M4 Upgrade to Smart Motorway Junctions 3 To12

Total Page:16

File Type:pdf, Size:1020Kb

M4 Upgrade to Smart Motorway Junctions 3 To12 M4 upgrade to smart motorway junctions 3 to 12 Project newsletter – Summer 2019 The M4 is the main strategic route Work to deliver 32 miles of new smart motorway between London, the west of England started a year ago and activity is now underway and Wales. It connects people, all along the route including preparatory work communities and businesses, carrying on structures and verges, installation of new on average 130,000 vehicles per day technology and construction work on the and is prone to congestion. Highways carriageway. We are making excellent progress England is improving the M4 between on the western section between junctions 8/9 junction 3 at Hayes and junction 12 to 12 and have recently started work on the at Theale by upgrading it to a smart eastern part of the scheme with the first bridge motorway. replacements starting in the autumn. From Spring 2022, the completed smart motorway will increase capacity, reduce congestion and deliver more reliable journeys. The M4 “One year on since work began, the project team is making great progress in upgrading The M4 forms a vital part of our road network, the M4 to a smart motorway between junctions linking London to Wales. As well as London, 3 and 12. This huge scheme is boosting other urban areas in the region rely on junctions economic development now by providing 3 to 12 for connectivity, including Reading, hundreds of jobs on site including many Maidenhead, Windsor, Slough and Hayes. graduates and apprentices. Once complete that Other transport hubs and tourist attractions economic boost will continue through tackling also rely on this stretch of the M4, for example congestion and improving journey times for the Heathrow Airport, Windsor Castle and 130,000 drivers using the route each day. Legoland. It is a vital transport link for the local area and the UK as a whole. “Our works are well underway up and down the route and we’re about to get started on several The M4 dates back to 1959 when the first complex bridge structures, including widening section opened as the Chiswick Flyover at what the New Thames Bridge at Bray and replacing is now junction 1. In 1961 the Maidenhead 11 other bridges. We are working closely with bypass opened, part of which would become our stakeholders across the region to keep the M4, then junctions 1 to 5 in 1965. Various them informed of our plans and to ensure that sections of motorway roads were built from we remain sensitive to all road users. Our free then until the English M4 in its current form was breakdown recovery service is in operation completed in 1971, followed by the Welsh M4 throughout the roadworks and we’re making in 1993. The smart motorway between junction sure all road users stay safe and well during 3 to 12 is the next step in the evolution of the their journeys. We’d like to thank everyone for M4 and is part of the Government’s smart their patience during our works and we look motorways programme. forward to leaving a great legacy that will bring Highways England Delivery Director Mike Grant benefits for all.” says: The timetable The smart motorway will be complete and open for traffic by Spring 2022. We have so far completed about 15% of our work and we aim to open the western section between junctions 8/9 and 12 in stages during 2021. A40 N M40 4 lane smart motorway A404 5 lane smart motorway A40 M25 A406 Hillingdon A40 Maidenhead Slough A308(M) 7 M4 Hayes Southall Ealing A404(M) 6 8/9 4 M4 5 4b 3 A4 Twyford Windsor M4 Heathrow Airport London M4 Hounslow Reading A30 M4 Feltham A316 A3290 12 A308 A33 10 Egham Theale A329(M) M25 M4 Bracknell A308 11 Wokingham M3 Surbiton A332 M3 Weybridge A33 M25 Camberley A3 A243 2 GFD19_0125 © Crown copyright and database rights 2019 OS 100030649 Major milestones ahead Marsh Lane overbridge will be demolished in mid-November. The M4 between junctions 6 Alongside the work taking place on the and 8/9 will be closed over the weekend of motorway itself, preparatory work is underway 15 - 18 November 2019 for this. Local traffic will on several bridges to create space for the smart be diverted via Lake End Road overbridge until motorway. This includes the New Thames the new Marsh Lane bridge is complete towards Bridge at Bray which is being widened to the end of 2020. accommodate the completed smart motorway. A pontoon is in place to divert the footpath Monkey Island Lane overbridge preparation ahead of main work starting in 2020. work is well underway – construction of the new bridge will begin during the mid-November The replacement of several bridges also starts closure and the existing structure will remain