Hovedstadens Letbane I/S Annual Report 2017 Hovedstadens Letbane I/S Metrovej 5 DK-2300 Copenhagen S CVR Number: 36032499

Total Page:16

File Type:pdf, Size:1020Kb

Hovedstadens Letbane I/S Annual Report 2017 Hovedstadens Letbane I/S Metrovej 5 DK-2300 Copenhagen S CVR Number: 36032499 Hovedstadens Letbane I/S Annual Report 2017 Hovedstadens Letbane I/S Metrovej 5 DK-2300 Copenhagen S CVR number: 36032499 T +45 3311 1700 E [email protected] Read more about Greater Copenhagen Light Rail at dinletbane.dk Layout, e-Types Printing, GraphicUnit ApS ISBN number: 978-87-92378-29-3 Annual Report 2017 Contents Management’s Report 05 Greater Copenhagen Light Rail’s employees 20 Foreword 05 Greater Copenhagen Light Rail’s Results and Expectations 06 Board of Directors 22 Key Figures for Greater Copenhagen Greater Copenhagen Light Rail’s Light Rail 10 Executive Board 24 Greater Copenhagen Light Rail 12 Annual Accounts 27 The Light Rail and urban development 13 Accounting Policies 28 New station at Delta Park in Profit and Loss Account 31 Vallensbæk Municipality 13 Balance Sheet 32 Statement of Changes in Equity 34 Hovedstadens Letbane I/S Status of the work on the Light Rail 14 Metrovej 5 Cash Flow Statement 36 DK-2300 Copenhagen S Selection of contractors 15 Notes 37 CVR number: 36032499 New quality assurance 16 T +45 3311 1700 Expropriation activities 16 E [email protected] Endorsements 43 Knowledge of the Light Rail 16 Read more about Greater Copenhagen Management Endorsement 43 Light Rail The Light Rail is classified as a at dinletbane.dk megaproject 17 Independent Auditors’ Report 44 Layout, e-Types Printing, GraphicUnit ApS Company Management 19 Appendix to the Management’s Report 49 ISBN number: 978-87-92378-29-3 Greater Copenhagen Light Rail’s Long-Term Budget 50 compliance and CSR Report 20 3 Greater Copenhagen Light Rail at one of the 29 coming stations along the line. Annual Report 2017 Management’s Report Foreword The work on the Light Rail in 2017 did not In the Light Rail municipalities, a large num- lead to any changes in the financial basis. ber of meetings were held with residents Greater Copenhagen Light Rail was able to and utility line owners, in preparation for maintain the overall budgets unchanged, the construction work. In the eight munici- while the invitations to tender for the palities in which the Light Rail will run, all major contracts and the preparation of inspections of properties and sites were the final decision by the owners toenter completed and approved. This means that into contracts could take place within the the expropriation process can begin in 2018. framework laid down by the owners for the construction budget of DKK 502 million Traffic plans during the construction period in 2017. were also prepared in the course of the year, and the final details concerning the align- One of the major milestones in 2017 was the ment fell into place. This meant, among other completion of the extensive procurement things, that the 28-kilometre long Light Rail process. Invitations to tender in accordance will have an extra 29th station. In Vallensbæk with EU regulations were held for eight Light Municipality, it was decided to construct an Rail contracts. This was a process charac- additional station, Delta Park, of which the terised by constructive negotiation. Both most important function will be to improve the winning bids and the other bids were the infrastructure and the development of the of high quality and Greater Copenhagen municipality’s largest business area. Light Rail looks forward to fruitful cooper- ation with the winning contractors in the Towards the end of the year, the EY firm of coming years. accountants undertook external quality assurance of the project’s aggregated risk Parallel to the invitations to tender, the and reserve requirements. extensive work was undertaken of prepar- ing the company and its surroundings for Thank you to all partners and employees. the forthcoming construction phase. The framework has been laid for cooperation We hope that you enjoy reading the report! with contractors, authorities and utility line owners. Before the contractors can start Birgitte Brinch Madsen work, buried utility lines along Ring 3 must Chair of the Board of Directors be realigned, and sites and properties must be expropriated in order to make areas avail- Henrik Plougmann Olsen able for the construction work. CEO 5 Annual Report 2017 Management’s Report Results and expectations Result for the year Development in equity The result for 2017 Greater Copenhagen Light Rail will not have Hovedstadens Letbane I/S was established “ any passenger revenue until the Light Rail on 19 June 2014. The Danish State repre- was in accordance opens. sented by the Danish Ministry of Trans- port, Building and Housing, the Capital with expectations.” During the first years, the company’s ac- Region and Lyngby-Taarbæk Municipality, counts will therefore show a deficit due to Gladsaxe Municipality, Herlev Municipality, the very significant investments in the con- Rødovre Municipality, Glostrup Municipality, struction of the Light Rail, without any pas- Alberts lund Municipality, Brøndby Munici- senger revenue. pality, Høje -Taastrup