What Is a Smart Motorway?

Total Page:16

File Type:pdf, Size:1020Kb

What Is a Smart Motorway? What is a smart motorway? A smart motorway is a section of a motorway that deploys traffic management methods to increase capacity and reduce congestion in particularly busy areas. These methods include using the hard shoulder as a running lane and using variable speed limits to control the flow of traffic. Highways England (previously the Highways Agency) developed smart motorways to manage traffic in a way that minimises environmental impact, cost and time to construct by avoiding the need to build additional lanes. There are three types of scheme which are classed as smart motorways. What different types of smart motorway are there? The three different types of smart motorway currently include: controlled motorways, dynamic hard shoulder running schemes and all lane running schemes. All lane running schemes As the name suggests all lane running smart motorways use the hard shoulder permanently as a running lane for traffic. On Monday 14 April 2014 eight miles of the M25 between junctions 23 and 25 became England’s first smart section of motorway with traffic running permanently on a new running lane that was previously used as the hard shoulder and a further section of the M25 between junctions 5 and 6 opened a few days later. Under all lane running schemes, lane one (formerly used solely as the hard shoulder) is only closed to traffic via overhead and verge mounted cantilever signs, in the event of an incident. On these sections broken white lines between all lanes indicates that each lane has the same status. Just as in the dynamic hard shoulder schemes, overhead gantry signs display the mandatory speed limit which varies depending on the traffic conditions and speed cameras are used to enforce these. Signs can also be used to close lanes should that be required. If an incident occurs in lane one – formerly the hard shoulder – a red cross (X) symbol is displayed to let motorists know the lane has been closed to traffic. Driving in a lane under which the red X symbol is being shown is illegal and could lead to you being prosecuted. CCTV is used extensively to monitor traffic for any incidents. Should drivers break down or be involved in an accident there are emergency refuge areas at the side of the carriageway for them to use. These are typically further apart than current sections of motorway operating the dynamic hard shoulder running configuration, with an average spacing of 1.5 miles apart. Controlled motorway Controlled motorways have three or more lanes with variable speed limits, but retains a hard shoulder. The hard shoulder should only be used in a genuine emergency. Dynamic hard shoulder running schemes Dynamic hard shoulder running involves opening the hard shoulder as a running lane to traffic at busy periods to ease congestion. The scheme, which was initially developed on the M42 in the Midlands, is now in operation on sections of the M42, M1, M6, M4 and M5. On these stretches a solid white line differentiates the hard shoulder from the normal carriageway. Overhead signs on gantries indicate whether or not the hard shoulder is open to traffic. They also display the mandatory speed limit which can vary according to the traffic conditions. Speed cameras are used to enforce the variable speed limits. If an incident occurs in lane one – formerly the hard shoulder – a red X symbol is displayed to let motorists know the lane has been closed to traffic. Driving under a red X sign is illegal. The hard shoulder must not be used if the signs over it are blank or display a red X, except in the case of an emergency. MORE ADVICE: How to demist your windscreen in double-quick time CCTV is used extensively to monitor traffic for any incidents. Should drivers break down or be involved in an accident there are emergency refuge areas at the side of the carriageway for them to use. Where are smart motorways in the UK? There are a number of smart motorways currently in use and many more planned or in development. Below is an up-to-date list of the current schemes. All running lane locations M62 J18-20 M6 J10a-13 M3 J2-4a M25 J5-6/7 M25 J23-27 M1 J28-31 M1 J32-35a M1 J39-42 Controlled motorway locations M60 J8-18 M42 J3a-M40 J16 M1 J6a-10 M26 J16-23 M25 J10-16 M25 J18-10 M25 J7-8 M20 J4-7 M25 J2-3 M25 J27-30 M1 J25-28 Hard shoulder running locations M62 J25-30 M6 J8-10a M6 J5-8 M4 J19-20 M5 J15-17 M1 J10-13 M42 J3a-7 (pilot) M42 J7-9 M6 J4-5 I've broken down on a smart motorway - what do I do? If you are unlucky enough to break down or be involved in an accident while on a smart motorway, you should follow these steps: • Use an emergency refuge area (ERA) if you are able to reach one safely. These are marked with blue signs featuring an orange SOS telephone symbol on them. Different types of smart motorways have different ERA spacing, but the furthest you will be away from one is around 1.5 miles. • If you cannot get to an emergency refuge area, you should try to move on to the verge if there is no safety barrier and it is safe to do so. • In all cases, switch on your hazard warning lights. • If you stop in the nearside lane, leave your vehicle via the nearside (left hand) door if it is safe to do so and wait behind the safety barrier, if there is one. If you are unable to move over to the nearside lane, remain in the vehicle with your seat belt on. • If you can leave your vehicle safely, contact Highways England via the roadside emergency telephone provided in all emergency refuge areas. If it is not possible to get out of your vehicle safely, then you should stay in your vehicle with your seat belt on and dial '999' if you have access to a working mobile phone. For advice on what to do if you break down elsewhere you might also want to refer to our general information. .
