Decision Template (With Guidance)

Total Page:16

File Type:pdf, Size:1020Kb

Decision Template (With Guidance) AGENDA ITEM 10 Report to Cabinet Forward Plan reference number: FP/127/05/15 Date of Meeting: 20 October 2015 County Divisions affected by the decision: All divisions within Basildon, Castle Point and Rochford Districts Title of report: South East LEP Local Growth Fund Transport schemes– A127 Road Safety and Network Resilience Package Report by: Cllr Rodney Bass, Cabinet Member for Highways and Transportation Responsible Director: Paul Bird – Director for Commissioning: Transport and Infrastructure Enquiries to: Alastair Southgate, Transportation Strategy Manager, Place Commissioning (Transport and Infrastructure) Tel: 03330 130561 Email: [email protected] 1. Purpose of report 1.1 Essex County Council (the Council) has bid for funding for a number of transport schemes. The bids were approved by Cabinet and the schemes were included in the Council’s Local Transport Plan (2015 – 2021): Strategy and Priority Projects for Stimulating Economic Growth and subsequently included within the SELEP Strategic Economic Plan programme and within the Capital Programme for delivery. 1.2 The South East LEP and the Department for Transport have agreed to part fund a number of schemes. That funding has already been included in the Capital Programme as part of the 2015-16 budget approval process. 1.3 This report seeks approval to proceed with the A127 Road Safety and Network Resilience Package (the A127 Package) on the basis set out in this report. 2. Recommendations 2.1. To authorise the Director for Commissioning: Transport and Infrastructure to implement the A127 Road Safety and Network Resilience Package already included in the Council’s capital programme for 2015/16 and subsequent years with a total existing budget of £8.0m (this total includes £114,000 which was spent in 2014-15) 2.2 To authorise re-profiling of existing S106 contributions, and the addition to the capital programme of new S106 funding as follows: Additional £250,000 S106 contribution received from Oakwood Grange Additional £13,000 in accrued interest making the total scheme value of £8.263m (£114,000 has already been spent in 2014-15 leaving a current programme value of £8.149m) 2.3 To authorise the Council to enter into a funding agreement with the South East Local Enterprise Partnership or its representative, if required. , releasing £4m Local Growth Fund for the A127 Road Safety and Network Resilience Package 2.4 To authorise the Director for Commissioning to procure contracts for the implementation of the scheme using appropriate framework agreements or the Council’s existing contract with Ringway Jacobs. 3. Background and proposal 3.1. In February 2014 Cabinet agreed to the adoption of the Local Transport Plan (2015 – 2021): Strategy and Priority Projects for Stimulating Economic Growth which includes a list of priority transport projects. This priority list of transport projects formed the Essex County Council submission to the SELEP for inclusion within its Strategic Economic Plan (SEP) programme. 3.2. The SELEP Growth Deal was agreed with Government in July 2014 to deliver the economic growth aspirations contained with the SEP. The Growth Deal includes a commitment by the Council to deliver an agreed programme of growth related transport projects between 2015/16 and 2020/21 in return for a commitment from Government to make available Local Growth Fund (LGF) capital funding to part fund the delivery of these projects. 3.3. Council funds have been included in the capital programme as part of the 2015/16 budget, for the delivery of this programme. 3.4. Funding for all projects on the A127 was retained by the Department for Transport and excluded from the letter confirming the award to SELEP of LGF sent by the Department for Communities and Local Government (DCLG) to SELEP on 6th February 2015. It was expected that this funding would be released following the submission of a business case to DfT. The DfT has now agreed that funding previously retained by DfT for this project will follow a local approval route and will be released to SELEP following the approval of the business case by SELEP. This funding is additional to the allocation £57.2m LGF to schemes promoted by the Council and confirmed in the Award Letter. A letter confirming this allocation is attached at Appendix 1. 3.5. The release of LGF to fund the second tranche of SELEP Growth Deal projects was approved by the SELEP shadow Accountability Board on 19th July 2015. This approval included LGF allocations to the project named within this report. 