Plat of Fourwinds Drive North

Total Page:16

File Type:pdf, Size:1020Kb

Plat of Fourwinds Drive North PLAT OF R.P.C. CASE NO. 11-16.2 FOURWINDS DRIVE NORTH STATE OF OHIO, COUNTY OF DELAWARE, TOWNSHIP OF BERKSHIRE AND BERLIN, FARM LOTS 2 AND 3, SECTION 2, TOWNSHIP 4, RANGE 17, UNITED STATES MILITARY LANDS NORTH SITUATED IN THE STATE OF OHIO, COUNTY OF DELAWARE, TOWNSHIP OF BERKSHIRE AND BERLIN, FARM LOTS 2 AND 3, SECTION 2, APPROVED THIS DAY OF 20 TOWNSHIP 4, RANGE 17, UNITED STATES MILITARY LANDS, BEING 85.383 ACRES OF LAND ALL OUT OF THAT 125.849 ACRE TRACT BERLIN TWP., ZONING INSPECTOR CONVEYED TO BROOKDOC II INVESTMENTS, LLC., BY DEED OF RECORD IN OFFICIAL RECORD 1482 PAGE 462. BEING OF RECORD IN THE RECORDER'S OFFICE, DELAWARE COUNTY, OHIO. THE UNDERSIGNED, BROOKDOC II INVESTMENTS, LLC., AN OHIO LIMITED LIABILITY COMPANY, BY PATRICK KELLEY, MANAGING APPROVED THIS DAY OF 20 MEMBER/AUTHORIZED SIGNATORY, OWNER OF THE LAND PLATTED HEREIN, DULY AUTHORIZED IN THE PREMISES, DOES HEREBY BERKSHIRE TWP., ZONING INSPECTOR SITE CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS "FOURWINDS DRIVE NORTH" & "N 3 B'S & K ROAD", A SUBDIVISION CONTAINING LOTS NUMBERED 1361 AND 1362, INCLUSIVE, AND DOES HEREBY ACCEPT THIS PLAT OF SAME AND DEDICATE TO PUBLIC USE, 8.264 ACRES (0.878 ACRES CURRENT RIGHT OF WAY EASEMENT OF N. 3 B'S & K ROAD), AS SUCH FOURWINDS DRIVE AND NOT HERETOFORE DEDICATED. APPROVED THIS DAY OF 20 DEPUTY GENERAL MANAGER I - 71 EASEMENTS ARE HEREBY RESERVED, IN, OVER AND UNDER AREAS DESIGNATED ON THIS PLAT AS "UTILITY EASEMENT OR DRAINAGE DEL-CO WATER CO., INC. N. THREE B's & K RD EASEMENT". EASEMENTS DESIGNATED AS "UTILITY EASEMENT" OR "DRAINAGE EASEMENT", PERMIT THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF ALL PUBLIC AND QUASI-PUBLIC UTILITIES ABOVE, BENEATH, AND ON THE SURFACE OF THE GROUND AND, WHERE NECESSARY, FOR THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF SERVICE CONNECTIONS TO ALL APPROVED THIS DAY OF 20 ST. RT. 37 ADJACENT LOTS AND LANDS AND FOR STORM WATER DRAINAGE. DELAWARE COUNTY SANITARY ENGINEER WITHIN THOSE AREAS OF LAND DESIGNATED AS "DRAINAGE EASEMENT" ON THIS PLAT, AN ADDITIONAL EASEMENT IS HEREBY RESERVED FOR THE PURPOSE OF CONSTRUCTING, OPERATING, AND MAINTAINING MAJOR STORM WATER DRAINAGE SWALES VICINITY MAP AND/OR OTHER ABOVE GROUND STORM WATER DRAINAGE FACILITIES. NO ABOVE GRADE STRUCTURES, DAMS, OR OTHER APPROVED THIS DAY OF 20 SCALE: 1"=2000' OBSTRUCTIONS TO THE FLOW OF STORM WATER RUNOFF ARE PERMITTED WITHIN DRAINAGE EASEMENTS AREAS AS DELINEATED DELAWARE COUNTY ENGINEER ON THIS PLAT. EASEMENT AREAS SHOWN HEREON OUTSIDE OF THE PLATTED AREA ARE WITHIN LANDS OWNED BY THE SIGNATURE BY THE DELAWARE COUNTY UNDERSIGNED AND EASEMENTS ARE HEREBY RESERVED FOR THE USES AND PURPOSES EXPRESSED HEREIN. ENGINEER'S OFFICE ON THE PLAT DOES NOT CONVEY APPROVAL OF THE A NON-EXCLUSIVE EASEMENT IS HEREBY SPECIFICALLY GRANTED UNTO DEL-CO WATER COMPANY, INC., ITS SUCCESSORS AND STORMWATER MANAGEMENT, EROSION AND ASSIGNS, FOR THE LOCATION OF WATER LINES, VALVES, AND APPURTENANCES WITHIN THE RIGHTS-OF-WAY HEREBY DEDICATED BASIS OF BEARING SEDIMENTATION CONTROL, SIDE ACCESS AND WITHIN AREAS DESIGNATED HEREON AS "UTILITY EASEMENT" OR "DRAINAGE EASEMENT" THAT ARE LOCATED ALONGSIDE THE BEARINGS SHOWN HEREON ARE BASED ON A BEARING OF N 24°51'02" E FOR A PORTION OF THE CENTERLINE OF N. POINTS, OR ANY WORK WITHIN THE RIGHTS-OF-WAY HEREBY DEDICATED. ALSO GRANTED IS THE RIGHT OF DEL-CO WATER COMPANY INC., TO INSTALL, SERVICE, AND 