2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY
Total Page:16
File Type:pdf, Size:1020Kb
2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Advanced to Construction ILLINOIS ILLINOIS MISSOURI HANLEY RD MISSOURI ST. CHARLES EVA AVE MISSOURI 270 ROCK ROAD MCDONNELL BLVD MISSOURI AIRPORT MISSISSIPPI RIVER 3 170 RIVER 370 170 MISSISSIPPI 270 RIVER 70 FUNDED FUNDED 255 FUNDED FUNDED270 70 70 FUNDED 170 141 AIRPORT 70 NORFOLK MISSOURI MISSOURI NORTH PARK RIDER TRAIL SOUTHERN Merchants Bridge (TRRA) Replacement I-270 Improvements from I-70 (MO) to North Park Access Improvements (MO) Earth City Access Improvements (MO) J.S. McDonnell Connector Access over the Mississippi River (MO-IL) Illinois Route 157 (MO-IL) Safety and capacity improvements (A) St. Charles Rock Road preservation of Improvements (MO) Replacement of Terminal Railroad (B) Chain of Rocks Bridge Replacement along Hanley Road from I-70 to Madison 1.3-mile corridor Roadway improvements to enhance Association of St. Louis 130-year old rail (C) I-270/IL-111 Interchange Reconstruction Avenue truck traffic movements and replace bridge Highest Priority Project (B) Arterial roadway pavement repairs in deteriorated rail crossing Freightway’s #1 Priority Earth City Funded: Summer 2018 Funded: Spring 2018 Funded in 2018 Construction Nearing Completion Construction Funding Approved 2019 Estimated Cost: $222 mil B) $211.6 mil (C) $19 mil Estimated Cost: $3 mil Estimated Cost: $4 mil Estimated Cost: $20.7 mil Advanced to Construction Partially Programmed for Construction UNION PACIFIC GREEN MOUNT RD ILLINOIS UP / KCS / NS MISSOURI ILLINOIS ILLINOIS DUPO YARD 270 255 MISSISSIPPI RIVER 70 MISSISSIPPI 270 RIVER 64 FUNDED FUNDED 270 FUNDED 255 70 70 158 170 DAVIS STREET RIVERVIEW DR HALL ST FERRY RD ILLINOIS AIRPORT ILLINOIS BROADWAY AVE BRANCH ST MISSOURI I-255 / Davis Street Ferry Road I-64 Improvements from Green Mount Union Pacific Railroad Lenox Tower North Riverfront Commerce Corridor I-270 Improvements from I-70 (MO) to Interchange (IL) Road to Illinois Route 158 (Air Mobility Replacement (IL) Improvements (MO) Illinois Route 157 (MO-IL) New interchange and connecting Drive) (IL) Remove Lenox Rail Tower in Mitchell, (A) Hall Street and Riverview Drive (A) Improvements and some widening roadways to serve emerging industrial Expansion of I-64 to six lanes as well as Illinois in order to centralize dispatching improvements (Partially Funded) from I-70 to Mississippi River (partially area near Union Pacific Dupo other safety and capacity improvements in Omaha, Nebraska (B) Branch Street improvements funded $250 mil) (MO) Intermodal Yard including future grade (C) I-70 westbound off-ramp to North (C) Widening from Mississippi River to separation over five rail tracks Broadway relocation (Complete) Route 157 (IL-111 Interchange Funded) Highest Priority Project Highest Priority Project Highest Priority Project Funded: Summer 2019 Funded: Summer 2019 Funded: Spring 2018 and 2019 Estimated Cost: $33.9 mil Estimated Cost: $1.2 bil Estimated Cost: $59 mil Estimated Cost: $32 mil Estimated Cost: $9 mil Unfunded: $28 mil Unfunded: (A) $450 mil (C) $268 October 2019 2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Partially Programmed for Construction Concept Development or Planning MISSOURI ILLINOIS UP / KCS ILLINOIS MISSOURI ILLINOIS B 255 64 64 170 70 44 270 44 55 3 3 64 MISSISSIPPI 55 BANSHEE RD RIVER TAXIWAY V 44 MISSISSIPPI FALLING MCDONNELL BLVD A RIVER SPRINGS RD MISSISSIPPI RIVER NORFOLK SOUTHERN MISSOURI MISSOURI ILLINOIS Illinois Route 3 Access America’s Central Port Improvements (IL) St. Louis Lambert International Airport I-70 Improvements from Warrenton to Mississippi River Port Development Improvements (IL) (A) Granite City Harbor track revitalization North Cargo Improvements (MO) Stan Musial Veterans Memorial Bridge (MO) Projects (MO) (A) Illinois Route 3 relocation from River (B) Granite City Harbor general cargo (A) Banshee Road reconstruction (A) Improvements from Wentzville to (A) Crystal City Port development with Park Drive to Monsanto Avenue dock revitalization (Funded) (B) McDonnell Boulevard / Airport Road Stan Musial Memorial Bridge (40 miles) access roadway (B) Falling Springs Road / Illinois Route 3 (C) Union Pacific / Kansas City Southern intersection reconstruction (B) Expansion to six lanes from (B) City of St. Louis south riverfront site railroad bypass (Partially Funded) connection through A&K yard (C) Taxiway V connector (Complete) Wentzville to Warrenton (20 miles) (C) St. Louis County Port development Highest Priority Project (D) New port entrance at IL-3 (Funded) Highest Priority Project north/south sites Estimated Cost: $147 - $192 mil Estimated Cost: $22.5 mil Estimated Cost: $18.2 mil Estimated Cost: $650 mil Estimated Cost: $17.5 mil Unfunded: $135 - $180 mil Unfunded: $12.5 mil Unfunded: $12.1 mil Concept Development or Planning TERMINAL #1 ILLINOIS UNION PACIFIC MISSOURI ILLINOIS ILLINOIS TERMINAL #2 DUPO YARD 158 370 270 64 158 255 161 177 154 GIST RD AIRPORT KASKASKIA RIVER RAMSEY ROAD ILLINOIS FEE FEE RD NORFOLK SOUTHERN AIRPORT Kaskaskia Regional Port District I-255 / Fish Lake (Ramsey Road) St. Louis Lambert International Airport MidAmerica St. Louis Airport Illinois Route 158 (Air Mobility Drive) Improvements (IL) Interchange (IL) Access Improvements (MO) Distribution Improvements (IL) Expansion from Route 161 to Route (A) Terminal #1 second rail loop track New interchange to provide additional (A) Cargo City access analysis New two-mile rail spur from Norfolk 177 (IL) and lead track rail upgrades access to the Union Pacific Dupo (B) Fee Fee Road bridge improvement Southern mainline to enable freight rail One-mile extension of two lanes (B) Terminal #2 2nd entrance & 3rd dock Intermodal Yard access for industry on the eastern side along a growth corridor near I-64 and (C) Gist Road upgrade (C) Port Development at Fayetteville of airport MidAmerica St. Louis Airport Estimated Cost: $11.8 mil Estimated Cost: $27 mil Estimated Cost: $30.25 mil Estimated Cost: $45 mil Estimated Cost: $20 mil October 2019.