3.6. The profile agreed at that time was as set out below. Note that this has now been superseded because there is a further £250,000 S106 contribution and a revised profile is set out in the table at section 5.1. Received 2015-16 2016-17 & Total 2014-15 Future Scheme Years Approval £’000 £’000 £’000 Council 3,000 3,000 Contribution LGF Grant 600 3,400 4,000 Third party (S106) 200 800 1,000 Total 200 600 7,200 8,000 Details of the Schemes 3.7. The A127 corridor is a vitally important primary route for the South Essex area which connects the M25, Basildon and Southend (including London Southend Airport). At peak periods, the A127 carries traffic volumes which exceed those on many urban motorways elsewhere in the UK. The route is heavily congested, especially during peak periods, when the road is extremely sensitive to incidents and collisions resulting in unreliable journeys. Realising much of the proposed growth in the area depends upon addressing the significant reliability and capacity issues within the A127 corridor. 3.8. The A127 Capacity Improvements and Network Resilience Package, includes the following components: A127 / A132 Nevendon interchange – capacity improvements to a grade separated junction. A127 / A129 Rayleigh Weir interchange – signals upgrade. A127 / B186 Warley interchange – installation of signals on slip roads and widening of slip roads where necessary. A127 Signing improvements. 3.9. Construction of this package will support housing and job growth by making best use of the existing highway network to reduce congestion at key pinch- points on the network, improve resilience of the corridor, and improve journey time reliability. The package also complements the planned improvements at A127 / A130 Fairglen interchange and junction improvements in Southend at Kent Elms and The Bell and the Southend strategic maintenance package. 3.10. A full description of the A127 Capacity Improvements and Network Resilience Package is attached at appendix 2. 3.11. The A127 Package will proceed to a full design stage and whilst communication strategies are in place for each activity ensuring that stakeholders, local residents and commuters are fully aware of the proposals and how it will affect them during the construction, the Director for Commissioning: Transport and Infrastructure will continue to monitor the impact of the scheme. Appropriate consultation will be undertaken where necessary. Where there is no long term impact then information will be provided to local residents through local newspapers and on site. 3.12. Where a component of the package is the subject of consultation any objections which cannot be resolved will be referred to the Cabinet Member for consideration before a commitment is granted to the scheme. 4. Policy context and Outcomes Framework 4.1. The proposal links strongly with the County Council’s Corporate Plan A Vision for Essex 2013-2017, specifically supporting the aims to ‘develop and maintain the infrastructure that enables our residents to travel and our businesses to grow’ and ‘support employment and entrepreneurship across our economy’. 4.2. The Corporate Outcomes Framework 2014-2018 sets out the seven high level outcomes that we want to achieve to ensure prosperity and wellbeing for our residents. Securing these outcomes will make Essex a more prosperous county; one where people can flourish, live well and achieve their ambitions. 4.3. The seven outcomes are listed below: Children in Essex get the best start in life People in Essex enjoy good health and wellbeing People have aspirations and achieve their ambitions through education, training and lifelong-learning People in Essex live in safe communities and are protected from harm Sustainable economic growth for Essex communities and businesses People in Essex experience a high quality and sustainable environment People in Essex can live independently and exercise control over their lives 4.4. The proposal in this report is consistent with our principles and fully supports the achievement of our outcomes. Delivery of the SELEP SEP programme will; Drive economic growth in Essex, widening access to employment and improving the competitiveness of the Essex economy, driving sustainable economic growth for Essex communities and businesses. Provide safe and sustainable transport for many people living within Essex enabling access to education, training and health services and supporting independent living. Fully supports the Draft Economic Plan for Essex (EPfE) delivering economic growth along the A12 and Great Eastern Mainline, M11 and West Anglia mainline, A127 London-Basildon-Southend and A13 London- Thurrock-Canvey Island, and A120 Haven Gateway Growth Corridors. 4.5. The proposal supports the delivery of the Essex Local Transport Plan vision for a transport system that supports sustainable economic growth and helps deliver the best quality of life for the residents of Essex by providing connectivity for Essex communities and international gateways to support sustainable economic growth and regeneration. 5. Financial Implications 5.1. This scheme is funded from multiple sources as identified below: A Council funding contribution of £3.0m towards scheme construction costs has been included in the Capital Programme for 2016/17 and profiled over subsequent years. SELEP grant funding of £4.0m has already been approved and accepted by the Council. Each grant award has been ringfenced by SELEP against the delivery of each of the specific projects.
