Rally Guide Breslau Poland 2

Total Page:16

File Type:pdf, Size:1020Kb

Rally Guide Breslau Poland 2 12.07 - 19.07.2014 RALLY GUIDE 2 TABLE OF CONTENTS 1 WELCOME TO THE “NEW” RALLYE BRESLAU INTERNATIONAL! .............................. 2 2 ORGANISATION ............................................................................................. 3 2.1 NAME AND ADDRESS ................................................................................ 3 2.2 OFFICIALS .............................................................................................. 3 3 BRESLAU POLAND – UPDATED RALLY SCHEDULE ................................................ 4 4 CLASSES AND CATEGORIES. CLASSIFICATION. .................................................. 8 4.1 FEATURES OF THE RACING CLASSES .......................................................... 8 4.2 CLASSIFICATION ..................................................................................... 8 5 TIMEKEEPING AND GPS TRACKING ................................................................... 9 6 ENTRY DETAILS ........................................................................................... 12 6.1 PAYMENT TERMS .................................................................................... 12 7 TECHNICAL AND SAFETY REQUIREMENTS ........................................................ 12 8 REFUELLING ................................................................................................ 13 9 CAMPS ........................................................................................................ 13 9.1 GENERAL INFORMATION ......................................................................... 13 9.2 FACILITIES ............................................................................................ 16 9.3 CAMP ACCESS ....................................................................................... 17 10 ADVERTISING AND IDENTIFICATION. STICKER PLAN. .................................... 18 10.1 ADVERTISING ........................................................................................ 18 10.2 IDENTIFICATION .................................................................................... 23 11 RALLY SIGNS ............................................................................................ 24 11.1 RALLY CONTROL SIGNS .......................................................................... 24 11.2 MANUAL START HANDLING ...................................................................... 26 12 SAFETY INSTRUCTIONS ............................................................................. 27 13 USEFUL INFORMATION ABOUT POLAND ........................................................ 28 1 WELCOME TO THE “NEW” RALLYE BRESLAU INTERNATIONAL! When I entered my first Breslau Rallye over 12 years ago as a participant I could not have imagined that I would one day be taking it over. I can still remember it well. At that time the Breslau was a wild, real adventure rally and clearly a German affair (Luckily I was proficient in German). Simply put, today‘s Dakar Rally motto: An "Odyssey"! But in this case an odyssey through the land of Poland, which like my own homeland, Bulgaria was in the early changes from a socialist state to an EU country. As the country changed, so did the rally. The rally became more international, at times, the French represented the majority of the participants, and for a few years the Polish teams were unbeatable. The founders Klaus Leihener and Franz Aigner moved on and a new operator took over. However, with the departure of Klaus and Franz ended an era. The Breslau had definitely changed, but it was still looking for "its way". When I took over the rally in 2013 I had to slowly become acquainted with the matter myself. There were lots of projects on the go and many wishes from the participants. There was praise, but there was also criticism. And I admit: I had to do many things, things that were not always beautiful - yes, I even got a few "grey hairs" in the process. What had I let myself into? New hurdles - but also new challenges. And these are what we want to set ourselves. 