3B's & K ROAD AND BASED ON GPS OBSERVATIONS PERFORMED IN JULY 2017. RIGHT-OF-WAY FOR ANY LOT SHOWN ON THIS PLAT. MAINTAIN WATER METER CROCKS AND APPURTENANCES IN SAID EASEMENT AREAS ALONGSIDE SAID RIGHT-OF-WAY. THE EASEMENT AREA SHALL BE FOR THE UNOBSTRUCTED USE OF DEL-CO WATER COMPANY, INC. PLACEMENT OF FENCES, WALLS, SOURCE OF DATA PILLARS, TREES, GARDENS, SHRUBBERIES, AND OTHER SURFACE FEATURES IS STRICTLY PROHIBITED. APPROVED THIS DAY OF 20 THE SOURCES OF RECORDED SURVEY DATA REFERENCED IN THE PLAN AND TEXT OF THIS PLAT ARE THE RECORDS DIRECTOR, DELAWARE COUNTY OF THE RECORDER'S OFFICE, UNION COUNTY, OHIO. STATE OF OHIO REGIONAL PLANNING COMMISSION COUNTY OF DELAWARE: IRON PINS ALL IRON PINS SET ARE SOLID 5/8" REBAR WITH A CAP MARKED "CESO". MONUMENTS SHALL BE SET UPON THIS DAY OF 20 , RIGHTS-OF-WAY FOR PUBLIC DELAWARE COUNTY COMMISSIONERS: BEFORE ME, A NOTARY PUBLIC IN AND FOR SAID STATE, PERSONALLY APPEARED PATRICK KELLEY, MANAGING/AUTHORIZED COMPLETION OF CONSTRUCTION. SIGNATORY OF SAID BROOKDOC II INVESTMENTS, LLC., WHO ACKNOWLEDGED THE SIGNING OF THE FOREGOING INSTRUMENT TO BE DRIVES HEREIN DEDICATED TO PUBLIC USE ARE HEREBY HIS VOLUNTARY ACT AND DEED AND THE VOLUNTARY ACT AND DEED OF BROOKDOC II INVESTMENTS, LLC., FOR ITS USES AND APPROVED FOR THE COUNTY OF DELAWARE, STATE OF OHIO. STREET PERMANENT MARKERS PURPOSES EXPRESSED THEREIN. IMPROVEMENTS WITHIN SAID DEDICATED RIGHT-OF-WAY SHALL NOT BE ALL IRON PINS SET ARE SOLID IRON PINS, 1" IN DIAMETER, WITH AN ALUMINUM CAP STAMPED "CESO". MONUMENTS ACCEPTED FOR PUBLIC USE AND/OR MAINTENANCE UNLESS AND IN WITNESS THEREOF, I HAVE HEREUNTO SET MY HAND AND AFFIXED MY OFFICIAL SEAL THIS SHALL BE SET UPON COMPLETION OF CONSTRUCTION. UNTIL CONSTRUCTION IS COMPLETED AND STREETS ARE FORMALLY DAY OF , 2019 ACCEPTED BY DELAWARE COUNTY. CERTIFICATION WE DO HEREBY CERTIFY THAT WE HAVE SURVEYED THE ATTACHED PREMISES, PREPARED THE ATTACHED PLAT, AND THAT SAID PLAT IS CORRECT. ALL DIMENSIONS ARE SHOWN IN FEET AND DECIMAL PARTS THEREOF. MY COMMISSION EXPIRES DIMENSIONS SHOWN ALONG CURVES ARE CHORD MEASUREMENTS. PERMANENT MARKERS, MAGNETIC NAILS AND IRON PINS ARE TO BE PLACED AS SHOWN UPON COMPLETION OF CONSTRUCTION NECESSARY TO THE IMPROVEMENTS OF THIS LAND. FIELD WORK WAS COMPLETED IN MARCH 2018. IN WITNESS WHEREOF, PATRICK KELLEY, MANAGING/AUTHORIZED SIGNATORY HAS CAUSED THIS PLAT TO BE EXECUTED BY THIS DULY AUTHORIZED OFFICE. TRANSFERRED THIS DAY OF , 2018 THIS DAY OF , 2019. AUDITOR, DELAWARE COUNTY, OHIO SIGNED AND ACKNOWLEDGED BROOKDOC II INVESTMENTS, LLC. IN THE PRESENCE OF: AN OHIO LIMITED LIABILITY COMPANY RECORDER, DELAWARE COUNTY, OHIO JEFFREY MILLER, P.S. DATE: OHIO P.S. NO. 7211 BY: 2800 CORPORATE EXCHANGE DRIVE, SUITE 160 PATRICK KELLEY COLUMBUS, OHIO 43231 MANAGING MEMBER/AUTHORIZED SIGNATORY PLAT FOUR WINDS DRIVE NORTH ACREAGE BREAKDOWN N. 3B's & K ROAD DELAWARE COUNTY, OHIO BUILDABLE LOT: LOT 1362 (72.504 ACRES) REVISIONS SCALE: N/A DATE: 8/27/2019 OPEN SPACE: LOT 1361 (4.615 ACRES) NO. DATE DESCRIPTION DESIGN: JOB NO.: FOURWINDS DR: 7.386 ACRES N/A 754900 N. 3 B'S & K: 0.878 ACRES DRAWN: SHEET NO.: ALB CHECKED: JAM 1 OF 8 W:\PROJECTS\KIMLEY HORN\754900-01 NORTH LAKES\04-SURVEY\PLAN\754900 KH - FOUR WINDS DRIVE NORTH_PLAT-04112019.DWG - 8/29/2019 9:44 AM NOTE "A": NOTE "E": NOTE "M": NOTE "F": NOTE "G": NOTE "N": NOTE "B": NOTE "H": NOTE "O": NOTE "I": NOTE "P": NOTE "J": NOTE "Q": NOTE "R": NOTE "K": NOTE "S": NOTE "C": NOTE "L": PLAT NOTE "D": FOUR WINDS DRIVE NORTH N. 3B's & K ROAD DELAWARE COUNTY, OHIO SCALE: N/A DATE: 8/27/2019 DESIGN: JOB NO.: N/A 754900 DRAWN: SHEET NO.: ALB CHECKED: JAM 2 OF 8 W:\PROJECTS\KIMLEY HORN\754900-01 NORTH LAKES\04-SURVEY\PLAN\754900 KH - FOUR WINDS DRIVE NORTH_PLAT-04112019.DWG - 8/29/2019 9:44 AM 1" IRON PIPE FND 44.41' 1/2" IRON PIN FND N 24° 51' 02" E 155.13' 40.0' N 24° 51' 02" E 552.12' (VARIABLEN. 