Meadowbank Education and Employment Precinct

Total Page:16

File Type:pdf, Size:1020Kb

Meadowbank Education and Employment Precinct Three cities icon 2 The three cities icon is a brand element that complements the GSC logo. It is to be used across GSC communications along with the primary logo in a consistent manner, where space and context makes it appropriate. The icon represents A Metropolis of Three Cities, a central concept in the GSC’s planning work. To protect the clarity and visibility of the logo it has a clearspace zone. This means that nothing else can be placed in the area surrounding the logo. The clearspace zone equals the height of one circle (x). Meadowbank EducationClearspace Monotone logos and Employment PrecinctX X X X Preliminary Master Plan October 2019 Built form Public open space T Train station F Meadowbank ferry wharf Core boundary West Ryde T Frame boundary Smalls Creek Meadowbank T Charity Creek Archer Creek F 0 50 100 200 300m Meadowbank Education & Employment Precinct (MEEP) Location Plan N Date August 2019 Scale 1:10,000 @ A3 Filename 19028_SA-Location.ai Acknowledgement of Country: The Greater Sydney Commission acknowledges the traditional owners of the lands that include Greater Sydney and the living culture of these lands. The Commission recognises that the traditional owners have occupied and cared for this Country over countless generations and celebrates their continuing contribution to the life of Greater Sydney. Document Information Job title Meadowbank Education and Employment Precinct Prepared by Greater Sydney Commission/ Studio GL Job number 19028 Report title Preliminary Master Plan File name 19028_Meadowbank-Draft-Preliminary-Master-Plan-Report.indd Revision Date Prepared by Reviewed by Draft 1 26/09/2019 DG, FL, DN, AN FL, DG Draft 2 02/10/2019 DG, FL, DN, AN, BB FL, DG, GSC Draft 3 11/10/2019 DG, FL, DN, AN, BB FL, DG, GSC Draft 4 16/10/2019 DG, FL, DN, AN, BB DG, GSC Draft 5 18/10/2019 DG, FL, DN, AN, BB FL, DG, GSC Final 22/10/2019 DG, FL, DN, AN, BB FL, DG Note: This document takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. The report layout is designed to be printed at A3 landscape. Disclaimer: Greater Sydney Commission and Studio GL hold the copyright/ copyright licence for all diagrams and photographs contained within this report unless otherwise indicated. Meadowbank Education and Employment Precinct | Preliminary Master Plan Report | 22 October 2019 2 Executive Summary 4 Chapter 1 - Introduction 9 1-1 What is the Master Plan? 9 1-2 The Precinct 10 1-3 The Master Plan objectives 12 Chapter 2 - Context 13 2-1 The bigger picture 13 2-2 The local area 17 2-3 Local challenges 19 2-4 Opportunities for improvement 19 2-5 Education proposals 20 Chapter 3 - Vision 22 3-1 What can Meadowbank look like? 22 3-2 Guiding Principles 23 3-3 Meadowbank Education and Employment Precinct Preliminary Master Plan 24 Chapter 4 - Ten Preliminary Ideas 25 4-1 Movement and Place framework 25 4-2 Movement 27 4-3 Place 36 4-4 Conclusion 47 Appendix - Context Analysis 48 A1-1 Introduction 48 A1-2 Landform and topography 49 A1-3 Access and movement 52 A1-4 Built form 55 A1-5 Heritage 57 A1-6 Sydney Water site 58 Meadowbank Education and Employment Precinct | Preliminary Master Plan Report | 22 October 2019 3 Executive Summary EXECUTIVE SUMMARY Have Your Say What is the Meadowbank Education Why does the and Employment Precinct Preliminary Precinct need a The Commission values and encourages the input Master Plan? Master Plan? of the local community, businesses and industry. The growing community in the Meadowbank area With significant new education facilities to be We now want to give everyone an opportunity to is set to receive brand new, purpose-built education delivered, the Meadowbank Education and provide feedback. facilities by 2022. The Meadowbank Education and Employment Precinct will benefit from a Employment Precinct (the Precinct) is an opportunity co-ordinated, master planned approach that to build on this investment in education infrastructure builds on this investment to enhance employment The exhibition and feedback period is from 24 October to 20 November 2019. to create an integrated, accessible, lively place for opportunities, improve the quality of pedestrian Visit nsw.gov.au/meadowbankprecinct or see page 8 for details on how you students, workers and