2014 is a sign of new beginnings. We take the rally seriously. We accept the wishes of the participants seriously. We take the requests of our Polish hosts seriously. Behind the Breslau is a great and experienced ORGA that will give you everything to deliver you a beautiful and exciting rally. The Breslau stands for adventure off the roads combined with the feeling of teamwork and togetherness. And in the future it will continue to stand for this. And even if the organization costs have increased drastically in comparison to earlier days: Registration fees remain fair. We remain a Rally for everyone. But we go with the times. The Breslau is now truly "International". An organiser from Bulgaria, an international ORGA, Poland as the host country. We invite "old hands" as well as new participants to start with us in the "New Breslau". We are ready! Are you ready too? Yours Alexander Kovatchev 2 ORGANISATION 2.1 NAME AND ADDRESS Rallye Breslau International Association 75, St. Peterburg Bvld. 4023 Plovdiv, Bulgaria Tel.: +359 32 277 999 Fax : +359 32 277 990 E-mail: [email protected] Website: www.rallye-breslau.com 2.2 OFFICIALS Race director Alexander Kovatchev [email protected] Clerk of the course Bernd Habermeier Rallye Administration Daniela Roussekova [email protected] Vilena Kovatcheva Marketing & advertising Vilena Kovatcheva [email protected] Public Relations Chris Armelin [email protected] Press Relations Officer TBA Achim Lust Race Control Center Marko Misson Thomas Schmidt Technical scrutineering Jürgen Teichert Thomas Lippe Competitors Relations Officer Uwe Groß Chief Medical Officer Artur Gawlowski Chief Safety Officer Wojtek Legutko Time keeping Geotraq team Logistics Karsten Dorn NOT REGULATORY POWER The Rally Guide 2, published in June 2014 has not regulatory power. It is a document produced for all teams, competitors and media with a view to prepare in advance Rallye Breslau Poland 2014. Any further updates will be published on our web site www.rallye-breslau.com and or/distributed via e-mail. 3 BRESLAU POLAND – UPDATED RALLY SCHEDULE CHANGE OF START LOCATION: Due to some last minute changes we will not be starting the competition in the Zagan area this year but instead we will be starting in Drawsko Pomorskie with our first camp at the old Breslau competitor favourite: Camp Glebokie. This famous camp offers a great location for everybody to meet for the start of the rally. For anybody planning to fly in for the start the closest airport in Germany remains Berlin or Szczecin in Poland. In addition to the rally experiences this year the football fans among the Breslau participants will enjoy the play-off for the 3rd place on 12th July and the final of the FIFA World Cup 2014 on 13th July in the camp. NEW! ITINERARY PREVIEW: * All information can be changed without notice. For information purpose only! Date Day Leg Place Name Distance Pre- Start Start 13.07 Sun 1 Glebokie "First Sweat" 71 km 08:30 09:00 13.07 Sun 2 Glebokie "Lazer night flights" 58 km 23:30 00:00 14.07 Mon 3 Glebokie "Crosser" 172 km 11:45 13:00 Miroslawiec Borne Sulinowo 15.07 Tue 4 Borne Sulinowo "Stretchy" 196 km 08:00 09:15 Czarne Okonek 16.07 Wed 5 Borne Sulinowo "Merry-go-Round" 137 km 09:00 09:30 Okonek 17.07. Thu 6 Borne Sulinowo "Fast-forward" & 280 km 06:30 07:00 Miroslawiec "Dizzy" Konotop Drawsko Pom. 18.07 Fri 7 Drawsko Pom. "Almost" 196 km 07:30 08:00 19.07 Sat 8 Drawsko Pom. "The spirit of 128 km 09:30 10:00 Klaus Leihener" DETAILED ITINERARY LEG 