Public Environmental Review

Total Page:16

File Type:pdf, Size:1020Kb

Public Environmental Review 400,000 402,500 N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 Maralla Road 6,487,500 6,487,500 LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping Class 1 (High to moderate risk) Class 2 (Moderate to low risk) The B roadway 6,485,000 6,485,000 The Promenade 6,482,500 6,482,500 400,000 402,500 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5C Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005C_GIS 402,500 405,000 N 03m 00 Strachan Road Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,495,000 6,495,000 Railway Parade LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping Class 1 (High to moderate risk) Class 2 (Moderate to low risk) Stock Road 6,492,500 6,492,500 Warbrook Road 6,490,000 6,490,000 402,500 405,000 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5D Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005D_GIS 402,500 h 405,000 R o a d N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,502,500 6,502,500 LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping 6,500,000 Class 1 (High to moderate risk) 6,500,000 Class 2 (Moderate to low risk) Muchea South Road 6,497,500 Neaves Road 6,497,500 West Road 402,500 405,000 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5E Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005E_GIS 402,500 405,000 N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 B r an d H i 6,507,500 g 6,507,500 h w a y LEGEND Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary DER ASS Risk Mapping Class 1 (High to moderate risk) Class 2 (Moderate to low risk) G re a t 6,505,000 E 6,505,000 a s te rn H ig h w a y M u ch ea S o u t h R o a d 6,502,500 6,502,500 402,500 405,000 Date: Figure No: Source & Notes 27.01.2015 Main Roads WA DER ASS Riak Mapping from DER. MXT: DER Acid Sulfate Soils Cadastre from MRWA (August 2014) 4483AA_18_GIS009_2 5F Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation Risk Mapping 4483AA_18_F005F_GIS 397,500 400,000 N SP2 )" 03m 00 Marshall Road Scale 1:20,000 Page size: A3 6,475,000 Projection: GDA 1994 MGA Zone 50 6,475,000 Beechboro Road North Road Beechboro Reid Highway Benara Road LEGEND 6,472,500 )" Sampling point 6,472,500 Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary ASS Environmental Risk Classification High Moderate Morley Drive Walter Road East 6,470,000 6,470,000 T o n k i n H Collier Road i g h w a ad y o R rd fo ld ui G SP1 )" 397,500 400,000 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6A Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006A_GIS 395,000 397,500 400,000 6,482,500 N 6,482,500 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 Gnangara Road Beechboro Road North Road Beechboro 6,480,000 6,480,000 Park Street LEGEND )" Sampling point Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary ASS Environmental Risk Classification High Moderate 6,477,500 6,477,500 He pb ur n A ven ue SP3 )" orth 395,000 397,500 N 400,000 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6B Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006B_GIS 400,000 402,500 N 03m 00 Scale 1:20,000 Page size: A3 SP4 Projection: GDA 1994 MGA Zone 50 )" Maralla Road 6,487,500 6,487,500 LEGEND )" Sampling point Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary ASS Environmental Risk Classification High Moderate The B roadway 6,485,000 6,485,000 The Promenade 6,482,500 6,482,500 400,000 402,500 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6C Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006C_GIS 402,500 405,000 N 03m 00 Strachan Road Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,495,000 6,495,000 Railway Parade LEGEND )" Sampling point Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary SP5 ASS Environmental Risk Classification )" High Moderate Low Stock Road 6,492,500 6,492,500 Warbrook Road 6,490,000 6,490,000 402,500 405,000 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6D Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006D_GIS 402,500 h 405,000 R o a d N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 6,502,500 6,502,500 LEGEND )" Sampling point Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary 6,500,000 ASS Environmental Risk Classification 6,500,000 High Moderate Low Muchea South Road SP6 )" 6,497,500 Neaves Road 6,497,500 West Road 402,500 405,000 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6E Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006E_GIS 402,500 405,000 N 03m 00 Scale 1:20,000 Page size: A3 Projection: GDA 1994 MGA Zone 50 B r an d H i 6,507,500 g 6,507,500 h w a y LEGEND SP7 )" )" Sampling point Tonkin Grade Separation project boundary Perth to Darwin National Highway project boundary ASS Environmental Risk Classification Moderate Low G re a t 6,505,000 E 6,505,000 a s te rn H ig h w a y M u ch ea S o u t h R o a d 6,502,500 6,502,500 402,500 405,000 Source & Notes Date: Figure No: Preliminary sampling locations and 27.01.2015 Main Roads WA Sampling locations and Acid sulfate soils risk mapping from Coffey (October 2014) MXT: 6F Cadastre from MRWA (August 2014) 4483AA_18_GIS012_1 ASS environmental risk classification Aerial imagery from Landgate (August 2014) File Name: Preliminary Acid Sulfate Soils Investigation 4483AA_18_F006F_GIS Appendices APPENDIX A Geomorphic wetlands Unique feature Wetland type Management category Consanguineous suite Location identifier (inside/outside) 8416 Palusplain Conservation category Bennett Brook Inside 8429 Sumpland Conservation category Bennett Brook Inside 8773 Palusplain Conservation category Ellenbrook Inside 8792 Dampland Conservation category Jandakot Inside 8800 Sumpland Conservation category Muchea Inside 8914 Palusplain Conservation category Ellenbrook Inside 15028 Sumpland Conservation category Jandakot Inside 15033 Sumpland Conservation category Jandakot Inside 15260 Palusplain Conservation category Bennett Brook Inside 8541 Dampland Resource enhancement Jandakot Inside 8554 Sumpland Resource enhancement Jandakot Inside 8779 Sumpland Resource enhancement Muchea Inside 8783 Sumpland Resource enhancement Ellenbrook Inside 15752 Palusplain Resource enhancement Bennett Brook Inside 15757 Sumpland Resource enhancement Jandakot Inside 8254 Dampland Multiple use Bennett Brook Inside 8411 Dampland Multiple use Bennett Brook Inside 8438 Dampland Multiple use Bennett Brook Inside 8447 Dampland Multiple use Jandakot Inside 8449 Dampland Multiple use Jandakot Inside 8464 Sumpland Multiple use Jandakot Inside 8730 Dampland Multiple use Jandakot Inside 8784 Floodplain Multiple use Ellenbrook Inside 8785 Floodplain Multiple use Ellenbrook Inside 8936 Sumpland Multiple use Muchea Inside 13096 Sumpland Multiple use Jandakot Inside 15029 Palusplain Multiple use Bennett Brook Inside 15030 Sumpland Multiple use Jandakot Inside 15175 Palusplain Multiple use Bennett Brook Inside 15200 Sumpland Multiple use Jandakot Inside 15732 Palusplain Multiple use Muchea/Ellenbrook Inside APPENDIX B Site photographs Plate 1 Soil lithology at borehole SP1 Plate 2 Soil lithology at borehole SP2 Plate 3 Creek line running through grazing land Plate 4 Typical grazing paddock Plate 5 Low lying bushland/sedges Plate 6 Low lying paddock with surface water Plate 8 Chicken farm within the PDNH alignment Plate 9 Ephemeral water course APPENDIX C Soil borelogs Drilling Log Hand Auger Hole SP1 Page: 1 of 1 Project Northlink Owner BG&E COMMENTS Location Perth - Darwin National Highway Proj.
