T)I, I,,(E B B Anouck D BronCe (N)CR .ver 9,600 Congolese seek refuge in Rwanda p. 1-2 Rwanda copes with its Arst refugee influ2 since 20099 Re-registra on e2ercise complete p. 3 5overnment and inter-Agency response BPRM (,A visits Rwandan camps p. 3 Fighng broke out in North Kivu, Democrac Republic of the Congo (DRC) in April Bra4ilian donor visit to 5ihembe p. 3 2 12 between the Armed Forces of the Democrac Republic of the Congo (FARDC) 6iving as a refugee with a disability p. 7 and deserng troops inially loyal to renegade General Bosco Ntaganda, who is want- ed by the Internaonal Criminal Court for war crimes, including the recruitment of Refugee womanhood p. 5 child soldiers. The other 8olie9 an urgent appeal p. 5 On Friday 2,th April, 5 Congolese refugees crossed the grande barrière from Goma, DRC, into Gisenyi, Rwanda, with numbers swelling to over 1, by .unday 29th. By Environment and hygiene in Kiziba p. 0 the end of the following week, .unday 0th 1ay, 5,200 individuals were registered at 5enocide Commemora on p. 7 Nkamira Transit Centre, a facility 4ust 25kms from the border which normally hosts Rwandan returnees for a night or two before their onwards 4ourney home. Interview with our photographer p. 8 A mul-disciplinary team, consisng of the Government of Rwanda and seven 5N DAFI ,cholars9 the road ahead p. -
World Bank Documents
REPUBLIC OF RWANDA Public Disclosure Authorized MINISTRY IN CHARGE OF EMERGENCY MANAGEMENT P.O. Box: 4386 KIGALI Public Disclosure Authorized SOCIO-ECONOMIC INCLUSION OF REFUGEES AND HOST COMMUNITIES PROJECT (SEIRHCP) Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) FINAL REPORT Public Disclosure Authorized March 2019 EXECUTIVE SUMMARY In the framework of improving the living conditions of refugees and host communities, the Government of Rwanda through the Ministry in Charge of Emergency Management and with the funding from the World Bank is developing the project entitled “Socio Economic Inclusion of Refugees and Host Communities” (SEIRHCP). The project will be implemented in the six Districts hosting refugee camps, namely Kirehe, Gatsibo, Karongi, Nyamagabe, Gisagara, and Gicumbi hosting respectively the refugee camps Mahama, Nyabiheke, Kiziba, Kigeme, Mugombwa, and Gihembe. The project has four components: the first component aims to ensure access to basic services and socio-economic investments. The component is divided into two parts: access to basic services (education, health and water) and socio-economic investments (roads and markets). The key sub- project activities will include construction, rehabilitation, or upgrading school infrastructures, health facilities, water and sanitation facilities, roads, and markets in six districts hosting refugees. The second component aims to ensure economic opportunity with access to finance (grants or loans) and livelihood opportunities to both refugees and host community. The main objectives of this component are to promote entrepreneurship and wage employment through access to finance (grants or loans) and to provide capacity building for improved access to finance to refugees and host communities. Component three aims to rehabilitate the environment in and around refugee camps. -
“All Thieves Must Be Killed” Extrajudicial Executions in Western Rwanda WATCH
HUMAN RIGHTS “All Thieves Must Be Killed” Extrajudicial Executions in Western Rwanda WATCH “All Thieves Must Be Killed” Extrajudicial Executions in Western Rwanda Copyright © 2017 Human Rights Watch All rights reserved. Printed in the United States of America ISBN: 978-1-6231-34990 Cover design by Rafael Jimenez Human Rights Watch defends the rights of people worldwide. We scrupulously investigate abuses, expose the facts widely, and pressure those with power to respect rights and secure justice. Human Rights Watch is an independent, international organization that works as part of a vibrant movement to uphold human dignity and advance the cause of human rights for all. Human Rights Watch is an international organization with staff in more than 40 countries, and offices in Amsterdam, Beirut, Berlin, Brussels, Chicago, Geneva, Goma, Johannesburg, London, Los Angeles, Moscow, Nairobi, New York, Paris, San Francisco, Sydney, Tokyo, Toronto, Tunis, Washington DC, and Zurich. For more information, please visit our website: http://www.hrw.org JULY 2017 ISBN: 978-1-6231-34990 “All Thieves Must Be Killed” Extrajudicial Executions in Western Rwanda Map of Rubavu .................................................................................................................... I Map of Rutsiro .................................................................................................................... II Summary ........................................................................................................................... 1 Recommendations -