3B'SPUBLIC & K RIGHT-OF-WAY)ROAD 100 0 100 200 GRAPHIC SCALE (IN FEET) 10.53' N 24° 29' 18" E 406.17' 433.77' S 89° 05' 07" W 478.18' W 07" 05' 89° S LOT 1361 4.615 AC 395.64' S 45° 03' 57" E 155.07' OPEN SPACE 378.31' E 07" 05' 89° N LEGEND SEE NOTE "R" SET 1" x 30" SOLID REBAR WITH YELLOW CAP STAMPED "CESO" 32.24' SET 5/8" x 30" REBAR (LOT 1 BERLIN TWP 1.302 10.64' YELLOW CAP STAMPED "CESO" ACRES) 1" IRON PIPE FND (LOT 1 BERKSHIRE TWP MAG NAIL SET 3.313 ACRES) IRON REBAR FND UNLESS NOTED OTHERWISE 20' UTILITY ESMT. BERLIN TOWNSHIP MAG NAIL FOUND 132.85' BERKSHIRE TOWNSHIP MONUMENT FOUND S 3° 50' 28" W 204.79' C3 144.60' 60.19' C8 C10 C4 Curve table 40.00' MATCH LINE SEE SHEET 4 FOURWINDS DRIVE Curve Radius Arc Length Chord Delta Angle 40.00' PUBLIC RIGHT OFS WAY11° 25' 58" E 486.01' C3 947.06' 48.10' S4° 38' 11"W, 48.10' 2° 54' 36" S 86° 37' 30" E 534.79' E 30" 37' 86° S C4 1010.00' 259.21' S4° 04' 50"E, 258.50' 14° 42' 17" 5/8" IRON PIN FND C8 1010.00' 781.95' S6° 49' 41"E, 762.56' 44° 21' 31" C10 1050.00' 1107.20' S14° 51' 26"E, 1056.61' 60° 25' 01" N 86° 30' 31" W 380.36' W 31" 30' 86° N PLAT FOUR WINDS DRIVE NORTH N. 3B's & K ROAD DELAWARE COUNTY, OHIO SCALE: 1"=100' DATE: 8/27/2019 DESIGN: JOB NO.: N 4° 03' 19" E 304.29' N/A 754900 SEE SHEET 5 LOT 1362 DRAWN: SHEET NO.: 72.504 AC ALB CHECKED: 118.00' JAM 3 OF 8 W:\PROJECTS\KIMLEY HORN\754900-01 NORTH LAKES\04-SURVEY\PLAN\754900 KH - FOUR WINDS DRIVE NORTH_PLAT-04112019.DWG - 8/29/2019 9:44 AM N 85° 56' 41" W 1" IRON PIPE 100 0 100 200 FND 5/8" IRON PIN FND BERLIN TOWNSHIP N 3° 48' 42" E 1130.93' BERKSHIRE TOWNSHIP 468.71' 150.51' 102.50' 108.20' 150.51' GRAPHIC SCALE (IN FEET) 5/8" IRON PIN FND IRON PIN FND 5/8" IRON PIN FND W/ CAP "STULTS & ASSOC" 5/8" IRON PIN FND W/ CAP "CEC INC" 5/8" IRON PIN FND 86.37' W/ CAP "STULTS & ASSOC" 5/8" IRON PIN FND W/ CAP "CEC INC" W/ CAP "STULTS & ASSOC" N 86° 01' 41" W S 4° 03' 19" W 150.94' C7 LOT 1361 166.37' 4.615 AC S 15° 21' 04" W 160.84' FOURWINDS DRIVE 40.00' 40.00' FOURWINDS DRIVE OPEN SPACE (80' PUBLIC) PUBLIC RIGHT OF WAY 40.00' S 4° 03' 19" W 150.88' (PC 4, SL 53) C9 SEE NOTE "R" C8 SEE SHEET 3 40.00' 40.00' S 15° 21' 04" W 160.84' 40.00' S 4° 03' 19" W 150.82' 40.00' 5/8" IRON PIN FND C11 W/ CAP "CEC INC" S 15° 21' 04" W 160.84' C10 40.00' C5 FARM LOT 3 FARM LOT 2 LOT FARM LEGEND SET 1" x 30" SOLID REBAR WITH YELLOW CAP STAMPED "CESO" CORMORANT DRIVE SET 5/8" x 30" REBAR (60' PUBLIC) YELLOW CAP STAMPED "CESO" (PC 4, SL 58) SEE SHEET 6 MAG NAIL SET IRON REBAR FND Curve table UNLESS NOTED OTHERWISE MAG NAIL FOUND Curve Radius Arc Length Chord Delta Angle MONUMENT FOUND C5 1090.00' 509.54' S1° 57' 33"W, 504.92' 26° 47' 02" C7 1090.00' 214.89' S9° 42' 11"W, 214.55' 11° 17' 45" PLAT C8 1010.00' 781.95' S6° 49' 41"E, 762.56' 44° 21' 31" FOUR WINDS DRIVE NORTH C9 1050.00' 207.01' S9° 42' 11"W, 206.67' 11° 17' 45" N.
Recommended publications
  • Untergrundbahnbau Frankfurt Am Main FH Potsdam Philipp Holzmann Archiv Prof
