2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY

Total Page:16

File Type:pdf, Size:1020Kb

2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY 2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Advanced to Construction ILLINOIS ILLINOIS MISSOURI HANLEY RD MISSOURI ST. CHARLES EVA AVE MISSOURI 270 ROCK ROAD MCDONNELL BLVD MISSOURI AIRPORT MISSISSIPPI RIVER 3 170 RIVER 370 170 MISSISSIPPI 270 RIVER 70 FUNDED FUNDED 255 FUNDED FUNDED270 70 70 FUNDED 170 141 AIRPORT 70 NORFOLK MISSOURI MISSOURI NORTH PARK RIDER TRAIL SOUTHERN Merchants Bridge (TRRA) Replacement I-270 Improvements from I-70 (MO) to North Park Access Improvements (MO) Earth City Access Improvements (MO) J.S. McDonnell Connector Access over the Mississippi River (MO-IL) Illinois Route 157 (MO-IL) Safety and capacity improvements (A) St. Charles Rock Road preservation of Improvements (MO) Replacement of Terminal Railroad (B) Chain of Rocks Bridge Replacement along Hanley Road from I-70 to Madison 1.3-mile corridor Roadway improvements to enhance Association of St. Louis 130-year old rail (C) I-270/IL-111 Interchange Reconstruction Avenue truck traffic movements and replace bridge Highest Priority Project (B) Arterial roadway pavement repairs in deteriorated rail crossing Freightway’s #1 Priority Earth City Funded: Summer 2018 Funded: Spring 2018 Funded in 2018 Construction Nearing Completion Construction Funding Approved 2019 Estimated Cost: $222 mil B) $211.6 mil (C) $19 mil Estimated Cost: $3 mil Estimated Cost: $4 mil Estimated Cost: $20.7 mil Advanced to Construction Partially Programmed for Construction UNION PACIFIC GREEN MOUNT RD ILLINOIS UP / KCS / NS MISSOURI ILLINOIS ILLINOIS DUPO YARD 270 255 MISSISSIPPI RIVER 70 MISSISSIPPI 270 RIVER 64 FUNDED FUNDED 270 FUNDED 255 70 70 158 170 DAVIS STREET RIVERVIEW DR HALL ST FERRY RD ILLINOIS AIRPORT ILLINOIS BROADWAY AVE BRANCH ST MISSOURI I-255 / Davis Street Ferry Road I-64 Improvements from Green Mount Union Pacific Railroad Lenox Tower North Riverfront Commerce Corridor I-270 Improvements from I-70 (MO) to Interchange (IL) Road to Illinois Route 158 (Air Mobility Replacement (IL) Improvements (MO) Illinois Route 157 (MO-IL) New interchange and connecting Drive) (IL) Remove Lenox Rail Tower in Mitchell, (A) Hall Street and Riverview Drive (A) Improvements and some widening roadways to serve emerging industrial Expansion of I-64 to six lanes as well as Illinois in order to centralize dispatching improvements (Partially Funded) from I-70 to Mississippi River (partially area near Union Pacific Dupo other safety and capacity improvements in Omaha, Nebraska (B) Branch Street improvements funded $250 mil) (MO) Intermodal Yard including future grade (C) I-70 westbound off-ramp to North (C) Widening from Mississippi River to separation over five rail tracks Broadway relocation (Complete) Route 157 (IL-111 Interchange Funded) Highest Priority Project Highest Priority Project Highest Priority Project Funded: Summer 2019 Funded: Summer 2019 Funded: Spring 2018 and 2019 Estimated Cost: $33.9 mil Estimated Cost: $1.2 bil Estimated Cost: $59 mil Estimated Cost: $32 mil Estimated Cost: $9 mil Unfunded: $28 mil Unfunded: (A) $450 mil (C) $268 October 2019 2020 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Partially Programmed for Construction Concept Development or Planning MISSOURI ILLINOIS UP / KCS ILLINOIS MISSOURI ILLINOIS B 255 64 64 170 70 44 270 44 55 3 3 64 MISSISSIPPI 55 BANSHEE RD RIVER TAXIWAY V 44 MISSISSIPPI FALLING MCDONNELL BLVD A RIVER SPRINGS RD MISSISSIPPI RIVER NORFOLK SOUTHERN MISSOURI MISSOURI ILLINOIS Illinois Route 3 Access America’s Central Port Improvements (IL) St. Louis Lambert International Airport I-70 Improvements from Warrenton to Mississippi River Port Development Improvements (IL) (A) Granite City Harbor track revitalization North Cargo Improvements (MO) Stan Musial Veterans Memorial Bridge (MO) Projects (MO) (A) Illinois Route 3 relocation from River (B) Granite