Recommended publications
  • Research on Weather Conditions and Their Relationship to Crashes December 31, 2020 6
    INVESTIGATION OF WEATHER CONDITIONS AND THEIR RELATIONSHIP TO CRASHES 1 Dr. Mark Anderson 2 Dr. Aemal J. Khattak 2 Muhammad Umer Farooq 1 John Cecava 3 Curtis Walker 1. Department of Earth and Atmospheric Sciences 2. Department of Civil & Environmental Engineering University of Nebraska-Lincoln Lincoln, NE 68583-0851 3. National Center for Atmospheric Research, Boulder, CO Sponsored by Nebraska Department of Transportation and U.S. Department of Transportation Federal Highway Administration December 31, 2020 TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. SPR-21 (20) M097 4. Title and Subtitle 5. Report Date Research on Weather conditions and their relationship to crashes December 31, 2020 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Dr. Mark Anderson, Dr. Aemal J. Khattak, Muhammad Umer Farooq, John 26-0514-0202-001 Cecava, Dr. Curtis Walker 9. Performing Organization Name and Address 10. Work Unit No. University of Nebraska-Lincoln 2200 Vine Street, PO Box 830851 11. Contract or Grant No. Lincoln, NE 68583-0851 SPR-21 (20) M097 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Nebraska Department of Transportation NDOT Final Report 1500 Nebraska 2 Lincoln, NE 68502 14. Sponsoring Agency Code 15. Supplementary Notes Conducted in cooperation with the U.S. Department of Transportation, Federal Highway Administration. 16. Abstract The objectives of the research were to conduct a seasonal investigation of when winter weather conditions are a factor in crashes reported in Nebraska, to perform statistical analyses on Nebraska crash and meteorological data and identify weather conditions causing the significant safety concerns, and to investigate whether knowing the snowfall amount and/or storm intensity/severity could be a precursor to the number and severity of crashes.
    [Show full text]
  • Southend-On-Sea Borough Council Infrastructure Delivery Plan
    Southend-on-Sea Infrastructure Delivery Plan Southend-on-Sea Borough Council Infrastructure Delivery Plan Navigus Planning February 2015 0 Southend-on-Sea Infrastructure Delivery Plan Southend-on-Sea Infrastructure Delivery Plan CONTENTS 1 INTRODUCTION ................................................................................... 1 2 RELEVANT PLANNING POLICY AND CONTEXT FOR GROWTH .............. 3 National policy ........................................................................................................ 3 Local context .......................................................................................................... 5 3 EDUCATION ........................................................................................ 11 Early Years and Childcare ...................................................................................... 11 Primary, Secondary and Sixth Form Education ........................................................ 12 Free Schools and Academies ................................................................................. 14 4 HEALTH AND SOCIAL WELLBEING ..................................................... 15 GP services .......................................................................................................... 15 Social care ........................................................................................................... 17 5 UTILITIES .......................................................................................... 19 Water – used water .............................................................................................