    Vitali Elin Untergrundbahnbau Frankfurt am Main FH Potsdam Philipp Holzmann Archiv Prof. Dr. phil. A. Kahlow Untergrundbahnbau Frankfurt am Main vom Fachbereich Bauingenieurwesen der Fachhochschule Potsdam zur Erlangung des Leistungsnachweises im Ingenieurprojekt: „Bilderarchiv der Philipp Holzmann AG“ Vitali Elin Gutachter: Prof. Dr. phil. A. Kahlow Potsdam, Januar 2017 1 Vitali Elin Untergrundbahnbau Frankfurt am Main FH Potsdam Philipp Holzmann Archiv Prof. Dr. phil. A. Kahlow Inhaltsverzeichnis 1. Allgemeines ….......................................................................................................... 3 2. Geschichte der Frankfurter U-Bahn …..................................................................... 6 3. Bauweisen ….......................................................................................................... 12 3.1 Tunnelbauten …................................................................................................. 12 4. Streckennetz …....................................................................................................... 15 4.1. Strecke A …..................................................................................................... 16 4.2. Strecke C …..................................................................................................... 19 5. Kosten …................................................................................................................. 20 6. Quellenverzeichnis …............................................................................................
    [Show full text]
  • Using Shapley Additive Explanations to Interpret Extreme Gradient Boosting Predictions of Grassland Degradation in Xilingol, China
    Geosci. Model Dev., 14, 1493–1510, 2021 https://doi.org/10.5194/gmd-14-1493-2021 © Author(s) 2021. This work is distributed under the Creative Commons Attribution 4.0 License. Using Shapley additive explanations to interpret extreme gradient boosting predictions of grassland degradation in Xilingol, China Batunacun1,2, Ralf Wieland2, Tobia Lakes1,3, and Claas Nendel2,3 1Department of Geography, Humboldt-Universität zu Berlin, Unter den Linden 6, 10099 Berlin, Germany 2Leibniz Centre for Agricultural Landscape Research (ZALF), Eberswalder Straße 84, 15374 Müncheberg, Germany 3Integrative Research Institute on Transformations of Human-Environment Systems, Humboldt-Universität zu Berlin, Friedrichstraße 191, 10099 Berlin, Germany Correspondence: Batunacun ([email protected]) Received: 25 February 2020 – Discussion started: 9 June 2020 Revised: 27 October 2020 – Accepted: 10 November 2020 – Published: 16 March 2021 Abstract. Machine learning (ML) and data-driven ap- Land-use change includes various land-use processes, such proaches are increasingly used in many research areas. Ex- as urbanisation, land degradation, water body shrinkage, and treme gradient boosting (XGBoost) is a tree boosting method surface mining, and has significant effects on ecosystem ser- that has evolved into a state-of-the-art approach for many vices and functions (Sohl and Benjamin, 2012). Grassland is ML challenges. However, it has rarely been used in sim- the major land-use type on the Mongolian Plateau; its degra- ulations of land use change so far. Xilingol, a typical re- dation was first witnessed in the 1960s. About 15 % of the gion for research on serious grassland degradation and its total grassland area was characterised as being degraded in drivers, was selected as a case study to test whether XG- the 1970s, which rose to 50 % in the mid-1980s (Kwon et Boost can provide alternative insights that conventional land- al., 2016).