residents. space, improve access and transport services and support the existing residential community with can provide your feedback. This Preliminary Master Plan (the plan) sets out more open space and other facilities. ideas for potential projects to support a liveable, sustainable and productive Precinct. The plan The Master Plan will provide the groundwork for a considers the local context and opportunities and fully coordinated approach to ensure the Precinct includes potential projects for public space, green is integrated, accessible and of high amenity for streets, transport and accessibility, local heritage, the whole community. The plan considers the area and enhanced employment opportunities. holistically, providing context for the new schools and TAFE NSW Meadowbank, and proposing new The Commission is looking for community feedback ideas for future projects. on the ideas proposed in the plan. The feedback, and your comments on any other aspects of the The Greater Sydney Commission has prepared plan, will inform preparation of a final Master Plan in this preliminary Master Plan as independent advice early 2020. The Commission will present potential to the NSW Government, to ensure that state and projects for consideration by the State Government local initiatives are aligned and so that input from and Ryde Council to occur over the next twenty the community helps create a liveable, sustainable years, subject to further investigation and funding and productive precinct. decisions. Meadowbank Education and Employment Precinct | Preliminary Master Plan Report | 22 October 2019 4 istin intersection Opportnity or improe peestrian access Support walking to school by investigating istin ey peestrian rote EXECUTIVE SUMMARY opportunities for pedestrian safety upgrades such as footpath widening, improved intersections, reduced istin ey cycleey eiclar rote access rotes speed limits and/or shared zones istin ey bsistin rote interections Improve pedestrian access around the stations, the The Meadowbank Education ANZAC employment lands, schools and TAFE arrier preentin peestrian access West Ryde Park T Opportnity or train station improement and Employment Precinct Station T R R Explore opportunities for a shared pedestrian and ey ecationMain entry entry point an plaa planne Preliminary Master Plan cyclist route along the railway line with links to the stations, schools, TAFE and the existing cycle network istin pblicPotential open space increase traic rin scool ors The preliminary Master Plan identifies Explore opportunities for enhanced connectivity MP ty Opportnityrea or improe access through pedestrian and cyclist connections across the potential projects to ensure an integrated, Sydney railway line and Victoria Road Opportnity or intersection liveable and accessible Precinct. These MM Water potential projects are subject to further ExistingInvestigate intersection opportunities for revitalisation and/ or Opportnity or reen lin GAZA R community spaces within heritage listed sites to consideration and funding and are anticipated STAO Opportunity for improved pedestrian access RM R strengthen the sense of place and local amenity to occur over the next twenty years. Opportnity or peestrian connectiity Existing key pedestrian route OO Support intensificationKey vehicular of accessemployment routes land as a The plan includes a ‘Core’ study area, LINTO AVE Existing key cycle route Opportnity or cycle rote significant asset for local jobs encompassing the new schools and TAFE Existing key busExisting route interections sites as well as existing employment lands, ANZAC T Opportnity or train station improement Consider theBarrier possibility preventing of a bus pedestrian service route access and bus istin sinalise intersection West Ryde Park T Opportunity for train station improvement the Sydney Water Pumping Station site and Station RYEDALE RD stop to the west of Meadowbank Station T Main entry and plaza (planned) mployment lan the area around the Meadowbank Railway RO Key education entry point Opportnity or improe intersection MOR Investigate public realm improvements through tree Station. The Precinct will connect students Existing publicPotential open space increased traffic during school hours ot it eritae liste item planting, new open spaces and/or greening initiatives istin ey peestrian rote and residents with local jobs