Recommended publications
  • Basingstoke Motorway Service Area Junction 6 M3 Motorway Transport Assessment Page Left Intentionally Blank
    BA04 Basingstoke Motorway Service Area Transport Assessment BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA July 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT DOCUMENT CONTROL Job No M342 File Reference G:\workfiles\M342\REPORTS\M342-DOC06 TA.docx Name Date Initials Prepared By P Key 22.09.2017 Checked By P L S Finlayson 27.09.2017 Issue Date Comments Approved For submission of 1 29.09.2017 planning application P L S Finlayson This document has been prepared for the exclusive use of the client in connection with the project and, unless otherwise agreed in writing by PFA Consulting, no other party may copy, reproduce, make use of or rely upon its contents other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document have been provided using due care and diligence. It should be noted and is expressly stated that no independent verification of any information supplied to PFA Consulting has been made. Warning: This document may contain coloured images which may not print satisfactorily in black and white. It may also contain images originally created at a size greater than A4 which may not print satisfactorily on small printers. If copying is authorised but difficulty is incurred in reproducing a paper copy of this document, or a scaled copy is required, please contact PFA Consulting. Authorisation for reproducing plans based upon Ordnance Survey information cannot be given. © PFA Consulting Ltd 2017 i M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT CONTENTS PAGE NO.
    [Show full text]
  • Road Investment Strategy: Overview
    Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Road Investment Strategy 2: 2020-2025
    Road Investment Strategy 2: 2020–2025 March 2020 CORRECTION SLIP Title: Road Investment Strategy 2: 2020-25 Session: 2019-21 ISBN: 978-1-5286-1678-2 Date of laying: 11th March 2020 Correction: Removing duplicate text on the M62 Junctions 20-25 smart motorway Text currently reads: (Page 95) M62 Junctions 20-25 – upgrading the M62 to smart motorway between junction 20 (Rochdale) and junction 25 (Brighouse) across the Pennines. Together with other smart motorways in Lancashire and Yorkshire, this will provide a full smart motorway link between Manchester and Leeds, and between the M1 and the M6. This text should be removed, but the identical text on page 96 remains. Correction: Correcting a heading in the eastern region Heading currently reads: Under Construction Heading should read: Smart motorways subject to stocktake Date of correction: 11th March 2020 Road Investment Strategy 2: 2020 – 2025 Presented to Parliament pursuant to section 3 of the Infrastructure Act 2015 © Crown copyright 2020 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/publications. Any enquiries regarding this publication should be sent to us at https://forms.dft.gov.uk/contact-dft-and-agencies/ ISBN 978-1-5286-1678-2 CCS0919077812 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office.
    [Show full text]
  • Pfmv9 Assumptions Report
    PFMv9 Assumptions Report May 2020 © HS2 Ltd www.hs2.org.uk High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, Two Snowhill Snow Hill Queensway Birmingham B4 6GA Telephone: 08081 434 434 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2020, except where otherwise stated. Copyright in the typographical arrangement rests with High Speed Two (HS2) Limited. This information is licensed under the Open Government Licence v2.0. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ version/2 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed in Great Britain on paper containing at least 75% recycled fibre PFMv9 Assumptions Report Revision: Rev01 Contents 1 Introduction
    [Show full text]
  • Volume 7.0 M4 Junctions 3 to 12 Smart Motorway TR010019
    Safe roads, reliable journeys, informed travellers M4 junctions 3 to 12 smart motorway TR010019 7.3 Engineering and design report 5(2) (q) Revision 0 March 2015 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 7.0 Volume An executive agency of the Department for Transport HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY EXECUTIVE SUMMARY The Highways Agency (the "Agency") is making an application (the "Application") for development consent to improve the M4 motorway ("M4") to a smart motorway between junction 3 (Hayes) in west London and junction 12 (Theale), which is near Reading, (the "Scheme"). This Engineering and Design Report ("EDR") accompanies the Application and its purpose is to explain the design principles and design rationale for the Scheme. It describes how the design has been influenced by the technical and operational requirements of creating all-lane running and smart motorway infrastructure. It is similar to a Design and Access Statement ("DAS"), but provides additional Scheme-specific information beyond that usually provided for within a DAS. It also supports the environmental impact assessment of the Scheme. The Strategic Road Network ("SRN") in England comprises motorways and all-purpose trunk roads. The SRN is operated, maintained and improved in England by the Agency on behalf of the Secretary of State. The Agency is an executive agency of the Department for Transport (“DfT”). The M4 is the main strategic route between London and the west of England, and on to South Wales. The M4 currently suffers from heavy congestion between junctions 3 (Hayes) and 12 (Theale), which leads to unpredictable journey times.