City Harbor general cargo (A) Banshee Road reconstruction (A) Improvements from Wentzville to (A) Crystal City Port development with Park Drive to Monsanto Avenue dock revitalization (Funded) (B) McDonnell Boulevard / Airport Road Stan Musial Memorial Bridge (40 miles) access roadway (B) Falling Springs Road / Illinois Route 3 (C) Union Pacific / Kansas City Southern intersection reconstruction (B) Expansion to six lanes from (B) City of St. Louis south riverfront site railroad bypass (Partially Funded) connection through A&K yard (C) Taxiway V connector (Complete) Wentzville to Warrenton (20 miles) (C) St. Louis County Port development Highest Priority Project (D) New port entrance at IL-3 (Funded) Highest Priority Project north/south sites Estimated Cost: $147 - $192 mil Estimated Cost: $22.5 mil Estimated Cost: $18.2 mil Estimated Cost: $650 mil Estimated Cost: $17.5 mil Unfunded: $135 - $180 mil Unfunded: $12.5 mil Unfunded: $12.1 mil Concept Development or Planning TERMINAL #1 ILLINOIS UNION PACIFIC MISSOURI ILLINOIS ILLINOIS TERMINAL #2 DUPO YARD 158 370 270 64 158 255 161 177 154 GIST RD AIRPORT KASKASKIA RIVER RAMSEY ROAD ILLINOIS FEE FEE RD NORFOLK SOUTHERN AIRPORT Kaskaskia Regional Port District I-255 / Fish Lake (Ramsey Road) St. Louis Lambert International Airport MidAmerica St. Louis Airport Illinois Route 158 (Air Mobility Drive) Improvements (IL) Interchange (IL) Access Improvements (MO) Distribution Improvements (IL) Expansion from Route 161 to Route (A) Terminal #1 second rail loop track New interchange to provide additional (A) Cargo City access analysis New two-mile rail spur from Norfolk 177 (IL) and lead track rail upgrades access to the Union Pacific Dupo (B) Fee Fee Road bridge improvement Southern mainline to enable freight rail One-mile extension of two lanes (B) Terminal #2 2nd entrance & 3rd dock Intermodal Yard access for industry on the eastern side along a growth corridor near I-64 and (C) Gist Road upgrade (C) Port Development at Fayetteville of airport MidAmerica St. Louis Airport Estimated Cost: $11.8 mil Estimated Cost: $27 mil Estimated Cost: $30.25 mil Estimated Cost: $45 mil Estimated Cost: $20 mil October 2019.
Recommended publications
  • AGENDA Board of Trustees Meeting Madison County Mass Transit District 9:00 A.M., Thursday, April 25, 2019 One Transit Way, Granite City, Illinois
    AGENDA Board of Trustees Meeting Madison County Mass Transit District 9:00 a.m., Thursday, April 25, 2019 One Transit Way, Granite City, Illinois Item Recommendation I. Pledge of Allegiance. II. Call to Order: Roll Call. III. Consideration of the minutes of the March 28, 2019, regular meeting for Approval inclusion in the official records of the District. IV. Public Comments. V. Presentation: St. Louis Regional Freightway, Information Mary C. Lamie, P.E., Executive Director VI Financial: A. Payments and Claims: Consideration of the March 2019 claims for Approval payment. B. Monthly Financial Report: Review of the monthly financial records as of Approval March 28, 2019. VII. Transit Service: A. Managing Director’s Report: Jerry J. Kane. Information May Service Change S.J. Morrison Approval B. Resolution 19-36 Authorizing the Award of Contract for Audit Services Approval C. Resolution 19-37 Approving Title VI Program Updated Approval D. Resolution 19-38 Supporting Funding for Improvements to I-270 and Approval the Intersection at IL-111 and Chain of Rocks Road VIII. Other Business: Information IX. Executive session to discuss the acquisition, and/or sale or lease of property, and/or security, and/or litigation, and/or review of executive session minutes (5ILCS 120/2 et. seq., 2(c)5, 2(c)6, 2(c) 8, 2(c)11, and 2(c)21 of the Open Meetings Act). X. Adjournment. Approval MINUTES Board of Trustees Meeting Madison County Mass Transit District One Transit Way, Granite City, Illinois 9:00 a.m., Thursday, March 28, 2019 I. Pledge of Allegiance Chairman Hagnauer led the reciting of the Pledge of Allegiance.