    [Show full text]
  • Stadtbahn Hannover
    Stadtbahn mit Haltestelle DB City-Ticket GVH Kombiticket 3 Bremen Soltau Tram line with stop gültig in Zone gültig in den Zonen Stadtbahn Hannover Stadtbahn mit Tunnelstation RE 1 valid in zone A valid in zones A B C RB38 Underground station RE 8 Bennemühlen Uelzen Veranstaltungslinie Hamburg 16 18 Special service S4 RE2 Abweichender Fahrweg Nienburg Hannover Flughafen / / / RE3 10 RE2 RE3 n n n im Nachtsternverkehr S2 S5 Celle Night service S6 RegionalExpress 5 Stöcken 5 Langenhage Langenhage Langenhage 1 Langenhagen 3 Altwarmbüchen RE 2 Marshof S S7 t/ Langenforther Zentrum Platz Kurt-Schumacher-Allee RB 38 RegionalBahn 4 S Langenhagen/Angerstr. Regional train 2 S S-Bahn Stöckener Markt Berliner Platz S2 8 4 Auf der HorsAuf der Horst/SkorpiongasseSchönebeckerPascalstr. AlleeWissenschaftsparkJädekampAuf Marienwerde der KlappenburgLauckerthofr Altwarmbüchen/ Garbsen 6 Nordhafen 2 Alte Heide Suburban train Zentrum Übergang zum Bus Wiesenau 1 RE Mecklenheidestr. 9 Interchange with bus Freudenthalstr. Bahnstrift Fasanenkrug Altwarmbüchen/ 38 Alter Flughafen Ernst-Grote-Str. Park+Ride Beneckeallee B RE Tempelhofweg Stufenfreier Zu-/Abgang Stadtfriedhof Stöcken Friedenauer Str. Zehlendorfweg Stadtfriedhof Step-free access Fuhsestr. Kabelkamp Bothfeld Altwarmbüchen/ RE1 RE8 RE60 Fuhse- Krepenstr. Papenwinkel Opelstr. Tarifzonen RE70 S1 S2 RE1 RE8 RE60 RE70 S1 S2 S51 str./Bhf. 2 RE3 R Kurze-Kamp-Str. A B C E Windausstr. Vahrenheider Markt Fare zones R Wunstorf Seelze Bahnhof Leinhausen Hainhölzer Reiterstadion Bothfeld Oldenburger Allee Markt Büttnerstr. S51 Bothfelder Kirchweg 7 Stand: Oktober 2020 Herrenhäuser Markt Großer Kolonnenweg gvh.de S Fenskestr. Niedersachsenring Buchholz/Bhf. Stadtfriedhof Lahe 6 S Schaumburgstr. Dragonerstr. 8 Haltenhoffstr. Bahnhof C B A Herrenhäuser Gärten Nordstadt Vahrenwalder Platz 11 Appelstr.
    [Show full text]
  • Rail Transport in the World's Major Cities
    Feature Evolution of Urban Railways (part 2) Rail Transport in The World’s Major Cities Takao Okamoto and Norihisa Tadakoshi Many of the world’s large cities grew in development, particularly with regard to American city; and Hong Kong, Seoul and conjunction with railways, and today, the following: Tokyo representing Asian cities. large cities cannot depend only on motor • The correlation between railways and vehicles for transportation. With worries urban growth over global environmental issues, public • The location of terminals for intercity London transportation systems are increasingly and intra-city transport seen as an important way to expand and • Examination of various public transit Located in southeast England near the revitalize large cities, while consuming systems, including non-infrastructure mouth of the River Thames, London less energy and other resources. • Strategic planning of rail networks expanded during the Industrial Revolution This article looks at public transportation based on urban development trends (1760–1850) and secured its dominance systems in some major cities of the world and future models as the heart of the British Empire during and identifies similarities and differences The cities selected for this comparative the Victorian era (1837–1901). It’s in areas such as history of development, study are: London as the first city to adapt population grew from about 500,000 in railway networks, and method of rail technology to public transport; Paris, the 17th century to 4.5 million by the end operation. Our aim is to explore the future Berlin and Moscow as three major of the 19th century. The modern relationship between urban and transport European cities; New York as a North- metropolis of Greater London consists of The London Railway Network King’s Cross/St.Pancras Paddington LCY Victoria Waterloo LHR R.
