City of Boston Public Records Requests 1

Total Page:16

File Type:pdf, Size:1020Kb

City of Boston Public Records Requests 1 City of Boston Public Records Requests Reference No Request Status Create Date Req. Compl. Date Close Date Assigned Dept Customer Full Name Company Name Public Record Desired R000245-061820 Full Release 04-03-19 04-17-19 06-18-20 Public Records Lorainne Harris CSDC, Inc. With regard to: RFP #EV00004702 – Public Records Request Tracking and Management Tool released by the City of Boston, MA (Submittal Date: February 12, 2019). CSDC Inc. would like to request an electronic copy (via e-mail) of: -the resulting contract with the selected vendor, -a copy of all responses to the RFP received from all vendors, and -the score cards or other evaluation notes taken during the selection process R000287-062620 Full Release 05-26-19 06-10-19 06-29-20 Inspectional Services Nina Mazzarelli I would like access to a dataset containing information on rental properties in Boston, please let me know whether this is ava lable. R000011-040320 Admin Closed 09-24-19 10-08-19 04-09-20 Public Records Vic Anderson The following emails, from January 1, 2015 to present: Search 1: to:[email protected] Search 2: from:[email protected] Search 3: cc: [email protected] Search 4: to:[email protected] Search 5: from:[email protected] Search 6: cc:[email protected] R000063-042820 No Records Exist 10-22-19 11-05-19 04-28-20 Public Records Paul R. Kennedy, Esq. Murphy & Riley, P.C. I represent a defendant in a lawsuit concerning a fa l that took place outside 126 Border Street, in East Boston, and I am requesting information and records concerning the street lights nearby. The adequacy of the lighting in the vicinity of the accident is an issue in the case, and some of the street lights on Border Street would ikely have illuminated the area where the accident occurred. I have been informed that after the accident (which took place onMay 31, 2018), the street lights were replaced or somehow adjusted so that the illumination in that area is brighter than it was at the time of the accident. If you could, please let me know whether this is true. Please also let me know what records would confirm this and provide me with a certified copy of the records. If I need to submit a formal pub ic records request, please let me know.Thank you for whatever help you can provide. R000079-050420 Admin Closed 10-31-19 11-14-19 05-05-20 Public Records Hristina Natcheva My name is Hristina Natcheva and I am writing on behalf of myself, my husband Nathan Lauren, and our neighbors Loic Vincent and Emilie Braun. We are the owners of the condo association at 469 E 4th St, South Boston, MA 02127. The association consists of two condo units, ours (#2) and Loic/Emilie's (#1). The condo building is new consturction and was completed in mid 2017. It replaced a prior single-family home with a yard at that address (Erect Permit dated 11/10/2016, permit No. ERT500382). In early August 2019, we came home after work one day and found a work crew in front of our home installing a 5G cell tower on a preexisting uti ity pole which is approximately 5 feet from our condo building wall. The pole had been there (owned by Crown Castle), but we had not really noticed it, as it was below the line of sight from our iving room window. The "upgrade" work done to the pole resulted in significant increase in its height and the installation of a 5G cell tower directly in front of and way too close (5-10ft) to our living space. We were not notified about any of these planned changes and when we spoke with various city officials from Mayor's office, zoning, public works, etc, we were told that they will look into this and figure out what is going on. The latest communication we received from the city was from Anthony DiBona on 9/12/19, stating that the utility pole "upgrade" was approved 3 years ago - which was before our house was even built. This means that whatever work was proposed to be done to the pole and subsequently approved did not take into consideration the proximity and intrusiveness of this structure on our property and lives. We have major health and noise pollution concerns about the location and proximity of this high frequency RF radiation emitter. I recently found out I am pregnant, and given the fact that children and pregnant women are much more susceptible to the harmful effects of high energy RF radiation, I feel unsafe in my own home. We would like to request the following documentation: 1. Any and all zoning/public works records related to this particular utility pole (on the corner of E 4th St and National St, in South Boston, Crown Castle Site ID: SB010). 