Building a Phase V Brooklyn Army Terminal
Total Page:16
File Type:pdf, Size:1020Kb
Brooklyn Army Terminal Building A 140 58th Street Brooklyn, NY 11220 PHASE V Building A – Typical Floorplan History Floor Loads Benefits and Incentives Built in 1918 for worldwide army shipping 250 lbs/SF REAP and ECSP and distribution, comprehensive renovation 2016–2017 Restrooms Security and Safety New Men’s & Women’s Facilities 24/7 on-site security and controlled vehicle Stories Floors 2–8 access to campus, Class E fire alarm system 8 stories (and basement), 89'-0" high building Elevators On-site Resources Square Footage Passenger: Two Management Office, Workforce Approximately 500,000 SF Service: One Development Center, Café, Banking, Freight: Four Day Care, Universal Pre-K Floor Plates Service Elevator Specs New energy efficient windows 65,000 SF open floor plates (potential to Doorway Length and Width: 7' x 5' expand to 120,000 SF floor plates) and Cabin Dimensions: 9'8" x 6'4" x 8'0" Waterfront views 5,000 SF plug in industrial units available Capacity: 10,000 lbs Freight Elevator Specs Direct access to pier Parking Ample permits offered for off-street parking Doorway Length and Width: 5'11" x 7'9" Cabin Dimensions: 12'1" x 5'11" x 12'0" Open brokerage policy pays full Capacity: 15,000 lbs commission to procuring broker Loading 118 off-street shared loading docks Public transportation access via subway Electricity 400A minimum, additional capacity available N & R lines to 59th Street and via bus B9, Ceiling Heights B11, and B37 lines 10' slab to slab Plumbing Ferry service starting Summer 2017 Column Spacing Water can be furnished from utility core Free subway shuttle service Open floorplan with 20' column grid HVAC Zoning Energy efficient HVAC system with variable air volume units M2-1 Sunset Park District Get in touch. [email protected] To learn more about opportunities for your 212 228 1000 business at Brooklyn Army Terminal, contact our leasing team. bklynarmyterminal.com Brooklyn Army Terminal Building A Phase V Transportation for Customers and Employees STATEN ISLAND NEW Verrazano JERSEY Bridge Brooklyn Army Terminal 278 B37 Bus Stop Brooklyn Army Terminal Ferry stop B11 Bus Stop WHALE SQUARE NYU LUTHERAN 59th St 478 N R BAT Shuttle Service World Trade Center Station Wall St./Pier 11 2 3 A C E N R W PATH INDUSTRY CITY Subway Citywide Ferry Stop (28 minutes by MTA) • 23 minutes to Atlantic Avenue/ LIBERTY VIEW (16 minutes) Barclays Center, Brooklyn 36th St • 47 minutes to Penn Station D N R 278 • 50 minutes to Grand Central Ferry BROOKLYN • 16 minutes from Lower Manhattan to Brooklyn 27 Army Terminal MANHATTAN • Connection to several Brooklyn stops via Citywide Ferry Atlantic Ave/Barclays Center 2 3 4 5 B D N Q R LIRR Car (23 minutes) • 16 minutes from Lower 278 Manhattan to Brooklyn Army Terminal • 8 minutes to Verrazano Sunset Park District Get in touch. [email protected] To learn more about opportunities for your 212 228 1000 business at Brooklyn Army Terminal, contact our leasing team. bklynarmyterminal.com.