2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY

Total Page:16

File Type:pdf, Size:1020Kb

2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY 2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Advanced to Construction ILLINOIS UP / KCS / NS MISSOURI HANLEY RD MISSOURI ST. CHARLES EVA AVE MISSOURI 270 ROCK ROAD MCDONNELL BLVD MISSOURI AIRPORT RIVER 3 170 370 MISSISSIPPI 170 RIVER 70 270 FUNDED FUNDED FUNDED FUNDED270 70 FUNDED 141 AIRPORT 70 NORFOLK MISSOURI ILLINOIS NORTH PARK RIDER TRAIL SOUTHERN Merchants Bridge (TRRA) Replacement Union Pacific Railroad Lenox Tower North Park Access Improvements (MO) Earth City Access Improvements (MO) J.S. McDonnell Connector Access over the Mississippi River (MO-IL) Replacement (IL) Safety and capacity improvements (A) St. Charles Rock Road preservation of Improvements (MO) Replacement of Terminal Railroad Remove Lenox Rail Tower in Mitchell, along Hanley Road from I-70 to Madison 1.3-mile corridor Roadway improvements to enhance Association of St. Louis 130-year old rail Illinois in order to centralize dispatching Avenue truck traffic movements and replace bridge (B) Arterial roadway pavement repairs in in Omaha, Nebraska deteriorated rail crossing Freightway’s #1 Priority Earth City Funded: Summer 2018 Construction Completed Funded in 2018 Construction Nearing Completion Construction Funding Approved 2019 Estimated Cost: $222 mil Estimated Cost: $9 mil Estimated Cost: $3 mil Estimated Cost: $4 mil Estimated Cost: $20.7 mil Advanced to Construction Partially Programmed for Construction UNION PACIFIC GREEN MOUNT RD ILLINOIS ILLINOIS ILLINOIS ► ILLINOIS DUPO YARD 158 255 70 270 MISSISSIPPI RIVER 64 270 161 MISSOURI 64 FUNDED FUNDED FUNDED I-70 Improvements from Wentzville to 255 70 158 177 Stan Musial Veterans Memorial Bridge (MO) 170 (A) I-70 Outer Roads from Fairgrounds Road to Cave DAVIS STREET Springs Road (MO)* (Funded $62 mil) FERRY RD ILLINOIS AIRPORT AIRPORT MISSOURI (B) I-70/Riverview Drive Interchange I-255 / Davis Street Ferry Road I-64 Improvements from Green Mount Illinois Route 158 (Air Mobility Drive) reconstruction (MO) (Funded) I-270 Improvements from I-70 (MO) to Interchange (IL) Road to Illinois Route 158 (Air Mobility Expansion from Route 161 to Route (C) Improvements to the I-70 Curve and Norfolk Illinois Route 157 (MO-IL) New interchange and connecting Drive) (IL) 177 (IL) Southern Railroad Bridge (MO)* (Not Funded) (A) I-70 to Mississippi River (MO) (Partially Funded $278 mil in 2018) roadways to serve emerging industrial Expansion of I-64 to six lanes as well as One-mile extension of two lanes along a (D) Improvements to I-70/I-64 Interchange (MO)* (Concept Development Phase) (B) Chain of Rocks Bridge Replacement (MO-IL) area near Union Pacific Dupo Intermodal other safety and capacity improvements growth corridor near I-64 and MidAmerica ($223 mil Funded in 2018) Yard including future grade separation St. Louis Airport (E) New interchange/expansion improvements— David Hoekel Pkwy, Wentzville south, Lake (C) Mississippi River to West of Illinois Route over five rail tracks St. Louis Blvd south and Route K (Funded) 157 (IL) (Partially Funded $84.5 mil in 2019) Highest Priority Project Highest Priority Project Highest Priority Project Funded: Summer 2019 Funded: Summer 2019 Funded in 2019 Estimated Cost: $650 mil Estimated Cost: $1.2 bil Estimated Cost: $42 mil Estimated