2. Any applications / proposals to install or upgrade a wireless faci ity in front of our home at 469 E 4th Street (cross street is Dorchester St). We are interested in who filed these proposals/applications, sought the relief, and who approved them on the city's end. 3. Any wireless emissions/RF safety surveys or engineering surveys that were submitted to the city in support of the safety of the installation/upgrade of this wireless faci ity/cell tower. Attached are some photos of the pole in question. Thank you very much for your help with this matter. Please let us know if you have any questions. R000304-070120 Not Public Records Requ 11-01-19 11-15-19 10-15-20 Public Schools J.K. Trotter MuckRock Copies of emails sent or received by any high school college counselors currently employed by Boston Public Schools and employees or officials of the following schools: — Harvard (harvard.edu) — Princeton (princeton.edu) — Yale (yale.edu) — Columbia (columbia.edu) — Brown (brown.edu) — Dartmouth (dartmouth.edu) — Cornell (cornell.edu) — University of Pennsylvania (upenn.edu) — Stanford University (stanford.edu) — University of Southern California (usc.edu) — University of Virginia (virginia.edu) — University of Michigan (umich.edu) — University of Wisconsin (wisc.edu) — University of Texas (utexas. edu) — William & Mary (wm.edu) — University of North Carolina (unc.edu) — U.S. Naval Academy (usna.edu) — U.S. Military Academy (usma.edu) — U.S. Air Force Academy (usafa.edu) — Arizona State University (asu.edu) — University of Arizona (arizona.edu) — University of Illinois (illinois.edu) — University of California, Los Angeles (ucla.edu) — University of California, Berkeley (berkeley.edu) — University of California, Santa Barbara (ucsb.edu) Please specifically search for correspondence with college or university employees whose used their official .edu account. I have included the .edu address for each school in the list above. Please search the same set of emails for correspondence containing the fo lowing keywords: — “Rick Singer” — “The Key” — “Edge Co lege & Career Network” — “Legacy” — “Legacies” — “Donor” — “Donation” — “Development admit” — “Development case” Please note that I am submitting this request under Massachusetts Public Records Law only. If any of the responsive records contain information whose release would violate the federal Privacy Act, the Family Educational Rights and Privacy Act, or any state-level privacy laws, please redact or withhold that information. Please imit this search to correspondence dated between January 1, 2014 and October 31, 2019. B001640-110819 Assigned 11-08-19 11-22-19 08-03-20 Law Department William Gillis I am a private investigator working on an auto accident that happened at the corner of Westview and Ames St. in Dorchester. There is a surveillance camera at that location and I would like to know when the camera was installed. I do not need any footage just the date that the camera was installed. Respectfully Submitted R000316-070220 Partial Release 11-22-19 12-06-19 07-15-20 Economic Development Cameron Sperance MuckRock Pursuant to the Massachusetts Public Records Law, I hereby request the following records: A l materials pertaining to opportunity zones in the City of Boston. R000055-042720 Partial Release 12-09-19 12-23-19 04-28-20 Public Records Justin de Benedictis-Kessner Boston University Subject: Records request: 311 survey data from DoIT Dear Mr. Wil iams, This is a request under the Massachusetts Public Records Law (M. G. L. Chapter 66, Section 10). I am requesting that I be provided a copy of the following records:Survey data from the Boston 311 system that automatically is sent to every person who makes a 311 request with an associated email attached to their user profile, and is sent both (1) when a request is made and (2) when the request is closed. These survey data are submitted in GoogleForms (see below screenshot of the bottom of the survey) and so data should be easily retrievable in tabular format from the GoogleSheet that is automatically generated by any Google Form. I would l ke to receive these data in csv or other tabular format, without redaction of any columns. I will be using these data to conduct analyses in the public interest, specifically related to the factors that influence residents' satisfaction with the City's 311 system. In case it's helpful, Kim Lucas in the Department of Innovation and Technology has specific knowledge of this dataset and I have confirmed with her that it exists and is easily retrievable from GoogleSheets. While the 311 Department designs the survey, she has informed me that the dataset is managed by DoIT. The Public Records Law requires you to provide me with a written response within 10 business days.