in in Autumn 2019. place until the replacement is ready. Recreation Ground Road overbridge, primarily Huntercombe Spur overbridge at junction 7 will a pedestrian and cycle route linking Datchet be demolished the weekend of 29 November to Upton Court Park, will be demolished in late - 2 December 2019, and the M4 between September. The M4 between junctions 5 and junctions 6 and 8/9 will again be closed over 6 will be closed over the weekend of 27 - 30 the weekend. A temporary overbridge will be September 2019 for this activity. The new bridge in place throughout the construction process. will be in place by Summer 2020. Weekend This will be installed during the weekend closure A40 closures start at approximately 20:00 on the of 15 - 18 November 2019 so that there will be Friday and finish by 06:00 on the Monday. M40 4 lane smart motorway A404 minimal interruption to traffic on the junction. 5 lane smart motorway A40 M25 A406 12 No through junction running Hillingdon A40 Maidenhead N Marsh Lane Huntercombe Spur overbridge overbridge A308(M) Slough A404(M) 7 M4 Hayes Southall Ealing 6 8/9 New Thames 4b 4 3 Bridge at Bray 5 Monkey Island A4 Lane overbridge Twyford Windsor Recreation Heathrow London M4 River Ground Road Airport Thames overbridge Hounslow Reading A30 M4 Feltham A316 A3290 12 Egham A308 A33 10 A329(M) Theale M25 3 M4 Bracknell A308 11 Wokingham M3 Surbiton A332 M3 Weybridge A33 M25 Camberley A3 A243 GFD19_0125 © Crown copyright and database rights 2019 OS 100030649 What is a smart motorway? Smart motorways are a technology driven All lane running approach to the use of our motorways, The hard shoulder will be permanently increasing capacity and relieving congestion converted into a traffic lane. while maintaining safety. Drivers should obey all signs, including Smart motorways help make journey times more speed limits and lane closure instructions reliable, at less cost than traditional widening and should not stop on the motorway schemes, meaning better value for the tax except in an emergency. payer. Emergency areas Key features of a smart motorway include: There will be highly visible emergency Variable mandatory speed limits areas. Speed limits will be set to smooth traffic There will be an emergency telephone in flows. each emergency area. The limits will be clearly displayed on This will connect you to Highways overhead gantries and roadside signs. England’s Regional Control Centres and will pinpoint your location. Signs will be used to inform drivers of conditions on the network and when variable speed limits are in place. new gantries new signals new CCTV cameras traffic monitoring emergency areas radar detector message signs speed limit enforcement camera lower noise surfacing signs concrete barriers under carriageway ducts technology ducting 4 Driving safely through our What if I break down in the roadworks? roadworks If you can’t reach a motorway service area or leave the motorway at the next junction: We understand that roadworks can be frustrating, but they are an essential element of All traffic passing through road works is any road upgrade project. We plan our work monitored by our 100% CCTV coverage so it takes place in the safest and most cost- 24hrs a day, every day. This allows us effective way, with minimum disruption to road to react quickly to breakdowns and users. motorway obstructions occurring within our roadworks. The traffic management we have installed on the M4 consists of 3 narrow lanes plus signs If for any reason your vehicle breaks down, and signals to keep you informed of planned put your hazard warning lights on to help work. To ensure the safety of road users and other drivers to see you and to help our our workforce, there is currently a 50mph speed control room staff spot you on CCTV. limit through the works. Automatic Number If you are in the left-hand lane and it is safe Plate Recognition (ANPR) cameras monitor to do so, leave your vehicle through the the average speed of traffic over a section of left-hand door and wait behind the barrier road, or network of roads. It is used in the UK, if possible. If you can’t get out stay inside including on the M4, to control speeds and to your vehicle and await assistance. Please safely manage vehicle traffic speeds through remember to keep your seat belt on and roadworks where we have put in narrow lanes. dial ‘999’ if there is an emergency. The 50mph speed limit through our roadworks We provide free roadside recovery in the is legally enforceable so please do not exceed roadworks so you will be picked up by our this as you may receive a penalty notice. Just recovery teams and your car will be taken because workers aren’t visible, it doesn’t mean to a suitably safe place to be attended to.