Municipality, Hvidovre Munici pality, Vallensbæk Munici pality and The company’s finances are planned on the Ishøj Municipality contributed DKK 3.5 billion basis of this strategy, which was also applied on the company’s establishment. The com- to the Great Belt Fixed Link, the Øresund pany’s book loss of DKK 30 million has been Fixed Link, the Copenhagen Metro and the deducted from equity, which amounted to Fehmarn Belt Fixed Link. DKK 3,035 million at the end of 2017. The result for 2017 was in accordance with expectations. Equity (DKK million) The result for 2017 before depreciation and write-downs is a loss of DKK 2 million. Depre- , ciation and write-downs totalled DKK 99 3,424 3,332 3,193 million in 2017, and concern write-downs on 3,065 3,035 the construction of the Light Rail. The result , before financial items is hereafter a loss of DKK 101 million. Financial items account for , income of DKK 71 million. The result for the year is a loss of DKK 30 million. , * *Opening balance sheet, 1 January 2014 6 Annual Report 2017 Management’s Report One consequence of the accounting policies Long-term economic applied by Hovedstadens Letbane I/S is that development equity would be expected to continue to be reduced in the following years, culminating Hovedstadens Letbane I/S prepared an up- with the establishment of the major civil dated long-term budget in December 2017. engineering contracts, expected to take The long-term budget shows the expecta- place in the first quarter of 2018. tions of the long-term economic develop- ment in the company. The long-term budget As a consequence, the company will record shows that the company’s net debt is ex- a liability in the accounts equivalent to the pected to reach its maximum level in 2032, negative value of the cash flows from the pro- at approximately DKK 3.9 billion (in current ject. This provision will affect the operating prices). See the graph below. result for the year in question significantly, just as most of the equity contributions can The debt is expected to be repaid in 2059, be expected to have been allocated at this which is in accordance with the previous time. This is in accordance with the assump- expectations. tions made at the time of the establishment of the company. Investment in the Light Rail Hovedstadens Letbane I/S is a partnership in which the owners are 100 per cent liable Investments in the construction of the Light for the company. Any negative equity capi- Rail totalled DKK 102 million in 2017, of which tal would thus not as such entail a need for DKK 93 million concerned capital investments further contributions from the owners, as and DKK 9 million concerned operations - Hovedstadens Letbane I/S would still be able related capital investments. In 2017, a write- to service its debt as planned. down of DKK 99 million was made concerning the construction of the Light Rail, and the net book value of the Light Rail is stated as DKK 0 in the balance sheet. This is a consequence of how the investment in the Light Rail will not be fully recovered via future revenue such Equity Long-term budget (DKK million) (DKK million) Revenue Expenses Debt , , , Note: In budgetary terms, reinvestment -, in rolling stock, mechanical and -, electrical installations is assumed in 2047, -, cf. the company’s long-term budget -, (Appendix to the Management Report) -, 7 Annual Report 2017 Management’s Report as passenger revenue, etc., and is therefore of Light Rail trains, the establishment of the written down on an ongoing basis to the Control and Maintenance Centre, trial opera- expected recoverable value of the Light Rail, tion, strategic spare parts and reinvestments. with due consideration of the planned capital The operations-related capital investments investments. The write-down that has been are financed by the Capital Region and the made is in accordance with expectations. 11 municipalities involved via their payment, once the Light Rail has been put into opera- The write-down is based on an estimate of tion, of annual operating contributions for a the value of the Light Rail according to the total value of approximately DKK 1 billion, as assumptions applied by the company in the well as an expected operating surplus at a current long-term budget, as well as the value totalling approximately DKK 0.3 billion. expectations of the future level of interest See the graph at the centre right. rates (discounting factor). The tables show that both the company’s In conjunction with its establishment, the capital investments and the operations- company’s owners made contributions to related capital investments are expected to the financing of the capital investments. The be defrayed during the 2014-2024 period, Based on the current Danish State, represented by the Ministry of while the related financing, from the owners “ Transport, Building and Housing, finances via owner contributions as instalments and long-term budget, the approximately DKK 1.4 billion, and the Capital operating contributions, and as passenger Region and the 11 municipalities involved revenue from the operation of the Light company expects the finance the remaining approximately DKK Rail, is expected to be contributed to the 2.1 billion.