1 - July, 13th 2014 - Sunday LEG 2 - July, 13th-14th 2014 Sunday - Monday Distance Distance Section Name Cross-Country Extreme Distance Distance "First Cross- 70,67 70,77 SS1 Sweat" Section Name Country Extreme "Lazer night TOTAL : 70,67 70,77 57,50 57,50 SS1 flights" 57,50 57,50 TOTAL : LEG 3 - July, 14th 2014 - Monday LEG 4 - July, 15th 2014 - Tuesday Distance Distance Distance Distance Section Name Cross-Country Extreme Section Name Cross-Country Extreme Connection to Start Connection to Start 41,43 41,43 41,97 41,97 SS1 SS1 SS1 "Crosser" 127,61 128,91 SS1 "Stretchy" 153,67 153,24 Connection to Camp 0,80 0,80 Connection to Camp 0,80 0,80 TOTAL : 169,84 171,14 TOTAL : 196,44 196,01 LEG 5 - July, 16th 2014 - Wednesday LEG 6 - July, 17th 2014 - Thursday Distance Distance Distance Distance Cross- Cross- Section Name Country Extreme Section Name Country Extreme "Marry-go- "Fast- 134,90 136,43 54,22 54,22 SS1 Round" SS1 Forward" Connection to Camp 0,80 0,80 Liason to Start SS2 31,46 31,46 TOTAL : 135,70 137,23 SS2 "Dizzy" 178,32 187,15 Connection to Camp 7,75 7,75 TOTAL : 271,75 280,58 LEG 7 - July, 18th 2014 - Friday LEG 8 - July, 19th 2014 - Saturday Distance Distance Distance Distance Section Name Cross-Country Extreme Cross- Section Name Country Extreme SS1 "Almost" 188,90 168,11 Connection to Start SS1 7,75 7,75 Connection to Camp 7,75 7,75 "The spirit of TOTAL : 196,65 175,86 Klaus 107,37 112,53 SS1 Leihener" Connection to Camp 7,75 7,75 TOTAL : 122,87 128,03 BRESLAU POLAND 2014 - TOTAL ITINERARY LEG Class LEG 1 LEG 3 LEG 4 LEG 5 LEG 6 LEG 7 LEG 8 TOTAL 2 Cross-Country 70,67 57,5 169,84 196,44 135,7 271,75 196,65 122,87 1221,42 Extreme 70,77 57,5 171,14 196,01 137,23 280,58 175,86 128,03 1217,12 NEW! PROGRAMME PREVIEW: Friday 11.07 13:00 – 18:00 Administrative check Camp 1 Glebokie Saturday 12.07 08:30 – 18:00 Scrutineering Friday 11.07 13:00 – 18:00 Sticker control Camp 1 Glebokie First aid course Saturday 12.07 08:00 – 18:00 Friday 11.07 13:00 – 18:00 GPS tracker
Recommended publications
  • Analyzing On-Road Emissions of Light-Duty Vehicles with Portable
    Analyzing on-road emissions of light-duty vehicles with Portable Emission Measurement Systems (PEMS) Martin Weiss, Pierre Bonnel, Rudolf Hummel, Urbano Manfredi, Rinaldo Colombo, Gaston Lanappe, Philippe Le Lijour, Mirco Sculati EUR 24697 EN - 2011 The mission of the JRC-IE is to provide support to Community policies related to both nuclear and non-nuclear energy in order to ensure sustainable, secure and efficient energy production, distribution and use. European Commission Joint Research Centre Institute for Energy Contact information Address: Sustainable Transport Unit, Via Enrico Fermi 2749, TP 230, 21010 Ispra, Italy E-mail: [email protected]; [email protected] Tel.: +39-0332-78-6649; +39-0332-78-5301 Fax: +39-0332-78-6328 http://ie.jrc.ec.europa.eu/ http://www.jrc.ec.europa.eu/ Legal Notice Neither the European Commission nor any person acting on behalf of the Commission is responsible for the use which might be made of this publication. Europe Direct is a service to help you find answers to your questions about the European Union Freephone number (*): 00 800 6 7 8 9 10 11 (*) Certain mobile telephone operators do not allow access to 00 800 numbers or these calls may be billed. Additional information on the European Union is available on the Internet and can be accessed through the Europa server http://europa.eu/ JRC 62639 EUR 24697 EN ISBN 978-92-79-19072-8 ISSN 1018-5593 doi:10.2788/23820 Luxembourg: Publications Office of the European Union © European Union, 2011 Reproduction is authorised provided the source is acknowledged Printed in Italy Executive summary Executive summary Emissions testing in the laboratory forms an essential part of the European type-approval procedure for light-duty vehicles.