Recommended publications
  • Basingstoke Motorway Service Area Junction 6 M3 Motorway Transport Assessment Page Left Intentionally Blank
    BA04 Basingstoke Motorway Service Area Transport Assessment BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA July 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT DOCUMENT CONTROL Job No M342 File Reference G:\workfiles\M342\REPORTS\M342-DOC06 TA.docx Name Date Initials Prepared By P Key 22.09.2017 Checked By P L S Finlayson 27.09.2017 Issue Date Comments Approved For submission of 1 29.09.2017 planning application P L S Finlayson This document has been prepared for the exclusive use of the client in connection with the project and, unless otherwise agreed in writing by PFA Consulting, no other party may copy, reproduce, make use of or rely upon its contents other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document have been provided using due care and diligence. It should be noted and is expressly stated that no independent verification of any information supplied to PFA Consulting has been made. Warning: This document may contain coloured images which may not print satisfactorily in black and white. It may also contain images originally created at a size greater than A4 which may not print satisfactorily on small printers. If copying is authorised but difficulty is incurred in reproducing a paper copy of this document, or a scaled copy is required, please contact PFA Consulting. Authorisation for reproducing plans based upon Ordnance Survey information cannot be given. © PFA Consulting Ltd 2017 i M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT CONTENTS PAGE NO.
    [Show full text]
  • Road Investment Strategy: Overview
    Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Appendix 1 I.01: DEPARTMENT for TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview
    Appendix 1 I.01: DEPARTMENT FOR TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The Strategic Vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Road Investment Strategy 2: 2020-2025
    Road Investment Strategy 2: 2020–2025 March 2020 CORRECTION SLIP Title: Road Investment Strategy 2: 2020-25 Session: 2019-21 ISBN: 978-1-5286-1678-2 Date of laying: 11th March 2020 Correction: Removing duplicate text on the M62 Junctions 20-25 smart motorway Text currently reads: (Page 95) M62 Junctions 20-25 – upgrading the M62 to smart motorway between junction 20 (Rochdale) and junction 25 (Brighouse) across the Pennines. Together with other smart motorways in Lancashire and Yorkshire, this will provide a full smart motorway link between Manchester and Leeds, and between the M1 and the M6. This text should be removed, but the identical text on page 96 remains. Correction: Correcting a heading in the eastern region Heading currently reads: Under Construction Heading should read: Smart motorways subject to stocktake Date of correction: 11th March 2020 Road Investment Strategy 2: 2020 – 2025 Presented to Parliament pursuant to section 3 of the Infrastructure Act 2015 © Crown copyright 2020 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/publications. Any enquiries regarding this publication should be sent to us at https://forms.dft.gov.uk/contact-dft-and-agencies/ ISBN 978-1-5286-1678-2 CCS0919077812 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office.