and support new Schools MEEP Study OpportunityArea for improved access businesses in enhanced employment lands. O OR onseration area Sydney Investigate Opportunitypotential to reducefor intersection the risk of flooding by Opportnity or improe peestrian rote MAXIM ST Water TAFE Green creating a blue link along the natural drainage corridor In the ‘Core’, there are preliminary ideas to Opportunity for green link GAZA RD TAFE Toporapical alley STATION ST istin ey cycle rote bring life to public spaces with new green HERMITAGE RD Opportunity for pedestrian connectivity streets and public plazas; to protect and VICTOR R ree NOOK LN Opportnity or sare peestrian cycle rote Aus LINTON AVE Opportunity for cycle route enhance local heritage with new recreation Grid reen open space Opportunity
Recommended publications
  • Sewage Treatment System Impact Monitoring Program
    Sewage Treatment System Impact Monitoring Program Volume 1 Data Report 2019-20 Commercial-in-Confidence Sydney Water 1 Smith Street, Parramatta, NSW Australia 2150 PO Box 399 Parramatta NSW 2124 Report version: STSIMP Data Report 2019-20 Volume 1 final © Sydney Water 2020 This work is copyright. It may be reproduced for study, research or training purposes subject to the inclusion of an acknowledgement of the source and no commercial usage or sale. Reproduction for purposes other than those listed requires permission from Sydney Water. Sewage Treatment System Impact Monitoring Program | Vol 1 Data Report 2019-20 Page | i Executive summary Background Sydney Water operates 23 wastewater treatment systems and each system has an Environment Protection Licence (EPL) regulated by the NSW Environment Protection Authority (EPA). Each EPL specifies the minimum performance standards and monitoring that is required. The Sewage Treatment System Impact Monitoring Program (STSIMP) commenced in 2008 to satisfy condition M5.1a of our EPLs. The results are reported to the NSW EPA every year. The STSIMP aims to monitor the environment within Sydney Water’s area of operations to determine general trends in water quality over time, monitor Sydney Water’s performance and to determine where Sydney Water’s contribution to water quality may pose a risk to environmental ecosystems and human health. The format and content of 2019-20 Data Report predominantly follows four earlier reports (2015-16 to 2018-19). Sydney Water’s overall approach to monitoring (design and method) is consistent with the Australian and New Zealand Environment and Conservation Council (ANZECC 2000 and ANZG 2018) guidelines.
    [Show full text]
  • Download the Paper (Pdf)
    Department of Agriculture, Fisheries & Forestry ASSESSMENT OF RISK OF SPREAD FOR STRATEGIC MANAGEMENT OF THE CORE ALLIGATOR WEED INFESTATIONS IN AUSTRALIA - TAKING STOCK FINAL REPORT October 2008 Department of Agriculture, Fisheries and Forestry Assessment of Risk of Spread for Strategic Management of the Core Alligator Weed Infestations in Australia- ‘Taking Stock’ CERTIFICATE OF APPROVAL FOR ISSUE OF DOCUMENTS Report Title: Final Report Document Status: Final Report Document No: NE210541-2008 Date of Issue: 10/10/2008 Assessment of Risk of Spread for Strategic Management Client: Department of Agriculture, Project Title: of the Core Alligator Weed Infestations in Australia - Fisheries & Forestry Taking Stock Comments: Position Name Signature Date Prepared by: Principal Consultant Dr. Nimal Chandrasena 10 October 2008 DAFF, CMAs, DPI, Peer Review by: LGAs and various Given in acknowledgements July-August 2008 others For further information on this report, contact: Name: Dr. Nimal Chandrasena Title: Principal Ecologist, Ecowise Environmental Address: 24 Lemko Place, Penrith, NSW 2750 Phone: 4721 3477 Mobile: 0408 279 604 E-mail: [email protected] Document Revision Control Version Description of Revision Person Making Issue Date Approval 1 Working Draft Dr. Nimal Chandrasena 27 July 2008 2 Final Draft Dr. Nimal Chandrasena 10 October 2008 © Ecowise Environmental Pty Ltd This Report and the information, ideas, concepts, methodologies, technologies and other material remain the intellectual property of Ecowise Environmental Pty Ltd. Disclaimer This document has been prepared for the Client named above and is to be used only for the purposes for which it was commissioned. No warranty is given as to its suitability for any other purpose.