Recommended publications
  • INNOVATION NETWORK »MORGENSTADT: CITY INSIGHTS« City Report
    City report City of the Future INNOVATION NETWORK »MORGENSTADT: CITY INSIGHTS« »MORGENSTADT: »MORGENSTADT: CITY INSIGHTS« City Report ® INNOVATION NETWORK INNOVATION Project Management City Team Leader Fraunhofer Institute for Dr. Marius Mohr Industrial Engineering IAO Fraunhofer Institute for Nobelstrasse 12 Interfacial Engineering and 70569 Stuttgart Biotechnology IGB Germany Authors Contact Andrea Rößner, Fraunhofer Institute for lndustrial Engineering IAO Alanus von Radecki Arnulf Dinkel, Fraunhofer Institute for Solar Energy Systems ISE Phone +49 711 970-2169 Daniel Hiller, Fraunhofer Institute for High-Speed Dynamics Ernst-Mach-Institut EMI Dominik Noeren, Fraunhofer Institute for Solar Energy Systems ISE COPENHAGEN [email protected] 2013 Hans Erhorn, Fraunhofer Institute for Building Physics IBP Heike Erhorn-Kluttig, Fraunhofer Institute for Building Physics IBP Dr. Marius Mohr, Fraunhofer Institute for lnterfacial Engineering and Biotechnology IGB OPENHAGEN © Fraunhofer-Gesellschaft, München 2013 Sylvia Wahren, Fraunhofer Institute for Manufacturing Engineering and Automation IPA C MORGENSTADT: CITY INSIGHTS (M:CI) Fraunhofer Institute for Industrial Engineering IAO Fraunhofer Institute for Factory Operation and Climate change, energy and resource scarcity, a growing Copenhagen has repeatedly been recognized as one Nobelstrasse 12 Automation IFF world population and aging societies are some of the of the cities with the best quality of life. Green growth 70569 Stuttgart Mailbox 14 53 large challenges of the future. In particular, these challen- and quality of life are the two main elements in Germany 39004 Magdeburg ges must be solved within cities, which today are already Copenhagen’s vision for the future. Copenhagen shall home to more than 50% of the world’s population. An be a leading green lab for sustainable urban solutions.
    [Show full text]
  • Growing Smart Cities in Denmark
    GROWING SMART CITIES IN DENMARK DIGITAL TECHNOLOGY FOR URBAN IMPROVEMENT AND NATIONAL PROSPERITY RESEARCH AND EDITORIAL ABOUT TEAM About Invest in Denmark Léan Doody As part of the Ministry of Foreign Affairs of Denmark, Invest Associate Director – Arup in Denmark is a customized one-stop service for foreign [email protected] companies looking to set up a business in Denmark. Nicola Walt www.investindk.com Principal Consultant – Arup [email protected] About Arup Ina Dimireva Consultant – Arup Arup is an independent consultancy providing professional [email protected] services in management, planning, design and engineering. As a global firm Arup draws on the skills and expertise of Anders Nørskov Director – CEDI nearly 11,000 consultants. Arup’s dedication to exploring [email protected] innovative strategies and looking beyond the constraints of individual specialisms allows the firm to deliver holistic, multi-disciplinary solutions for clients. STEERING COMMITTEE www.arup.com This research was commissioned by: About CEDI CEDI is a consulting company with expertise in public sector digitization in Denmark. CEDI provides strategic consulting Financing partners and steering committee: to the government and the IT industry based on solid insight into the subjects of digitization and technology, extensive knowledge on the administrative and decision-making pro- cesses of government agencies, and a deep understanding of the political agenda. www.cedi.dk Additional participants in the steering committee meetings were the Central Denmark Region, Local Government Den- mark (LGDK) and the municipalities of Aarhus and Vejle. Layout Mads Toft Jensen +45 25143599 [email protected] www.spokespeople.dk ©2016 Arup, CEDI.