    [Show full text]
  • Madison County Board
    MADISON COUNTY BOARD STATE OF ILLINOIS ) ) SS COUNTY OF MADISON ) Proceedings of the County Board of Madison County, Illinois, as the recessed session of said Board held at the Nelson "Nellie" Hagnauer County Board Room in the Administration Building in the City of Edwardsville, in the County and State aforesaid on said Wednesday, November 19, 2014, and held for the transaction of general business. WEDNESDAY, NOVEMBER 19, 2014 5:00 PM EVENING SESSION The Board met pursuant to recess taken October 15, 2014. * * * * * * * * * * The meeting was called to order by Alan J. Dunstan, Chairman of the Board. The Pledge of Allegiance was said by all members of the Board. The Roll Call was called by Debra Ming-Mendoza, County Clerk, showing the following members present: PRESENT: Messers. Alons, Asadorian, Brazier, Burris, Ms. Ciampoli, Davis, Ms. Dalton, Dodd, Ms. Glasper, Goggin, Ms. Gorman, Ms. Hawkins, Holliday, Ms. Kuhn, Madison, Malone, Maxwell, McRae, Meyer, Minner, Ms. Novacich, Petrillo, Robertson, Ms. Roosevelt, Semanisin, Ms. Tracy, Trucano and Walters. ABSENT: Adler. * * * * * * * * * * Ms. Hawkins moved, seconded by Ms. Glasper, to approve the minutes of the October 15, 2014 meeting. MOTION CARRIED * * * * * * * * * * The following letter was received and placed on file: ILLINOIS DEPARTMENT OF TRANSPORTATION November 1, 2013 The Honorable Brant Walker Mayor of the City of Alton 101 East Third Street Alton, IL 62002 1 Dear Mayor Walker: In accordance with your resolution dated July 10, 2014, we find no objection to making use of IL 100 on Saturday, November 29, 2014, between the hours of 7:30 a.m. to 12:00 p.m.
    [Show full text]
  • Meeting Packet
    EAC Meeting - October 22, 2019 Page 1 AGENDA EAST-WEST GATEWAY COUNCIL OF GOVERNMENTS EXECUTIVE ADVISORY COMMITTEE MEETING TUESDAY, OCTOBER 22, 2019 – 2:00 P.M. 1. CALL TO ORDER 2. APPROVAL OF MINUTES OF SEPTEMBER 17, 2019 3. DISCUSSION ITEMS A. Regional Crime - - Richard Rosenfeld, UMSL B. MetroLink System-Wide Security Assessment - - Lurae Stuart, WSP 4. ACTION ITEMS A. 2020 Regional Safety Performance Targets - - Jerry Blair B. Functional Classification Update - - Brenden Giblin C. St. Louis Regional Freightway – 2020 Multimodal Project List - - Jim Wild D. Procurement Policy Update - - Jim Wild E. Calendar Year 2020 East-West Gateway Budget - - Jim Wild F. Modifications of the FY 2020-2023 Transportation Improvement Program (TIP), Connected2045, and the Related Air Quality Conformity Determination – Requested by MoDOT - - Josh Schwenk G. Regional Security Expenditures - - Nick Gragnani 5. OTHER BUSINESS 6. ADJOURNMENT ANNUAL MEETING: WEDNESDAY, NOVEMBER 13, 2019 NEXT MEETING DATE: TUESDAY, JANUARY 21, 2020 EAC Meeting - October 22, 2019 Page 2 Chair Mark A. Kern Chairman, St. Clair County Board Vice Chair Memo to: Board of Directors Steve Ehlmann County Executive St. Charles County 2nd Vice Chair From: Staff Robert Elmore Chairman, Board of Commissioners Monroe County Subject: Project Reviews Executive Committee Tim Brinker Presiding Commissioner Date: October 14, 2019 Franklin County Dennis Gannon County Executive Jefferson County Lyda Krewson For the period September 7, 2019 – October 11, 2019, there were no St. Louis area Mayor, City of St. Louis Dr. Sam Page projects listed in the weekly Missouri State Federal Assistance Clearinghouse Tables. County Executive St. Louis County The Missouri State Clearinghouse Table contains information about grant applications Kurt Prenzler for federal assistance, announcements, and public notices.