Recommended publications
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Suffolk University Institutional Master Plan Notification Form
    SUFFOLK UNIVERSITY Institutional Master Plan Notification Form Submitted to Prepared by Boston Redevelopment Authority Vanasse Hangen Brustlin, Inc. Boston, Massachusetts In association with Submitted by Chan Krieger Sieniewicz Suffolk University CBT/Childs Bertman Tseckares, Inc. Boston, Massachusetts Rubin & Rudman LLP Suffolk Construction January, 2008 SUFFOLK UNIVERSITY Table of Contents 1. INTRODUCTION Background.............................................................................................................................1-1 The Urban Campus ................................................................................................................1-2 Institutional Master Planning Summary ..................................................................................1-3 2002 Suffolk University Institutional Master Plan....................................................1-3 2005 Amendment to Suffolk University Institutional Master Plan ...........................1-4 2007 Renewal of the Suffolk University Institutional Master Plan...........................1-5 2007 Amendment to Suffolk University Institutional Master Plan – 10 West Street Student Residence Hall Project .....................................................1-5 Public Process and Coordination............................................................................................1-6 Institutional Master Plan Team .............................................................................................1-10 2. MISSION AND OBJECTIVES Introduction.............................................................................................................................2-1
    [Show full text]
  • Summer Guide
    @summerboston 2011 Summer Guide City of Boston Thomas M. Menino, Mayor It is my great pleasure to welcome you to another exciting summer in the City of Boston. From traditional favorites like the Swan Boats and the Freedom Trail, to newer attractions like the Boston Cyberarts Festival and the Extreme Sailing Series at Boston Harborfest, our city has something for everyone. Boston is where history meets innovation. To keep up with our unique cultural landscape, I invite you to follow us @summerboston. There, you will find the the latest Thomas M. Menino information on free events, parades, festivals and more. Mayor of Boston For those who prefer more traditional methods of receiving information, please call 617-635-3911 or visit www.cityofboston.gov/summer. I hope to see you this summer! Thomas M. Menino Mayor of Boston Mayor Menino is excited to launch @summerboston! Follow it for continuous updates about all the fun summer summerboston activities for the whole family to enjoy here in Boston. @ Thank you to our sponsors: 2. May 1st - August 7th May 1st Chihuly, Through the GREASE --May-- Looking Glass Wang Theatre, World-famous glass artist Citi Performing Arts Center, Dale Chihuly, has revolution- 270 Tremont St., Boston. 1 p.m and 6 p.m. $. ized the art of blown glass Various Dates in May 617-482-9393 Frog Pond Yoga and moving it into the realm of www.citicenter.org Tai Chi Classes large-scale sculpture and Honoring the tranquility of establishing the use of glass, May 1st the reflecting pool, weekly an inherently fragile but also B.B.
    [Show full text]
  • The Boston Case: the Story of the Green Line Extension
    The Boston Case: The Story of the Green Line Extension Eric Goldwyn, Alon Levy, and Elif Ensari Background map sources: Esri, HERE, Garmin, © OpenStreetMap contributors, and the GIS User Community INTRODUCTION The Issue of Infrastructure The idea of a mass public works program building useful infrastructure is old, and broadly popular. There was a widespread conversation on this topic in the United States during the stimulus debate of the early Obama administration. Subsequently, there have been various proposals for further federal spending on infrastructure, which could take the form of state-level programs, the much- discussed and much-mocked Infrastructure Week initiatives during the Trump administration, Alexandria Ocasio-Cortez’s call for a Green New Deal, and calls for massive federal spending on infrastructure in the 2020 election campaign including a $1.5-2 trillion figure put out by the Biden campaign. This is not purely an American debate, either. The Trudeau cabinet spent considerable money subsidizing infrastructure construction in Canada, including for example helping fund a subway under Broadway in Vancouver, which is the busiest bus corridor in North America today. Within Europe, there is considerable spending on infrastructure as part of the coronavirus recovery program even in countries that practiced fiscal austerity before the crisis, such as Germany. China likewise accelerated the pace of high-speed rail investment 2 during the global financial crisis of 2009 and its aftermath, and is currently looking for major investment of comparable scale due to the economic impact of corona. With such large amounts of money at stake—the $2 trillion figure is about 10% of the United States’ annual economic output—it is critical to ensure the money is spent productively.