    [Show full text]
  • Etzerodt & Hansen Redesigning Wealth Redistribution Systems In
    Aalborg Universitet Redesigning Wealth Redistribution Systems in Local Government A Theory-Based Stakeholder Analysis of Power Struggles Amongst Danish Municipalities Frank Etzerodt, Søren; Hansen, Morten Balle Publication date: 2018 Link to publication from Aalborg University Citation for published version (APA): Frank Etzerodt, S., & Hansen, M. B. (2018). Redesigning Wealth Redistribution Systems in Local Government: A Theory-Based Stakeholder Analysis of Power Struggles Amongst Danish Municipalities. 1. Paper presented at Regional Inequalities – Patterns, Causes, Effects and Policies, , March 14-16, 2018, Marburg, Germany. General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. ? Users may download and print one copy of any publication from the public portal for the purpose of private study or research. ? You may not further distribute the material or use it for any profit-making activity or commercial gain ? You may freely distribute the URL identifying the publication in the public portal ? Take down policy If you believe that this document breaches copyright please contact us at [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Downloaded from vbn.aau.dk on: October 01, 2021 Redesigning Wealth Redistribution Systems in Local Government: A Theory-Based Stakeholder Analysis of Power Struggles Amongst Danish Municipalities Søren Frank Etzerodt & Morten Balle Hansen Aalborg University To be presented at the conference on ”Regional Inequalities – Patterns, Causes, Effects and Policies”, Marburg, March 14-16, 2018.
    [Show full text]
  • Annual Report 2019
    Hovedstadens I Letbane Hovedstadens S Letbane I/S Annual Report Annual Report Hovedstadens Letbane I/S Metrovej DK- Copenhagen S CVR number: T + E [email protected] Read more about the Greater Copenhagen Light Rail at dinletbane.dk Cover visualisation: Gottlieb Paludan Architects Layout, e-Types Printing, GraphicUnit ApS ISBN number: ---- EMÆR AN KE V T S Tryksag 5041 0473 Annual Report 2019 Contents Foreword 05 2019 In Brief 06 Directors’ Report 08 Results and Expectations 08 Status of the Greater Copenhagen Light Rail 16 Design 22 Communication 23 Safety on the Right Track 25 Corporate Management 26 Compliance and CSR Report 27 Annual Accounts 35 Accounting Policies 36 Accounts 39 Management Endorsement 59 Independent Auditors’ Report 60 Appendix to the Directors’ Report 65 Long-Term Budget 66 3 The Light Rail will run under the viaduct at Buddingevej before continuing up to Lyngby Station. Visualisation: Gottlieb Paludan Architects Annual Report 2019 Foreword The Greater Copenhagen Light Rail will be 2019 was the year in which the Light Rail In May, the design of the coming Light Rail part of the public transport network that construction activities got underway and trains was decided on. The trains will be will enable residents, commuters and busi- the project became visible in several places green and will thereby have their own iden- nesspeople to get around in an easy, fast and along Ring 3. The major preparatory works tity in relation to the other modes of trans- more environmentally friendly way. When it at Lyngby Station, Buddinge Station and the port in the Greater Copenhagen area, while goes into operation, the Light Rail will run Control and Maintenance Centre in Glostrup also making it easy to spot the Light Rail in on electricity, which is one of the most en- picked up speed and utility line owners began the cityscape.