Cost: $32 mil Estimated Cost: $20 mil * Identified as high priority sections 2021 FW200752 | Oct. 9, 2020 2021 Multimodal Transportation Project List ST LOUIS REGIONAL FREIGHTWAY Partially Programmed for Construction MISSOURI ILLINOIS MISSOURI ILLINOIS MISSOURI UP / KCS ILLINOIS TERMINAL #1 ILLINOIS 270 TERMINAL #2 64 64 170 44 70 MISSISSIPPI 3 RIVER 3 55 70 BANSHEE RD TAXIWAY V 154 MISSISSIPPI FALLING RIVERVIEW DR HALL ST MCDONNELL BLVD RIVER SPRINGS RD BROADWAY AVE BRANCH ST NORFOLK SOUTHERN MISSISSIPPI RIVER KASKASKIA RIVER Illinois Route 3 Access North Riverfront Commerce Corridor St. Louis Lambert International Airport America’s Central Port Intermodal Kaskaskia Regional Port District Improvements (IL) Improvements (MO) North Cargo Improvements (MO) Improvements (IL) Improvements (IL) (A) Illinois Route 3 Relocation from River (A) Hall Street and Riverview Drive (A) Banshee Road reconstruction (A) Granite City Harbor track revitalization (A) Terminal #1 second rail loop track Park Dr to Monsanto Ave (Funded 2019) improvements (Partially Funded) (Not Funded) (Not Funded) and lead track rail upgrades (B) Illinois Route 3 railroad grade separation (B) Branch Street improvements (B) Taxiway V connector (Complete) (B) Red Dock rail expansion (Not Funded) (B) Terminal #2 2nd entrance & 3rd dock bridge over Alton & Southern railroad (C) I-70 westbound off-ramp to North (C) New port entrance at Illinois Route 3 (C) Port Development at Fayetteville (Partially Funded 2019) Broadway relocation (Complete) (Funded 2018) Highest Priority Project Highest Priority Project Estimated Cost: $33.7 mil Estimated Cost: $18.2 mil Estimated Cost: $21.3 mil Estimated Cost: $40 mil Unfunded: $28 mil Unfunded: $11 mil Unfunded: $12.9 mil Concept Development or Planning MISSOURI ILLINOIS UNION PACIFIC MISSOURI ILLINOIS MISSOURI MISSISSIPPI 70 B 255 DUPO YARD 370 270 64 RIVER 44 55 158 55 255 64 64 MISSISSIPPI MO-Z Crystal City RIVER 55 MISSISSIPPI RIVER 55 GIST RD 44 RAMSEY ROAD AIRPORT A MISSOURI ILLINOIS ILLINOIS FEE FEE RD NORFOLK SOUTHERN US-67 ILLINOIS Mississippi River Port Development I-255 / Fish Lake (Ramsey Road) St. Louis Lambert International MidAmerica St. Louis Airport I-55 Improvements from Route Z to Terminal Railroad Association of St. Projects (MO) Interchange (IL) Airport Access Improvements (MO) Distribution Improvements (IL) U.S. Route 67 (MO) Louis (TRRA) Tunnel-Arch Riverfront (A) Crystal City Port Development with New interchange to provide additional (A) Cargo City access analysis New two-mile rail spur from Norfolk Pavement and bridge rehabilitation, Dewatering (MO) access roadway access to the Union Pacific Dupo (B) Fee Fee Road bridge improvement Southern mainline to enable freight rail increased capacity by expanding to a Drill dewatering wells and pump incoming (B) City of St. Louis south riverfront site Intermodal Yard (C) Gist Road upgrade access for industry on the eastern side six-lane highway for approximately six flood water at a rate that would allow for train (C) St. Louis County Port development of airport miles from Route Z to U.S. Route 67, and traffic to continue operation in a flood that north/south sites interchange improvements reached up to 45 feet on the St. Louis Gage. Estimated Cost: $27 mil Estimated Cost: $30.3 mil Estimated Cost: $45 mil Estimated Cost: $213 mil Estimated Cost: $8 mil FW200752 | Oct. 9, 2020.