    [Show full text]
  • Existing Conditions EXISTING CONDITIONS
    COLLINSVILLE 2025 - COMPREHENSIVE PLAN Chapter 1: Existing Conditions EXISTING CONDITIONS Section 1.01 SUMMARY The Existing Conditions section includes an executive summary of the comprehensive planning process, the resulting plan, and an analysis of Collinsville’s socio-economic conditions and description of existing zoning and land uses. It also includes a baseline report on the existing services available to residents of Collinsville, the condition of these services, recommendations for improving these services and implementation strategies to provide ongoing services. Section 1.02 STUDY AREA The study area includes all areas within the City’s current boundaries, located mainly in Madison County and partially in St. Clair County, and extending outwards by 1½ miles into unincorporated County areas within the City’s jurisdiction as authorized by the Illinois Municipal Code (65 ILCS 5/11- 12-6) and any areas proposed for future annexation. The City of Collinsville is centered at 38° 40′ 28″ North, 89° 59′ 43″ West (38.674444, -89.995278). The map below (Figure 1.1) is of the study area shown in red. Figure 1.1: Study Area Map (Source: City of Collinsville)) 4 COLLINSVILLE 2025 - COMPREHENSIVE PLAN Chapter 1: Existing Conditions SECTION 1.03 HISTORY OF COLLINSVILLE Collinsville is a “Home Rule Unit” City with a Council-Manager form of government. The elected, policy-making body of the City consists of a Mayor and four-member Council. The Mayor and all council members are elected at-large. Municipal elections are held on the first Tuesday of April every other year. The City Manager is appointed by, and responsible to, the Mayor and City Council, and is the chief administrative officer of the City supervising all departments and the day-to-day operations of the City.
    [Show full text]
  • 2022 Priority Freight Projects, St. Louis Regional Freightway
    2022 PRIORITY FREIGHT PROJECTS ST LOUIS REGIONAL FREIGHTWAY The St. Louis Regional Freightway’s 2022 Priority Business and industry leaders work directly Projects List represents the infrastructure needs of with local and state officials and departments of the manufacturing and logistics industries in the transportation to set infrastructure priorities by Eastern Missouri and Southwestern Illinois area. helping them to understand how infrastructure and The list includes 21 projects representing a total efficiency impacts on-time delivery and costs. investment of more than $2.75 billion, with more than $1.1 billion covering infrastructure projects The updated 2022 Priority Projects List has that are already funded and under construction, identified the I-70 improvements from Route 141 expected to start in 2021/2022, or programmed to to I-170 in Missouri near the St. Louis Lambert begin within the next few years. The list indicates International Airport as a new high priority project. tremendous progress on a range of projects Other regionally significant projects have made that will strengthen critical roads, bridges, rail significant construction progress or continue to infrastructure, and port and airport facilities across advance towards construction. This includes the the bi-state St. Louis region, supporting multimodal highest priority project, the Merchants Bridge connectivity and providing global access to shippers Replacement (MO-IL) scheduled for completion in and carriers throughout the world. late 2023. Among the projects advancing towards construction are the I-255/Davis St. Ferry Rd The Priority Projects List is a valuable tool used Interchange (IL), I-64 Improvements from Green by the St. Louis Regional Freightway to align and Mount Rd to Illinois Route 158 (Air Mobility Drive) amplify advocacy for support and funding for (IL), segments of I-70 in Missouri and of I-270 critical infrastructure improvements.