    [Show full text]
  • View of Where There Are Fillings Heights As Both Maps Are Based on the Field Survey and Fill Thickness
    The Journal of Transdisciplinary Environmental Studies vol. 12, no. 2, 2013 Public Archives and other Sources for Surveying of Dumpsites and Polluting Enterprises before 1950 Anne-Sofie Fleischer Michaelsen,Department of Environmental, Social and Spatial Change, Roskilde University, Denmark E-mail: [email protected] Abstract: In Denmark, the local environmental authorities have had an obligation to survey areas for soil contamination since the early 1980s. Through the years, detecting and locating old dumpsites and gathering historical information on them have been very dependent on old aerial photographs. As a result, the environmental authorities only have little knowledge of dumpsites operating before the mid-1950s. This study describes the utility of various historical sources for surveying of old dumpsites in the former Ballerup-Maaløv Municipality near Copenhagen. The minute books of the Council and the Health Commission in the municipality were used. In order to locate two dumpsites mentioned in the minute books and gather information on them, the fol- lowing additional sources were used: Old census papers, index cards from tax assessments of real property, income tax returns, writings from local history societies on the former villages, recorded memories told by senior citizens and jubilee publications from homeowners’ associations together with old cadastral maps, old topographical maps, and old aerial photographs plus a comparison of terrain heights in a topographical military map from 1900 and the Danish Elevation Model from 2005-2007. The minute books of the Council and the Health Commission contain information on 31 dumpsites and 15 possible dumpsites of very different characteristics. Only a few of the dumpsites were already known by the local environmental authorities.
    [Show full text]
  • The Influence of Political Structures and Local Community Engagement on Placemaking in Train Stations a Case Study of Glostrup M
    The influence of political structures and local community engagement on placemaking in train stations A case study of Glostrup Multifunctional Station Sustainable Cities Thesis Aalborg University of Copenhagen Mohammad Ghannam Study No. 2094407 Date: October 2th, 2019 Abstract Traditionally the development of a train station focuses on transportation manners for commuters. The challenge in modern train stations is the quality of the public space, which adds value to citizens through sustainable measures. It is crucial to strengthen participation for better development of train stations. There is a lack of involvement, and throughout the thesis, it is demonstrated that the argument is two- folded. The first one is local, about local development, inclusion, and achieving locally sustainable objectives. The other is about the system level. In order to handle the urbanization, new ways of governing are fundamental to achieve an optimal train station that comprehends all aspects of the transportation system. In a paradigm of transport where time-travel is at the center, there is not enough focus on the quality of the trip as a whole for people. The quality of the space is affected by the existing infrastructure that puts some limitations on the recreation of the place. Other challenging aspects of urban spaces, at the stations, are better transport modes, energy-efficiency, pollution reduction and policy framework. The focus on train stations is relevant for the development of sustainable cities since it offers quality of life, efficient connectivity, optimal and innovative use of public spaces and reduction of human footprint. The purpose of this thesis is to explore the influence of the political structure and the local community concerning strengthening placemaking in train stations.
    [Show full text]
  • PHS-QUALITY Project Job Quality and Industrial Relations in the Personal and Household Services Sector - VS/2018/0041
    PHS-QUALITY Project Job Quality and Industrial Relations in the Personal and Household Services Sector - VS/2018/0041 COUNTRY REPORT: DENMARK Mikkel Mailand and Trine P. Larsen This paper related to the action PHS-QUALITY is made by the beneficiaries and it reflects only the author’s view. The Commission is not responsible for any use that may be made of the information it contains. 2 Contents Summary .............................................................................................. 3 1. Introduction .................................................................................. 4 2. PHS in Denmark in general ............................................................. 6 2.1 Introducing the Danish PHS sector and its subsectors ........................ 6 2.2 Legal framework ............................................................................... 11 3. Cleaning services in private homes ..............................................15 3.1 Introducing the sector .............................................................................. 15 3.2 Legal framework and policy initiatives ................................................... 17 3.3. Main actors ............................................................................................. 18 3.4 Wages and working conditions ............................................................... 19 3.5 Challenges and social partners actions .................................................... 24 3.6 The interplay between job quality and service quality ...........................
