2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY
Total Page:16
File Type:pdf, Size:1020Kb
2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Advanced to Construction ILLINOIS UP / KCS / NS MISSOURI HANLEY RD MISSOURI ST. CHARLES EVA AVE MISSOURI 270 ROCK ROAD MCDONNELL BLVD MISSOURI AIRPORT RIVER 3 170 370 MISSISSIPPI 170 RIVER 70 270 FUNDED FUNDED FUNDED FUNDED270 70 FUNDED 141 AIRPORT 70 NORFOLK MISSOURI ILLINOIS NORTH PARK RIDER TRAIL SOUTHERN Merchants Bridge (TRRA) Replacement Union Pacific Railroad Lenox Tower North Park Access Improvements (MO) Earth City Access Improvements (MO) J.S. McDonnell Connector Access over the Mississippi River (MO-IL) Replacement (IL) Safety and capacity improvements (A) St. Charles Rock Road preservation of Improvements (MO) Replacement of Terminal Railroad Remove Lenox Rail Tower in Mitchell, along Hanley Road from I-70 to Madison 1.3-mile corridor Roadway improvements to enhance Association of St. Louis 130-year old rail Illinois in order to centralize dispatching Avenue truck traffic movements and replace bridge (B) Arterial roadway pavement repairs in in Omaha, Nebraska deteriorated rail crossing Freightway’s #1 Priority Earth City Funded: Summer 2018 Construction Completed Funded in 2018 Construction Nearing Completion Construction Funding Approved 2019 Estimated Cost: $222 mil Estimated Cost: $9 mil Estimated Cost: $3 mil Estimated Cost: $4 mil Estimated Cost: $20.7 mil Advanced to Construction Partially Programmed for Construction UNION PACIFIC GREEN MOUNT RD ILLINOIS ILLINOIS ILLINOIS ILLINOIS DUPO YARD 158 255 MISSISSIPPI 70 RIVER 270 270 161 64 64 FUNDED FUNDED FUNDED 255 70 158 177 170 44 DAVIS STREET FERRY RD ILLINOIS AIRPORT AIRPORT MISSOURI MISSOURI I-255 / Davis Street Ferry Road I-64 Improvements from Green Mount Illinois Route 158 (Air Mobility Drive) I-70 Improvements from Wentzville to I-270 Improvements from I-70 (MO) to Interchange (IL) Road to Illinois Route 158 (Air Mobility Expansion from Route 161 to Route Stan Musial Veterans Memorial Bridge (MO) Illinois Route 157 (MO-IL) New interchange and connecting Drive) (IL) 177 (IL) (A) I-70 Outer Roads from Fairgrounds Road to Cave (A) I-70 on the West to West of Riverview Drive Springs Road (MO)* (Partially Funded $34.5 mil) (MO) (Partially Funded $278 mil in 2018) roadways to serve emerging industrial Expansion of I-64 to six lanes as well as One-mile extension of two lanes along a (B) Improvements to the I-70 Curve and Norfolk (B) Chain of Rocks Bridge Replacement (MO-IL) area near Union Pacific Dupo Intermodal other safety and capacity improvements growth corridor near I-64 and MidAmerica Southern Railroad Bridge (MO)* ($223 mil Funded in 2018) Yard including future grade separation St. Louis Airport (C) Mississippi River to West of Illinois Route over five rail tracks (C) Improvements to I-70/I-64 Interchange (MO)* 203 (IL) ($84.5 mil Funded in 2019) Highest Priority Project Highest Priority Project Highest Priority Project Funded: Summer 2019 Funded: Summer 2019 Funded in 2019 Estimated Cost: $650 mil Estimated Cost: $1.2 bil Estimated Cost: $42 mil Estimated Cost: $32 mil Estimated Cost: $20 mil * Identified as high priority sections 2021 July 27, 2020 2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Partially Programmed for Construction