    [Show full text]
  • Area Roads, Bridges Addressed in State's New Six-Year Plan
    Page 8 Subscribe online now! www.ibjonline.com Illinois Business Journal August 2020 Area roads, bridges addressed in state’s new six-year plan Gov. JB Pritzker joined the Illinois Major highway projects of interest that Dupo to Illinois Route 15 in St. Clair and of $1.6 million. Department of Transportation in mid-July are tentatively scheduled during the Monroe counties, including the Jefferson • Interstate 270 at the Illinois 111 in Collinsville to announce the release of a FY2021-2026 timeframe include: Barracks Bridges. Resurfacing on 22.3 interchange in Madison County. Interchange $21.3 billion plan to improve Illinois roads • Interstate 55/Interstate 64 at Poplar Street miles (including ramp repair), a bridge reconstruction and construction engineering and bridges over the next six years. Collector-Distributor eastbound from Poplar deck overlay, bridge repair, superstructure are programmed in FY 2021 at a cost of The investment, which effects Street Bridge to Trendley Avenue in St. Clair rehabilitation, bridge joint replace/repair, $19 million. Provides for efficient freight communities throughout the state, is part of County. Bridge substructure rehabilitation, bridge deck repairs, bridge deck sealing and movement. the governor’s Rebuild Illinois capital plan, a new bridge deck, bridge painting, a bridge bridge painting are programmed during FY • U.S. 67 at Delhi Bypass in Jersey County. the first in nearly a decade. deck overlay, bridge joint replace/repair and 2021-2026 at a cost of $123.6 million. Of New construction of 3.2 miles of a four-lane The multi-year plan provides funding to bridge repair are programmed in FY 2021 at this total, engineering for contract plans and expressway for the bypass around Delhi reconstruct more than 3,300 miles of roads a cost of $35.4 million.
    [Show full text]
  • Minutes of the Special Meeting of the Board of Trustees Southern Illinois University December 12, 2018
    MINUTES OF THE SPECIAL MEETING OF THE BOARD OF TRUSTEES SOUTHERN ILLINOIS UNIVERSITY DECEMBER 12, 2018 Pursuant to notice, a special meeting was called by the Chair of the Board of Trustees of Southern Illinois University, and the meeting convened at 10:06 a.m., Wednesday, December 12, 2018, in Ballroom B of the Student Center, Southern Illinois University Carbondale, Carbondale, Illinois. The meeting was called to order by Chair Sholar. The following members of the Board were present: Ms. Amy Sholar, Chair Hon. J. Phil Gilbert, Vice Chair Mr. Joel Sambursky, Secretary Mr. Tom Britton Mr. Brione Lockett Dr. Marsha Ryan MG (RET) Randal E. Thomas The following Board members were absent: Dr. Shirley Portwood Ms. Molly Smith The Executive Secretary reported and the Chair determined that a quorum was physically present. Also present for the duration of the meeting were Dr. J. Kevin Dorsey, President; Mr. Lucas Crater, General Counsel; and Ms. Misty Whittington, Executive Secretary of the Board. Chancellor Randall Pembrook, SIUE; and Dean and Provost Jerry Kruse, SIU School of Medicine; attended a portion of the meeting. Chair Sholar explained the procedures for the public comment and question portion of the Board’s agenda. 2 Dr. Scott Ishman, SIUC College of Science Interim Dean, made his presentation to the Board. Dr. Ishman spoke of his work at the campus for nearly 20 years and noted the need for significant change. He reminded the Board that it charged the late Chancellor Montemagno to make such change. He reviewed the Chancellor’s plan that included a strawman reorganization structure with a number of goals.
