s y Aatmanirbhar Bharat a has become a mantra for 130 crore Indians today. y of Railw

Narendra Modi Ministr Prime Minister BUILDING AN AATMANIRBHAR BHARAT D E C E M B E R 2 0 2 0 Achievements of Ministry of Railways Lifeline of the nation in times of COVID-19 Converted 5,601 coaches to serve as COVID care centres

PM Garib Kalyan Earmarked 5,000 beds in 17 dedicated Rojgar Abhiyaan: hospitals Over 14 lakh mandays employment Shramik Special started from 33 isolated hospital blocks also generated Shramik Diwas (1st May 2020) reserved for COVID care Unveiled the world’s rst Covid- Safe 4,621 Shramik Special trains operated coach with signicant design improvements for post Covid travel 63.1 Lakh migrant workers ferried Railways turns crisis into opportunity 1.85 Cr meals distributed 2.21 water bottles Cr supplied for free

02 03 Railways Spreading Engine of connectivity Goodwill during 958 Special trains, 618 Festival trains, 3,936 Suburban, 264 COVID-19 Metro, 138 Passenger trains started

Achievements in Make in Supplied essential commodities - 5.5 Lakh Coveralls of PPEs foodgrains, coal, Time tabled Parcel trains started and 1.4 Lakh litres of sanitizer petroleum, fertiliser and carried 6.4 Lakh Tonnes from 1st Apr iron ore among others 2020 to 15th Dec 2020 20 Lakh reusable face covers

Record loading of foodgrain Developing Infrastructure (1st Apr 2020 to 30th Nov 2020) completed 350 major works Cr 4.4 Tonnes to improve safety and speed 2020 Cr 2.4Tonnes 2019

04 05 2018-19

1,013 Rail 2019-20 Suraksha 1,367 Bridges Rehabilitated Best ever Safety Increased by 35% Performance: Zero passenger Track Renewal Fatality since Apr 2019 Arrears reduced drastically 1st time ever in history of Launched ‘CORAS’ - Commandos for Railway 1,274 Security

132 stations provided CCTV 631 based surveillance system Elimination of Manned during 2019-20 Level Crossing Gates Accelerated by 102% Total 635 stations provided 2018-19 2019-20 with CCTV system so far

06 07 1,458 Infrastructure Km/year North East: For a Better Connecting THE

Tomorrow 375 Seven Sisters Km/year CAPEX of ` 6,45,600 Cr in 2014-20 112 km long Agartala-Sabroom has surpassed the cumulative 4 Times Increase in rail line in completed investment made in 60 years from Commissioning of 45 km long doubling project from 1951 to 2014 (` 4,95,958 Cr) Doubling Works 2009-2014 2014-2020 Lumding to Hojai completed 32 projects of 1,353 km length completed Migration from traditional 1x25 kV to 2X25 kV traction on Golden Quadrilateral / Golden Diagonal routes Already functional in Bina-Katni- Bishrampur section and DFCs New - Mumbai and - to be completed by 2024

08 09 Aatmanirbhar Increase in Rolling Stock Production Bharat 605 नये भारत क ताकत, 2018-2019

आनभर भारत 784 2019-2020 Electric Locomotives Production Increased by 30% Policy change in procurement: More Procurement for 44 rakes of Vande Bharat Trains initiated than 95% of 4,429 components to be sourced indigenously 2018-2019 Components Enhanced Enhancement of Axle capacity of Rail 6,277 Wheel Factory (RWF) to reduce import Gearing up exports 2019-2020 dependence , LHB Coaches Production has exported 7 diesel locomotives Increased by 42% to Sri Lankan Railways

10 11 Swachh Rail 13,687 Green Railways rkm Swachh Bharat

100% coaches tted 3,038 with bio-toilets rkm Electrication Work Increased by 4.5x 2009-14 2014-19 Integrated mechanized cleaning now provided at 57 Made in India 12,000 HP 953 stations electric locos delivered

Commissioned 105.7 MW power Solar plants over rooftops of 960 major Railway Buildings

103.4 MW Wind power also commissioned

12 13 Skilling Dedicated Freight India Corridor on Track

National Rail & Transportation 306 km long Rewari-Madar Institute - a Deemed to be section in Western DFC University & Institute of National completed Importance 351 km long Khurja-Bhaupur section in Eastern DFC Classes commenced in 2018 completed

Benets of DFC : 200 students from 20 states & UTs Rapid, Seamless and Easier ow of goods

2 programs (3 year B.Sc & BBA) Economic Development and Job Creation by connecting factories and farms to ports