    [Show full text]
  • The National Road Fund and the Railway Fund As a Source of Financing for the Development of Transport Infrastructure in Poland
    PTiL 2/2019 (46) | ISSN: 1644-275X | www.wnus.edu.pl/ptil | DOI: 10.18276/ptl.2019.46-03 | 29–38 THE NATIONAL ROAD FUND AND THE RAILWAY FUND AS A SOURCE OF FINANCING FOR THE DEVELOPMENT OF TRANSPORT INFRASTRUCTURE IN POLAND DATA PRZESŁANIA: 30.11.2018, DATA AKCEPTACJI: 14.01.2019, KODY JEL: R42, E62, H54 Sylwia Kowalska University of Szczecin [email protected] SUMMARY The article is a review paper whose main objective is to analyze and evaluate the National Road Fund and the Railway Fund as sources of financing infrastructural investments in the transport sector in Poland. The first part of the article presents the theoretical approach to the financing of transport infrastruc- ture. The essence of investments in both road and rail infrastructure is presented. In addition, selected sources of fundraising for infrastructure investments were discussed on the basis of a literature review. The second part presents and compiles secondary data on financial flows in the National Road Fund and the Railway Fund. The receipts and expenditures of both Funds were analyzed and their importance in infrastructure financing was determined. KEYWORDS transport infrastructure, transport financing, infrastructure investments INTRODUCTION Transport infrastructure is a fundamental physical and social resource, the presence of which is necessary for proper social and economic functioning and development. It is one of the links in the national economy, whose comprehensive development affects the overall efficiency of the econ- omy. Consequently, economic progress can be reduced through neglects and inaccuracies in the development of transport infrastructure (Grzywacz, 1982). Furthermore, it is noted that there are strong two-way links between the development of transport infrastructure and the improvement of competitiveness and economic and spatial cohesion of the regions.
    [Show full text]
  • Appendix D.1: Key Personnel Résumés and References
    Appendix D.1 Key Personnel Résumés and References Appendix D.1: Key Personnel Résumés and References Key Personnel – Concession Facility Proposed Key Résumé Key Position Proposed Title Personnel Name Page Number Overall management of the Concession Facility Javier Martin Rivals 3 Concession Facility Project Manager Overall management of the Concession Facility Emmanuel Rotat 5 Concession Facility Deputy Project Manager Overall management and/or Chief Financial Officer control of the Concession Luis Rivas 7 (Developer) Facility’s finances Public relations and community Public Information Rossanna Salazar 9 outreach Coordinator Design of the Concession Design Manager Luis Amigo Lunares 11 Facility Construction, coordination of Construction Manager Mark Smith 14 subcontractors, and scheduling ROW Acquisition Right-of-way Dennis Sedlachek 17 Manager Utility Manager Utility adjustment John Schulte 20 (subconsultant) Control of quality, and the implementation and operation QA/QC Operations Jesús Alvarez Arcos 23 of the Concession Facility’s Manager (Developer) quality systems Corporate Quality Independent quality acceptance Francisco Moreno 25 Manager (Developer) North Tarrant Express Key Personnel Résumés and References 1 Appendix D.1: Key Personnel Résumés and References Proposed Key Résumé Key Position Proposed Title Personnel Name Page Number Environmental Environmental compliance Compliance Manager Jennifer Oshel 27 (DBJV) Concession Facility operations Roadway Operations (such as traffic control and toll Federico Gredilla 30 Director collection) Concession Facility Maintenance Manager Carles Franch Torm 32 maintenance 1 North Tarrant Express Key Personnel Résumés and References 2 Appendix D.1: Key Personnel Résumés and References Javier Martin Rivals Project Manager – Concession Facility Over his 11-year career with Cintra, Mr. Rivals has gained extensive experience in design, construction Education management, ROW acquisition, quality management MS, Civil Engineering, Polytechnic University and project management for toll road projects.
