1. Technical description of railway siding:

2.1. Location of railway siding:

Centrum Logistyczno Inwestycyjne Poznań II sp. z o.o. siding is a station siding with branching turnout no. 6 to station no. 6b of Swarzędz station at km 291.017 of railway line no. 003 Warsaw West - Kunowice (for the siding it is km 0.000 - beginning of turnout no. 6 is the beginning of the siding track).

2.2. Switch circles and traffic operation positions and their manning:

CLIP II Railway siding constitutes five manoeuvring zones. No traffic operation position and manning on the siding.

2.3. Location of delivery-acceptance points at the siding:

1) The acceptance track for wagons, groups of wagons and full sets brought by the Carrier is track no. 101 or track no. 105 of the siding CENTRUM LOGISTYCZNO INWESTYCYJNE POZNAŃ II. 2) The delivery track for wagons, groups of wagons and full train sets brought by the Carrier is track no. 101 or track no. 103 of the siding CENTRUM LOGISTYCZNO INWESTYCYJNEGO POZNAŃ II. 3) On site, the delivery-acceptance point is marked with a sign “Delivery-acceptance point”, the sign is located at the intertrack space of tracks 101 and 103. 2.4. Tracks on siding:

General length of track Usable length of track Capacity -

Notes

(‰)

section section

Purpose

Trackno.

to to to

axle axle

[m] [m]

-

Length crossLength

from from from

[pcs.]

2

length

wagons length

1 2 3 4 5 6 7 8 9 10 11

Manoeuvri 101 E 987.20 740.00 74 0.5

S 6 S ng zone V

S 206 S

U 103 U 206 U Acceptance

2

Manoeuvri 101a 77.00 - - - - 7.3

S 7 S ng zone V

bulk head bulk

Trappoint

Manoeuvri 102 E 872.00 740 74 0.5

ng zone V

S 103 S 207 S 207 S

U 103 U

Passage

Manoeuvri

103 E 730.50 102 637.00 63 0.5

ng zone V

S 102 S 205 S

U 205 U

Delivery

Manoeuvri 105 E 867.35 637.00 63 0.5

ng zone V

S 101 S 207 S

U 102 U 205 U

Acceptance

Manoeuvri 206 E 480 - - - - 0.00

track ng zone V

S 207 S 601 S

Steeplygraded

Manoeuvri 207 115.44 - - - - 0.5

ng zone V

S 208 S

Wk207

Approach

Manoeuvri 251 170.20 - - - - 2.5

ng zone I

S 251 S 255 S

Approach

3

Manoeuvri

ng zone

V/Approac 501 96.20 - - - - 6.2

Gate h to S 100 S

Approach STENA

siding

Manoeuvri 301 272 - - - - 2.5

ng zone I

S 301 S 302 S

Approach

- Manoeuvri 303 470 156 15 2.5

ng zone I

S 300 S 303 S

U 303 U

km+ 265 0

Approach loading

Manoeuvri

304 358 250 25 0.00

k.t. ng zone I

S 302 S

bulk head bulk

km+ 380 0

Loading

Manoeuvri 305 310 210 21 0.00

k.t. ng zone I

S 303 S

U 304 U

Loading

bulk head bulk

Manoeuvri 306 255 210 21 0.00

k.t. ng zone I

U304

S 304 S

Loading

bulk head bulk

Manoeuvri 400 701.400 - - - - 3.7

ng zone II

S 601 S

Approach Km Km +559.50 0

4

-

Manoeuvri 401 510.60 377 37 0.00

ng zone II

loading

bulk head bulk

Approach

Km Km +559.50 0 Km +631.10 0 Km +008.00 1

Manoeuvri

601 E 602 347.18 - - - - 10.6

ng zone III

S 601 S S

Approach

Manoeuvri 601a 63.65 - - - - 0.0

ng zone III

S 602 S

bulk head bulk

Trappoint

-

Manoeuvri

602 p. 756.60 660 66 7.25

ng zone III

S 603 S

U 603 U 612 U

loading

mat 614 mat

Approach

-

Manoeuvri

603 653.40 513 51 4.5 +140.00

ng zone III

S 602 S 610 S 610 S

loading

Approach

Km Km 0

-

Manoeuvri

603a point 110.00 78 7 7.25 -

k.t. ng zone III

S 610 S

U 610 U

side track side

bulk head bulk

Trap

Manoeuvri

- 603b 109.55 - - - 7.25

ng zone III

S 610 S

Approach

p. mat. p. 612

8.77 to Manoeuvri 611 978.41 871 87

0.00 ng zone III

S 621 S 632 S

U 621 U 632 U Loading

5

Manoeuvri

ng zone III

611b 41.00 27 2 0.00

k.t.

