NORTH CENTRAL RAILWAY

Shri Hon'ble Prime Minister

HAMIRPUR PARLIAMENTARY CONSTITUENCY , the most populous state of the nation, is served by North Central Railway along with Northern, North Vinay Kumar Tripathi Eastern and East Central Railways. (IR) plays a General Manager very important role in development of the state and provide North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers-with in it, which is 14% of entire Indian Railways network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed , which initially ran between and . It has now been extended upto - a move that will boost tourism in region of Uttar Pradesh. After Gatiman, the nation's first engineless semi high speed train set "" which is running from to is also serving the state of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last seven years with 461% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be matter of past and a new Railway equipped with state-of-the art facilities will be able to serve the citizens in a better manner and provide them enhanced value for their money. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the HAMIRPUR constituency of Uttar Pradesh in last seven years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN HAMIRPUR PARLIAMENTARY CONSTITUENCY

HAMIRPUR PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS: Hamirpur, Rath, , , Tindwari

B. WORKS COMPLETED IN LAST SEVEN YEARS 1. INFRASTRUCTURAL DEVELOPMENT Electrification GElectrification of Bhimsen to Khairar section at a cost of Rs.116.86 crore. GElectrification of Jhansi to Manikpur section at a cost of Rs 287.91 crore. LHS/RUB/ROB IN LIEU OF: GLevel Crossing no. 438 between Baripura- stations. GLevel Crossings no. 411 between Belatal- station. GLevel Crossings no. 413 between Belatal-Kulpahar station. GLevel Crossings no. 415 between Charkhari-Kulpahar station. GLevel Crossing no. S-30 between Ingohta Bharuwa Sumerpur stations. GLevel Crossing no. S-33 between Bharuwa Sumerpur-Jamuna south bank stations. GLevel Crossing no. S-34 between Bharuwa Sumerpur-Jamuna south bank stations GLevel Crossing No. 402 between Gutai and Harpalpur station. GLevel Crossing No. 405 between Gutai and Belatal station. GLevel Crossing No.431 between Mahoba and Baripura station. GLevel Crossing No.S-4 between Khairar Jn and Ichauli station. GLevel Crossing No. S-14 between Akona and Ragaul station. GLevel Crossing No. S-13 between Akona and Ragaul station. Yard Remodeling GExtension of loop line to 715 meter at Ragual.

2. IMPROVEMENTS IN PASSENGERS AMENITIES : GPassenger Reservation System provided at Bharuwa Sumerpur. GIncrease in level of platforms at Bharuwa Sumerpur . G Development of Kulpahar as Adarsh station. GProvision of platform shelters at Mahoba station. GToilets for Divyang passengers at Mahoba station. GMechanized Cleaning contract awarded at Mahoba. GOne water vending machine installed at Mahoba station. G03 Automatic ticket vending machine installed at Mahoba station. GMahoba station certified as ISO 14001 : 2015. GWi-fi facility at Mahoba, Belataal, Kabrai.

C. OTHER DEVELOPMENTS: New G12447/12448 - Uttar Pradesh 6 days a week to daily at Mahoba station.

D. ON-GOING WORKS: GDoubling works between Jhansi-Manikpur & Bhimsen-Khairar (425 km) with the total cost Rs.4955 Cr. GElectrification work between Mahoba-Udaipura (196 kms) with the total cost Rs.200.76 Cr. Passenger Amenities GProvision of 387 steel benches and 199 steel dustbins. GProvision of manual Public Address system at Akona & Ichauli GExtension of PF No. 1&2 for handling 24/26 coach trains with PF shed at Hamirpur & Ragaul. GProvision of RCC over head water storage tank & bore wells at Mahoba. Inauguration of Automatic Ticket Vending Inaugural function of ATVM Machine and Water Vending Machine at Mahoba and WVM at Mahoba Station

Inauguration of Ticket Booking Counter at Naugaon Post Office

Window Ticket Counter at Mahoba Station