    [Show full text]
  • Government Gazette No 164 of Friday 23 April 2021
    GOVERNMENT GAZETTE – 4 September 2020 Government Gazette of the State of New South Wales Number 164–Electricity and Water Friday, 23 April 2021 The New South Wales Government Gazette is the permanent public record of official NSW Government notices. It also contains local council, non-government and other notices. Each notice in the Government Gazette has a unique reference number that appears in parentheses at the end of the notice and can be used as a reference for that notice (for example, (n2019-14)). The Gazette is compiled by the Parliamentary Counsel’s Office and published on the NSW legislation website (www.legislation.nsw.gov.au) under the authority of the NSW Government. The website contains a permanent archive of past Gazettes. To submit a notice for gazettal, see the Gazette page. By Authority ISSN 2201-7534 Government Printer NSW Government Gazette No 164 of 23 April 2021 DATA LOGGING AND TELEMETRY SPECIFICATIONS 2021 under the WATER MANAGEMENT (GENERAL) REGULATION 2018 I, Kaia Hodge, by delegation from the Minister administering the Water Management Act 2000, pursuant to clause 10 of Schedule 8 to the Water Management (General) Regulation 2018 (the Regulation) approve the following data logging and telemetry specifications for metering equipment. Dated this 15 day of April 2021. KAIA HODGE Executive Director, Regional Water Strategies Department of Planning, Industry and Environment By delegation Explanatory note This instrument is made under clause 10 (1) of Schedule 8 to the Regulation. The object of this instrument is to approve data logging and telemetry specifications for metering equipment that holders of water supply work approvals, water access licences and Water Act 1912 licences and entitlements that are subject to the mandatory metering equipment condition must comply with.
    [Show full text]
  • Sydney Green Grid District
    DISTRICT SYDNEY GREEN GRID SPATIAL FRAMEWORK AND PROJECT OPPORTUNITIES 29 TYRRELLSTUDIO PREFACE Open space is one of Sydney’s greatest assets. Our national parks, harbour, beaches, coastal walks, waterfront promenades, rivers, playgrounds and reserves are integral to the character and life of the city. In this report the hydrological, recreational and ecological fragments of the city are mapped and then pulled together into a proposition for a cohesive green infrastructure network for greater Sydney. This report builds on investigations undertaken by the Office of the Government Architect for the Department of Planning and Environment in the development of District Plans. It interrogates the vision and objectives of the Sydney Green Grid and uses a combination of GIS data mapping and consultation to develop an overview of the green infrastructure needs and character of each district. FINAL REPORT 23.03.17 Each district is analysed for its spatial qualities, open space, PREPARED BY waterways, its context and key natural features. This data informs a series of strategic opportunities for building the Sydney Green Grid within each district. Green Grid project opportunities have TYRRELLSTUDIO been identified and preliminary prioritisation has been informed by a comprehensive consultation process with stakeholders, including ABN. 97167623216 landowners and state and local government agencies. MARK TYRRELL M. 0410 928 926 This report is one step in an ongoing process. It provides preliminary E. [email protected] prioritisation of Green Grid opportunities in terms of their strategic W. WWW.TYRRELLSTUDIO.COM potential as catalysts for the establishment of a new interconnected high performance green infrastructure network which will support healthy PREPARED FOR urban growth.
    [Show full text]
  • UBM Ecological Consultants Projects 2006–2016
