Morley and Noranda Stations Q&A

Total Page:16

File Type:pdf, Size:1020Kb

Morley and Noranda Stations Q&A Morley and Noranda stations Q&A Question/Comment Response Noranda Station 1. For Noranda Station, will there As part of planning there is a strong focus be any changes to the new on everyone being able to access the footpath installed outside 183 & station using different modes of transport. 191 Benara Rd? My concern is Consideration of where gaps in for it not being suitable for the pathways/access points exist will take elderly and disabled place. pedestrians. Residents are parking on it and it is also quite There are also laws and requirements that narrow for use. any infrastructure project needs to meet, such as the Disability Discrimination Act, and planning and design includes consideration of all user groups who may access the station to ensure that all abilities are able to access the station with ease. 2. How many people are expected Around 1,800 daily boardings are to use the underpass entry from expected at Noranda Station, so while we Davis Court? don’t have an exact figure of how many people will use the underpass, modelling for the underpass is based on a percentage of daily boardings. 3. Why do buses not enter the There are a number of challenges carpark and drop passengers associated with bringing the buses into off outside the platform at the car park, and the needs of all users, Noranda Station? It seems it is not just those travelling to/from the train the only station not to have the station, need to be considered. There are buses enter. Is this something timing and traffic impacts around bringing that can be considered? It is buses to the car park, however there may quite a long walk from the bus be opportunities through traffic modelling stops. in the area to improve connectivity. 4. Can you tell me where the bus Buses will extend in each direction - for route along Benara Rd extends the east it will go out past Kiara College, in each direction? and to the west it will connect to the Noranda Shopping Centre. 5. The bus stops on Benara Road Answered in Question 3. seem to be a fair way from the station. Is it possible for the bus to enter the station precinct and stop at the 'kiss and ride' area, given the aging population in the area walking up the bridge would be a real challenge for a lot of people? 6. How will traffic and parking of Rat running and informal parking is a cars be dealt with in street at common concern raised for all our the entrance of the underpass? stations, and we will work closely with the i.e. Davis Court. City of Bayswater to address issues around traffic on local roads. 7. Will Benara Road have the Not at this stage but this will be confirmed. speed limit changed from 70 to 60? 8. I am concerned about the bus The distance from the walkway to the access at Noranda. The buses station is 60 metres, and the bus stop to are a long way from the the station is 240 metres. station. This is unsuitable for elder people and people with disabilities. What is the distance? 9. What bike facilities will be at There will be secure bike lockers at the Noranda Station? station. These facilities are the same standard as other stations across the network. 10. Is the flora and fauna being There has been a lot of planning work considered on the south eastern studying the environment, including flora side of Tonkin Highway? There and fauna studies. One consideration for are trees that are habitat for the the car park at Noranda was preserving Redtail cockatoos and trees, and the majority will be retained for numerous other birds. the project. Unavoidably there are a small number of tress in the vicinity of Noranda Station that will need to be removed during construction. 11. How do vehicles turn right It is a left turn only out of the car park, leaving the station onto Benara with a U-turn on Benara Road for vehicles Road? wanting to travel west. The U-Turn is an existing U-Turn. 12. Turning right out of Noranda Answered in Question 11. Station onto Benara Road looks like it could be a problem. 13. Is the bus stop in Benara Road New bus services will mainly be focused near Noranda station going to on east-west connections, however be connected to Morley bus existing services will still be in place which station? includes connections to Morley bus station. 14. Motorcycles are currently using Ways to prevent clashes and issues such the footpath off Benara Road to as this will be considered in the next stage enter Davis Court. Is there a of design, and this will also be raised with plan to stop this from continuing the City of Bayswater as part of ongoing and also not being possible for conversations. motorcyclist to ride through the underpass from the station car park? 15. Will lighting, security and Safety is an important consideration and cameras be installed at the is strongly considered during the next Davis Court entrance of the phase of design, our station precinct and underpass to Noranda Station? facilities are designed with patron safety in mind and include Lightings, CCTV and transit officers at stations as they are at other stations on the network. The underpass will have lighting installed and designed with safety as a key consideration. 16. Will the northern end of the car Access to the station from the west will be park at Noranda Station be from Benara Road, the existing shared connected to the existing PSP path on the east of the station will be along the eastern side of Tonkin connected via the station precinct to Highway? Acacia Court and the Sewell Court Footbridge to the North. 