S 632 S 632 S

Bulk Bulk head Trappoint

Manoeuvri

8.77 to ng zone III 612 960.60 871 87

0.00

S 621 S 632 S

U 621 U 632 U Loading

Manoeuvri

ng zone III 8.77 to

613 914.19 622 829 82

k.t. 0.00

S 622 S

U

Loading Bulk Bulk head

Manoeuvri

ng zone III

-

613a 164.73 - - - 8.77

S 622 S

Approach

p. mat. p. 614

8.77 to Manoeuvri 614 916.12 836 83

0.00 ng zone III

S 622 S

U 622 U

Loading

Bulk Bulk head Bulk head

Manoeuvri

261 263.55 256 213.00 21 0.6

k.t.

k.t. ng zone IV

S 256 S

U Loading

Manoeuvri

262 345.43 213.00 21 0.6 k.t.

k.t. ng zone IV

S 255 S

U 256 U Loading

Manoeuvri

263 517.66 300 30 0.6 k.t.

k.t. ng zone IV

S 251 S

U 255 U Loading

6

1) Abbreviations - S (turnout joint), U (fouling point), p. mat. (mathematical point), k.t. (end of track) 2) Total length of track on the siding is 14,414.96 m. 3) Siding capacity - max. no. of railway vehicles which may be present at the same time at the siding (without the access tracks and trap points on which cannot be placed), allowing for maintaining the full operation efficiency (with consideration of operation reserve coefficient: „0.6”) – is: 562 railway vehicles for two- axle type wagons 10 m long. 2.5. Turnouts and at the siding and turnout directing to the siding:

Manner of switching:

electric

(e), Supplementar No. of turnout No. of Angle Radius

manual y information derail

(r), Turnout/railtype

the switch the point / mechanic Primarylocation of al (m) 1 2 3 4 5 6 7 8

To track PKP PLK 6 - Rz/60E e 1:9 300 6b S.A. 1

To track Rz/S 7 - e 1:9 190 PKP PLK S.A 101a 49

In the direction Rz/S 190 100 - r 1:9 of turnout 49 7 In the direction Rz/S 190 101 - r 1:9 of turnout 49 103 In the direction Rz/S 190 102 - r 1:9 of turnout 49 103 In the direction Rz/S 190 103 - r 1:9 of turnout 49 101 In the direction Rz/S 190 205 - r 1:9 of turnout 49 103 In the 206 - Rz/S r 1:9 190 direction 49

7

of turnout 101

In the direction Rz/S 190 207 - r 1:9 of turnout 49 102 In the direction Rz/S 190 208 - r 1:9 of turnout 49 207 In the direction Rz/S 190 251 - r 1:9 of turnout 49 208 In the direction Rz/S 255 - r 1:9 190 of turnout 49 263 In the direction Rz/S 256 - r 1:9 205 of turnout 42 262 In the direction Rz/S 190 300 - r 1:9 of turnout 49 251 In the direction Rz/S 301 - r 1:9 190 of turnout 49 301 In the direction Rz/S 190 302 - r 1:9 of turnout 49 304 In the direction Rz/S 303 - r 1:9 190 of turnout 49 304 In the direction Rz/S 190 304 - r 1:9 of turnout 49 305 In the direction Rz/S 601 - r 1:9 190 of turnout 49 601 To track 602 - Rz/S r 1:6.6 190 601a 49 In the Rz/S 603 - direction r 1:6.6 190 49 of turnout

8

602

To track 610 - Rz/S r 1:6.6 190 603a 49 In the direction Rkpd/S 612 - r 1:9 190 of turnout 49 614 In the direction Rkpd/S 190 614 - r 1:9 of turnout 49 612 In the direction Rz/S 190 621 - r 1:6.6 of turnout 49 612 In the direction Rz/S 622 - r 1:9 190 of turnout 49 613 In the direction Rz/S 190 632 - r 1:9 of turnout 49 612

Dependant - 207 On rail - - - - from turnout 208 On rail Dependant - 251 - - - - from turnout 301 and 251 On rail - 301 - - - - Dependant from turnout 251 On rail - 302 - - - - Dependant from turnout 300 On rail - 401 - - - - None

Designations in the table: Rz – ordinary turnout, Rkpd – double slip e – electric manner of point switching, r – manual manner of point switching

Detailed description of technical railway traffic steering devices is included in Appendix no 3 to the hereby Rules and Regulations.