    UBM Ecological Consultants Projects 2006–2016 www.urbanbushland.com.au LGA 1 LGA 2 Title Client Year Flora and Fauna Assessment for a Proposed Gale Planning Group Pty Ashfield Development at the Grosvenor Centre - 2006 Ltd Grosvenor Street, Summer Hill Final Report Translocation of Pomaderris Rookwood Necropolis 2008 - Auburn Strathfield prunifolia from Area 4 to Area 6 Trust 2011 Threatened Plant Census for Rookwood Necropolis Rookwood Necropolis Auburn Strathfield 2009 2008-2009 Trust Rookwood Necropolis Bush Regeneration Annual Rookwood Necropolis Auburn Strathfield 2010 Report for July 2009 - June 2010 Trust Rookwood Trial Fire Monitoring Program. Rookwood Necropolis Auburn Strathfield 2010 Monitoring & Annual Report Trust Rookwood Necropolis Final Report to Rookwood Necropolis Trust on the Trust & Land and Auburn Strathfield Translocation of the endangered population of 2011 Property Management Pomaderris prunifolia from Area 4 to Area 9 Authority Rookwood Necropolis Bush Regeneration Annual Rookwood Necropolis Auburn Strathfield 2012 Report for July 2010 -July 2011 Trust Rookwood Necropolis Threatened Plant Census Rookwood Necropolis Auburn Strathfield 2012 (Year 10) Trust Biodiversity Studies: Flora & Fauna Invertigations Rookwood Necropolis Auburn Strathfield 2013 For Native Bushland at Rookwood Necropolis Trust Rookwood Necropolis Bushland Management Plan Rookwood Necropolis Auburn Strathfield 2015 2014-2019 Trust Rookwood Necropolis Auburn Strathfield Rookwood Necropolis Bush Regeneration Ongoing Trust Interim Report: Pomaderris
    [Show full text]
  • UBM Ecological Consultants Projects 2010–2020
    UBM Ecological Consultants Projects 2010–2020 www.urbanbushland.com.au LGA 1 LGA 2 Title Client Year Rookwood Necropolis Bush Regeneration Rookwood Necropolis Auburn Strathfield 2010 Annual Report for July 2009 - June 2010 Trust Rookwood Trial Fire Monitoring Program. Rookwood Necropolis Auburn Strathfield 2010 Monitoring & Annual Report Trust Final Report to Rookwood Necropolis Trust Rookwood Necropolis on the Translocation of the endangered Trust & Land and Auburn Strathfield 2011 population of Pomaderris prunifolia from Property Management Area 4 to Area 9 Authority Final Report Translocation of Pomaderris Rookwood Necropolis Auburn Strathfield 2008 - 2011 prunifolia from Area 4 to Area 6 Trust Rookwood Necropolis Bush Regeneration Rookwood Necropolis Auburn Strathfield 2012 Annual Report for July 2010 -July 2011 Trust Rookwood Necropolis Threatened Plant Rookwood Necropolis Auburn Strathfield 2012 Census (Year 10) Trust Biodiversity Studies: Flora & Fauna Rookwood Necropolis Auburn Strathfield Invertigations For Native Bushland at 2013 Trust Rookwood Necropolis Rookwood Necropolis Bushland Management Rookwood Necropolis Auburn Strathfield 2015 Plan 2014-2019 Trust Rookwood Necropolis Auburn Strathfield Rookwood Necropolis Bush Regeneration Ongoing Trust Biodiversity Assessments for 4 Bayside Sutherland environmentally sensitive sites requiring Canterbury - Shire Sydney Water 2018 updated Property Environmental Bankstown Shellharbour Management Plans for Sydney Water Assessments of Significance for the Green & Bankstown City Bankstown
    [Show full text]
  • Wool Statistical Area's
    Wool Statistical Area's Monday, 24 May, 2010 A ALBURY WEST 2640 N28 ANAMA 5464 S15 ARDEN VALE 5433 S05 ABBETON PARK 5417 S15 ALDAVILLA 2440 N42 ANCONA 3715 V14 ARDGLEN 2338 N20 ABBEY 6280 W18 ALDERSGATE 5070 S18 ANDAMOOKA OPALFIELDS5722 S04 ARDING 2358 N03 ABBOTSFORD 2046 N21 ALDERSYDE 6306 W11 ANDAMOOKA STATION 5720 S04 ARDINGLY 6630 W06 ABBOTSFORD 3067 V30 ALDGATE 5154 S18 ANDAS PARK 5353 S19 ARDJORIE STATION 6728 W01 ABBOTSFORD POINT 2046 N21 ALDGATE NORTH 5154 S18 ANDERSON 3995 V31 ARDLETHAN 2665 N29 ABBOTSHAM 7315 T02 ALDGATE PARK 5154 S18 ANDO 2631 N24 ARDMONA 3629 V09 ABERCROMBIE 2795 N19 ALDINGA 5173 S18 ANDOVER 7120 T05 ARDNO 3312 V20 ABERCROMBIE CAVES 2795 N19 ALDINGA BEACH 5173 S18 ANDREWS 5454 S09 ARDONACHIE 3286 V24 ABERDEEN 5417 S15 ALECTOWN 2870 N15 ANEMBO 2621 N24 ARDROSS 6153 W15 ABERDEEN 7310 T02 ALEXANDER PARK 5039 S18 ANGAS PLAINS 5255 S20 ARDROSSAN 5571 S17 ABERFELDY 3825 V33 ALEXANDRA 3714 V14 ANGAS VALLEY 5238 S25 AREEGRA 3480 V02 ABERFOYLE 2350 N03 ALEXANDRA BRIDGE 6288 W18 ANGASTON 5353 S19 ARGALONG 2720 N27 ABERFOYLE PARK 5159 S18 ALEXANDRA HILLS 4161 Q30 ANGEPENA 5732 S05 ARGENTON 2284 N20 ABINGA 5710 18 ALFORD 5554 S16 ANGIP 3393 V02 ARGENTS HILL 2449 N01 ABROLHOS ISLANDS 6532 W06 ALFORDS POINT 2234 N21 ANGLE PARK 5010 S18 ARGYLE 2852 N17 ABYDOS 6721 W02 ALFRED COVE 6154 W15 ANGLE VALE 5117 S18 ARGYLE 3523 V15 ACACIA CREEK 2476 N02 ALFRED TOWN 2650 N29 ANGLEDALE 2550 N43 ARGYLE 6239 W17 ACACIA PLATEAU 2476 N02 ALFREDTON 3350 V26 ANGLEDOOL 2832 N12 ARGYLE DOWNS STATION6743 W01 ACACIA RIDGE 4110 Q30 ALGEBUCKINA