    [Show full text]
  • The Realization of the Autostrada A1 in Poland: a Discussion of Spatial Implications
    THE REALIZATION OF THE AUTOSTRADA A1 IN POLAND: A DISCUSSION OF SPATIAL IMPLICATIONS BY DEVON M. LECHTENBERG THESIS Submitted in partial fulfillment of the requirements for the degree of Master of Arts in Russian, East European, and Eurasian Studies in the Graduate College of the University of Illinois at Urbana-Champaign, 2010 Urbana, Illinois Adviser: Professor Julie Cidell ABSTRACT The Autostrada A1 is a highway currently under construction in Poland. The Autostrada A1 will connect two major Polish ports on the Baltic Sea with industrial areas in the south of the country. Together with the construction of other major highways such as the A2, A3, and A4, it will form a network the significance of which for Poland is paralleled by the Interstate Highway system in the United States and the Autobahn network in Germany. I would suggest that almost every effect that the Autostrada A1 or its realization has had or will have on its environment carries spatial implications. Economic and demographic patterns will likely be significantly affected by the presence of a new north-south highway in Poland. The Autostrada A1 itself, the process to build it, and the transformed government and legal regimes to administer it are all Polish spaces which are merging with the greater space of the European Union while still having ties to the East. Implicit in this process is the further enablement of Poland and other Central European countries which will benefit from the Autostrada A1 to realize their full economic, political and social potential within the contemporary order in Europe and the world.
    [Show full text]
  • Review of 2015 – EUR Version We Build for a Better Society Contents
    Review of 2015 – EUR version We build for a better society Contents Group overview Skanska – 2015 in brief 1 Comments by the President and CEO 2 Promise and values 6 Business model 7 Business plan 2016 –2020 8 Financial targets 2016 –2020 9 Business plan 2016 –2020 – focus areas 12 – Great People 12 – Market Making 13 – Operational Excellence 14 Sustainability 16 Share data 20 Market overview 22 Business streams 24 Construction 26 Residential Development 30 Commercial Property Development 34 Infrastructure Development 38 UN contract completed 42 History 44 Financial information Report of the Directors 46 Corporate Governance Report 53 Consolidated income statement 66 Cover: Malmö now has a brand new, centrally-located city Consolidated statement of comprehensive income 67 district – Malmö Live, Malmö, Sweden. Malmö Symphony Consolidated statement of financial position 68 Orchestra’s new concert hall is here and its two halls have world-class acoustics. There is also a congress hall for 1,500 Consolidated statement of changes in equity 70 guests and a hotel with 444 rooms and two restaurants. The Consolidated cash flow statement 71 hotel’s sky bar on the 25th floor offers a panoramic view over Notes, table of contents 73 the city and the Öresund Strait. Malmö Live covers a total space of 54,000 sq m. Statement by the President and Chief Executive Officer 140 There are also offices, parking facilities and two residential Independent Auditor’s report 141 buildings containing 158 apartments. Skanska developed and constructed Malmö Live working in close cooperation with the City of Malmö from an early stage, thereby creating Senior Executive Team 144 lasting benefits for all parties involved.