9

2.6. Security devices and railway traffic steering devices at the siding:

1) List of manoeuvre shields and pin locks used at the siding in presented in the table:

Designa Type of operation Name Purpose Notes tion and operator

1 2 3 4 5 Exit from siding in the direction of Electric, CLIP II siding Manoeuvre shield Tm 4 Swarzędz station Sw area

2) The siding has no semaphores. 3) Tracks and turnouts on the siding are assigned to five manoeuvring zones: Manoeuvring zone I (tracks 301, 303, 304, 305, 306, 251 and turnouts 300, 301, 302, 303 and 304) - STS Logistic Polska Sp. z o.o. ul. Rabowicka 6, 62-020 Swarzędz Manoeuvring zone II (tracks 400 and 401) - Volkswagen Polska Sp. z o.o. ul. Warszawska 349, 61-060 Poznań, Manoeuvring zone III (tracks 601, 601a, 602, 603, 603b, 611, 611a, 611b, 612, 613, 613a, 614 and turnouts: 601, 602, 603, 610, 612, 614, 621, 622, 632) - Clip Logistyka Sp. z o.o. ul. Rabowicka 6, 62- 020 Swarzędz Manoeuvring zone IV (tracks 261, 262, 263 and 256) - Volkswagen Polska Sp. z o.o. ul. Rabowicka 6, 62-020 Swarzędz Manoeuvring zone IV (tracks 101, 102, 103, 105, 206, 207, 501 and turnouts 100, 101, 102, 103, 205, 206, 207, 208, 251) – delivery-acceptance group tracks and access tracks directing to particular users of the siding. 4) Layout of railway traffic steering devices on the siding constitutes Appendix no. 2.

2.13. Construction and rolling stock gauge and gauges on the siding:

At the access tracks to siding and on siding tracks there area gauges: construction PN-69-K-02057, rolling stock PN-70/K-02056 and UIC regulations. The siding does not have gauges to determine whether the wagon load does not exceed the size of the .

10

2.14. Signals, indicators and information signs on the siding:

Designati Refers to Type Purpose Notes on tracks/turnouts 1 2 3 4 5 Entry / exit gates on the siding Forbids to perform Signal display on entry D1 Stop sign (tracks no. 263, manoeuvring drives - gates, visible from both „Stop” 301, 303, 304, gate closed sides of the gate 305, 401) Indicates a point up to Fouling point which two adjacent W 17 Turnouts signal tracks can be taken by rolling stock End loading Signal on the right hand platform, tracks side of each track in front 261, 262, 263, of the end loading Track closing 304, 305, 306 Z 1 platform and on signal and in front of the bulkheads (at the bulkhead at beginning of sand tracks 401, 601a, backfill) 603a, 611b. Point of delivery and Intertrack space acceptance of wagons Delivery- - of tracks 101 and for siding operations acceptance point 103 (with respect to tracks 101, 103, 105) Access tracks to rail-road crossings and Point of giving the Warning signal W 6a crossings of attention sign by the train railway tracks team with internal siding roads Road sign placed before rail-road crossings and Information to road user St. Andrew’s cross G 3 crossings of about point of danger railway tracks with internal siding roads

The signals, stop signs, track closing signal and information signs used at the siding shall not be additionally lit during the night.

2.18. Means of communication and siding communication devices:

1) Telephone communication is used at the siding in order for the employees to communicate with each other and with external entities

11

within the operations related to the service of the siding in bandwidth generally available from wireless telephony operators, with the use of cellular communication devices. 2) Manoeuvring team performing the manoeuvring work at the siding communicates with the use of the provided manoeuvre radio communications.

2.19. Traction at the siding. Operation of traction disconnectors :

1. Traction network of the siding is powered with direct 3 kV current. Traction is located above tracks 101 to 103, 105, 206 and 601. The traction is powered from one side from the traction network of the adjacent track 6 od Swarzędz station via section disconnector no. 6a located on post 0-3 in the vicinity of turnout no. 100.