Recommended publications
  • Northlink WA Stage 1 - Southern Section Perth, WA, Australia
    CASE STUDY ––––––––––––––––––––––––– Northlink WA Stage 1 - Southern Section Perth, WA, Australia Reinforced Earth® TerraTilt® Abutment & Retaining walls Owner: Main Roads WA Consultants: Aurecon Contractor: John Holland Pty Ltd Construction: Nov 2016 - Jan 2018 Background Challenges The $1.02 billion NorthLink WA - Re-design an in-situ counterfort Project, jointly funded by the retaining wall to a Reinforced Federal and State Government, Earth® wall that can takes traffic off local roads and accommodate large horizontal onto the Tonkin Highway. This traffic barrier loads. means local roads will be used for - Large horizontal bridge loads local traffic and those who live and - Architectural finish, circle pattern work locally will experience a safer, - Curved abutment panels with more peaceful environment. It also architectural finish, circle pattern provides an efficient alternative freight route, taking about 80 per Solutions cent of trucks away from the Great RECO was able to develop a modified Northern Highway. traffic barrier and Reinforced Earth® wall interaction that restrained any The southern section of Northlink horizontal loads from the traffic WA provides a freeway-standard, barriers being transferred to the wall free-flowing link from Collier Road itself. through to Reid Highway via Tonkin Highway. The system incorporates a column and capping beam that the traffic Works included: barrier is cast on top of. The capping - Grade separations at Benara beam has soil reinforcement Road, Morley Drive and Collier connected to it and it is this, along Road with the columns, that restrain the - 4m wide shared path along horizontal loading. Tonkin Highway from Guildford Road to Reid Highway Due to traffic barrier loads not being transferred to the wall, we were able The Reinforced Earth Company to use our standard TerraTilt® panel (RECO) was awarded the design design with optimised thickness and and supply of the abutment walls at reinforcement.
    [Show full text]
  • Swan Valley Visitor Guide
    SWAN VALLEY VISITOR GUIDE N AUST R RA TE L S IA E ’ S W 25 Minutes TO O N L D O Perth I E G S T E W I N E R swanvalley.com.au SWAN VALLEY VINEYARDS SINCE 1829 H10 CONTENTS WINERIES 11 RESTAURANTS/CAFES 19 Crunchy Munchy LOCAL PRODUCE 24 DISTILLERIES 28 Morish Nuts BOUTIQUE BARS 28 BREWERIES 29 PICNIC SPOTS 30 FUNCTION CENTRES 30 ATTRACTIONS 31 ARTS & CRAFTS 36 TOURS + MASTERCLASSES 37 ACCOMMODATION 40 HERITAGE 43 RETAIL THERAPY 46 BEYOND THE SWAN VALLEY 48 LOCAL INFORMATION 50 Call in for the full Morish Nuts experience. There’s free tastings, demonstrations, Swan Valley Visitor Centre Cnr Meadow and Swan Streets, Guildford merchandise and our full range of freshly T: (08) 9207 8899 Open 7 Days made, original recipe, mouth watering 9am–4pm (closed Christmas Day) Morish Nuts. But beware, you won’t be able to Accredited Tourism Business stop at just one! This symbol indicates the proven commitment of a tourism business to provide the highest quality of service. Cycle Friendly Business This symbol represents a business that welcomes and provides facilities for cyclists. Map Reference Positioned in the top right corner of advertisements, and within listings, Opening hours: this reference indicates the business location on the maps within this guide. Monday – Sunday 9:30am – 5pm 640 Great Northern Highway Herne Hill, WA 6056 Telephone 1800 888 184 Swan Valley Food & Wine Trail Map H10 for festival and event details www.morish.com.au CALENDAR OF EVENTS visit swanvalley.com.au 3 MORISH advert GUIDE 101x215mm.indd 1 21/03/2018 1:47 PM H10 CONTENTS WINERIES 11 RESTAURANTS/CAFES 19 Crunchy Munchy LOCAL PRODUCE 24 DISTILLERIES 28 Morish Nuts BOUTIQUE BARS 28 BREWERIES 29 PICNIC SPOTS 30 FUNCTION CENTRES 30 ATTRACTIONS 31 ARTS & CRAFTS 36 TOURS + MASTERCLASSES 37 ACCOMMODATION 40 HERITAGE 43 RETAIL THERAPY 46 BEYOND THE SWAN VALLEY 48 LOCAL INFORMATION 50 Call in for the full Morish Nuts experience.