Recommended publications
  • Shelters – Monroe County Call for Help CARITAS FAMILY SOLUTIONS
    Contents (CRTL + Click to Access) Shelters – Monroe County ...........................................................................................................1 Youth Shelters – Monroe County ................................................................................................4 Therapy/Counseling – Monroe County ........................................................................................6 Substance Abuse Treatment – Monroe County ............................................................................9 Drop-In Services - Monroe County ........................................................................................... 12 Food Pantries - Monroe County................................................................................................. 13 Employment Services - Monroe County .................................................................................... 15 Legal Services – Monroe County .............................................................................................. 16 Language Access/ Translation Services – Monroe County ......................................................... 18 24 Hour Hotline Services – Monroe County .............................................................................. 21 Trafficking Education and Awareness/Training – Monroe County ............................................ 26 Trafficking Prevention Programming – Monroe County ............................................................ 27 Shelters – Monroe County Call for Help Phone:
    [Show full text]
  • Big Book of St. Louis Nostalgia Authors: Bill Nunes, Lonnie Tettaton, and Dave Lossos
    Big Book of St. Louis Nostalgia Authors: Bill Nunes, Lonnie Tettaton, and Dave Lossos Index by Dave Lossos ([email protected]) 10 Cent Radio Treasures. ............................................................................................ 8 1811 New Madrid Quake. ....................................................................................... 227 1896 Cyclone. ................................................................................................... 55, 144 1904 St. Louis World's Fair. ...................................................................................... 66 1925 Tornado.......................................................................................................... 191 1960s St. Louis Restaurants....................................................................................... 50 66 Park-In Theater. ................................................................................................... 33 7-Up Soda............................................................................................................... 214 Absorbene Mfg. Co.. ........................................................................................ 269, 281 Ace Cab Company..................................................................................................... 90 Actors and Actresses. .............................................................................................. 229 Admiral - Tribute to the SS Admiral. ........................................................................
    [Show full text]
  • AGENDA Board of Trustees Meeting Madison County Mass Transit District 9:00 A.M., Thursday, April 25, 2019 One Transit Way, Granite City, Illinois
    AGENDA Board of Trustees Meeting Madison County Mass Transit District 9:00 a.m., Thursday, April 25, 2019 One Transit Way, Granite City, Illinois Item Recommendation I. Pledge of Allegiance. II. Call to Order: Roll Call. III. Consideration of the minutes of the March 28, 2019, regular meeting for Approval inclusion in the official records of the District. IV. Public Comments. V. Presentation: St. Louis Regional Freightway, Information Mary C. Lamie, P.E., Executive Director VI Financial: A. Payments and Claims: Consideration of the March 2019 claims for Approval payment. B. Monthly Financial Report: Review of the monthly financial records as of Approval March 28, 2019. VII. Transit Service: A. Managing Director’s Report: Jerry J. Kane. Information May Service Change S.J. Morrison Approval B. Resolution 19-36 Authorizing the Award of Contract for Audit Services Approval C. Resolution 19-37 Approving Title VI Program Updated Approval D. Resolution 19-38 Supporting Funding for Improvements to I-270 and Approval the Intersection at IL-111 and Chain of Rocks Road VIII. Other Business: Information IX. Executive session to discuss the acquisition, and/or sale or lease of property, and/or security, and/or litigation, and/or review of executive session minutes (5ILCS 120/2 et. seq., 2(c)5, 2(c)6, 2(c) 8, 2(c)11, and 2(c)21 of the Open Meetings Act). X. Adjournment. Approval MINUTES Board of Trustees Meeting Madison County Mass Transit District One Transit Way, Granite City, Illinois 9:00 a.m., Thursday, March 28, 2019 I. Pledge of Allegiance Chairman Hagnauer led the reciting of the Pledge of Allegiance.
    [Show full text]
  • Randolph County Conservation Area Would Seem a Million Miles from Nowhere at Times
    At this secluded Conservation Area in southwest Illinois, campers, sportsmen and trail riders all have it made in the shade. Rando lph Coun ty Esc ap e Story By Joe McFarland he angler seated in the small fishing boat on Randolph County Photos By Adele Hodde Lake paused before making another cast. Until a moment earlier, he had the lake nearly to Thimself. Finally, he responded with a Looking for a peaceful reluctant wave of his hand. Yet he retreat in rural Illinois? seemed nervous about the inquiry. Randolph County “A few,” the gray-haired man replied, Conservation Area has a the standard response of all fishermen. Then he looked away again, fearful, great supply of both. perhaps, he might be expected to tell the truth. The truth is, fishing at this 65-acre lake in the forests of southern Illinois hill country really is no secret—not for the ini - fishermen who come here for trout still tiated regulars who come here. Randolph manage to catch a few into the summer.” County Lake boasts a strong fishery, and As she described the comparatively not just for traditional southern species. unique fishing opportunities at Ran - “Last week, a fisherman caught a 25- dolph County Conservation Area, a inch walleye that weighed almost 9 mounted black crappie of distracting pounds,” said Joan Bade, site superin - proportions hung from the wall beside tendent for the secluded Randolph the park office counter. County Conservation Area. From her “That came from here,” Bade office at the end of a winding forest acknowledged the massive panfish, Anglers find plenty of room to cast road, Bade described the rainbow trout then added as an update: “The crappie at Randolph County Lake.