    [Show full text]
  • Improvements on I-270 from Chain of Rocks Canal to I-255 Madison County, Illinois
    IMPROVEMENTS ON I-270 FROM CHAIN OF ROCKS CANAL TO I-255 MADISON COUNTY, ILLINOIS DRAFT SECTION 4(f) EVALUATION Submitted Pursuant to 49 USC 303 by the U.S. Department of Transportation Federal Highway Administration and Illinois Department of Transportation DECEMBER 15, 2020 ___________________________________ Date of Approval For FHWA The following persons may be contacted for additional information concerning this document: Ms. Arlene K. Kocher Mr. Keith Roberts Division Administrator Acting Deputy Director, Region 8 Engineer Federal Highway Administration Illinois Department of Transportation 3250 Executive Park Drive 1102 Eastport Plaza Springfield, Illinois 62703 Collinsville, Illinois 62234 ABSTRACT: The proposed undertaking involves improvements along Interstate 270 (I-270) from Chain of Rocks Canal to Interstate 255 (I-255) in Madison County Illinois. While the project study area limits extend from Riverview Drive in Missouri to Illinois Route 157 (IL 157) in Illinois, the improvements from Riverview Drive in Missouri to Chain of Rocks canal will be addressed as part of the new Mississippi River bridge project. Based on the evaluation completed during the engineering analysis, no improvements are currently needed on I-270 from the I-255 interchange to IL 157 to meet the project purpose and need. Therefore, the termini for the proposed improvements will be from the Chain of Rocks Canal to the I-255 interchange in Madison County, Illinois. I-270 will be widened to accommodate 3 lanes in each direction and 12-foot shoulders will be provided on both sides, with barrier wall down the median. Interchange improvements throughout the corridor include the conversion of the IL Route 3 interchange into a partial cloverleaf interchange, the conversion of the Illinois Route 111 (IL 111) interchange into a diverging diamond interchange and the Illinois Route 203 (IL 203) interchange will be reconstructed to improve the ramp configuration.
    [Show full text]
  • 2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY
    2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Advanced to Construction ILLINOIS UP / KCS / NS MISSOURI HANLEY RD MISSOURI ST. CHARLES EVA AVE MISSOURI 270 ROCK ROAD MCDONNELL BLVD MISSOURI AIRPORT RIVER 3 170 370 MISSISSIPPI 170 RIVER 70 270 FUNDED FUNDED FUNDED FUNDED270 70 FUNDED 141 AIRPORT 70 NORFOLK MISSOURI ILLINOIS NORTH PARK RIDER TRAIL SOUTHERN Merchants Bridge (TRRA) Replacement Union Pacific Railroad Lenox Tower North Park Access Improvements (MO) Earth City Access Improvements (MO) J.S. McDonnell Connector Access over the Mississippi River (MO-IL) Replacement (IL) Safety and capacity improvements (A) St. Charles Rock Road preservation of Improvements (MO) Replacement of Terminal Railroad Remove Lenox Rail Tower in Mitchell, along Hanley Road from I-70 to Madison 1.3-mile corridor Roadway improvements to enhance Association of St. Louis 130-year old rail Illinois in order to centralize dispatching Avenue truck traffic movements and replace bridge (B) Arterial roadway pavement repairs in in Omaha, Nebraska deteriorated rail crossing Freightway’s #1 Priority Earth City Funded: Summer 2018 Construction Completed Funded in 2018 Construction Nearing Completion Construction Funding Approved 2019 Estimated Cost: $222 mil Estimated Cost: $9 mil Estimated Cost: $3 mil Estimated Cost: $4 mil Estimated Cost: $20.7 mil Advanced to Construction Partially Programmed for Construction UNION PACIFIC GREEN MOUNT RD ILLINOIS ILLINOIS ILLINOIS ILLINOIS DUPO YARD 158 255 MISSISSIPPI 70 RIVER 270 270 161 64 64 FUNDED FUNDED
    [Show full text]
  • AGENDA Board of Trustees Meeting Madison County Mass Transit District 8:30 A.M., Thursday, November 19, 2020 Video/Teleconference
    AGENDA Board of Trustees Meeting Madison County Mass Transit District 8:30 a.m., Thursday, November 19, 2020 Video/Teleconference Section Item Recommendation I. Pledge of Allegiance II. Call to Order: Roll Call. III. Public Comments. IV. Consideration of the minutes of the October 29, 2020 regular Approval meeting for inclusion in the official records of the District. V. Financial: A. Presentation of the FY2020 Audit: Scott Weber and Drew Approval Nicol, Scheffel Boyle B. Payments and Claims: Consideration of the October 2020 Approval claims for payment. C. Monthly Financial Report: Review of the monthly financial Approval records as of October 31, 2020. VI. Transit Service: A. Managing Director’s Report, SJ Morrison Information B. Resolution 21-14 Authorizing the Fares and Fees for the Approval District’s Regional Vanpool Program C. Resolution 21-15 Authorizing an Award of Contract to Oates Associates, Inc. for Design Services for Schoolhouse Trail Approval Tunnel Under IL-157 VII. Other Business: VIII. Executive session to discuss the acquisition or lease of real property under (c)(5), and litigation under (c)(11) of the Open Meetings Act (5 ILCS 120/2). IX. Adjournment Approval MINUTES Board of Trustees Madison County Mass Transit District One Transit Way, Granite City, Illinois 8:30 a.m., Thursday, October 29, 2020 I. Pledge of Allegiance Chairman Jedda led the reciting of the Pledge of Allegiance. II. Call to Order: Roll Call Chairman Jedda called the meeting to order at 8:30 a.m. MEMBERS PRESENT: ALLEN P. ADOMITE, ANDREW F. ECONOMY, CHRISTOPHER C. GUY, RONALD L. JEDDA, AND J.