    [Show full text]
  • 2020–2024 CAPITAL INVESTMENT PLAN UPDATE Text-Only Version
    2020–2024 CAPITAL INVESTMENT PLAN UPDATE Text-Only Version This page intentionally left blank 2020–2024 CAPITAL INVESTMENT PLAN TABLE OF CONTENTS Table of Contents Table of Contents ......................................................................................................................... i Letter from Secretary Pollack ...................................................................................................... ii Non-Discrimination Protections .................................................................................................. iv Translation Availability ............................................................................................................. v Glossary of Terms ..................................................................................................................... vii Introduction ................................................................................................................................ 1 What’s New ................................................................................................................................ 6 Program Changes .................................................................................................................. 7 Funding .....................................................................................................................................12 State Funding ........................................................................................................................12 Federal
    [Show full text]
  • 101 Merrimac LLC 101 Huntington Avenue 5Th Floor Boston, MA
    101 Merrimac LLC 101Continental Partners LLC 1st Rate Plumbing Heating Llc 101 Huntington Avenue Attn Richard Johnson 71 Littleton Road 5th Floor 3 Hamilton Landing Suite 200 Chelmsford, MA 01824 Boston, MA 02199 Novato, CA 94949 1st Source Parts Center 1st Source Parts Center 21st Century Pool Patio West Inc 101 E Nakoma St PO Box 671589 3736 Vestal Parkway East San Antonio, TX 78216-2737 Dallas, TX 75267-1589 Vestal, NY 13850 2xl Corporation 3 G Media LLC 3 Wire Restaurant Appliance 2415 Braga Dr Gulf Coast Bride Magazine 22322 20th Ave S E Broadview, IL 60155-3941 1400 Commerce Boulevard Suite 25 Bothell, WA 98021 Anniston, AL 36207 3J Happy Floors 3Wire Golden State 4 Contract Design 5099 N W 195 Lane Nw7964 10271 Pua Drive Miami Gardens, FL 33055 Box 1450 Huntington Beach, CA 92646 Minneapolis, MN 55485-7964 4Realcrazydeal Com Llc/Koby Dumas 7 Seas Tours Travel A 1 Asphalt Care Inc 125 Arbor Dr 1 210 Franz Dr 50 Wilson Ave San Diego, CA 92103 Freedom, PA 15042 Ivyland, PA 18974 A 1 Event and Party Rentals A 1 Fire A 1 Fire Equipment Corp 251 East Front Street Gary B Goldman PO Box 370926 Covina, CA 91723 c/o Law Offices of Gary B Goldman Miami, FL 33127 17071 W Dixie Hwy N Miami Beach, FL 33160 A 1 Fire Equipment Inc A 1 Ice Equipment Dist Inc A 1 Locksmiths 1002 Central Ave N 1143 Central Avenue 2685 Walnut Hill Lane Kent, WA 98032 Albany, NY 12205 Dallas, TX 75229 A 1 Ocean Breeze Inc A 2 Z Plumbing Services Inc A A C United Fire Safety Eq 26845 Oak Avenue PO Box 147 305 S W 15th Ave Unit 16 Placentia, CA 92871 Pompano Beach, FL
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • Maximizing the Benefits of Mass Transit Services
    Maximizing the Benefits of Mass Transit Stations: Amenities, Services, and the Improvement of Urban Space within Stations by Carlos Javier Montafiez B.A. Political Science Yale University, 1997 SUBMITTED TO THE DEPARTMENT OF URBAN STUDIES AND PLANNING IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER IN CITY PLANNING AT THE MASSACHUSETTS INSTITUTE OF TECHNOLOGY JUNE 2004 Q Carlos Javier Montafiez. All rights reserved. The author hereby grants to MIT permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole or in part. Signature of Author: / 'N Dep tment of Urban Studies and Plav ning Jvtay/, 2004 Certified by: J. Mai Schuster, PhD Pfessor of U ban Cultural Policy '09 Thesis Supervisor Accepted by: / Dennis Frenthmfan, MArchAS, MCP Professor of the Practice of