    [Show full text]
  • Noranda Station Passengers Travelling by Train from Noranda Station to the Perth CBD Will Enjoy an 18-Minute Journey to Their Destination
    Noranda Station Passengers travelling by train from Noranda Station to the Perth CBD will enjoy an 18-minute journey to their destination. Positioned at the intersection of Tonkin Highway and Benara Road, the station will offer passengers a full range of convenient facilities while delivering a reliable and efficient transport service for local and surrounding communities. Station design Noranda Station will Benara Road add to the ‘liveability’ of the surrounding suburbs of Beechboro, Kiara and Noranda, while offering local residents another transport choice when Tonkin Highway travelling to and from Noranda Station the Perth CBD and the Tonkin Highway looking north north-eastern suburbs. Artist illustration of concept design only. This is subject to change as the station architecture and final design will be further developed after a contractor is appointed. Platform and access Parking and Bus services Safety and security Noranda Station will be built in drop off Bus services providing Safety and security through the median of Tonkin Highway, Passengers driving to valuable transport links best practice design is always a immediately north of Benara the station can leave from the station to the priority when planning stations. Road. Passengers can access the their vehicles at a surrounding suburbs Passive security measures platform using a walkway from the ground-level car park and beyond will stop such as good lighting and clear Benara Road bridge or a pedestrian on the eastern side of at new bus bays on line of sight are vital to the bridge over Tonkin Highway, with Tonkin Highway, which Benara Road, close station design.
    [Show full text]
  • Northlink WA – Southern Section: Guildford Road to Reid Highway
    MAIN ROADS WESTERN AUSTRALIA MAY 2017 Construction Update NorthLink WA – Southern Section: Guildford Road to Reid Highway John Holland is working in Upcoming: road closures and traffic changes partnership with Main Roads Over the next month there will be a number of road closures and changes to to deliver the upgraded Tonkin traffic including: Highway on NorthLink WA’s LONG WEEKEND CLOSURES 7pm Friday 2 June – 5am Tuesday 6 June Southern Section. • Benara Road closed at Tonkin Highway: To construct the Benara Road flyover, we need to install bridge beams. Large cranes will be positioned on As we reach the end of Autumn, Tonkin Highway near Benara Road requiring lane closures on Tonkin Highway construction is progressing at a and the closure of Benara Road between Beechboro Road North and Crimea fast rate. We are working along Street. Local resident access to the closed section of Benara Road will be maintained. the full length of Tonkin Highway between Guildford Road and • Guildford Road on-ramp to Tonkin Highway northbound closed: The Benara Road with a strong focus on-ramp to Tonkin Highway northbound at Guildford Road will be closed so on building the bridges at Collier that newly constructed traffic lanes can be connected with the existing traffic Road, Morley Drive and Benara lanes. Tonkin Highway will remain open with a single lane available in each direction. Road. June/July • Cul-de-sac at Spencer Street: As part of the final road design Spencer Street will be closed to become a cul-de-sac on both sides of Collier Road.
    [Show full text]
  • Bayswater to Malaga Rail Works EPA Referral Supporting Document
    Bayswater to Malaga Rail Works EPA Referral Supporting Document For more information contact Public Transport Authority Public Transport Centre, West Parade, Perth WA 6000 PO Box 8125, Perth Business Centre, Perth WA 6849 Telephone: (08) 9326 2000 Email: [email protected] www.pta.wa.gov.au Contents Executive Summary ...................................................................................................................... 6 1. Introduction .......................................................................................................................... 21 1.1 Purpose and Scope ........................................................................................................ 21 1.2 Proponent ....................................................................................................................... 21 1.3 Environmental impact assessment process .................................................................... 23 2. The Proposal ........................................................................................................................ 29 2.1 Background .................................................................................................................... 29 2.2 Proposal description ....................................................................................................... 29 2.3 Local and regional context .............................................................................................. 41 3. Stakeholder consultation ...................................................................................................