    [Show full text]
  • Capital Programme by Portfolio 34 5
    ESSEX COUNTY COUNCIL ORGANISATION PLAN 2018/19 CONTENTS 1. A foreword by the Leader and Chief Executive 3 • Environment and Waste 49 • Health and Adult Social Care 51 2. The Financial Challenge – a report by the Cabinet 4 • Highways 53 Member for Resources • Housing, Planning and Property 55 • Leader 57 3. Our Strategic Priorities 5 • Resources 58 • Other Operating Costs 60 4. Resources 25 d. Trading Activities 63 a. Report by Executive Director for Corporate 26 and Customer Services (S151 Officer) e. Reserves 64 b. Financial Strategy 2018/19 – 2020/21 30 c. Revenue Budget and Capital Programme by portfolio 34 5. Delivery 67 • Children and Families 39 a. Managing risk 67 • Culture, Communities and Customer 41 b. Equalities 68 • Economic Growth, Skills, Infrastructure 43 c. Measuring our performance 69 and the Digital Economy • Education 46 6. Annex 1: Capital Strategy 72 ESSEX COUNTY COUNCIL ORGANISATION PLAN 2 A foreword by the Leader and Chief Executive Essex is at the cutting edge of innovation and is one of In July we agreed a new Organisation Strategy that set This Organisation Plan the most dynamic counties in the UK. With two leading out what we want to achieve in Essex by 2021. We are universities, international airports and seaports, one of now focused on achieving our four aims to: sets out the progress we the longest coastlines and excellent road and rail links • Enable inclusive economic growth, have made in 2017/18 to the capital, Essex is uniquely placed and an excellent • Help people get the best start and age well, county to live and work in.
    [Show full text]
  • Investigation of Weather Conditions and Their Relationship to Crashes
    INVESTIGATION OF WEATHER CONDITIONS AND THEIR RELATIONSHIP TO CRASHES Dr. Mark Anderson1 Dr. Aemal J. Khattak2 Muhammad Umer Farooq2 John Cecava1 Curtis Walker3 1. Department of Earth and Atmospheric Sciences 2. Department of Civil & Environmental Engineering University of Nebraska-Lincoln Lincoln, NE 68583-0851 3. National Center for Atmospheric Research, Boulder, CO Sponsored by Nebraska Department of Transportation and U.S. Department of Transportation Federal Highway Administration December 31, 2020 TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. SPR-21 (20) M097 4. Title and Subtitle 5. Report Date Research on Weather conditions and their relationship to crashes December 31, 2020 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Dr. Mark Anderson, Dr. Aemal J. Khattak, Muhammad Umer Farooq, John 26-0514-0202-001 Cecava, Dr. Curtis Walker 9. Performing Organization Name and Address 10. Work Unit No. University of Nebraska-Lincoln 2200 Vine Street, PO Box 830851 11. Contract or Grant No. Lincoln, NE 68583-0851 SPR-21 (20) M097 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Nebraska Department of Transportation NDOT Final Report 1500 Nebraska 2 Lincoln, NE 68502 14. Sponsoring Agency Code 15. Supplementary Notes Conducted in cooperation with the U.S. Department of Transportation, Federal Highway Administration. 16. Abstract The objectives of the research were to conduct a seasonal investigation of when winter weather conditions are a factor in crashes reported in Nebraska, to perform statistical analyses on Nebraska crash and meteorological data and identify weather conditions causing the significant safety concerns, and to investigate whether knowing the snowfall amount and/or storm intensity/severity could be a precursor to the number and severity of crashes.
    [Show full text]
  • Capital Project Business Case Fairglen New Link Road
    Capital Project Business Case Fairglen New Link Road The template This document provides the business case template for projects seeking funding which is made available through the South East Local Enterprise Partnership. It is therefore designed to satisfy all SELEP governance processes, approvals by the Strategic Board, the Accountability Board and also the early requirements of the Independent Technical Evaluation process where applied. It is also designed to be applicable across all funding streams made available by Government through SELEP. It should be filled in by the scheme promoter – defined as the final beneficiary of funding. In most cases, this is the local authority; but in some cases the local authority acts as Accountable Body for a private sector final beneficiary. In those circumstances, the private sector beneficiary would complete this application and the SELEP team would be on hand, with local partners in the federated boards, to support the promoter. Please note that this template should be completed in accordance with the guidelines laid down in the HM Treasury’s Green Book. https://www.gov.uk/government/publications/the-green-book- appraisal-and-evaluation-in-central-governent As described below, there are likely to be two phases of completion of this template. The first, an ‘outline business case’ stage, should see the promoter include as much information as would be appropriate for submission though SELEP to Government calls for projects where the amount awarded to the project is not yet known. If successful, the second stage of filling this template in would be informed by clarity around funding and would therefore require a fully completed business case, inclusive of the economic appraisal which is sought below.