Urban Design Chair, Master in City Planning Committee MASSACH USEUSq INSTIUTE OF TECHNOLOGY JUN 21 2004 ROTCH LIBRARIES Maximizing the Benefits of Mass Transit Stations: Amenities, Services, and the Improvement of Urban Space within Stations by Carlos Javier Montafiez B.A. Political Science Yale University, 1997 Submitted to the Department of Urban Studies and Planning on May 20, 2004 in Partial Fulfillment of the Requirements for the degree of Master in City Planning ABSTRACT Little attention has been paid to the quality of the spaces within rapid mass transit stations in the United States, and their importance as places in and of themselves. For many city dwellers who rely on rapid transit service as their primary mode of travel, descending and ascending into and from transit stations is an integral part of daily life and their urban experience.
    [Show full text]
  • Green Line Extension Project EEA #13886
    Draft Environmental Impact Report/ Environmental Assessment and Section 4(f) Statement Green Line Extension Project EEA #13886 Volume 1 | Text October 2009 Executive Office of Transportation and Public Works U.S. Department of Transportation Federal Transit Administration DRAFT ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL ASSESSMENT (DEIR/EA) AND DRAFT SECTION 4(F) EVALUATION FOR THE GREEN LINE EXTENSION PROJECT CAMBRIDGE, SOMERVILLE, MEDFORD, MASSACHUSETTS STATE PROJECT NO. 13886 Prepared Pursuant to the Code of Federal Regulations, Title 23, Part 771, Section 119 (23 CFR 771.119); 49 U.S.C. Section 303 [formerly Department of Transportation Act of 1966, Section 4(f)] and the Massachusetts Environmental Policy Act M.G.L. CH 30 Sec. 61 through 62H by the FEDERAL TRANSIT ADMINISTRATION U.S. DEPARTMENT OF TRANSPORTATION and the COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF TRANSPORTATION AND PUBLIC WORKS (EOT) Draft Environmental Impact Report/Environmental Green Line Extension Project Assessment and Draft Section 4(f) Evaluation Table of Contents Acronyms and Abbreviations Secretary’s Certificate on the EENF Executive Summary 1 Introduction and Background .......................................................................................... 1-1 1.1 Introduction ............................................................................................................................. 1-1 1.2 Project Summary .................................................................................................................... 1-2 1.3
    [Show full text]
  • Suffolk University 1 Court Street Residence Hall Project Notification Form
    September 2019 Suffolk University 1 Court Street Residence Hall Project Notification Form SUBMITTED TO PREPARED BY Boston Planning and Development Agency IN ASSOCIATION WITH NBBJ C3 Project Notification Form 1 Court Street Residence Hall Boston, Massachusetts SUBMITTED TO Boston Redevelopment Authority, d/b/a Boston Planning and Development Agency One City Hall Square, 9th Floor Boston, MA 02201 PROPONENT Suffolk University 8 Ashburton Place Boston, MA 02108 PREPARED BY VHB 99 High Street, 10th Floor Boston, MA 02110 In association with: NBBJ C3 September 2019 1 Court Street Residence Hall Project Notification Form Table of Contents Chapter 1: Project Description 1.1 Proposed Institutional Project Overview and Purpose ..................................................... 1-1 1.2 Institutional Master Plan Overview ........................................................................................... 1-2 1.2.1 Consistency with the 2020 IMP .................................................................................. 1-2 1.3 Site Context and Existing Conditions ....................................................................................... 1-2 1.3.1 Existing On-site Uses ..................................................................................................... 1-3 1.4 Project Description .......................................................................................................................... 1-3 1.4.1 Proposed Development Program ............................................................................