    [Show full text]
  • VSL News 2010 Issue 1
    NEWS THE VSL NEWS MAGAZINE • ISSUE ONE 2010 NUCLEAR CONTAINMENTS New generations’ challenges LNG tank Formwork System Moses Mabhida Stadium NUCLEAR 8 SUSTAINABLE 4 DEVELOPMENT Assessing sustainability 4 FACTS&TRENDS 6 EIT: Worldwide first 6 R&D: No voids 7 COVER STORY 8 BRIDGES Post-tensioning solutions for nuclear containments 16 Addressing the new generations’ challenges TANK SITE INSIGHTS 16 FORMWORK Australia: Six months ahead 16 27 New Zealand: Staged delivery 17 Abu Dhabi: Parisian prestige 20 Spain: Tight squeeze for a TBM 25 R&D 26 New LNG tank Formwork system: One system, one cycle highlights FOCUS 28 Fast track road construction with PPCP TECHNICAL REPORT 31 Testing the SSI saddle STADIUM 32 TECH SHOW 32 We shelter the fun The Moses Mabhida Stadium in South Africa will soon be staging the Soccer World cup. VSL placed the arch above the stadium and lifted the cable net roof structure NEWS, magazine published by VSL International Ltd. • Bern, Switzerland Director of Publication: Daniel Rigout• [email protected] Editor in chief: Jane Rousseau • [email protected] Editor : Elisabeth Lichter-Rodriguez • [email protected] Co-ordinators: Carlos Such, Emilie Parati, Doris Tong. Distribution: VSL Communications Design: Red Line Photos: Derek Allan, Philippe Guignard, Hervé Gouband, Christine Mueller-Sinz, David O’Donnell, others Copyright: VSL 2010 • Cover photo: Shin Kori 1-2 nuclear plant, Korea ISSUE ONE • 2010 EDITORIAL VSL, a name that is recognised and highly valued For more than 50 years, VSL’s core strategies have been research and innovation, technical development and achieving high quality to serve our clients.
    [Show full text]
  • Programme 8 13 March
    Programme 8 13 March 13 March European Integration Special Events Time Business & Economy & Reforms 3.35 “Tough Brotherhood”. A documentary by Jerzy Lubach about the Polish-Ukrainian 11:15-12:20 alliance against the Bolsheviks in 1920 (Business & Economy) 12:15-12:30 Coffee Break Thematic Block: Thematic Block: From Association to Customs The Role of Ukrainian Union? Ukraine in Search 12:30-13:30 Diaspora in Building of a Realistic Model the European Economy of European Integration p.13 p.19 13:30-13:45 Coffee Break Panel Discussion: Thematic Block: Lunch Ukrainians in European Coun- Local Identity as an Opportunity 13:45-14:45 14:30- tries. Science, Work, Politics for Tourism Development 16:00 p.14 s.20 14:45-15:15 Lunch Thematic Block: Thematic Block: How to Break Russian Suppliers’ Development of Transport Infra- Domination? The Modifications structure between Ukraine and 15:15-16:15 on the Central and Eastern EU Countries as an Opportunity Europe’s Gas Market to Strenghten Economic Ties p.15 p.22 Success Stories: 16:15-16:45 Mirosław Bieniecki 16:30-16:45 Coffee Break 16:45-18:00 Plenary Session 18:00-18:10 Coffee Break Presentation of Thematic Block: the “Prisoners Thematic Block: Medical Tourism - Do We Need of Kremlin. Why Didn’t Decentralisation 18:10-19:10 Foreign Patients or Do They Invisible Victims Reform Change Ukraine? Need Us? of Undeclared p. 24 p.17 War” Exhibition p.41 19:10-19:20 Coffee Break Thematic Block: Thematic Block: Is it Possible to Separate Busi- 19:20-20:20 How to Build a Friendly Border? ness from Politics? The East p.18 Central Europe Experience p.