17. Are you able to give an exact The underpass will align with the existing location of the entrance/exit to connection point at Davis Court. This will the underpass near Davis be confirmed through detailed design. Court please? 18. What will be the frequency of The frequency of the buses will be the buses on Benara Road, if planned to tie in with the train timetables, people have to wait for a long more information on this will be known time they just won't use the bus. closer to the line opening. When the building of the Benara Community feedback has indicated Road flyover happened, this preferences not to have traffic lights penalised the residents by not leaving the station and on Benara Road, being able to exit at Benara making a left turn only out of the car park Road and either go off at Reid the safest option. There are no plans to Highway or Morley Drive, modify Benara Road to connect to provide seems the Noranda Station is entry or exit from the Tonkin Highway. being overlooked as well for access. 19. Will the area around Noranda Answered in Question 15. Station be sufficiently lit considering the public safety especially during night? 20. Is there a concern of there The intersection is fully compliant and being a blind spot for vehicles meets all standards for safe sight distance exiting the Noranda Station as requirements. the Benara Road overpass is steep? 21. At Noranda Station what steps This is a consideration for all stations will be taken to stop light and along the line, there are standards both noise from spilling onto nationally and for the state that need to be properties backing on to the met for noise and light. Once a contractor stations and car parks? i.e. the comes on board, they will undertake houses on the northeast side of detailed design which includes the station? considering solutions to these issues. 22. Could the east/west bus to Taken on notice, this will be raised with Noranda run from Mirrabooka to the bus planning team. Caversham? 23. Will the pedestrian bridge at The Public Transport Authority will be able Noranda Station have a to close and secure the stations outside of lockable gate that is closed operating hours. outside of rail service times? 24. If the only way to get out of the This will form part of the traffic Noranda Station is to go left and assessment, the aim for this area is to then go up and do a U-turn, this utilise existing infrastructure to ensure is fraught with danger as there aren’t any adverse impacts to traffic Benara Road is extremely busy flow. and you know how impatient some drivers are. 25. Can the traffic lights can be set The current design does not include traffic up to allow right turn traffic from lights from the Station onto Benara Road. Noranda Station onto Benara During community consultation it was Road? (Similar to the one at raised that there is a preference to include Thornlie Station) traffic lights. This will be confirmed through the detail design which includes traffic modelling assessments. 26. Follow up to my question to Transit officers have powers on all undesirables entering from property owned by the PTA, including car Davis Court, you answered that parks. Outside our facilities we can work transit guards will be with councils and local police to help deter monitoring, that’s fine on the crime, but we do not have control outside platform, but when they clear this area. the platform, what extra security is being planned? 27. Is there access from Acacia Pedestrian access though this area will be Court to Noranda Station? And maintained, however there will not be is this being taking into account vehicle access.
Recommended publications
  • Federal Priorities for Western Australia April 2013 Keeping Western Australians on the Move
    Federal priorities for Western Australia April 2013 Keeping Western Australians on the move. Federal priorities for Western Australia Western Australia’s rapid population growth coupled with its strongly performing economy is creating significant challenges and pressures for the State and its people. Nowhere is this more obvious than on the State’s road and public transport networks. Kununurra In March 2013 the RAC released its modelling of projected growth in motor vehicle registrations which revealed that an additional one million motorised vehicles could be on Western Australia’s roads by the end of this decade. This growth, combined with significant developments in Derby and around the Perth CBD, is placing increasing strain on an already Great Northern Hwy Broome Fitzroy Crossing over-stretched transport network. Halls Creek The continued prosperity of regional Western Australia, primarily driven by the resources sector, has highlighted that the existing Wickham roads do not support the current Dampier Port Hedland or future resources, Karratha tourism and economic growth, both in terms Exmouth of road safety and Tom Price handling increased Great Northern Highway - Coral Bay traffic volumes. Parabardoo Newman Muchea and Wubin North West Coastal Highway East Bullsbrook Minilya to Barradale The RAC, as the Perth Darwin National Highway representative of Great Eastern Mitchell Freeway extension Ellenbrook more than 750,000 Carnarvon Highway: Bilgoman Tonkin Highway Grade Separations Road Mann Street members, North West Coastal Hwy Mundaring Light Rail PERTH believes that a Denham Airport Rail Link strong argument Goldfields Hwy Fremantle exists for Western Australia to receive Tonkin Highway an increased share Kalbarri Leinster Extension of Federal funding Kwinana 0 20 Rockingham Kilometres for road and public Geraldton transport projects.