    [Show full text]
  • Main Roads Tonkin Highway Guildford Road to Hepburn Avenue
    Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Table of Contents 1. Summary ........................................................................................................................ 1 1.1 Project Information ............................................................................................. 1 1.2 Impacts to key environmental aspects ................................................................ 2 1.3 Key Environmental Management Actions ........................................................... 2 1.4 Summary of Regulatory Approvals ...................................................................... 3 2. INTRODUCTION .............................................................................................................. 4 2.1 Purpose of this document ................................................................................... 4 3. PROJECT DESCRIPTION .................................................................................................. 5 3.1 Proposal Location ...............................................................................................
    [Show full text]
  • Western Australia Police
    WESTERN AUSTRALIA POLICE SPEED CAMERA LOCATIONS FOLLOWING ARE THE SPEED CAMERA LOCATIONS FOR THE PERIOD OF MONDAY 24/03/2008 TO SUNDAY 30/03/2008 Locations Marked ' ' relate to a Road Death in recent years MONDAY 24/03/2008 LOCATION SUBURB ALBANY HIGHWAY KELMSCOTT ALBANY HIGHWAY MOUNT RICHON ALBANY HIGHWAY MADDINGTON ALBANY HIGHWAY CANNINGTON ALEXANDER DRIVE DIANELLA CANNING HIGHWAY ATTADALE CANNING HIGHWAY SOUTH PERTH GRAND PROMENADE DIANELLA GREAT EASTERN HIGHWAY CLACKLINE GREAT EASTERN HIGHWAY SAWYERS VALLEY GREAT EASTERN HIGHWAY WOODBRIDGE GREAT EASTERN HIGHWAY GREENMOUNT GREAT NORTHERN HIGHWAY MIDDLE SWAN KENWICK LINK KENWICK KWINANA FREEWAY BALDIVIS LAKE MONGER DRIVE WEMBLEY LEACH HIGHWAY WINTHROP MANDURAH ROAD PORT KENNEDY MANDURAH ROAD GOLDEN BAY MANDURAH ROAD EAST ROCKINGHAM MANNING ROAD MANNING MARMION AVENUE CLARKSON MARMION AVENUE CURRAMBINE MITCHELL FREEWAY INNALOO MITCHELL FREEWAY GWELUP MITCHELL FREEWAY GLENDALOUGH MITCHELL FREEWAY WOODVALE MITCHELL FREEWAY BALCATTA MITCHELL FREEWAY HAMERSLEY MOUNTS BAY ROAD PERTH ROCKINGHAM ROAD WATTLEUP ROE HIGHWAY LANGFORD SAFETY BAY ROAD BALDIVIS STIRLING HIGHWAY NEDLANDS THOMAS STREET SUBIACO TONKIN HIGHWAY MARTIN TONKIN HIGHWAY REDCLIFFE WANNEROO ROAD CARABOODA WANNEROO ROAD NEERABUP WANNEROO ROAD GREENWOOD WANNEROO ROAD WANNEROO WEST COAST HIGHWAY TRIGG TUESDAY 25/03/2008 LOCATION SUBURB ALEXANDER DRIVE YOKINE ALEXANDER DRIVE ALEXANDER HEIGHTS BEACH ROAD DUNCRAIG BERRIGAN DRIVE SOUTH LAKE BRIXTON STREET BECKENHAM BULWER STREET PERTH
    [Show full text]
  • Morley and Noranda Stations Q&A
    Morley and Noranda stations Q&A Question/Comment Response Noranda Station 1. For Noranda Station, will there As part of planning there is a strong focus be any changes to the new on everyone being able to access the footpath installed outside 183 & station using different modes of transport. 191 Benara Rd? My concern is Consideration of where gaps in for it not being suitable for the pathways/access points exist will take elderly and disabled place. pedestrians. Residents are parking on it and it is also quite There are also laws and requirements that narrow for use. any infrastructure project needs to meet, such as the Disability Discrimination Act, and planning and design includes consideration of all user groups who may access the station to ensure that all abilities are able to access the station with ease. 2. How many people are expected Around 1,800 daily boardings are to use the underpass entry from expected at Noranda Station, so while we Davis Court? don’t have an exact figure of how many people will use the underpass, modelling for the underpass is based on a percentage of daily boardings. 3. Why do buses not enter the There are a number of challenges carpark and drop passengers associated with bringing the buses into off outside the platform at the car park, and the needs of all users, Noranda Station? It seems it is not just those travelling to/from the train the only station not to have the station, need to be considered. There are buses enter. Is this something timing and traffic impacts around bringing that can be considered? It is buses to the car park, however there may quite a long walk from the bus be opportunities through traffic modelling stops.
