<<

Building A 140 58th Street, , NY 11220 Phase V

PHASE V

Building A – Typical Floorplan

History Floor Loads Benefits and Incentives Built in 1918 for worldwide army shipping 250 lbs/SF REAP and ECSP and distribution, comprehensive renovation 2016–2017 Restrooms Security and Safety Stories New Men’s & Women’s Facilities 24/7 on-site security and controlled vehicle Floors 2–8 access to campus, Class E fire alarm system 8 stories (and basement), 89'-0" high building Elevators On-site Resources Square Footage Passenger: Two Management Office, Workforce Approximately 500,000 SF Development Center, Café, Day Care, Service: One District 20 Pre-K Center Floor Plates Freight: Four Service Elevator Specs New energy efficient windows 65,000 SF open floor plates (potential to expand to 120,000 SF floor plates) and Doorway Length and Width: 7' x 5' 5,000 SF plug in industrial units available Cabin Dimensions: 9'8" x 6'4" x 8'0" Waterfront views Capacity: 10,000 lbs Direct access to Parking Freight Elevator Specs Ample permits offered for off-street parking Doorway Length and Width: 5'11" x 7'9" Public transportation access via subway Cabin Dimensions: 12'1" x 5'11" x 12'0" Loading N & R lines to 59th Street and via bus B9, Capacity: 15,000 lbs B11, and B37 lines 118 off-street shared loading docks Electricity NYC Ferry service Ceiling Heights 400A minimum, additional capacity available 10' slab to slab Plumbing Column Spacing Water can be furnished from utility core Open floorplan with 20' column grid HVAC Zoning Energy efficient HVAC system with variable M2-1 air volume units

Managed by Get in touch. To learn more about opportunities for your business at , contact our leasing team: [email protected] | www.bat.nyc Building A 140 58th Street, Brooklyn, NY 11220 Phase V

Transportation for Customers and Employees

STATEN ISLAND NEW Verrazano JERSEY Bridge

Brooklyn Army Terminal

278 B37 Bus Stop Brooklyn Army Terminal Ferry stop

B11 Bus Stop WHALE SQUARE NYU LUTHERAN 59th St 478 N R BAT Shuttle Service World Trade Center Station Wall St./Pier 11 2 3 A C E N R W PATH Citywide Ferry Stop (28 minutes by MTA) Subway LIBERTY VIEW (16 minutes) • 23 minutes to Atlantic Avenue/ 36th St Barclays Center, Brooklyn D N R 278 • 47 minutes to Penn Station • 50 minutes to Grand Central BROOKLYN Ferry • 16 minutes from Lower 27 to Brooklyn Army Terminal MANHATTAN • Connection to several Brooklyn stops via NYC Ferry Atlantic Ave/Barclays Center 2 3 4 5 B D N Q R LIRR Car (23 minutes) • 16 minutes from 278 to Brooklyn Army Terminal • 8 minutes to Verrazzano

Managed by Get in touch. To learn more about opportunities for your business at Brooklyn Army Terminal, contact our leasing team: [email protected] | www.bat.nyc