    [Show full text]
  • Topic Paper 2: Stategic Highway Network
    Southend Central Area Action Plan TOPIC PAPER 2: STATEGIC HIGHWAY NETWORK March 2017 Topic Paper 2: Strategic Highway Network This topic paper builds upon the information set out in the Southend Infrastructure Delivery Plan (IDP) (2015)1 in explaining that the Council has been, and continues to be, successful in implementing key transport improvements and securing future funds to support the growth targets of the adopted Core Strategy (2007). Local Policy Context The IDP is a supporting document for the Southend Core Strategy and part of the Local Planning Framework for Southend. The IDP covers the remaining plan period up until 2021. The document includes details of the infrastructure identified by the Council and other service providers as being needed to support the delivery of the Core Strategy. The IDP assesses the transport infrastructure required to support the planned jobs and housing growth of the Core Strategy, which include those of the SCAAP. The assessment was informed by the SOSBC Transport Team and the Highway Agency. In compliance with the Transport Act 2000, Southend Borough Council (SBC) has prepared a Local Transport Plan Strategy (LTP3) and an Implementation Plan for the period 2011/2012 to 2026. This, together with the use of the Southend Multi-Modal Transport Model, information sourced from the Local Sustainable Transport Fund and the Better Bus Area application (in terms of levels of infrastructure investment), has informed the IDP assessment. Significant projects and the business case used to inform the development of the South East Local Enterprise (SELEP) Strategic Economic Plan (SEP) are referred to further in this section in terms of transport funding for the planned growth in employment and housing in both Southend and Rochford (predominantly in the context of the Joint Area Action Plan (JAAP) for London Southend Airport and Environs).
    [Show full text]
  • Essex Waste Partnership Courtauld Road, Basildon
    Essex Waste Partnership Courtauld Road, Basildon Environmental Site Appraisal (EnSA) Report FINAL January 2010 Entec UK Limited Copyright and Non-Disclosure Notice The contents and layout of this report are subject to copyright owned by Entec (© Entec UK Limited 2010) save to the extent that copyright has been legally assigned by us to another party or is used by Entec under licence. To the extent that we own the copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose indicated in this report. The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of Entec. Disclosure of that information may constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be subject to the Third Party Disclaimer set out below. Third Party Disclaimer Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by Entec at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third party who is able to access it by any means. Entec excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability.