    [Show full text]
  • Pfmv9 Assumptions Report
    PFMv9 Assumptions Report May 2020 © HS2 Ltd www.hs2.org.uk High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, Two Snowhill Snow Hill Queensway Birmingham B4 6GA Telephone: 08081 434 434 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2020, except where otherwise stated. Copyright in the typographical arrangement rests with High Speed Two (HS2) Limited. This information is licensed under the Open Government Licence v2.0. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ version/2 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed in Great Britain on paper containing at least 75% recycled fibre PFMv9 Assumptions Report Revision: Rev01 Contents 1 Introduction
    [Show full text]
  • M5 Oldbury Viaduct Traffic Management Study Executive Summary
    M5 Oldbury Viaduct Traffic Management Study Executive Summary Oldbury and Park Street viaducts carry approximately 3km of the elevated sections of the M5 to the west of Birmingham between junctions 1 and 2. Constructed in 1970, it has deteriorated in recent years and has seen increased emergency interventions (55 in 2016). Therefore we need to repair and upgrade sections now in order to prevent bigger challenges and further disruption in the future. By maintaining this key corridor we’re delivering a huge investment that will support economic growth locally and in the wider West Midlands. Once complete, customers will benefit from a safer, more resilient route and enhanced driver experience. Other planned interventions on the strategic network in coming years include HS2, M6 J10 redesign, and on the local network, proposed Birchley island project and M5 junction 1 redesign. Therefore, we have a window of opportunitybetween April 2017 and autumn 2018 to complete this work at M5 Oldbury Viaduct. This section of the M5 motorway is particularly busy, carrying both local and strategic south-west and south-east to north-west traffic, with seasonal peaks. It is a commuter hub with traffic joining with the M6, other roads into and out of the Birmingham hub, and other cities in the region. Our engineers advised that in order to carry out the work safely, the carriageway would have to be treated in sections under traffic management. Four options were progressed to the modelling stage to understand impact and we chose the one that was safest, offered most value for money and most appropriate timeline.
    [Show full text]
  • Volume 7.0 M4 Junctions 3 to 12 Smart Motorway TR010019
    Safe roads, reliable journeys, informed travellers M4 junctions 3 to 12 smart motorway TR010019 7.3 Engineering and design report 5(2) (q) Revision 0 March 2015 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 7.0 Volume An executive agency of the Department for Transport HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY EXECUTIVE SUMMARY The Highways Agency (the "Agency") is making an application (the "Application") for development consent to improve the M4 motorway ("M4") to a smart motorway between junction 3 (Hayes) in west London and junction 12 (Theale), which is near Reading, (the "Scheme"). This Engineering and Design Report ("EDR") accompanies the Application and its purpose is to explain the design principles and design rationale for the Scheme. It describes how the design has been influenced by the technical and operational requirements of creating all-lane running and smart motorway infrastructure. It is similar to a Design and Access Statement ("DAS"), but provides additional Scheme-specific information beyond that usually provided for within a DAS. It also supports the environmental impact assessment of the Scheme. The Strategic Road Network ("SRN") in England comprises motorways and all-purpose trunk roads. The SRN is operated, maintained and improved in England by the Agency on behalf of the Secretary of State. The Agency is an executive agency of the Department for Transport (“DfT”). The M4 is the main strategic route between London and the west of England, and on to South Wales. The M4 currently suffers from heavy congestion between junctions 3 (Hayes) and 12 (Theale), which leads to unpredictable journey times.
    [Show full text]
  • M4 Smart Motorway Faqs
    Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway.