    [Show full text]
  • M4 Smart Motorway Faqs
    Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway.
    [Show full text]
  • Intelligent Transport Systems in the UK
    Ref. Ares(2018)2176293 - 24/04/2018 Intelligent Transport Systems in the UK Progress Report As required by European Union Directive 2010/40/EU August 2017 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 General enquiries https://forms.dft.gov.uk Website www.gov.uk/dft Crown copyright 2017 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence v3.0. To view this licence visit http://www.nationalarchives.gov.uk/doc/open- government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. 2 Contents INTRODUCTION ................................................................................................................................... 6 1. NATIONAL APPROACH TO ITS ......................................................................................................
    [Show full text]
  • Upgrading the M4 to a Smart Motorway – Road Users’ Views May 2019 Upgrading the M4 to a Smart Motorway – Road Users’ Views
    Upgrading the M4 to a smart motorway – road users’ views May 2019 Upgrading the M4 to a smart motorway – road users’ views Foreword pgrading transport networks is welcomed by is encouraging that Highways England wants to Uusers. Unfortunately, such investment will put the road user at the heart of its thinking and, generally bring short-term disruption. specifically, to actively seek their views. Users of the M4 motorway between Reading and This initial research, summarised here, London are starting to experience such short-term paves the way for Highways England to refine pain while the road is upgraded to a four-lane smart its communications and operational activities motorway. Transport Focus is pleased to be working relating to the M4 smart motorway construction with Highways England to apply the knowledge and to provide road users with the best possible and learnings from several major rail improvement experience while these changes take place. projects to the M4 works, including the expertise Transport Focus has acquired in researching Guy Dangerfield users’ awareness and experience of, and attitudes Head of strategy towards, such major upgrade programmes. It Transport Focus Foreword ustomer service is one of our key channels, including apps and digital media, Cimperatives and a focus of the M4 team. to provide current updates about the works We continue to make progress to improve the and how they may affect these journeys. customer experience on our network but there’s Evidence shows smart motorways are just clearly more we can do, and the opportunity as safe as traditional motorways. We recognise to work with Transport Focus so closely on the however, that as well as being safe, drivers project, provides better understanding of the want to feel safe and understand how to use customer needs and where we can make the our motorways and, later this year, Highways most difference.
    [Show full text]
  • Cross Boundary Study – Easy Read Guide
    Cross Boundary Study – Easy Read Guide Overview ‘Cross Boundary’, for the purpose of this study, refers to a journey or ‘trip’ which starts in one local authority area and ends in another. Examples include someone making a journey from their home in Midlothian to their place of work in the City of Edinburgh. The SESplan Cumulative Impact Cross Boundary and Land Use Appraisal is known as the ‘Cross Boundary Study’. The Study considers how growth set out in the 2013 Strategic Development Plan, such as new housing and employment, will impact on transport movements crossing Local Authority boundaries within the region. The key components of the Cross Boundary Study are: • To predict transport impacts from journeys which cross Local Authority boundaries and are predicted to occur as a result of development from the 2013 Strategic Development Plan; • To identify possible transport interventions which could resolve these transport impacts; • To set out the type and likely scale of these interventions; and • To understand how effective these interventions would be. This information will be used by SESplan in the creation of a developer contribution mechanism for the region. The developer contribution mechanism is a way to gather money from developers to contribute towards the cost of the transport interventions required as a result of their development. It will take the form of Supplementary Guidance referred to as the Cross Boundary Transport Contributions Framework in SESplan’s Proposed Strategic Development Plan. The Study Team The Study was prepared by a team of transport and planning consultants employed by Transport Scotland. In preparation of the study Transport Scotland, the consultants, SESplan, SEStran and the six member local authorities have worked together.