3. Rules for conduction of railway traffic between the siding and the railway infrastructure administrator tracks with which the siding is connected:

1) All drives of railway vehicles between the Swarzędz station tracks and the railway siding tracks are performed according to the rules of manoeuvring drives stipulated in Instructions for technology of performance of manoeuvers (Ir-9), Signalling instructions [Ie-1(E-1)], Conduction of railway traffic instructions (Ir-1). 2) Between the switch circle of Swarzędz station (Sw) and the siding track, there is no equipment dependency of switching operations. 3) Turnouts no. 6 and 7, and track section from the Tm 4 manoeuvring sign are insulated and are dependant in srk devices of Swarzędz station. 4) Operation of CLIP II siding is performed as manoeuvring drives from the CLIP II siding to tracks 6 and 8 of Swarzędz station, and from tracks 6 or 8 of Swarzędz station to CLIP II siding with the use of the siding delivery-acceptance tracks. 5) Wagons brought and taken from the siding may be pulled or pushed depending on the location they are brought. 6) Maximum length of manoeuvring set is limited by the length of delivery-acceptance tracks and equals 740 m (note: tracks 103 and 105 have usable length of 637 m). 7) In order to exit from CLIP II siding track to Swarzędz station, the manoeuvring manager shall inform the Sw switch traffic controller about the intended exit and discuss the type of manoeuvring work which is to be performed at the station tracks (pulling or pushing set of wagons from siding to tracks 6-8 or taking set of wagons from tracks 6-8 to the siding), in order to prepare the passage route to the Swarzędz station tracks and displaying the manoeuvring signal on Tm 4 manoeuvring sign. After the

12

receipt of the signal “Manoeuvring drive allowed” at Tm4, the manoeuvring manages shall give the signal to start manoeuvring drive. 8) The set of wagons pulled or pushed from the siding to Swarzędz station tracks shall be stopped in front of the semaphore of the given track, stop the set of wagons with air brake system and additionally pull the hand brake of the first wagon in the set. Return of the manoeuvring engine to the siding free or with wagons is performed after obtaining consent and appropriate signals being displayed. 9) The wagons may be taken from Swarzędz station by pulling or pushing to siding tracks. While performing the manoeuvring drive, the manoeuvring manager shall inform the Sw switch traffic controller via telephone or via radiotelephone about the intended drive to the siding, in order to prepare the passage route and displaying the signal allowing for manoeuvring drive on semaphore E6/m or E8/m. 10) Passage route on CLIP II tracks shall be prepared by the manager of the manoeuvring team, which is to enter the siding from Swarzędz station or enter the Swarzędz station tracks from the siding.

4. Technical conditions for railway siding operations:

4.1. Bringing wagons to the siding:

1) In order to exit from CLIP II siding track to Swarzędz station, the manoeuvring manager shall inform the Sw switch traffic controller about the intended exit and discuss the type of manoeuvring work which is to be performed at the station tracks (pulling or pushing set of wagons from siding to tracks 6-8 or taking set of wagons from tracks 6-8 to the siding), in order to prepare the passage route to the Swarzędz station tracks and displaying the manoeuvring signal on Tm 4 manoeuvring sign. After the receipt of the signal “Manoeuvring drive allowed” at Tm4, the manoeuvring manages shall give the signal to start manoeuvring drive. 2) The set of wagons pulled or pushed from the siding to Swarzędz station tracks shall be stopped in front of the semaphore of the given track, stop the set of wagons with air brake system and additionally pull the hand brake of the first wagon in the set. Return of the manoeuvring engine to the siding free or with wagons is performed after obtaining consent and appropriate signals being displayed. 3) The wagons may be taken from Swarzędz station by pulling or pushing to siding tracks. While performing the manoeuvring drive, the manoeuvring manager shall inform the Sw switch traffic