The Surface Investigations of the Geothermal Resources of Rwanda Have Been Carried out Along Approximately the Last 30 Years
Proceedings ARGeo-C5 2014 Arusha, Tanzania 2014 Geological and geothermal manifestation mapping in the Karisimbi prospect, Nyabihu District, North-western Rwanda Jean-Claude Ngaruye1 (1)Energy, Water and Sanitation Authority, P.O.BOX 537 KIGALI, Rwanda, Email: [email protected] Keywords: North-western Rwanda, East African Rift System, geological mapping, exploration drilling, geothermal ABSTRACT The surface investigations of the geothermal resources of Rwanda have been carried out along approximately the last 30 years. The investigations were carried out in two potential prospects which are: the young volcanic lava flows of the Virunga massif which are hosting active volcanoes in its western limb in the Democratic Republic of Congo (Nyiragongo and Nyamuragira volcanoes) and the Upper-Tertiary volcanic field of the Bugarama graben in the South- western part of Rwanda. In both domains, the geothermal manifestations are mainly hot springs, warm springs, gas- rich mineralized springs and travertine either along North-South faulted zones of the Virunga area or in the Bugarama graben. The Virunga geothermal domain was investigated in details and two exploration wells (of the three planned) were drilled. The Bugarama, Gisenyi and Kinigi prospects did not go beyond the reconnaissance phase. Sampling of cold waters, hot waters, soil gas, gasses and rock samples for their chemical analyses and interpretations, geophysical measurements using TEM, MT, passive seismicity etc. and finally the remote sensing-based geological investigations were used for the reconnaissance survey. The key outcome of these researches was that a geothermal resource may exist within the Virunga Massif and/or surroundings. A cross-check of different lithological units, tectonic features and different cones/craters was conducted from October 29th to November, 7th, 2012. -
Report 1 Preliminary Analysis and Diagnosis
Developing Rwandan Secondary Cities as Model Green Cities with Green Economic Opportunities Report 1 Preliminary Analysis and Diagnosis Musanze Secondary City, Rwanda Rwanda Country Program March 2015 Developing Rwandan Secondary Cities as Model Green Cities with Green Economic Opportunities Report 1: Preliminary Analysis and Diagnosis This document is paginated for a two-sided printing. © Republic of Rwanda Ministry of Infrastructure © Global Green Growth Institute - Rwanda Country Program 19F Jeongdong Bldg. 21-15 Jeongdong-gil Jung-gu Seoul 100-784 Republic of Korea Table of Contents Table of Figures 5 List of Tables 5 Acronyms 7 Glossary 9 Executive Summary 13 Introduction 17 1.1 Project Background and Objectives 17 1.2 Overall Activities 18 1.2.1 Urbanization and Rural Settwlement Sector Strategic Plan 2012/13-17/18 18 1.2.2 National Strategy for Climate Change and Low-Carbon Development 19 1.3 The Secondary Cities 20 1.4 Scope of the Project 20 1.4.1 Component 1 21 1.4.2 Component 2 21 1.4.3 Component 3 21 1.5 Introduction to this report 22 Quantitative and Qualitative Analysis of the District Development Level . 25 2.1 Introduction 25 2.2 National Economic Profile 25 2.2.1 Services and Infrastructure 25 2.2.2 Agriculture 26 2.2.3 Industry 27 2.2.4 Trade performance 27 2.2.5 Sustainable Tourism 27 2.3 General District Profiles 27 2.3.1 City of Kigal 30 2.3.2 Huye 30 2.3.3 Muhanga 31 2.3.4 Nyagatare 32 2.3.6 Musanze 32 2.3.7 Risizi 33 2.4 District Development Index (DDI) 33 2.4.1 Specific Methodology 33 2.4.2 Key Findings 36 2.4.3 -
Improving the Cross-Border Trade Environment