    [Show full text]
  • Perth Metropolitan Mobile Speed Camera Deployment Locations
    Perth Metropolitan Mobile Speed Camera Deployment Locations Current as at 01 December 2020 Locations are correct at time of printing and are subject to change without notice. Locations will be updated each month as required. Location Location Street Name Locality Street Name Locality Criteria Criteria Alexander Drive Alexander Heights 2, 4 Neilson Avenue Armadale 3, 4 Hepburn Avenue Alexander Heights 2, 4 Powell Crescent Armadale 3, 4 Marangaroo Drive Alexander Heights 1, 2, 4 Railway Avenue Armadale 4 Mirrabooka Avenue Alexander Heights 1, 2, 4 Robin Hood Avenue Armadale 3, 4 Northumberland Avenue Alexander Heights 3, 4 Schruth Street Armadale 2, 3, 4 Canning Highway Alfred Cove 2, 4 Seventh Road Armadale 2, 4 Kitchener Road Alfred Cove 2, 4 Seville Drive Armadale 4 Latham Street Alfred Cove 4 South Western Highway Armadale 2, 4 North Lake Road Alfred Cove 4 Streich Avenue Armadale 4 Marmion Avenue Alkimos 4 Tijuana Road Armadale 3, 4 Kwinana Freeway Anketell 1, 2, 4 Wungong Road Armadale 4 Thomas Road Anketell 2, 4 Grandstand Road Ascot 2, 4 Canning Highway Applecross 2, 4 Great Eastern Highway Ascot 2, 4 Dunkley Avenue Applecross 2, 4 Raconteur Drive Ascot 4 Glenelg Street Applecross 3, 4 Resolution Drive Ascot 4 Kintail Road Applecross 2, 3, 4 Stoneham Street Ascot 4 Kishorn Road Applecross 2, 3, 4 Tonkin Highway Ascot 4 Sixth Avenue Applecross 3, 4 Carosa Road Ashby 2, 4 Tweeddale Road Applecross 4 Monet Drive Ashby 4 Alness Street Ardross 4 Pinjar Road Ashby 2, 4 Ardessie Street Ardross 2, 3, 4 Wanneroo Road Ashby 2, 4 Ardross Street
    [Show full text]
  • Northlink WA Stage 1 - Southern Section Perth, WA, Australia
    CASE STUDY ––––––––––––––––––––––––– Northlink WA Stage 1 - Southern Section Perth, WA, Australia Reinforced Earth® TerraTilt® Abutment & Retaining walls Owner: Main Roads WA Consultants: Aurecon Contractor: John Holland Pty Ltd Construction: Nov 2016 - Jan 2018 Background Challenges The $1.02 billion NorthLink WA - Re-design an in-situ counterfort Project, jointly funded by the retaining wall to a Reinforced Federal and State Government, Earth® wall that can takes traffic off local roads and accommodate large horizontal onto the Tonkin Highway. This traffic barrier loads. means local roads will be used for - Large horizontal bridge loads local traffic and those who live and - Architectural finish, circle pattern work locally will experience a safer, - Curved abutment panels with more peaceful environment. It also architectural finish, circle pattern provides an efficient alternative freight route, taking about 80 per Solutions cent of trucks away from the Great RECO was able to develop a modified Northern Highway. traffic barrier and Reinforced Earth® wall interaction that restrained any The southern section of Northlink horizontal loads from the traffic WA provides a freeway-standard, barriers being transferred to the wall free-flowing link from Collier Road itself. through to Reid Highway via Tonkin Highway. The system incorporates a column and capping beam that the traffic Works included: barrier is cast on top of. The capping - Grade separations at Benara beam has soil reinforcement Road, Morley Drive and Collier connected to it and it is this, along Road with the columns, that restrain the - 4m wide shared path along horizontal loading. Tonkin Highway from Guildford Road to Reid Highway Due to traffic barrier loads not being transferred to the wall, we were able The Reinforced Earth Company to use our standard TerraTilt® panel (RECO) was awarded the design design with optimised thickness and and supply of the abutment walls at reinforcement.