    [Show full text]
  • Und Informations-Dialog 2018 Baumaßnahmen Im Netz Der Berliner S-Bahn 2018 - 2020
    2. Bau- und Informations-Dialog 2018 Baumaßnahmen im Netz der Berliner S-Bahn 2018 - 2020 DB Netz AG | I.NP-O-D-BLN(BS) + I.NM-O-F(S) | Berlin | 17.07.2018 Übersicht Regionalbereich Ost – Netz Berliner S-Bahn Bauschwerpunkte 2018 Ersatzneubau SÜ Rhinstraße + ESTW+ZBS S7 Ost SEV Lichtenberg–Springpfuhl/ Wuhletal Wochenenden April bis Juni + Dezember 2018 Brückenarbeiten S2 Nord + Neubau SÜ BAB114 SEV Lichtenberg–Ahrensfelde/ Wartenberg SEV Blankenburg–Karow + Blankenburg- 19.10.–25.10.2018 Schönfließ SEV Sprinpfuhl–Wartenberg/ Ahrensfelde 26.06.–16.07.2018 20.07.–23.07.2018 SEV Blankenburg–Buch + Blankenburg- Schönfließ 16.07.–23.07.2018 SEV Blankenburg–Buch Ersatzneubau 23.07.–17.08.2018 EÜ Thälmannstr. + Entflechtung S-/F- ZBS S5 West Schienenauswechslung Bahn Bf Strausberg SEV Westkreuz–Spandau SEV Tiergarten–Charlottenburg SEV Mahlsdorf– 13.08.–16.08.2018 (in Prüfung 23.07.-03.08.2017 Strausberg Nord Verschiebung IBN nach 01/2019) 23.11.–29.11.2018 Umbau Ostkreuz – Neubau Bahnsteig Karlshorst Ibn Endzustand 4-gleisigkeit SEV Rummelsburg–Wuhlheide ZBS S7 West + Begegnungsabschn. Potsdam SEV Ostkreuz–Karlshorst 06.07.–16.07.2018 SEV Wannsee–Potsdam 02.11.–12.11.2018 kein Verkehrshalt Karlshorst 03.08.–06.08. + 10.08.–13.08. + 14.12.–17.12.2018 SEV Alexanderplatz–Lichtenberg 06.07. – 06.08.2018 SEV Westkreuz–Wannsee + Babelsberg–Potsdam 02.11.–05.11. + 09.11.–12.11.2018 eingleisig Wuhlheide – Karlshorst 31.08.–03.09.2018 06.08. – 15.08.2018 SEV Westkreuz–Grunewald 16.11.–19.11.2018 Ende Neubau EÜ Sterndamm + Neubau PT Schöneweide bis 2021 bis 20.08.2018 halbseitg.
    [Show full text]
  • X-Ray Structural Analyses of Cyclodecasulfur (S10) and of A
    X-Ray Structural Analyses of Cyclodecasulfur (S10) and of a Cyclohexasulfur-Cyclodecasulfur Molecular Addition Compound (S6 • S10) [1] Ralf Steudel*, Jürgen Steidel Institut für Anorganische und Analytische Chemie, Technische Universität Berlin, Sekr. C2, D-1000 Berlin 12 Richard Reinhardt** Institut für Kristallographie der Freien Universität Berlin, Takustraße 6, D-1000 Berlin 33 Dedicated to Professor Dr. Karl Winnacker on the occasion of his 80th birthday Z. Naturforsch. 38 b, 1548-1556 (1983); received August 11, 1983 Elemental Sulfur, Sulfur Rings, Molecular Structure, Crystal Structure, Vibrational Spectra Low temperature X-ray structural analyses of monoclinic single crystals of Sio and Sö • Sio (prepared from the components) show that the cyclic Sio molecule exhibits the same D2 conformation in both compounds with bond distances between 203.3 and 208.0pm, bond angles (a) between 103 and 111°, and torsional angles (r) between 73 and 124°. The Sß molecule (site symmetry Ci) in Sö • Sio is very similar to the one in pure Sö (dss = 206.2 pm, a= 103°, r = 74°). All intermolecular interactions are of van-der-Waals type. The Raman spectrum of S6 • Sio can be explained by a superposition of the Se and Sio spectra. Introduction In all cases the reason for the differing bond distances is the variation of the torsional angles The tremendous industrial importance of ele- leading to a varying degree of lone-pair-lone-pair mental sulfur and its surplus expected for the near repulsion between neighboring atoms. In fact, the future (and occasionally already experienced in the torsional angles r in sulfur rings Sre vary between 0° past) have stimulated considerable research ac- and 140° resulting in a bond length variation of tivities with the result that 19 well characterized 19 pm or 9% [18].
    [Show full text]
  • Techno-Economic Assessment of Battery Electric Trains and Recharging Infrastructure Alternatives Integrating Adjacent Renewable Energy Sources
    sustainability Article Techno-Economic Assessment of Battery Electric Trains and Recharging Infrastructure Alternatives Integrating Adjacent Renewable Energy Sources Christoph Streuling 1,* , Johannes Pagenkopf 1, Moritz Schenker 1 and Kim Lakeit 2 1 German Aerospace Center (DLR), Institute of Vehicle Concepts, 70569 Stuttgart, Germany; [email protected] (J.P.); [email protected] (M.S.) 2 Institute of Electric Power Systems, Otto von Guericke University, 39106 Magdeburg, Germany; [email protected] * Correspondence: [email protected] Abstract: Battery electric multiple units (BEMU) are an effective path towards a decarbonized regional rail transport on partly electrified rail lines. As a means of sector coupling, the BEMU recharging energy demand provided through overhead line islands can be covered from decentralized renewable energy sources (RES). Thus, fully carbon-free electricity for rail transport purposes can be obtained. In this study, we analyze cost reduction potentials of efficient recharging infrastructure positioning and the feasibility of covering BEMU energy demand by direct-use of locally produced renewable electricity. Therefore, we set up a model-based approach which assesses relevant lifecycle costs (LCC) of different trackside electrification alternatives comparing energy supply from local RES and grid consumption. The model-based approach is applied to the example of a German regional rail line. In Citation: Streuling, C.; Pagenkopf, J.; the case of an overhead line island, the direct-use of electricity from adjacent wind power plants with Schenker, M.; Lakeit, K. on-site battery storage results in relevant LCC of EUR 173.4 M/30a, while grid consumption results in Techno-Economic Assessment of EUR 176.2 M/30a whereas full electrification results in EUR 224.5 M/30a.