    [Show full text]
  • The Use of Public Plazas in China and the United States: Measuring the Differences Using Direct Observation in Boston and Chongqing
    University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses Dissertations and Theses March 2017 The Use of Public Plazas in China and the United States: Measuring the Differences Using Direct Observation in Boston and Chongqing Maozhu Mao University of Massachusetts Amherst Follow this and additional works at: https://scholarworks.umass.edu/masters_theses_2 Part of the Landscape Architecture Commons, and the Urban Studies and Planning Commons Recommended Citation Mao, Maozhu, "The Use of Public Plazas in China and the United States: Measuring the Differences Using Direct Observation in Boston and Chongqing" (2017). Masters Theses. 475. https://doi.org/10.7275/9443695 https://scholarworks.umass.edu/masters_theses_2/475 This Open Access Thesis is brought to you for free and open access by the Dissertations and Theses at ScholarWorks@UMass Amherst. It has been accepted for inclusion in Masters Theses by an authorized administrator of ScholarWorks@UMass Amherst. For more information, please contact [email protected]. THE USE OF PUBLIC PLAZAS IN CHINA AND THE UNITED STATES: MEASURING THE DIFFERENCES USING DIRECT OBSERVATION IN BOSTON AND CHONGQING A Thesis Presented by MAOZHU MAO Submitted to the Graduate School of the University of Massachusetts Amherst in partial fulfillment of the requirements for the degree of MASTER OF LANDSCAPE ARCHITECTURE February 2017 Department of Landscape Architecture and Regional Planning ©Copyright by Maozhu Mao 2017 All Rights Reserved THE USE OF PUBLIC PLAZAS IN CHINA AND THE UNITED STATES: MEASURING THE DIFFERENCES USING DIRECT OBSERVATION IN BOSTON AND CHONGQING A Thesis Presented by MAOZHU MAO Approved as to style and content by: Robert Ryan, chair Michael Di Pasquale Piper R.
    [Show full text]
  • In the United States Bankruptcy Court for the District of Delaware
    Case 13-12680-MFW Doc 181 Filed 11/26/13 Page 1 of 410 IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF DELAWARE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - x : In re: : Chapter 11 : SAVIENT PHARMACEUTICALS, INC., : Case No. 13-12680 (MFW) et al., : : Jointly Administered Debtors.1 : : - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - x GLOBAL NOTES, METHODOLOGY AND SPECIFIC DISCLOSURES REGARDING THE DEBTORS’ SCHEDULES OF ASSETS AND LIABILITIES AND STATEMENTS OF FINANCIAL AFFAIRS Introduction Savient Pharmaceuticals, Inc. and Savient Pharma Holdings, Inc., the debtors and debtors-in- possession in the above-captioned cases (together, the “Debtors,” and the Debtors together with their non-debtor subsidiaries and affiliates, the “Company”), with the assistance of their advisors, have filed their respective Schedules of Assets and Liabilities (the “Schedules”) and Statements of Financial Affairs (the “Statements” and, together with the Schedules, the “Schedules and Statements”) with the United States Bankruptcy Court for the District of Delaware (the “Bankruptcy Court”), pursuant to section 521 of title 11 of the United States Code (the “Bankruptcy Code”) and Rule 1007 of the Federal Rules of Bankruptcy Procedure (the “Bankruptcy Rules”). These Global Notes, Methodology and Specific Disclosures Regarding the Debtors’ Schedules and Statements (the “Global Notes”) pertain to, are incorporated by reference in, and comprise an integral part of all the Schedules and Statements. The Global Notes should be referred to, considered and reviewed in connection with any review of the Schedules and Statements.2 Mr. John P. Hamill has signed the Schedules and Statements. Mr. Hamill is Co-President and the Chief Financial Officer of Savient Pharmaceuticals, Inc., and an authorized signatory for the Debtors.
    [Show full text]