    [Show full text]
  • Healthy Rivers Action Plan
    Healthy Rivers Action Plan An Action Plan to improve water quality in the Swan Canning river system For more information about the Healthy Rivers Action Plan and opportunities to help keep our rivers healthy, please contact the Swan River Trust. Swan River Trust Hyatt Centre, Level 1 20 Terrace Road East Perth WA 6004 Telephone: (08) 9278 0900 Fax: (08) 9325 7149 Email: [email protected] www.swanrivertrust.wa.gov.au Printed on 100% recycled paper Contents Figures Minister’s foreword ..................................................................................................2 Figure 1a Health of the Swan Canning river system 2008 ................................12 Chairman’s introduction ...........................................................................................3 Figure 1b Desired health of the Swan Canning river system ............................13 Executive summary .................................................................................................5 Figure 2a-d Seasonal states – Swan Canning river system .................................18 Setting the scene .....................................................................................................9 Figure 3 Ecological management zones for the Swan Canning river system 25 Health of the rivers ................................................................................................15 Figure 4 Priority catchments of the Swan Canning river system .....................29 Our response .........................................................................................................23
    [Show full text]
  • Tonkin Highway Extension Thomas Road to South Western Highway
    PROJECT UPDATE JANUARY 2021 Tonkin Highway Extension Thomas Road to South Western Highway We are extending Tonkin Highway from Thomas Road to South Western Highway south-east of Mundijong, creating a high standard north-south transport link in Perth’s south-eastern corridor. The project is jointly funded by Extensive planning and development work is well underway to the Australian ($404 million) and confirm the scope, and progress various approvals to allow for Western Australian ($101 million) road construction. Procurement is also underway, along with Governments. industry engagement. Geotechnical works, site investigations, • likely growth and redistribution of Connectivity and accessibility groundwater modelling, traffic and noise traffic to the Tonkin Highway Extension; As part of the project’s development, an modelling assessments, and stakeholder and access and connectivity strategy is being consultation are underway. The urban • future performance of the proposed prepared to identify opportunities and design and landscape framework is also highway intersection treatments. constraints to enable movement of all progressing. traffic modes (vehicle, equestrian, cyclists Heavy vehicle inspection bays, similar to and pedestrians) on local roads adjacent All this work will inform the detailed those on the existing highway between to the highway. project scope, which is expected to be Rowley Road and Thomas Road in finalised during 2021, in conjunction with Oakford, are also being considered The strategy will consider: procurement. between Bishop Road and Orton Road. • retaining existing access where Heavy vehicle inspection bays on the road Traffic modelling possible; network allow operators to check loads • provision of alternate access where the The results from recent traffic monitoring and inspectors to assess compliance of existing is impacted; activities have been loaded into traffic heavy vehicles in a safe manner.
    [Show full text]
  • Public Environmental Review
    400,000 402,500 N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 Maralla Road 6,487,500 6,487,500 LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping Class 1 (High to moderate risk) Class 2 (Moderate to low risk) The B roadway 6,485,000 6,485,000 The Promenade 6,482,500 6,482,500 400,000 402,500 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5C Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005C_GIS 402,500 405,000 N 03m 00 Strachan Road Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,495,000 6,495,000 Railway Parade LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping Class 1 (High to moderate risk) Class 2 (Moderate to low risk) Stock Road 6,492,500 6,492,500 Warbrook Road 6,490,000 6,490,000 402,500 405,000 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5D Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005D_GIS 402,500 h 405,000 R o a d N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,502,500 6,502,500 LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping 6,500,000 Class 1 (High to moderate risk) 6,500,000 Class 2 (Moderate to low risk) Muchea South Road 6,497,500 Neaves Road 6,497,500 West Road 402,500 405,000 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER.