    [Show full text]
  • World Para Swimming World Records Long Course
    World Para Swimming World Records Long Course World Para Swimming World Records created by IPC Sport Data Management System Gender: Men | Course: Long Course Men's 50 m Freestyle Class Name NPC Birth Time Date City Country S1 Mamistvalov, Itzhak ISR 1979 01:03.80 2014-03-09 Esbjerg Denmark S2 Zou, Liankang CHN 1995 00:50.65 2016-09-11 Rio de Janeiro Brazil S3 Huang, Wenpan CHN 1995 00:38.81 2017-12-06 Mexico City Mexico S4 Leslie, Cameron NZL 1990 00:37.14 2019-09-13 London Great Britain S5 Fantin, Antonio ITA 2001 00:30.16 2019-06-01 Lignano Sabbiadoro Italy S6 Xu, Qing CHN 1992 00:28.57 2012-09-04 London Great Britain S7 Trusov, Andrii UKR 2000 00:27.07 2019-09-15 London Great Britain S8 Tarasov, Denis RUS 1993 00:25.32 2014-08-10 Eindhoven Netherlands S9 Barlaam, Simone ITA 2000 00:24.00 2019-09-15 London Great Britain S10 Brasil, Andre BRA 1984 00:23.16 2012-08-31 London Great Britain S11 Yang, Bozun CHN 1986 00:25.27 2012-09-01 London Great Britain S12 Veraksa, Maksym UKR 1984 00:22.99 2009-10-21 Reykjavik Iceland S13 Boki, Ihar BLR 1994 00:23.20 2015-07-13 Glasgow Great Britain IPC Sport Data Management System Page 1 of 22 29 September 2021 at 00:11:44 CEST World Para Swimming World Records Long Course Men's 100 m Freestyle Class Name NPC Birth Time Date City Country S1 Mamistvalov, Itzhak ISR 1979 02:15.83 2012-09-01 London Great Britain S2 Liu, Benying CHN 1996 01:46.63 2016-09-11 Rio de Janeiro Brazil S3 Lopez Diaz, Diego MEX 1994 01:32.69 2018-06-08 Berlin Germany S4 Dadaon, Ami Omer ISR 2000 01:19.77 2021-05-17 Funchal Portugal
    [Show full text]
  • Stadt Zürich | Zurich City
    Stadt Zürich | Zurich City Zürich Flughafen Tarifzone 110 111 121 Fare zone 110 S9 REGENSDORF 10 S Glattbrugg 762 116 111 1 S24 768 Halden 5 764 12 KATZENSEE 110 Bhf. Lätten- 115 162 Käshaldenstr. Im Ebnet S16 Zentrumwiesen 161 Birch-| 114 113 124 Köschenrüti Glatttalstr. S2 Post 160 118 163 Leimgrübelstr. 123 Schönauring 75 Ausser- 112 120 164 dorfstr. 117 S6 Mühlacker 761 S7 UnteraffolternSchwandenholzWaidhof 742 Ettenfeld 761 Frohbühl- 111 170 62 121 122 171 str. Bhf. Opfikon Chrüzächer Holzerhurd 184 Friedhof Seebach Giebeleichstr. 154 110 130 135 32 Schwandenholz Hertenstein- 131 172 Buhnstr. Lindbergh- OPFIKON 173 Aspholz 40 str. 140 Fronwald platz 155 132 Oberhusen 142 133 Blumen-feldstr. 150 Staudenbühl 141 134 111 Bahnhof 75 143 491 61 Affoltern Nord 768 Lindbergh-Allee 156 151 Hungerbergstr. Maillartstr.Stierenried 180 40 Himmeri Chavez-Allee 152 154 62 Glattpark 182 183 Bhf. Seebach Seebacherplatz Wright-Strasse 153 181 Zehntenhausplatz S6 S21 Fernsehstudio Glaubtenstr.Glaubtenstr. Einfangstr. Hürstholz 12 ENGSTRINGEN 64 Neun- 111 110 Mötteliweg Felsenrain- Grünwald brunnen str. Genossen- 11 Bollinger- schaftsstr. Schauen- berg weg 14 Oerlikerhus Orionstr. Heizenholz Bhf. Auzelg Oerlikon Leutschen- Lerchenhalde Glaubtenstr. Riedbach Rütihof Lerchen- weg Nord bach WALLISELLEN Süd 62 Chalet- 781 rain 79 Herti Belair Giblenstr. Hagenholz Auzelg Ost 46 Schumacherweg Bahnhof 485 80 Geeringstr. Schützenhaus Bhf. Höngg Birchstr. Wallisellen 80 Oerlikon S8 S14 S19 Riedhofstr. Neu- Platz 61 Ost 37 Oberwiesen-Max-Bill- Saatlenstr. S8 Friedhof Bahnhof Hallenbad Riedgraben Dreispitz Aubrücke 89 affoltern str. Hönggerberg Oerlikon 94 Oerlikon 94 Flora- 40 str. 308 Ifang 62 Schürgi- 304 Michelstr. Althoos Frankental ETH 61 str. 110 121 Segantinistr.Singlistr.
