Dlrcc Traffic News
Total Page:16
File Type:pdf, Size:1020Kb
DLRC C TRAFFIC NEW S Saturday, 27th January 2018 – to – Friday, 2nd February 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs. on the preceding Thursday. Emergency road works cannot be forecast. » New Entry Estimate of Potential Disruption: # Update *** major ** medium * minor PROPOSED ROAD CLOSURE » Section 75, Roads Act, 1993, Temporary closure of Kellystown Road, Rathfarnham, Dublin 16 Dún Laoghaire Rathdown County Council proposes to temporarily close Kellystown Road, Rathfarnham, Dublin 16. The proposed closure will be from Tuesday 20th March, 2018 to Friday 13th April, 2018. The purpose of the closure is to facilitate drainage works between the junction with Ticknock Road and “Briarwood”. The proposed traffic diversion will be via Ticknock Road and Harold’s Grange Road and vice versa. A Traffic Management Plan will be in operation and the diversion clearly signposted. Local access to Kellystown Road, via College Road/Harold’s Grange Road junction will be maintained at all times. Any interested party may lodge an objection in writing with the Senior Engineer, Traffic Section, Dún Laoghaire Rathdown County Council, Marine Road, Dún Laoghaire, Co. Dublin or via e-mail to [email protected] on or before noon on Thursday 1st March, 2018. Page 1 of 5 Section 75, Roads Act, 1993, Temporary closure of Killiney Road, Killiney Dún Laoghaire-Rathdown County Council proposes to temporarily close Killiney Road, Killiney from Ballinclea Road to Avondale Park from 5th February to 24th February 2018 inclusive, in order to facilitate road and footpath restoration works by the Roads Maintenance Section, Dún Laoghaire Rathdown County Council. The proposed diversion route is via Avondale Park-Avondale Road-Cluny Grove-Ballinclea Road or Barnhill Road-Saval Park Road-Dalkey Avenue and vice versa. A Traffic Management Plan will be in operation and local access will be maintained. Any interested party may lodge an objection in writing with the Senior Engineer, Traffic Section, County Hall, Marine Road, Dún Laoghaire, Co. Dublin or email [email protected] before noon on 29th January 2018. ROAD CLOSURES Section 75, Roads Act 1993 Temporary Closure of St. Fintan’s Park, Deansgrange St. Fintan’s Park will be closed from the end of the green area until the junction St. Fintan’s Park with Abbey Court. This closure is proposed from 9.00 to 5.00pm each day from Wednesday the 03/01/18 to Friday the 02/02/18. Pedestrian and local access will be maintained at all times. The proposed diversion routes will be via Abbey Road and Deansgrange Road. A traffic and pedestrian management plan will be in place and diversions will be clearly signposted. The purpose of the closure is to make a foul and surface water connection for the new housing development on Abbey Road. ROADWORKS / LANE RESTRICTIONS » N11 – Northbound between the Clonkeen and Johnstown Junctions ** Public lighting column and lantern upgrade works will commence on Monday, 29th January 2018 until Friday, 27th April 2018 between 10:00 and 16:00 hrs. and 19:30 – Midnight (if required). A Traffic Management Plan will be in operation for the duration of the work. Page 2 of 5 » Newtownpark Avenue, Blackrock *** (Night Works) GRP survey works will commence on Thursday, 25th January 2018 until Saturday, 3rd February 2018 between 20:00 and 05:00 hrs. A Give/Take and 4-Way Junction Control Traffic Management Plan will be in operation. » Goatstown Road, Brighton Road Junction, Dublin Road Bray, and Enniskerry Road – Kilternan Bridge ** (Night Works) Survey works will commence on Monday, 29th January 2018 until Thursday, 1st February 2018 between 22:00 and 05:00 hrs. on the following roads: 1. Goatstown Road 2. Brighton Road Junction 3. Dublin Road Bray 4. Enniskerry Road – Kilternan Bridge A Stop/Go Traffic Management Plan will be in operation. » Clonard Road, Sandyford * Road repairs on Clonard Road will commence on Monday, 29th January 2018 until Friday, 16th February 2018 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation. # Westminster Road, Foxrock - Stanford Park Development *** Road works for the main foul and storm connections from the development into the main lines on Westminster Road at Cairn Hill junction will take place from 8th January 2018 until 16th February 2018 between 10:00 and 16:00 hrs. A Stop/Go System will be in place. R118 / Wyattville Dual Carriageway, Cherrywood *** Works are well advanced on the delivery of the first phase of the road infrastructure for the Cherrywood Strategic Development Zone by JCL, the joint venture between John Cradock Ltd. and Jons Civil Engineering. This involves major road works along the Wyattville Dual Carriageway, between the M50 Junction 16 and the N11 at Cherrywood. This work is expected to continue until March 2018. Page 3 of 5 Wyattville Road Pedestrian and Cycle Scheme *** Work commenced on the Wyattville Road Pedestrian and Cycle Scheme on Monday, 8th May 2017 between 08.00 and 18.00 hrs. - Monday to Friday. The scheme involves the upgrade of Wyattville Road between Wyattville Close and Churchview Road and is expected to continue until May 2018. A Traffic Management Plan will be in operation for the duration of the works. Balally Drive and Balally Estate, Dundrum*** Watermain rehabilitation works will continue on Balally Drive and in the Balally estate until Friday, 9th February 2018 approximately. A Traffic Management Plan will be in operation. Blackthorn Road, Sandyford *** (Night Works) Installation of flexible bollards will take place on the north side of Blackthorn Road opposite the Beacon Hospital over two evenings (weather dependent) on dates between Monday, 22nd January and Friday, 9th February 2018 between 20:00 and 23:00 hrs. The eastbound lane will be closed during the works. A Traffic Management Plan will be in operation Ballinteer Road, Dundrum *** Stone wall construction, bank formation and tree removal between Lynwood and Ailsbury Lawns will continue between 10:00 and 16:30 hrs. until Friday, 2nd February 2018. A Traffic Management Plan will be in operation. Avoca Ave/ Grove Ave/ Priory Ave Junction ** Public lighting column installation works to commence on 18th January 2018 for 2 weeks. A Stop/Go Traffic Management Plan will be in operation. Page 4 of 5 Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. Kilmacud Road Upper 2. Sandyford Road 3. Deansgrange Road 4. Clonkeen Road 5. Blackthorn Drive 6. Kill Lane/Avenue 7. Enniskerry Road 8. Clonskeagh Road 9. Leopardstown Road 10. Kilmacud Road Lower 11. Cornelscourt Hill 12. Avoca Ave These works will continue until Friday, 21st December 2018. A Stop / Go Traffic Management Plan will be in operation as required. M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/ End Page 5 of 5 .