    [Show full text]
  • CV – Niels Hoé
    CV – Niels Hoé Profile Niels is founder and CEO of HOE360 Consulting and has worked with cycling, green mobility and urban planning for 15 years with a strong focus on how those are combined in order to create high quality cities with great liveability. He holds strong experience and knowledge within planning and development of cycling and public transport, being; project management, product-design and concept-development, piloting or prototyping. And an understanding of cycling and bicycle traffic, and the users behaviour. Niels has conducted several workshops and been guest teaching both in Denmark and Internationally and are a regular speaker at Education various events. Cand.scient.soc, Roskilde University He has a comprehensive and broad global network and holds additional insight from positions at Atkins, the Municipality of Nationality Copenhagen and the Danish State Railways. Danish Born Member of the Cycling Embassy of Denmark's Executive Committee 31th of May 1973 and Certified QUEST Auditor. Experience with HOE360 Consulting (2012 -) ___________________________________________________________________________________ 2018: City of Zürich, Switzerland: Planning and alignment of Cyclesuperhighway. 2018: Capital Region of Copenhagen: Evaluation of employer commuter bike-share system. Questionnaires and analysis. 2017: Group of 6 municipalities: Communication strategy, signage- and routing plan for 200 kilometers of bicycle tourist routes. 2017: City of Copenhagen: Temporary bike parking for use at events. Concept -and process description and design. Prototyping and testing. 2017: City and Commuter Bike Foundation: Assessment of new locations at future metro stations. 2017: Kolding Municipality: Market analysis of bicycle parking and related visual communication for use in connection with events. 2017: Roskilde Municipality: Improvements of bike parking at 4 train stations and the downtown area.
    [Show full text]
  • [email protected] 2920 Charlottenlund
    HOUSEKEEPING – PART TIME JOB June 2021 If you are living in Copenhagen or surrounding areas and are looking for part time work, then you just might be the person we are looking for. Skovshoved Hotel is a small and cozy hotel (22 rooms) located in the fishing village of Skovshoved (Gentofte municipality), just 20 minutes away from Copenhagen. (Bus 23 directly to the front door, nearest train station Ordrup St.) Together with the rest of the Housekeeping Team, you will be responsible for the daily cleaning of hotel rooms, common areas and meeting rooms as well as ordering goods and linen. It is preferable that you have a minimum of 1 year of experience from similar work. People with less experience are not dismissed though. We expect: • You have an eye for detail and are passionate about ensuring a high level of cleaning • You can maintain a high level of service and smile • You can work both weekdays and weekends • You are a team player • Speaks, reads and understands Danish(optional), as well as speaks and understands English • You have a minimum of 1 year experience from similar jobs We offer: • Education and training • Good and proper working conditions • A positive work environment with wonderful colleagues who are passionate about providing high service • Part-time contract (60 minimum hours guaranteed) If we have caught your interest, please send an E-mail with your application, resume and any references you may have, to our housekeeping manager Estera Turcu ([email protected]). Application deadline: 20.07.2021 Date of employment: As soon as possible If you have not received a reply from us within 10 days after your application, it means the position has been filled.
    [Show full text]
  • Aalb on 1996 Lisbo Over 2000 Hannov G 2004 Aalborg 2007 Sevilla
    Aalb Lisboon 1996 Hannovover 2000 Aalborgg 2004 Sevilla 2007 +I=:JGDE:6C8DC;:G:C8: DCHJHI6>C67A:8>I>:HIDLCH &."'&B6N'%&% 9JC@:GFJ:!;G6C8: 9Za^kZg^c\HjhiV^cVWaZ8^i^Zh/ I]ZAdXVaAZVYZgh]^e8]VaaZc\Z gVbbZ mmm$Zkda[hgk[(&'&$eh] Organised by: Co-organised by: Table of contents Welcome from the host and the organisers .............................................. p.3 &RQIHUHQFHREMHFWLYHVSDUWLFLSDQWV SURJUDPPHÀRZ ........................... p. 4 Aalborg Commitments Signatory Ceremony ............................................ p. 5 Mayors’ session ........................................................................................ p. 5 Agora ........................................................................................................ p. 6 Side events ............................................................................................... p. 6-7 Programme Wednesday 19 May 2010 ......................................................................... p. 8-10 Thursday 20 May 2010 ............................................................................. p. 11-13 Friday 21 May 2010 .................................................................................. p. 14 Study visits ................................................................................................ p. 15 Cultural events in Dunkerque .................................................................... p. 16-17 Dunkerque 2010: Crossroad for sustainable development ....................... p. 18-19 A green event ..........................................................................................