    [Show full text]
  • Swan Valley Visitor Guide
    SWAN VALLEY VISITOR GUIDE N AUST R RA TE L S IA E ’ S W 25 Minutes TO O N L D O Perth I E G S T E W I N E R swanvalley.com.au SWAN VALLEY VINEYARDS SINCE 1829 H10 CONTENTS WINERIES 11 RESTAURANTS/CAFES 19 Crunchy Munchy LOCAL PRODUCE 24 DISTILLERIES 28 Morish Nuts BOUTIQUE BARS 28 BREWERIES 29 PICNIC SPOTS 30 FUNCTION CENTRES 30 ATTRACTIONS 31 ARTS & CRAFTS 36 TOURS + MASTERCLASSES 37 ACCOMMODATION 40 HERITAGE 43 RETAIL THERAPY 46 BEYOND THE SWAN VALLEY 48 LOCAL INFORMATION 50 Call in for the full Morish Nuts experience. There’s free tastings, demonstrations, Swan Valley Visitor Centre Cnr Meadow and Swan Streets, Guildford merchandise and our full range of freshly T: (08) 9207 8899 Open 7 Days made, original recipe, mouth watering 9am–4pm (closed Christmas Day) Morish Nuts. But beware, you won’t be able to Accredited Tourism Business stop at just one! This symbol indicates the proven commitment of a tourism business to provide the highest quality of service. Cycle Friendly Business This symbol represents a business that welcomes and provides facilities for cyclists. Map Reference Positioned in the top right corner of advertisements, and within listings, Opening hours: this reference indicates the business location on the maps within this guide. Monday – Sunday 9:30am – 5pm 640 Great Northern Highway Herne Hill, WA 6056 Telephone 1800 888 184 Swan Valley Food & Wine Trail Map H10 for festival and event details www.morish.com.au CALENDAR OF EVENTS visit swanvalley.com.au 3 MORISH advert GUIDE 101x215mm.indd 1 21/03/2018 1:47 PM H10 CONTENTS WINERIES 11 RESTAURANTS/CAFES 19 Crunchy Munchy LOCAL PRODUCE 24 DISTILLERIES 28 Morish Nuts BOUTIQUE BARS 28 BREWERIES 29 PICNIC SPOTS 30 FUNCTION CENTRES 30 ATTRACTIONS 31 ARTS & CRAFTS 36 TOURS + MASTERCLASSES 37 ACCOMMODATION 40 HERITAGE 43 RETAIL THERAPY 46 BEYOND THE SWAN VALLEY 48 LOCAL INFORMATION 50 Call in for the full Morish Nuts experience.
    [Show full text]
  • Noranda Station Passengers Travelling by Train from Noranda Station to the Perth CBD Will Enjoy an 18-Minute Journey to Their Destination
    Noranda Station Passengers travelling by train from Noranda Station to the Perth CBD will enjoy an 18-minute journey to their destination. Positioned at the intersection of Tonkin Highway and Benara Road, the station will offer passengers a full range of convenient facilities while delivering a reliable and efficient transport service for local and surrounding communities. Station design Noranda Station will Benara Road add to the ‘liveability’ of the surrounding suburbs of Beechboro, Kiara and Noranda, while offering local residents another transport choice when Tonkin Highway travelling to and from Noranda Station the Perth CBD and the Tonkin Highway looking north north-eastern suburbs. Artist illustration of concept design only. This is subject to change as the station architecture and final design will be further developed after a contractor is appointed. Platform and access Parking and Bus services Safety and security Noranda Station will be built in drop off Bus services providing Safety and security through the median of Tonkin Highway, Passengers driving to valuable transport links best practice design is always a immediately north of Benara the station can leave from the station to the priority when planning stations. Road. Passengers can access the their vehicles at a surrounding suburbs Passive security measures platform using a walkway from the ground-level car park and beyond will stop such as good lighting and clear Benara Road bridge or a pedestrian on the eastern side of at new bus bays on line of sight are vital to the bridge over Tonkin Highway, with Tonkin Highway, which Benara Road, close station design.