    [Show full text]
  • Highways England Annual Report and Accounts 2015-2016
    Highways England Annual Report and Accounts 2015-2016 Highways England Annual Report and Accounts 2015-2016 Presented to the House of Commons pursuant to Section 7 of the Government Resources and Accounts Act 2000 Ordered by the House of Commons to be printed 13 July 2016 HC 529 © Crown copyright 2016 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: [email protected]. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/government/publications Any enquiries regarding this publication should be sent to us at: [email protected] Print ISBN 9781474134279 Web ISBN 9781474134286 ID 2815682 07/16 Printed on paper containing 75% recycled fibre content minimum Printed in the UK by the Williams Lea Group on behalf of the Controller of Her Majesty’s Stationery Office Contents Our role and how to contact us 6 Section 1 Chairman’s statement 7 Section 2 Chief Executive’s review 9 Strategic report Section 3 Overview A snapshot of our performance against our KPIs 12 Performance headlines 13 Section 4 Making our network safer 14 Section 5 Improving customer service Customer satisfaction 17 A better maintained network 19 A free-flowing network 22 An accessible and
    [Show full text]
  • Bus Facilities on the Strategic Road Network Demonstration Project: Stakeholder Engagement Report by Campaign for Better Transport for Transport Focus
    Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report by Campaign for Better Transport for Transport Focus March 2019 Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report by Campaign for Better Transport for Transport Focus March 2019 CONTENTS Executive Summary Full report 1. Introduction 2. Methodology Our approach Stakeholder identification and contact Workshops Online survey Other submissions 3. Stakeholder views Common themes M32 case study A27 case study 4. Conclusions and next steps Lessons learned Key messages Next steps Appendices 1. List of participant groups 2. Examples of awareness raising materials 3. Workshop materials 4. Workshop notes 5. Survey questions and responses 6. Other submissions 1 Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report: Executive Summary Campaign for Better Transport has been commissioned in partnership with Transport Focus to collect stakeholder views on the priorities and opportunities for improving bus facilities on the Strategic Road Network to inform Highways England. This report records how the engagement with stakeholders was undertaken, and the responses received. Having captured their feedback, the report sets out some of the key issues identified by stakeholders, including challenges to be addressed, and opportunities to deliver improvements. It contains full reports of the stakeholder workshops and responses from the online surveys together with some additional individual submissions. This stakeholder engagement is part of a larger demonstration project commissioned by Highways England looking at two locations, to identify issues affecting bus and coach operation on the strategic road network to inform future investment. Methodology We contacted a wide range of local stakeholders in both case study areas and invited them to participate in a workshop held in January 2019 in the local area.
    [Show full text]
  • HIGHWAYS ENGLAND Asset Management Development Group
    HIGHWAYS ENGLAND Asset Management Development Group ASSET DATA MANAGEMENT MANUAL Part 2 – Requirements and Additional Information October 2020 Version: 12.0 Asset Data Management Manual Page 1 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information This page is intentionally left blank. Asset Data Management Manual Page 2 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information Revision Sheet For revisions across all ADMM documents see the Revision Log available on Standards for Highways: http://www.standardsforhighways.co.uk/ha/standards/admm/index.htm Version Date Issued 3.0 April 2016 4.0 September 2016 5.0 March 2017 6.0 September 2017 7.0 March 2018 8.0 October 2018 9.0 April 2019 10.0 October 2019 11.0 April 2020 12.0 October 2020 Asset Data Management Manual Page 3 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information Contents Contents……… ......................................................................................................... 4 Foreword…….. .......................................................................................................... 9 Part 2.1 – GENERIC ASSET DATA REQUIREMENTS .......................................... 12 1 Asset Data Lifecycle Requirements ......................................................... 13 1.1 Capture or Update ....................................................................................... 13 1.2 Store ...........................................................................................................
    [Show full text]
  • M180/M181 A180/A160 Investing in Our Road Network
    M180/M181 A180/A160 Investing in our road network We’ll be working on the M180 At Highways England we believe in a of Immingham which plays a key role in the long- connected country and our network term growth of the economy and provides essential access to global markets. makes these connections happen. Our improvements include vital repairs to the surface We strive to improve our major roads and motorways on the M180 and A180, bridge maintenance and – engineering the future to keep people today and improvements to junction 5 of the M180. moving better tomorrow. We want to make sure all We’re working closely with North Lincolnshire our major roads are more reliable, durable and, most Council to unlock jobs and homes in the Scunthorpe importantly, safe and that’s why we’re investing more area. The Lincolnshire Lakes development one of the than £5 million improving our network in this area. largest residential developments, not just in Yorkshire We’re carrying out a range of improvements along and the Humber region but in the whole of the UK the M180, M181, A180 and A160 over the next 12 and will create new homes, a business park and months to ensure we make the road safer and office accommodation. provide better journeys for drivers and residents. A new M181 junction will be created to improve By improving safety and creating smoother journeys access routes to the motorway and make the area we’ll create better links for those travelling to the Port more accessible as a place to live, visit and work.
    [Show full text]