    [Show full text]
  • Braintree, Brentwood, Chelmsford, Maldon and Uttlesford Landscape Character Assessments
    BRAINTREE, BRENTWOOD, CHELMSFORD, MALDON AND UTTLESFORD LANDSCAPE CHARACTER ASSESSMENTS September 2006 CHRIS BLANDFORD ASSOCIATES Environment Landscape Planning CONTENTS Preface Executive Summary 1.0 INTRODUCTION 1.1 Background and Study Area 1.2 Study Aims and Objectives 1.3 The Importance of Landscape Character 1.4 Planning Policy Framework 1.5 Approach and Methodology 1.6 Structure of the Report 2.0 OVERVIEW OF THE STUDY AREA 2.1 General 2.2 Physical Influences on the Shaping of the Landscape 2.3 Historical Influences on the Landscape 2.4 Key Forces for Change in the Landscape 2.5 Landscape Character in The Study Area – An Overview 3.0 LANDSCAPE CHARACTER OF BRAINTREE DISTRICT 3.1 General 3.2 River Valley Landscapes 3.3 Farmland Plateau Landscapes 3.4 Wooded Farmland Landscapes 4.0 LANDSCAPE CHARACTER OF BRENTWOOD BOROUGH 4.1 General 4.2 River Valley Landscapes 4.3 Wooded Farmland Landscapes 4.4 Fenland Landscapes 5.0 LANDSCAPE CHARACTER OF CHELMSFORD BOROUGH 5.1 General 5.2 River Valley Landscapes 5.3 Farmland Plateau Landscapes 5.4 Drained Estuarine Marsh Landscapes 5.5 Wooded Farmland Landscapes 6.0 LANDSCAPE CHARACTER OF MALDON DISTRICT 6.1 General 6.2 River Valley Landscapes 6.3 Farmland Plateau Landscapes 6.4 Estuarine Marsh/Mudflat Landscapes 6.5 Drained Estuarine Marsh Landscapes 6.6 Coastal Farmland Landscapes 6.7 Wooded Farmland Landscapes 7.0 LANDSCAPE CHARACTER OF UTTLESFORD DISTRICT 7.1 General 7.2 River Valley Landscapes 7.3 Farmland Plateau Landscapes 7.4 Chalk Upland Landscapes 11100101R Final LCAs_09-06 Contents 8.0 RECOMMENDATIONS 8.1 General 8.2 Key Applications of the Landscape Character Assessments 8.3 Incorporating Landscape Character into Local Development Frameworks 8.4 Monitoring Landscape Change 8.5 Enhancing the Character Evidence Base APPENDICES A.
    [Show full text]
  • M25 Junction 28 Improvements Environmental Study Report
    Road Investment Strategy M25 Junction 28 Improvements Environmental Study Report October 2016 V 3.0, October 2016 Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363 M25 Junction 28 Improvements Environmental Study Report Notice This document and its contents have been prepared and are intended solely for Highway England’s information and use in relation to the M25 Junction 28 Improvements. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document control The Project Manager is responsible for production of this document, based on the contributions made by his/her team existing at each Stage. Document Title M25 Junction 28 Improvements Environmental Study Report Author Env Team. Co-ordinator: Sarah Wallis Owner Piotr Grabowiecki Distribution HE Reviewers, Atkins Team Document Status Final Revision History This document is updated at least every stage. Version Date Description Author Checked Reviewed Authorised by by by Env SLW VA & NW PG 1.0 22/07/16 First draft Team Revised draft with SLW NW PG Noise & Air Quality and Env 2.0 10/10/2016 addressing comments Team from Highways England Env SLW NW PG 3.0 26/10/2016 Final Team Reviewer List Name Role Victoria Allen Technical Review - Environment Pete George Atkins Project Manager Henry Penner HE PTS Environmental Advisor Piotr Grabowiecki, Eze HE Integrated Project Team Onah, Andrew Salmon. Approvals The Project SRO is accountable for the content of this document Name Signature Title Date of Issue Version Andrew Salmon HE Project SRO i i M25 Junction 28 Improvements Environmental Study Report Table of Contents Glossary ..................................................................................................................