    [Show full text]
  • Trends in WWTP Nutrient Loads and Water Quality of the Hawkesbury-Nepean River
    w Sewage Treatment System Impact Monitoring Program Interpretive Report 2016-17 Trends in WWTP nutrient loads and water quality of the Hawkesbury-Nepean River Water Quality Report 2017 Commercial-in-Confidence Sydney Water Project and Services Level 1, 20 William Holmes Street, Potts Hill, NSW 2143 DX2552W Report version: STSIMP Interpretive report 2016-17_revised final to EPA Cover photo: Winmalee Lagoon (November 2015) © Sydney Water 2018 This work is copyright. It may be reproduced for study, research or training purposes subject to the inclusion of an acknowledgement of the source and no commercial usage or sale. Reproduction for purposes other than those listed requires permission from Sydney Water. Sewage Treatment System Impact Monitoring Program | Interpretive Report 2016-17 Page | ii Executive summary Purpose A requirement of Sydney Water’s Environment Protection Licences (EPLs) is to undertake an ongoing Sewage Treatment System Impact Monitoring Program (STSIMP) to identify and quantify environmental impacts associated with Sydney Water’s wastewater services across our area of operations. The program aims to monitor the environment within Sydney Water’s area of operations to: • determine general trends in water quality over time • monitor Sydney Water’s performance • determine where Sydney Water’s contribution to water quality may pose a risk to environmental ecosystems and human health. The sampling program is designed to provide a longitudinal and spatial dataset that allows the identification of statistically significant changes in water quality or ecosystem health parameters that may be related to discharges from wastewater systems. The STSIMP generates two types of reports: an annual data report and an interpretive report.
    [Show full text]
  • Progress Since 2012
    Progress Since 2012 Name Suburb Region/District Project Type Project Description Current Status 2nd Bulk Liquids Berth Port Botany Eastern City Freight Planning approval to develop a second Bulk Liquids Completed District Berth (BLB2) at Port Botany was received in 2008. On 31 May 2011, John Holland Pty Ltd was engaged to construct the BLB2. The berth became operational in December 2013. The main products handled at the BLB are refined fuels, gases and chemicals / other bulk liquids. BLB2 comprise a steel piled pier adjacent to the existing BLB1; associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities and pipelines from existing user sites to the new berth. The open access, multi user berth operates on a 24 hour/ 7 day per week basis. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall. Abbotsford Wharf - Abbotsford Eastern City Maritime The upgrade aims to provide easier access to the wharf, Planning Wharf Upgrade District better weather protection, additional seating, improved program safety, quicker and more efficient boarding and disembarking, increased capacity and more efficient interchange with other modes of transport. Acacia Avenue Lake Munmorah Central Coast Walking and Cycling Shared Path cycleway alongside Acacia Avenue Completed cycleway Name Suburb Region/District Project Type Project Description Current Status Additional Boating Castle Cove North Maritime Planning Access Points at Middle Harbour (Investigation), Willoughby Additional Boating Penrith West Maritime Investigation and concept designs for eight passive craft Planning Access Points on the access points to the Neapean River. Nepean River (Investigation) Airds Road cycleway Leumeah Western City Walking and Cycling Shared Path cycleway alongside Airds Road Completed District Airport East Precinct Mascot Eastern City Road Roads east of the airport will be upgraded and the In-Progress District General Holmes Drive rail level crossing will be removed by constructing a road underpass.