    [Show full text]
  • Train Simulator - Right Through Berlin
    Train Simulator - Right through Berlin © Historical S-Bahn Berlin e.V. 2020 Page 1 Train Simulator - Right through Berlin Manual "Mitten durch Berlin" - Operation Series 476 Table of contents Table of contents ....................................................................................................... 2 0. authors ................................................................................................................ 3 1. introduction .......................................................................................................... 3 2. system requirements .............................................................................................. 4 3. the driver's cab ..................................................................................................... 5 4. upgrading .......................................................................................................... 10 4.1 Train is cold (full upgrade) .............................................................................. 10 4.2 Transfer of trains from other Tf ......................................................................... 10 4.3 Train is fully upgraded .................................................................................... 10 4.4 Change of driver's cab ................................................................................... 11 5. door control ....................................................................................................... 11 6. driving and braking ...........................................................................................
    [Show full text]
  • Buses and Trains In
    Selected Fares for Frankfurt & airport 2021 (valid from 1st of July 2021) Purchasing tickets 1.7.2021 from valid and Tickets and and Tickets and s Transit Maps Maps Transit Transit Single ticket Weekly, monthly or annual RMV tickets are Maps Transit RMV-PrepaidRabatt For immediate travel only Frankfurt & Airport Save 20 percent on every single available as eTicket RheinMain (Chip cards Single ticket Adults 2,75 5,10 ticket purchase with the RMV-App Valid for 1 trip incl. change Children aged 6 - 14 1,55 3,00 can be purchased at all ticket offices) or as by loading at least € 40 onto your Adults „Handy-Ticket“ using the RMV-App meinRMV account. Short-trip Max. 2km, destinations 1,50 listed at stops/ticket machines Children aged 6 - 14 1,00 Ticket machines at all S-Bahn, U-Bahn and Day tickets tram stations and at selected bus stops Ideal for families! Valid until 5 am on following day The RMV group day ticket Adults 5,35 9,95 entitles up to five passengers to Day ticket From bus drivers (no season tickets) Children aged 6 - 14 unlimited travel within Frankfurt 3,00 5,85 for only € 11,50. Group day ticket For up to 5 people 11,50 16,95 VGF-TicketShops (season tickets only) Locations at vgf-ffm.de/ticketshops Season tickets „RMV-HandyTicket“ mobile phone ticket RMV-App: Mobile phone ticket Weekly ticket transferable 26,80 Registration at www.rmv.de 2021 2021 2021 No change, no queues at Monthly ticket transferable 93,10 2021 in one in in one in ticket-machines, and no fare- Annual ticket personal or transferable 12 × 77,60 RMV-TicketShop (selected season tickets only) knowledge needed.
    [Show full text]
  • 1 Additional File 1. Supplemental Figures S1-S6: a Trans Locus Causes
    Additional File 1. Supplemental figures S1-S6: A trans locus causes a ribosomopathy in hypertrophic hearts that affects mRNA translation in a protein length-dependent fashion Franziska Witte1,2,$, Jorge Ruiz-Orera1,$, Camilla Ciolli Mattioli3,4, Susanne Blachut1, Eleonora Adami1,5, Jana Felicitas Schulz1, Valentin Schneider-Lunitz1, Oliver Hummel1, Giannino Patone1, Michael Benedikt Mücke1,6,7, Jan Šilhavý8, Matthias Heinig9, Leonardo Bottolo10, Daniel Sanchis11, Martin Vingron12, Marina Chekulaeva3, Michal Pravenec8, Norbert Hubner1,6,7,13,*, Sebastiaan van Heesch1,14,* 1 Cardiovascular and Metabolic Sciences, Max Delbrück Center for Molecular Medicine in the Helmholtz Association (MDC), 13125 Berlin, Germany 2 Present address: Research and Development, Pharmaceuticals, Bayer AG, 13353 Berlin, Germany 3 Berlin Institute for Medical Systems Biology (BIMSB), Max Delbrück Center for Molecular Medicine in the Helmholtz Association (MDC), 10115 Berlin, Germany. 4 Present address: Department of Biological Regulation, Weizmann Institute of Science, 7610001, Rehovot, Israel. 5 Present address: Program in Cardiovascular and Metabolic Disorders, Duke-National University of Singapore, Singapore 169857, Singapore. 6 DZHK (German Centre for Cardiovascular Research), Partner Site Berlin, 13347 Berlin, Germany. 7 Charité -Universitätsmedizin, 10117 Berlin, Germany. 8 Institute of Physiology of the Czech Academy of Sciences, 142 20, Praha 4, Czech Republic 9 Institute of Computational Biology (ICB), HMGU, Ingolstaedter Landstr. 1, 85764 Neuherberg (Munich), Germany; Department of Informatics, Boltzmannstr. 3, 85748 Garching, Technische Universitaet Muenchen (TUM), Munich, Germany. 10 Department of Medical Genetics, University of Cambridge, Cambridge, CB2 0QQ, UK; The Alan Turing Institute, London, NW1 2DB, UK; MRC Biostatistics Unit, University of Cambridge, Cambridge, CB2 0SR, UK. 11 Institut de Recerca Biomedica de Lleida (IRBLLEIDA), Universitat de Lleida, Edifici Biomedicina-I.
    [Show full text]