    [Show full text]
  • Kontrola Państwowa
    NAJWY¯SZA IZBA KONTROLI ... ktokolwiek grosz publiczny do swego rozporz¹dzenia odbiera, wydatek onego¿ usprawiedliwiæ winien. * WARSZAWA ROCZNIK XLIX NR 5 (298) WRZESIEÑ PADZIERNIK 2004 R. ISSN 04525027 * Cytat z pisma ministra skarbu Ksiêstwa Warszawskiego, Tadeusza Dembowskiego, wystosowa- nego w zwi¹zku z pracami przygotowawczymi do dekretu z 14 grudnia 1808 roku o G³ównej Izbie Obrachunkowej. SPIS TRECI Iwona Sierpowska Prokurator jako organ kontroli i ochrony prawa ...... 3 Janusz Witkowski Rozwój statystyki pracy a jakoæ informacji .............. 16 Pawe³ Wieczorek Zró¿nicowanie poziomu rozwoju spo³eczno-gospodar- czego w Unii Europejskiej ....................................................................... 28 Krzysztof Zalega Polityka strukturalna Unii Europejskiej w obszarze rolnictwa a zasady wspierania sektora rolnego w Polsce po akcesji... 45 * Irena Wyszyñska Nowy system finansowania jednostek samorz¹du terytorialnego (Wybrane zagadnienia) .................................................. 70 USTALENIA NIEKTÓRYCH KONTROLI Piotr Wasilewski Ma³o skuteczna restrukturyzacja s³u¿by zdrowia ........ 90 Wojciech Dziurewicz Jak nie s¹ budowane autostrady w Polsce ............ 100 Lech Witecki Przygotowanie kadr administracji publicznej do funkcjo- nowania w Unii Europejskiej .................................................................. 110 RELACJE, POLEMIKI Dariusz £ubian, Piotr Szpakowski Zarys systemu wdra¿ania funduszy strukturalnych w Polsce w latach 2004-2006 ......................................... 119 *
    [Show full text]
  • Sustainable Transport Campaigns This Past July, My Path Was Blocked by the Roads
    SUSTAINABLETRANSPORT Number 8 Winter 1998 Upward Mobility in South Africa Central Europe: Notes from the Underground p. 4 GEF’s Transport Project in Tehran p. 10 South Africa’s Workbike Project ITDP p. 8 Institute for Transportation & Development Policy SUSTAINABLETRANSPORT Organizing Pedestrians, Cyclists, and Bus Passengers It’s a Matter of Life and Breath Letter from the Executive Director While bicycling through Prospect most bicyclists fear for their lives and thus livable cities by providing technical assis- Park, Brooklyn on a Saturday morning refuse to operate them on most major tance to sustainable transport campaigns this past July, my path was blocked by the roads. Being struck by a motor vehicle is in developing countries and in Central yellow police tape of a crime scene. likely to be the second leading cause of and Eastern Europe, redirecting the fund- Behind it, flecks of blood on a dented van, death in developing countries by the year ing of major development institutions long skid marks, a detective surveying the 2020, according to the World Health towards more sustainable transport pro- scene. The following Monday I learned Organization. jects, and sponsoring demonstration pro- that the driver of the van, who was taking Transportation is not a free market. jects which show how scarce development a “short cut” through the park on a car- Private motor vehicles dominate because dollars could be better spent. free road at 65 kilometers per hour with a they make the streets too polluted and cracked windshield, was given a $45 ticket dangerous for non-motorized alternatives, Demonstration Projects for his negligence.
    [Show full text]
  • World Bank Document
    L- 1 VOL. 7 International Bank for Reconstruction-ana Development Public Disclosure Authorized 'A A' 00 Preliminary Paper No. 7 FILECOPY for the rking Party on the Polish Loan Application Public Disclosure Authorized Transport in Poland Public Disclosure Authorized Public Disclosure Authorized Issued by: Eastern European Division Loan Department May 30, 1947 Acknowledgment The study which follows vwasprepared by the Division of Operational Analysis, IJNRRA Mission, Warsaw, in collaborationwith the Division of Industrial Rehabilitationof the Mission and various agencies of the Polish Government. The report, based upon a paper on the same subject originally issued by the European Regional Office of UNRRA in London, is presented here because it is believed to give the most impartial and complete account of Polish transport currently available. CONTENTS Page I. Introduction. 1 II. Inland Transport. 7 Railway Transport. 7 Devastation . 8 Permanent Way . 9 Rolling Stock . 114 Repair Shops. .. 17 Standard Gauge. 19 Narrow Gauge. 24 Former Private Rolling Stock Repair Shops. 26 Road Transport . 31 Road Network. .. 31 Repair and Maintenance Equipment. 33 Horse-dravw-Vehicles. 36 Motor Vehicles. 37 Inland Waterways . 42 III. Overseas Transport . 45 General. 45 Ports. 46 Gdansk (Danzig) . 46 Gdynia. 48 Szczecin (Stettin). , . 49 Merchant Navy. 50 IV. Civil Aviation. 52 V. UNRRA Assistance . .5. .. 541.. Road Transport . 56 Road Building. 61 Advisory Services. 61 Railways . 62 Water Transport. 63 Indirect Assistance. 64 VI. Four Year Plan. 65 Railways.. 66 Road Transport. .. 69 Inland Waterways . 70 Ports. .. 73 Appendix I. Required Imports of Equipment for Rehabilitation of Transport in Poland .78 a. Rail Transport . 78 b. Road Maintenance .