BASELINE EVALUATION Improving the Cross Border Trade Environment through Improved Research and Advocacy on Cross Border Trade Issues SEPTEMBER-OCTOBER, 2016 Theogene Mugisha, DM&E Coordinator Contacts: Narcisse KALISA Kevin OSBORNE Country Director - Rwanda Country Director - DRC Search for Common Ground Search for Common Ground Kimironko Road, Remera, Kigali 104, Avenue de la Corniche, Goma Phone: +250 785671066 Phone : +243(0)816268032 Email: [email protected] Email: [email protected] Baseline Evaluation | Improving the Cross Border Trade Environment through Improved Research and Advocacy on Cross Border Trade Issues Table of contents Acronyms ...................................................................................................................................................... 3 Executive summary ....................................................................................................................................... 4 Project Context.......................................................................................................................................... 4 Methodology ............................................................................................................................................. 5 Limitations ................................................................................................................................................ 5 Conclusions .............................................................................................................................................. -
African Development Bank
AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND Public Disclosure Authorized PROJECT: INCREASING CLIMATE CHANGE ADAPTIVE CAPACITY OF RWANDAN COMMUNITIES Increasing the adaptive capacity of vulnerable Rwandan communities to adapt to the adverse effects of climate change: Livelihood diversification and investment in rural infrastructures COUNTRY: RWANDA isclosure Authorized Public D ONEC October 2016 Table of contents Acronyms and Abbreviations .................................................................................................... ii Grant/Loan Information ........................................................................................................... iv Project Summary ................................................................................................................... viii 1. INTRODUCTION ............................................................................................................. 1 2. INITIAL PROGRAM ....................................................................................................... 1 2.1 Description and Background Information ....................................................................... 1 2.2 Project Cost and Financing Arrangements ...................................................................... 2 2.3 Status of SEAP Implementation ...................................................................................... 3 3. PROJECT REAPPRAISED .............................................................................................. 3 3.1 Rationale -
Republic of Rwanda
REPUBLIC OF RWANDA Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF AGRICULTURE AND ANIMAL RESOURCES RWANDA FEEDER ROADS DEVELOPMENT PROJECT Public Disclosure Authorized FINAL REPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR SELECTED FEEDER ROADS NYAMASHEKE DISTRICT Public Disclosure Authorized NOVEMBER, 2013 Environmental and Social Impact Assessment for Selected Feeder Roads in the District of Nyamasheke in Rwanda - Project ID: P 126498 TABLE OF CONTENTS List of Tables 4 List of Figures 5 List of Photographs 5 List of Annexure 5 Abbreviation 5 0 Executive Summary 8 PART I ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 14 1 Introduction 14 1.1 Background of the Project 14 1.2 Objective 15 1.3 Scope of Services 16 1.4 Approach and Methodology 16 1.4.1 Review of Baseline Data and Up-date 17 1.4.2 Environmental and Social Impact Assessment 19 1.4.3 Social Analysis 19 1.4.4 Environmental and Social Management Plan 20 1.4.5 Environmental and Social Monitoring 20 1.5 Liaison with Authorities 20 1.6 Format of the Report 20 2 Policy, Legal and Administrative Framework 22 2.1 National Relevant Policies and Strategy 22 2.1.1 National Environmental Policy 22 2.1.2 Water Policy 23 2.1.3 National Forest Policy 23 2.1.4 Transport Policy 23 2.1.5 National Land Policy 24 2.1.6 Public Transport Policy on Environmental Sustainability 24 2.1.7 National Development Strategy 24 2.2 Legal Instruments 25 2.2.1 Important Environmental Legislations 25 2.3 Institutional Framework/ Arrangement 20 2.3.1 Province and Districts 28 2.3.2 EIA