    [Show full text]
  • Metropolitan Road Fact Sheet
    1. What are Main Roads and Highways in the Perth metropolitan area? Metropolitan In the Perth metropolitan area, the following highways and main roads (whole or part) are under the care and control of Main Roads Road Fact Sheet Western Australia: Albany Highway Albany Highway – starts at Welshpool Road and finishes at Metropolitan Boundary Armadale Road Starts at Albany Highway and finishes at Kwinana Freeway Brearley Avenue Starts at Great Eastern Highway and finishes at Airport boundary Brookton Starts at Albany Highway and finishes at Highway the Metropolitan Boundary Canning Highway Starts at Causeway and finishes at Stirling Highway Causeway Cockburn Road Starts at Hampton Road and finishes at Russell Road Garratt Road Bridge Great Eastern Starts at Causeway into Johnson Street Highway right at James Street into East Street and right at Great Eastern Highway to Roe Highway intersection and then through Greenmount, Mundaring and past the Lakes Turn-off to the Metropolitan Boundary west of Linley Valley Road Great Eastern Starts at Great Eastern Highway and Highway Bypass finishes at Roe Highway Great Southern Starts at Great Eastern Highway to Highway Metropolitan Boundary approx. 2.5 km Graham Farmer Starts at Tunnel and finishes at Freeway Chamberlain Road Great Northern Starts at Roe Highway to Metropolitan Highway Boundary near parking bay 300 metres south of Brand Highway Guildford Road Starts on south side of bridge over Graham Farmer Freeway on East Parade and finishes at Johnson Street, Guildford High Street Starts at Carrington Street
    [Show full text]
  • Northlink WA – Southern Section: Guildford Road to Reid Highway
    MAIN ROADS WESTERN AUSTRALIA MAY 2017 Construction Update NorthLink WA – Southern Section: Guildford Road to Reid Highway John Holland is working in Upcoming: road closures and traffic changes partnership with Main Roads Over the next month there will be a number of road closures and changes to to deliver the upgraded Tonkin traffic including: Highway on NorthLink WA’s LONG WEEKEND CLOSURES 7pm Friday 2 June – 5am Tuesday 6 June Southern Section. • Benara Road closed at Tonkin Highway: To construct the Benara Road flyover, we need to install bridge beams. Large cranes will be positioned on As we reach the end of Autumn, Tonkin Highway near Benara Road requiring lane closures on Tonkin Highway construction is progressing at a and the closure of Benara Road between Beechboro Road North and Crimea fast rate. We are working along Street. Local resident access to the closed section of Benara Road will be maintained. the full length of Tonkin Highway between Guildford Road and • Guildford Road on-ramp to Tonkin Highway northbound closed: The Benara Road with a strong focus on-ramp to Tonkin Highway northbound at Guildford Road will be closed so on building the bridges at Collier that newly constructed traffic lanes can be connected with the existing traffic Road, Morley Drive and Benara lanes. Tonkin Highway will remain open with a single lane available in each direction. Road. June/July • Cul-de-sac at Spencer Street: As part of the final road design Spencer Street will be closed to become a cul-de-sac on both sides of Collier Road.
    [Show full text]
  • Extract from Hansard [COUNCIL — Tuesday, 10 May 2016] P2484c-2485A Hon Helen Morton
    Extract from Hansard [COUNCIL — Tuesday, 10 May 2016] p2484c-2485a Hon Helen Morton GATEWAY WA PROJECT Statement HON HELEN MORTON (East Metropolitan) [9.47 pm]: I wanted to congratulate everybody involved in the very successful completion of the Perth Airport and freight access project. The project has delivered a really safe and more efficient transport network around Perth Airport and the freight and industrial areas of Kewdale and Forrestfield. The project began in 2013 and the full scope of the works was completed by the end of the first quarter of 2016. It was opened on 12 April 2016 by the Prime Minister, the state transport minister, Hon Dean Nalder, and the federal transport minister, Hon Darren Chester; many other members of Parliament were there to celebrate the very successful project. It was completed ahead of the planned consolidation of the domestic and international Perth Airport terminals, which was an important milestone for that project. The project is valued at around about $1 billion and is the largest road project undertaken to date in Perth. The federal government contributed $676 million and the state government $310 million. The Gateway WA project, as it is referred to, is a stunning success in every respect. I use that road nearly every day and marvel at how easy and safe it is, and at the pure enjoyment of travelling from Kalamunda to the city now that that project has been completed. It will be enjoyed by thousands of people for decades to come. This project is a fantastic asset for Western Australia and for all Western Australians.
    [Show full text]
  • (MINOR PROJECTS) Intersection Improvement Tonkin H
    PRELIMINARY ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN (MINOR PROJECTS) Intersection Improvement Tonkin Highway / Morley Drive Printed copies are uncontrolled unless marked otherwise MAIN ROADS Western Australia PEIA & EMP, Tonkin-Morley, version 2 – March 2011 1 of 32 CONTENTS 1 PROJECT DESCRIPTION ........................................................................................... 3 2 BACKGROUND ........................................................................................................... 3 3 DESCRIPTION OF THE PROJECT ............................................................................. 3 3.1 PROJECT LOCATION ................................................................................................ 3 4 METHODOLOGY ......................................................................................................... 9 4.1 PRELIMINARY DESKTOP STUDY ............................................................................... 9 4.2 COMMONWEALTH REFERRAL ................................................................................. 10 4.3 SITE INVESTIGATION .............................................................................................. 10 5 EXISTING ENVIRONMENT ....................................................................................... 10 5.1 DESCRIPTION ........................................................................................................ 10 6 CLEARING OF NATIVE VEGETATION ...................................................................
    [Show full text]