14 15 Fast Track Freight on Freight rates rationalised Freight Front Foot Removed 15% Busy Season Surcharge

Removed 5% supplementary charge on 45.63 km/h two point combinations and Mini rake 12,649 23.61 km/h 2018-19 Reduction in rate class of Industrial Salt Freight speed 15,447 E-Payment Facility introduced 2019-20 almost doubled 1,268 Freight Customers are now Nov 2019 Nov 2020 Induction of New Wagons Increased by 22% availing e-payment facility Higher speeds institutionalised All private sidings permitted in Time Table Concessions approved to become private freight terminals Timetable to incorporate separate Long lead: 15 to 20% on Coal, Iron freight & maintenance corridors ore and Finished steel Automobile transport for Export to through New Modied Goods (NMG) rakes started Short lead: 10 to 50% on all cargo 11.0 Cr (except Coal and Iron ore) Tonnes Policy for development of Goods sheds Container trafc: 5% on loaded 10.1 Cr Tonnes through private investment issued and 25% on empty Freight Loading Increased by 9% Fly ash: 40% Nov 2019 Nov 2020 Youtube Videos 16 17 Prosperity Continue Budget 2020 - ‘Kisan Rail’ to be set-up for a 2 Tejas trains with modern passenger amenities in farms with seamless national cold supply chain for to making introduced in Delhi-Lucknow and Mumbai- Kisan Rail perishables, inclusive of milk, meat and sh, Passengers smile Ahmedabad routes through PPP arrangement Vistadome Coaches panoramic Second with modern First service agged-off in Aug 2020 -Deolali transparent coaches deployed in passenger amenities inducted in regular service to Danapur - as pilot project covering mountainous tourist destinations for between New Delhi and Katra , Madhya Pradesh, enhanced experience - 31 coaches in use and 134 new trains introduced, services of 118 trains extended and frequency of 22 train services Now extended to on demand increased

7 more Kisan Rails started Special trains operated for Ganpati festival, JEE/NEET exams and NDA & Naval academy 50% concession on transport of notied fruits exams as per demands in coordination with State and vegetables in Kisan Rail Governments in August & September

Protein Container Special Started Clone Trains introduced as part of the strategy to 144 trips done (Dadri to JNPT/Mundra/Pipavav) meet the unmet demand on certain sectors (Apr-Jul 2020) 20 pairs of special trains introduced as clones of highly patronized trains with high waitlists

18 19 Platforms Public-Private- 5,891 Stations provided with high speed of Progress free Wi-Fi so far (4,411 stations in 2019-20) Partnership

835 Railway stations were provided with in Operations improved illumination levels similar to Airport Standards during 2019-20 151 modern trains (Rakes) over 109 routes on PPP mode Ease of Ticketing IRCTC-SBI Rupay Card launched on 28 Jul Improved technology 2020 for savings to frequent Rail travellers, transaction fee waivers and delightful Reduced transit time; better travel shopping experience experience to passengers Private Investment in Rail sector Upgradation and Modernization of ~ ` 30,000 Cr expected Ayodhya Railway Station New station building, 2 modern foot over bridges, platform improvement and development of circulating areas to be done at the cost of ` 105 Cr. Project to be completed in 2020-21

20 21 Vikas ki Rail

Inauguration of Kosi Rail Mega Bridge to -New Delhi improve Railway connectivity in Bihar set a record by running at a speed of 130 kmph for the rst time 12 projects worth about ` 2,720 Cr inaugurated between Patna to New Delhi under in Bihar, including new rail line, electric loco the "Mission Raftaar" of Railways shed, gauge conversion and electrication

22 23 Nimble Railways Transparency & IREPS & GeM Integration Fast Railways Integration of Indian Railway Electronic Accountability Procurement System (IREPS) with Government e-Marketplace (GeM) will Rail Drishti: be completed soon Portal providing public access Restructuring of Railway Board to Railway key performance Retain best features of both on Functional Lines completed indicators of Railways Usher in a new era of transparency & Railway Board now has digitisation in the procurement CEO cum Chairman Railway Board Development of wider vendor base and supply ecosystem 4 Members on Functional Lines instead of 8 Members on Conducted computer based test for open Transition of Indian Railways departmental basis market recruitment for more than 1.4 Lakh procurement (` 70,000 Cr) to GeM vacancies involving 2.56 Cr candidates Single Service approved Indian Railway Management Launched Human resource Management e-Reverse Auction now Service (IRMS) instead of Services for benet of 12 Lakh railways the default mode of existing 8 employee tendering for tenders for procurement of goods valuing more than ` 5 Cr 24 25