    [Show full text]
  • Section 4 Brentwood Borough
    4.0 LANDSCAPE CHARACTER OF BRENTWOOD BOROUGH 107 4.0 LANDSCAPE CHARACTER OF BRENTWOOD BOROUGH 4.1 General 4.1.1 This section of the report provides the detailed ‘profiles’ of Landscape Character Areas within Brentwood Borough, structured as follows: x Location of character area (map) x Boundaries of character area (map) x Photograph x Key characteristics x Overall character description x Visual characteristics x Historic land use x Ecological features x Key planning and land management issues x Sensitivities to change x Proposed landscape strategy objectives x Suggested landscape planning guidelines x Suggested land management guidelines The profiles should be read as a whole when used to inform decision making. Where Landscape Character Areas fall within two or more adjacent District/Borough areas, included in this Study report the same profile has been included within the respective section. In such instances, a cross-reference is noted in the respective Character Area profile(s). Reference should also be made to other studies for neighbouring authority areas including: x Thurrock Landscape Capacity Study 4.1.2 The following Landscape Character Types and Areas have been identified with Brentwood Borough (see Figure 4.1), and are described in the following sections: A - River Valley A11 - Roding River Valley F - Wooded Farmland F7 - Blackmore Wooded Farmland F8 - Doddinghurst Wooded Farmland F9 - Little Warley Wooded Farmland F10 - Heybridge Wooded Farmland F13 - Great Warley Wooded Farmland F14 - Ingrave and Herongate Wooded Farmland
    [Show full text]
  • Dunton Area Landscape Corridor Design Options Local Plan Green Infrastructure
    The Dunton Area Landscape Corridor Design Options Local Plan Green Infrastructure Client: Date: Basildon Council 20/12/2017 Brentwood Council Prepared by Document owner Organisation role Ryan Mills Landscape Consultant Control Date Author Checked by 20/12/2017 Ryan Mills Peter Dawson Landscape Corridor Design Options Contents Introduction The Document 4 Location 5 Landscape Analysis 6 Land Character and Use 7 Ecology 10 Historic 13 Constraints Physical Constraints 14 Landscape Corridor Options Concept and Vision 18 All Schemes 19 Scheme 1 22 Scheme 2 23 Scheme 3 24 Development Interface Principles 25 Highway Principles 26 Management and Maintenance 28 Funding 29 Evaluation Next Steps 30 Professional Contributors 31 References and Reading List 32 Appendices 34 3 © Place Services 2017 Landscape Corridor Design Options Introduction The Document Place Services have been commissioned by Basildon Borough Council (BaBC) and Brentwood Borough Council (BrBC) to undertake a broad scale landscape assessment and present proposals for a landscape buffer and green corridor that could encompass the borough boundaries and give visual separation between two potential residential development sites. These two sites represent an urban extension to Basildon on its west side and a new ‘Garden Village’ settlement based on the Dunton Hills area. This document sets out the analysis undertaken and the scheme options proposed. This study is guided by the two councils’ draft local plans for future strategic development, and the project requirement to ensure that there is a visual separation between the potential new settlement areas. The work is intended to investigate the following aspects: • Whether a corridor can be provided to achieve visual separation; • Whether there are opportunities to use this landscape corridor to improve biodiversity and recreational connectivity; • Whether there are opportunities for the corridor to be traversed by local highway connections.
    [Show full text]
  • Highways England
    M25 junction 28 improvement scheme TR010029 6.1 Environmental Statement Chapter 9: Landscape and visual APFP Regulation 5(2)(a) Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 6 May 2020 M25 junction 28 improvement scheme TR010029 6.1 Environmental Statement Chapter 9: Landscape and visual Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 M25 junction 28 scheme Development Consent Order 202[x ] 6.1 ENVIRONMENTAL STATEMENT CHAPTER 9: LANDSCAPE AND VISUAL Regulation Number: Regulation 5(2)(a) Planning Inspectorate Scheme TR010029 Reference: Application Document Reference: TR010029/APP/6.1 Author: M25 junction 28 improvement scheme project team, Highways England Version Date Status of Version 1 May 2020 Application issue Planning Inspectorate scheme reference: TR010029 Application document reference: TR010029/APP/6.1 Page 2 of 53 M25 junction 28 improvement scheme TR010029 6.1 Environmental Statement Chapter 9: Landscape and visual Table of contents Chapter Pages Executive summary 5 9. Landscape and visual 5 9.1 Introduction 5 9.2 Competent expert evidence 5 9.3 Legislative and policy framework 5 9.4 Study area 9 9.5 Assessment methodology 10 9.6 Assessment assumptions and limitations 16 9.7 Baseline conditions 17 9.8 Potential impacts 27 9.9 Design, mitigation and enhancement measures 31 9.10 Assessment of effects 32 9.11 Cumulative effects 42 9.12 NPS NN compliance 50 9.13 Monitoring 51 9.14
    [Show full text]