    [Show full text]
  • Development Occurring Throughout Southwestern Illinois Development Occurring Throughout Southwestern Illinois
    11/22/2015 Development occurring throughout Southwestern Illinois Development occurring throughout Southwestern Illinois Print Details Parent Category: June 2015 (/development-occurring-throughout-southwestern-illinois/889-june-2015) Category: page 16 (/development-occurring-throughout-southwestern-illinois) Published: 07 June 2015 Last Updated: 07 June 2015 Created: 07 June 2015 Hits: 111 User Rating: 0 / 5 Please Rate Vote 5 Rate Like Share Sign Up to see w hat your friends like. Tw eet By ALAN J. ORTBALS While major projects like the Stan Musial Veterans Memorial Bridge have been completed, new developments are going on throughout Southwestern Illinois. Here is a review of just some of the projects recently finished, currently underway or set to begin later this year. Alton — A construction project estimated at $2.7 million is underway on the campus of v(/iiemwa1g.jepsg/)articles/june2015/p16_FATH-MCGIV-PHASE-1-2013- OSF Saint Anthony’s Health A rendering of the planned 53,000-square-foot, tw o-story Father McGivney Center to help support the Catholic High School under construction at the corner of Old Troy Road and transformation of the delivery of Bouse Road in Glen Carbon. primary care services for area residents. Saint Anthony’s Physician Group, a locally-based multispecialty physician group of 25 physicians, specialists and advanced practice clinicians, is undergoing total renovation of its 11,000- square-foot primary care space to make way for a patient-centric environment with an expanded care team, as part of a new national care model to meet the health and wellness needs of patients. http://ibjonline.com/development-occurring-throughout-southwestern-illinois/2273-development-occurring-throughout-southwestern-illinois?tmpl=component&pri… 1/3 11/22/2015 Development occurring throughout Southwestern Illinois The Alton City Council has approved plans for its multi-modal transportation development project on Homer Adams Parkway.
    [Show full text]
  • Notice of Meeting and Agenda Bi-State Development Operations Committee Tuesday, August 21, 2018 8:00 A.M. Headquarters
    Notice of Meeting and Agenda Bi-State Development Operations Committee Tuesday, August 21, 2018 8:00 a.m. Headquarters - Board Room, 6th Floor One Metropolitan Square, 211 N. Broadway, Suite 650 St. Louis, Missouri 63102 This location is accessible to persons with disabilities. Individuals with disabilities needing information or communication accommodations should call Bi-State Development at (314) 982-1400, for TTY access, call Relay 711. Sign language interpreter services or other accommodations for persons with hearing or speech disabilities will be arranged if a request for such service is made at least two days in advance of the meeting. Large print material, Braille material or other formats will also be provided upon request. Agenda Disposition Presentation 1. Call to Order Approval Chairman Buehlhorn 2. Roll Call Quorum S. Bryant 3. Public Comment* Information Chairman Buehlhorn 4. Minutes from May 18, 2018, Combined Audit, Finance and Approval Chairman Buehlhorn Administration Committee / Operations Committee 5. St. Louis Regional Freightway Priority Freight Project Approval M. Lamie List for 2019 6. Contract Award: Date and Analysis Consulting Services Approval M. Lamie / G. Smith for St. Louis Regional Freightway 7. Contract Modification: MetroLink – Boyle Avenue Approval C. Poehler / G.Smith (CORTEX) Station/Central West End Platform Extension Construction Contract 8. 4th Quarter Operations Summary Information J. Mefford-Miller 9. Unscheduled Business Information Chairman Buehlhorn 10. Call of Dates for Future Committee Meetings
    [Show full text]