    [Show full text]
  • Catalog of Hydrologic Units in Kentucky
    James C. Cobb, State Director and Geologist Kentucky Geological Survey UNIVERSITY OF KENTUCKY CATALOG OF HYDROLOGIC UNITS IN KENTUCKY Daniel I. Carey 2003 CONTENTS HYDROLOGIC UNITS.............................................................................................................................................................................4 Ohio River Basin - Region 05 (38,080 sq. mi.)..........................................................................................................................................5 Big Sandy River Basin - Subregion 0507 (2,290 sq. mi.) ......................................................................................................................5 Big Sandy River - Accounting Unit 050702 (2,290 sq. mi.)...........................................................................................................5 Big Sandy River - Catalog Unit 05070201 (478 sq. mi.) ..............................................................................................................5 Upper Levisa Fork - Catalog Unit 05070202 (359 sq. mi.).........................................................................................................7 Levisa Fork - Catalog Unit 05070203 (1,116 sq. mi.)...............................................................................................................12 Big Sandy River, Blaine Creek - Catalog Unit 05070204 (337 sq. mi.).......................................................................................18 Tygarts Creek, Little Sandy River,
    [Show full text]
  • Hills 2026 Growing Our Future State of the Environment Report 2008 - 2009 Community Vision Our Performance Snapshot
    Hills 2026 growing our future state of tHe environment report 2008 - 2009 CommuniTy vision our performanCe snapshot T we spent qUality of life measUres trenD aCtions/targets aChieveD napsho n people who agree there are opportunities to have a ‘real say’ on issues s that affect their lives 28 e Our $12,985,000 C n Community satisfaction with Council’s financial management approach proactively leading our community n Community satisfaction with Council’s preparation for future changes 94 community by considering new innovative ways of working with in the shire groups and organisations to achieve outcomes that n Community satisfaction with Council’s professional conduct 12 benefit the community as a whole and developing and n Council staff satisfied with working at the hills shire Council implementing a very clear plan for the future”. 0 erforman direction p n Community satisfaction with Council provided services CommuniTy Vision Proactive leadership creating vibrant ur n Community satisfaction with ovals and sporting facilities o communities balancing urban growth 18 protecting our environment and building a $34,831,000 n Community satisfaction with parks and gardens modern local economy. n Community satisfaction with lighting of public areas creating vibrant communities 90 n Community satisfaction with emergency services reporTing on our fuTure by enhancing our unique local spirit and encouraging n Community satisfaction with provision of community events high levels of volunteering, involvement in sports, 5 this soe report responds to the hills 2026 n Community satisfaction with support for volunteer organisations community strategic direction, and fits within the connection with neighbours and family.
    [Show full text]
  • Index of Surface-Water Records to September 30, 1 967 Part 1 0.-The Great Basin
    Index of Surface-Water Records to September 30, 1 967 Part 1 0.-The Great Basin Index of Surface-Water Recordr to September 30, 1967 Part 1 0.-The Great Basin By H. P. Eisenhuth GEOLOGICAL SURVEY CIRCULAR 580 Washington J 968 United States Department of the Interior STEWART L. UDALL, Secretory Geological Survey William T. Pecora, Director Free on application to the U.S. Geological Survey, Washington, D.C. 20242 Index of Surface-Water Records to September 30, 1967 Part 10.- The Great Basin By H. P. Eisenhuth INTRODUCTION This report lists the streamflow and reservoir stations in The Great Basin for which records have been or are to be published in reports of the Geological Survey for periods through September 30, 1967. It supersedes Geological Survey Circular 510. Basic data on surface-water supply have been published in an annual series of water-supply papers consisting of several volumes, including one each for the States of Alaska and Hawaii. The area of the other 48 States is divided into 14 parts whose boundaries coincide with certain natural drainage lines. Prior to 1951, the records for the 48 States were published in 14 volumes, one for each of the parts. From 1951 to 1960, the records for the 48 States were published annually in 18 volumes, there being 2 volumes each for Parts 1, 2, 3, and 6. The boundaries of the various pans are shown on the map in figure 1. Beginning in 1961, ·the annual series ofwater-supplypapers on surface-water supply was changed to a 5-year series.
    [Show full text]