    [Show full text]
  • Regional Context Analysis
    Regional context analysis A comparative picture of the six partner regions of the ICHNOS Plus project with regard to the implementation of the One-Stop-Shops for business start-ups: Galicia, North Aegean, Sardinia; Silesia, Southern Estonia and Vysocina. November 2008 1 Introduction ______________________________________________________ 2 2 Goals of a Regional Centre of Competence for OSS ______________________ 3 3 Socio Economic report of each new region _____________________________ 3 3.1 Galicia ____________________________________________________________ 3 3.2 North Aegean _____________________________________________________ 24 3.3 Sardinia __________________________________________________________ 37 3.4 Silesia ____________________________________________________________ 47 3.5 Southern Estonia___________________________________________________ 67 3.6 Vysocina__________________________________________________________ 89 4 State-of-the-art in the partner regions related to OSS ____________________ 99 4.1 Galicia ___________________________________________________________ 99 4.2 North Aegean ____________________________________________________ 105 4.3 Sardinia _________________________________________________________ 107 4.4 Silesia ___________________________________________________________ 110 4.5 Existing best practices and other supporting organisations _______________ 112 4.6 Southern Estonia__________________________________________________ 115 4.7 Vysočina_________________________________________________________ 115 5 Structural
    [Show full text]
  • Geographia Polonica Vol. 87 No. 1 (2014) : Road Accessibility
    Geographia Polonica 2014, 87, 1, pp. 5-26 Geographia Polonica Volume 87, Issue 1, pp. 5-26 http://dx.doi.org/10.7163/GPol.2014.1 INSTITUTE OF GEOGRAPHY AND SPATIAL ORGANIZATION POLISH ACADEMY OF SCIENCES www.igipz.pan.pl www.geographiapolonica.pl ROAD ACCESSIBILITY TO TOURIST DESTINATIONS OF THE POLISH-SLOVAK BORDERLAND: 2010-2030 PREDICTION AND PLANNING Marek Więckowski1 • Daniel Michniak2 • Maria Bednarek-Szczepańska1 Branislav Chrenka2 • Vladimír Ira2 • Tomasz Komornicki1 Piotr Rosik1 • Marcin Stępniak1 • Vladimír Székely2 Przemysław Śleszyński1 • Dariusz Świątek1 • Rafał Wiśniewski1 1 Institute of Geography and Spatial Organization Polish Academy of Sciences Twarda 51/55, 00-818 Warsaw: Poland e-mails: [email protected][email protected][email protected] [email protected][email protected][email protected][email protected] [email protected] 2 Institute of Geography Slovak Academy of Sciences Stefánikova 49, 814 73 Bratislava: Slovakia e-mails: [email protected][email protected][email protected][email protected] Abstract An essential requirement for the development, not only of tourism but also of most sectors of economy, is the development of transport infrastructure and adequate accessibility of areas. Accessibility is an important element for tourism development. The Polish-Slovak borderland is currently suffering from inadequate routes to the region and cross-border connections because of the mountains. The borderland are characterised by the poor accessibility and bad condition of the roads. Unfortunately, tourism development analyses and studies carried out over recent decades in Poland and Slovakia have not addressed the problems. The aims of the article was to analyse the Polish-Slovak borderland road accessibility and the key transport solutions required for successful road development.
    [Show full text]