    [Show full text]
  • LICENCES and PERMITS 4002 GOVERNMENT GAZETTE, WA 26 August 2005
    PRINT POST APPROVED PP665002/00041 WESTERN 4001 AUSTRALIAN GOVERNMENT ISSN 1448-949X PERTH, FRIDAY, 26 AUGUST 2005 No. 162 SPECIAL PUBLISHED BY AUTHORITY JOHN A. STRIJK, GOVERNMENT PRINTER AT 3.45 PM © STATE OF WESTERN AUSTRALIA POISONS ACT 1964 _________ LICENCES AND PERMITS 4002 GOVERNMENT GAZETTE, WA 26 August 2005 INDEX Page Licence to sell by retail, poisons included in Schedule 2...................... 4003 Licence to sell by retail, poisons included in Schedule 7...................... 4006 Licence to wholesale and/or manufacture poisons................................ 4011 Poisons Permit (Stockfeed Manufacture).............................................. 4016 Poisons Permit ....................................................................................... 4017 Pharmaceutical Chemist’s Licence to sell poisons................................ 4035 Poisons Permit (Distribution of Samples)............................................. 4044 LIST OF PERSONS HOLDING A LICENCE TO SELL SCHEDULE 2 POISONS BY RETAIL NAME ON BEHALF OF ADDRESS 2005 26 August NIGEL LANGMAN BOWBRIDGE ROADHOUSE VIA, DENMARK ROBERT FORSYTHE 1 BEACH SANDS PTY LTD 31 PRINCE STREET, LEDGE POINT MARK BRADY ANOTHER HORSE PTY LTD T/AS GUILDERTON GENERAL STORE CNR EDWARDS & DEWAR STREETS, GUILDERTON JULIE COOK BARDI ARDYALOON STORE BARDIE ARDYALOON STORE, ONE ARM POINT MICHAEL HULMES BARROCK GOLD AUSTRALIA (PLUTONIC GOLD MINE) RUBYSET STORE,PLUTONIC GOLD MINE,180KM NORTH OF, MEEKATHARRA MICHELLE MIGUEL BEACON CO-OPERATIVE LOT 3, LINDSAY STREET, BEACON ROBIN TUCKER
    [Show full text]
  • Final Lightning Swamp Management Plan
    LIGHTNING SWAMP BUSHLAND MANAGEMENT PLAN Prepared by The City of Bayswater and the Friends of Lightning Swamp October 2002 LIGHTNING SWAMP BUSHLAND MANAGEMENT PLAN Prepared by The City of Bayswater and The Friends of Lightning Swamp Original Management Plan prepared by Students of N319: Environmental Management, Environmental Science, Murdoch University, 1996 Edited by: Sarah Dawson, Kim Grace, Linda Taman and John Williams Cover : Lightning Swamp Eastern Wetland (Photo - Sarah Dawson) 2 TABLE OF CONTENTS MANAGEMENT PLAN RECOMMENDATIONS...................................................................6 EXECUTIVE SUMMARY....................................................................................................... 10 ACKNOWLEDGMENTS......................................................................................................... 12 SECTION 1.0 INTRODUCTION........................................................................................ 14 1.1 SPECIAL NATURE OF PERTH’S BUSHLAND AND WETLANDS .............................. 14 1.2 CURRENT STATUS OF PERTH’S BUSHLAND AND WETLANDS............................. 14 1.3 LOCATION AND DESCRIPTION OF LIGHTNING SWAMP BUSHLAND (LSB) .......... 15 1.4 CURRENT STATUS OF LIGHTNING SWAMP BUSHLAND...................................... 15 1.5 SIGNIFICANCE OF LIGHTNING SWAMP BUSHLAND............................................ 15 1.6 NEED FOR A MANAGEMENT PLAN FOR LIGHTNING SWAMP BUSHLAND............ 17 1.7 ADMINISTRATION OF THE LIGHTNING SWAMP BUSHLAND MANAGEMENT PLAN17 1.8 OBJECTIVES
    [Show full text]
  • Road Fatalities in Perth's Eastern Region Between 2011 and 2015