MISSOURI ILLINOIS MISSOURI ILLINOIS MISSOURI UP / KCS ILLINOIS TERMINAL #1 ILLINOIS 270 TERMINAL #2 64 64 170 44 70 MISSISSIPPI 3 RIVER 3 55 70 BANSHEE RD TAXIWAY V 154 MISSISSIPPI FALLING RIVERVIEW DR HALL ST MCDONNELL BLVD RIVER SPRINGS RD BROADWAY AVE BRANCH ST NORFOLK SOUTHERN MISSISSIPPI RIVER KASKASKIA RIVER Illinois Route 3 Access North Riverfront Commerce Corridor St. Louis Lambert International Airport America’s Central Port Intermodal Kaskaskia Regional Port District Improvements (IL) Improvements (MO) North Cargo Improvements (MO) Improvements (IL) Improvements (IL) (A) Illinois Route 3 Relocation from River (A) Hall Street and Riverview Drive (A) Banshee Road reconstruction (A) Granite City Harbor track revitalization (A) Terminal #1 second rail loop track Park Drive to Monsanto Avenue (Funded) improvements (Partially Funded) (B) McDonnell Boulevard / Airport Road (B) Granite City Harbor general cargo dock and lead track rail upgrades revitalization (Complete) (B) Illinois Route 3 railroad grade separation (B) Branch Street improvements intersection reconstruction (Funded) (B) Terminal #2 2nd entrance & 3rd dock bridge over Alton & Southern railroad (C) Red Dock rail expansion (C) I-70 westbound off-ramp to North (C) Taxiway V connector (Complete) (C) Port Development at Fayetteville (D) New port entrance at Illinois Route 3 (Funded) (Partially Funded) Broadway relocation (Complete) Highest Priority Project Highest Priority Project Estimated Cost: $121.4 mil Estimated Cost: $33.7 mil Estimated Cost: $18.2 mil Estimated Cost: $21.3 mil Estimated Cost: $40 mil Unfunded: $28 mil Unfunded: $11 mil Unfunded: $12.9 mil Concept Development or Planning MISSOURI ILLINOIS UNION PACIFIC MISSOURI ILLINOIS MISSOURI MISSISSIPPI 70 B 255 DUPO YARD 370 270 64 RIVER 44 55 158 55 255 64 64 MISSISSIPPI MO-Z Crystal City RIVER 55 MISSISSIPPI RIVER 55 GIST RD 44 RAMSEY ROAD AIRPORT A MISSOURI ILLINOIS ILLINOIS FEE FEE RD NORFOLK SOUTHERN US-67 ILLINOIS Mississippi River Port Development I-255 / Fish Lake (Ramsey Road) St. Louis Lambert International MidAmerica St. Louis Airport I-55 Improvements from Route Z to Terminal Railroad Association of St. Projects (MO) Interchange (IL) Airport Access Improvements (MO) Distribution Improvements (IL) U.S. Route 67 (MO) Louis (TRRA) Tunnel-Arch Riverfront (A) Crystal City Port Development with New interchange to provide additional (A) Cargo City access analysis New two-mile rail spur from Norfolk Pavement and bridge rehabilitation, Dewatering (MO) access roadway access to the Union Pacific Dupo (B) Fee Fee Road bridge improvement Southern mainline to enable freight rail increased capacity by expanding to a Drill dewatering wells and pump incoming (B) City of St. Louis south riverfront site Intermodal Yard (C) Gist Road upgrade access for industry on the eastern side six-lane highway for approximately six flood water at a rate that would allow for train (C) St. Louis County Port development of airport miles from Route Z to U.S. Route 67, and traffic to continue operation in a flood that north/south sites interchange improvements reached up to 45 feet on the St. Louis Gage. Estimated Cost: $37.5 mil Estimated Cost: $27 mil Estimated Cost: $30.3 mil Estimated Cost: $45 mil Estimated Cost: $213 mil Estimated Cost: $8 mil July 27, 2020.