    [Show full text]
  • CTR Engelsk Version, 1. Korrektur
    WORLDCLASS, CLIMATE- FRIENDLY HEATING CTR – Centralkommunernes Transmissionsselskab I/S Worldclass, climate-friendly heating 3 CTR Comes into Being after reams of reports and a fight to the finish 4 The Technical Feat: On time and within the budget – without sacrificing quality 8 Greater Copenhagen’s Hotline 12 Aiming for Zero Carbon Emissions 14 Timeline 16 CONTENTS Board of Directors 18 COVER The transmission system’s 26 exchanger stations is located underneath the squaes of the city. The stations transfer the heat from the transmission system to the district heating network that supplies heat to households in the 5 Municipalities. WORLDCLASS, CLIMATE- FRIENDLY HEATING Twenty-five years ago, the five central municipalities and about the technical feat posed by constructing of Greater Copenhagen – Frederiksberg, Gentofte, the system in CTR’s early years. You can also read Gladsaxe, Copenhagen and Tårnby – joined forces to about what it means to be a heating utility for the ensure that their citizens would have a well-thought- municipalities involved and the benefits of district through system for supplying electricity and heat for heating – in the future as well. many years to come. This required an investment of billions of DKK in a vast heat transmission system CTR is a multifaceted success story involving many that would protect the environment, stabilise crucial factors for our society and our citizens: consumer prices and ensure highly reliable supplies. economy, safety, environment and comfort. The catchword for CTR’s activities is “teamwork” – which Looking back, we now see how the founding of the has been exemplary throughout the process.
    [Show full text]
  • From Challenges to Opportunities – Climate Adaptation in Danish Municipalities
    Faculty of Natural Resources and Agricultural Sciences From Challenges to Opportunities – Climate Adaptation in Danish Municipalities Helene Albinus Søgaard Department of Urban and Rural Development Master’s Thesis • 30 HEC Sustainable Development - Master’s Programme Uppsala 2015 From Challenges to Opportunities - Climate Adaptation in Danish Municipalities Helene Albinus Søgaard Supervisor: Hans Peter Hansen, Swedish University of Agricultural Sciences, Department of Urban and Rural Development, Division of Environmental Communication Examiner: Cristián Alarcón Ferrari, Swedish University of Agricultural Sciences, Department of Urban and Rural Development, Division of Environmental Communication Credits: 30 HEC Level: Second cycle (A2E) Course title: Independent Project in Environmental Science - Master’s thesis Course code: EX0431 Programme/Education: Sustainable Development - Master’s Programme Place of publication: Uppsala Year of publication: 2015 Other maps and/or images: (1) Photo p. 47, Flooding in Istedgade, Copenhagen 2011. Photographer: Anne Christine Imer Eskildsen, published with permission from copyright owner. (2) Water texture background in Figure 5 p. 43, open source from Flickr, for link click here, or see Reference list, Pictures, Flickr Online publication: http://stud.epsilon.slu.se Keywords: Climate Adapation, Organizational Learning Theory, Advocacy Coalition Framework, Innovative Practices, and Sustainable Development Sveriges lantbruksuniversitet Swedish University of Agricultural Sciences Faculty of Natural Resources and Agricultural Sciences Department of Urban and Rural Development Page 1/105 Abstract The increasingly dense and paved cities often situated in coastal areas, are challenged by climate change that intensifies damages to urban infrastructure. Through a theoretical framework combining Advocacy Coalition Framework with organizational learning theory of ‘Ba’, the public knowledge creation processes on climate adaptation in Danish municipalities are analyzed in an empirical study.
    [Show full text]