    [Show full text]
  • M4 Smart Motorway Roadworks May 2019 – Qualitative Research
    M4 SMART MOTORWAY UPGRADE PROJECT QUAL REPORT M4 Smart motorway roadworks May 2019 – qualitative research 1 M4 SMART MOTORWAY UPGRADE PROJECT QUAL REPORT Contents 1. Methodology and sample 2. Wider road use context 3. Understanding the M4 smart motorway upgrade and roadworks Understanding the impact of changes to the motorway during roadworks • Car and motorcycle drivers 4. • Disabled drivers • HGV and commercial drivers 5. Phasing and stakeholders 6. Information and communication needs 7. Conclusions 8. Research timings and next steps This research was conducted by Populus Ltd, an independent market research agency 2 2 M4 Smart motorway roadworks May 2019 – qualitative research SECTION 1 Methodology and Sample 3 M4 Smart motorway roadworks May 2019 – qualitative research SECTION 2 Wider Road Use Context 5 M4 Smart motorway roadworks May 2019 – qualitative research Driving on the M4 is part of everyday life for most people • Whether a short cut around town, the journey to school drop off or work, a long distance leisure trip or HGV delivery, the M4 is a familiar feature of our audience’s travel habits • As such roadworks and changes to the motorway have a direct impact on drivers and they are keen to understand how their driving experience will be affected • What’s more, many drivers (especially non- professional drivers) admit that they currently have low awareness of how to drive correctly through roadworks or on smart motorways 6 M4 Smart motorway roadworks May 2019 – qualitative research People have a specific relationship with motorways which affects their expectations of the M4 upgrade works • Driving is a direct, personal experience - you are in control (e.g.
    [Show full text]
  • Road Investment Strategy
    RIS investment plan commitments Road Investment Strategy: Investment Plan - list of commitments Expected Status in Expected Scheme name Map Key Region Scheme Description First announced cost Investment Plan start date category A1: Jn 67 (Coal House) to Jn 71 ( Metro Centre): increasing Yorkshire & lane capacity from two to three lanes in each direction within A1 Coal House to Metro Centre A1 Under Construction Autumn Statement 2012 £250-500m Already Started North East the highway boundary; creating parallel link roads between the Lobley Hill and Gateshead Quay junctions A1: Jn 51 (Leeming) to Jn 56 (Barton): upgrading to three lane Yorkshire & motorway standard completing the remaining non motorway A1 Leeming to Barton A2 Under Construction Autumn Statement 2012 £250-500m Already Started North East section on the strategic M1/A1(M) route between London and Newcastle Yorkshire & M1: Jn 39 (Denby Dale) to Jn 42 (M62 interchange): upgrading M1 Junctions 39-42 A3 Under Construction Spending Review 2010 £100-250m Already Started North East to Smart Motorway including hard shoulder running Yorkshire & M1: Jn 32 (M18 interchange) to 35a (A616): upgrading to M1 Junctions 32-35A A4 Under Construction Spending Review 2010 £50-100m Already Started North East Smart Motorway including hard shoulder running A19: (A1058 junction): upgrading the existing grade separated roundabout to a three level interchange to increase capacity Yorkshire & Committed - previously Early Road A19 Coast Road A5 and improve safety; together with the A19 Testos, raises the
    [Show full text]
  • Designing Smart Motorways Nic Bowler 1Arup, 13 Fitzroy St, London, W1T 4BQ
    Contemporary Ergonomics and Human Factors 2019. Eds. Rebecca Charles and David Golightly. CIEHF Designing Smart Motorways Nic Bowler 1Arup, 13 Fitzroy St, London, W1T 4BQ ABSTRACT The AmeyArup collaborative design team were commissioned by Highways England to design two new Smart Motorways schemes on the M1 motorway between junctions 13-16 and 23a-25. The human factors (HF) team from Arup proved the value that could be added to the final product early in the project tender and scoping phases, including the added benefit of helping Highways England achieve their strategic aims of improved customer experience, road user safety and service delivery. This led to HF professionals being included in a smart motorways design team for the first time. As the application of a HF approach was novel to smart motorways design, there was little direction or standards to follow for its integration into the design process. The HF team had to explore methods of integrating with the variety of design disciplines and immersed themselves in various relevant design meetings. The team applied a user-centred approach to the design of all infrastructure and assets requiring human interaction. This involved ensuring the needs of all users - including customers, operators and maintainers - were considered at the beginning of the design process and that these groups were consulted during design development. The aim was to ensure the new smart motorway met user needs and enabled them to carry out their intended actions safely. The HF team identified 125 issues that were progressed to closure and accommodated 114 user-specified requirements in the designs.
    [Show full text]