    Perth’s Eastern Region Road Safety Report Card Killed or Seriously Injured Crashes 320 302 290 300 287 280 244 * 260 NUMBER * 240 220 220 2011 2012 2013 2014 2015 YEAR * Provisional 2015 Statistics Vehicle Type Crash Type Road Feature 266 Motor Vehicle 36% 24% Rear End 46% involved a of crashes 40 vulnerable road user occurred at intersections. Motorcycle Of these 23 21% Right Angle Bicycle 24% did not involve 28% 21 another vehicle did not have Truck any stop signs or traffic light controls 15 30% 15% Hit Object Pedestrian of motorcycle crashes were 2 single vehicle Bus Source: Main Roads Western Australia, Crash Analysis Reporting System accessed 9 January 2017. In Perth’s Eastern Region between 2011 and 2015 there were: were vulnerable Road 42 road users (pedestrian, bicycle, 107 fatalities Of these motorcycle) fatalities BLACK SPOTS Major roads Hospitalisations Fatalities Legend INTERSECTIONS # ROADS # Tonkin Highway / Guildford Rd (eastern intersection) 9 Great Eastern Highway from Roe Highway to region border 67 Tonkin Highway / Benara Road 9 • Roe Highway to Scott Street (10) Orrong Road / Francisco Street 7 • After Scott Street to Bilgoman Road (10) Reid Highway / Beechboro Road North 7 • After Bilgoman Road to Stoneville Road (14) Roe Highway / Kalamunda Road 7 • After Stoneville Road to Eastern border (33) Tonkin Highway / Hale Road 6 Toodyay Road from Roe Highway to region border 32 Reid Highway / West Swan Road 6 Orrong Road between Great Eastern Highway and Leach Highway 30 Guildford Road / Garratt Road 6 Great Eastern Highway between Lloyd Street and Roe Highway 20 Roe Highway / Great Northern Highway 5 Great Eastern Highway between Tonkin Highway and Fauntleroy Ave 16 Broun Avenue / Collier Road 5 Abernethy Road between Campbell Street and Leach Highway 16 Guildford Road / Eighth Avenue 5 Abernethy Road between Leach Highway and Tonkin Highway 14 Tonkin Highway between Guildford Road and Great Eastern Highway 10 Note: The 2014 and 2015 data are considered provisional as all ‘hospitalisations’ may not have been available at the time of analysis.
    [Show full text]
  • Beechboro Service Directory
    Services for Children and Families living in Beechboro Directory of Services Please note that the Department for Communities can provide an extensive range of assistance in most of the categories listed. Department for Communities Gordon Stephenson House 140 William St, Perth WA. 6000 General Enquiries 8am-5pm Mon-Fri: 6217 8700 A/H: 1800 199 008 (free call STD) or Crisis Care 9223 1111 Meerilinga © Disclaimer: The advice and information contained herein is provided in good faith as a service. However the accuracy of any statements made is not guaranteed and it is the responsibility of readers to make their own enquiries as to the accuracy, currency and appropriateness of any information or advice provided. Liability for any act or omission occurring in the reliance on this document or for any such loss, damage or injury occurring as a consequence of such act or omission is expressly disclaimed. Table of Contents SCHOOLS ................................................................................................................. 3 CHILD CARE ............................................................................................................. 3 PLAYGROUPS .......................................................................................................... 4 HEALTH ..................................................................................................................... 4 FAMILY SUPPORT .................................................................................................... 6 IN HOME SUPPORT ...............................................................................................
    [Show full text]