13

controller via telephone or via radiotelephone about the intended drive to the siding, in order to prepare the passage route and displaying the signal allowing for manoeuvring drive on semaphore E6/m or E8/m. 4) Passage route on CLIP II tracks shall be prepared by the manager of the manoeuvring team, which is to enter the siding from Swarzędz station or enter the Swarzędz station tracks from the siding. 5) Bringing of wagons to delivery-acceptance point of the siding and taking of wagons from this point to the Swarzędz station shall be performed with the use of the railway carrier’s rolling stock operating on the siding or siding user’s rolling stock on the basis of a separate agreement between the user of the siding and PKP Polskie Linie Kolejowe S.A. 6) Passage thought manoeuvring zone V of CLIP II siding (delivery- acceptance tracks group) must take place along passage track no. 102 after the following conditions are met: a) the Carrier’s engine setter was informed, if such engine is present at CLIP II tracks, b) passage track no. 102 is free and the Carrier’s engine stopped the manoeuvring works and is on side track no. 105, c) free engine or manoeuvring set passing through CLIP siding area were stopped before the CLIP II siding border in order to be prepared and to check the passage route along the passage track no. 102 by the manoeuvring manager, d) passage route was properly prepared and inspected and the appropriate signals in force at the railway infrastructure administrator tracks - PKP Polskie Linie Kolejowe S.A. - were displayed, e) after the performance of the passage and driving past the CLIP II border, the Carrier’s engine setter shall immediately be informed, if such engine is present at CLIP II siding tracks. 7) In order to bring wagons to loading points, the following conditions shall be met: a) wagons brought to manoeuvring zone I tracks are pulled from delivery-acceptance tracks in the direction of track no. 400a and the pushed tracks 304-306 or to track 301, b) wagons brought to manoeuvring zone I and II tracks are pushed or pulled from delivery-acceptance tracks to track 401 or 603, c) wagons brought to tracks 611 and 612 may be pushed or pulled, d) wagons brought to tracks 613 and 614 must be pushed, e) Wagons brought to tracks 602 and 603 with electric traction must be pushed to the turnout joint no. 602, and then the

14

electric engine is disconnected and the set is taken over by CLIP II diesel engine, f) wagons brought to tracks 261, 262 and 263 must be pushed. 8) One manoeuvring zone with loading tracks (manoeuvring zones I to IV) of CLIP II siding may be operated at a time. 4.3. Braking weight of manoeuvring sets at the siding:

2) Required braking weight calculated on the basis of Ir-1 instruction for speed of 25 km/h for tracks with reliable slope of 10.6 per mille is 18 %, 3) Manoeuvring drives may take place only with the use of air brake for the drives between Swarzędz station and siding tracks. 4) Sets must be connected with air brake during the drive within the siding area, but the number of wagons without working air brake in one group may not be more than 10 two-axle wagons. 5) If the length of manoeuvring set exceeds the allowed number of axles without working wagon brakes, it should brake with air brakes. In such a case, the manoeuvring manager should perform air brake test at the wagons designated to brake the manoeuvring set.

4.4. Allowed axle load on rails:

Max. allowed axle load on rails of the siding is 221 kN for engines and wagons, with the exception of tracks no. 261 and 262, where the max. axle load is 196 kN.

4.5. Limitations to passage of railway vehicles on the siding:

1. The tracks on the siding have min. arch radius R=184.3m, turnouts R=190, so there are not limitations to the allowed axle gauge of wagons brought by the Carrier to the siding. 2. All types of diesel engines and wagons with axle load up to 221 KN may pass on CLIP II siding (with the exception of tracks 261 and 262). 3. Traffic of electric traction railway vehicles is possible only on tracks 101, 102, 103, 105, 206 and 601.

5.1. Max. speed of manoeuvring drives on siding tracks:

1) Speed of manoeuvring drives on siding tracks, due to slopes on most of the tracks of over 2.5%0 shall not exceed: a) 25 km/h on free track no. 206 wagons may be pushed or pulled in the direction of tracks no. 301, 303;

15

b) 15 km/h while driving on free track on the siding when the engine pushes or pulls the wagons on tracks : 101, 102, 103, 105, 207, 251; c) 10 km/h while performing manoeuvres with dangerous load, extraordinary shipment or exceeded load gauge, d) 5 km/h when: - shunting wagons loaded with dangerous goods marked with a warning label no. 8 and 15 according to RID/appendix 2 to SMGS, and tank wagons marked with coloured highlighting stripes, - driving the manoeuvring set with railway vehicles forward with the employee in front if the employee may not take a seat in the first pushed vehicle, - driving the manoeuvring set at turnouts and rail-road crossings. 2) Speed of manoeuvring drive shall be limited to 3 km/h at the siding when: b) driving on tracks 303, 401, 601, 602 and 603 next to ramps by warehouses, c) driving on tracks 261, 262, d) passing through entrance gates, e) approaching stationary wagons, f) approaching sand backfill in front of the bulkhead at the end of track, 3) in bad weather conditions (storm, blizzard, black ice, fog), with lack of appropriate visibility, limit the speed, so that the manoeuvring railway vehicles may be stopped immediately in case of encountering an obstacle on the route. 4) Speed limits shall be applied in order to ensure safety of rolling stock traffic, the employees performing the manoeuvring works and third parties.

16