    [Show full text]
  • Madison County Board
    MADISON COUNTY BOARD STATE OF ILLINOIS ) ) SS COUNTY OF MADISON ) Proceedings of the County Board of Madison County, Illinois, as the recessed session of said Board held at the Nelson "Nellie" Hagnauer County Board Room in the Administration Building in the City of Edwardsville, in the County and State aforesaid on said Wednesday, November 19, 2014, and held for the transaction of general business. WEDNESDAY, NOVEMBER 19, 2014 5:00 PM EVENING SESSION The Board met pursuant to recess taken October 15, 2014. * * * * * * * * * * The meeting was called to order by Alan J. Dunstan, Chairman of the Board. The Pledge of Allegiance was said by all members of the Board. The Roll Call was called by Debra Ming-Mendoza, County Clerk, showing the following members present: PRESENT: Messers. Alons, Asadorian, Brazier, Burris, Ms. Ciampoli, Davis, Ms. Dalton, Dodd, Ms. Glasper, Goggin, Ms. Gorman, Ms. Hawkins, Holliday, Ms. Kuhn, Madison, Malone, Maxwell, McRae, Meyer, Minner, Ms. Novacich, Petrillo, Robertson, Ms. Roosevelt, Semanisin, Ms. Tracy, Trucano and Walters. ABSENT: Adler. * * * * * * * * * * Ms. Hawkins moved, seconded by Ms. Glasper, to approve the minutes of the October 15, 2014 meeting. MOTION CARRIED * * * * * * * * * * The following letter was received and placed on file: ILLINOIS DEPARTMENT OF TRANSPORTATION November 1, 2013 The Honorable Brant Walker Mayor of the City of Alton 101 East Third Street Alton, IL 62002 1 Dear Mayor Walker: In accordance with your resolution dated July 10, 2014, we find no objection to making use of IL 100 on Saturday, November 29, 2014, between the hours of 7:30 a.m. to 12:00 p.m.
    [Show full text]
  • Meeting Packet
    EAC Meeting - October 22, 2019 Page 1 AGENDA EAST-WEST GATEWAY COUNCIL OF GOVERNMENTS EXECUTIVE ADVISORY COMMITTEE MEETING TUESDAY, OCTOBER 22, 2019 – 2:00 P.M. 1. CALL TO ORDER 2. APPROVAL OF MINUTES OF SEPTEMBER 17, 2019 3. DISCUSSION ITEMS A. Regional Crime - - Richard Rosenfeld, UMSL B. MetroLink System-Wide Security Assessment - - Lurae Stuart, WSP 4. ACTION ITEMS A. 2020 Regional Safety Performance Targets - - Jerry Blair B. Functional Classification Update - - Brenden Giblin C. St. Louis Regional Freightway – 2020 Multimodal Project List - - Jim Wild D. Procurement Policy Update - - Jim Wild E. Calendar Year 2020 East-West Gateway Budget - - Jim Wild F. Modifications of the FY 2020-2023 Transportation Improvement Program (TIP), Connected2045, and the Related Air Quality Conformity Determination – Requested by MoDOT - - Josh Schwenk G. Regional Security Expenditures - - Nick Gragnani 5. OTHER BUSINESS 6. ADJOURNMENT ANNUAL MEETING: WEDNESDAY, NOVEMBER 13, 2019 NEXT MEETING DATE: TUESDAY, JANUARY 21, 2020 EAC Meeting - October 22, 2019 Page 2 Chair Mark A. Kern Chairman, St. Clair County Board Vice Chair Memo to: Board of Directors Steve Ehlmann County Executive St. Charles County 2nd Vice Chair From: Staff Robert Elmore Chairman, Board of Commissioners Monroe County Subject: Project Reviews Executive Committee Tim Brinker Presiding Commissioner Date: October 14, 2019 Franklin County Dennis Gannon County Executive Jefferson County Lyda Krewson For the period September 7, 2019 – October 11, 2019, there were no St. Louis area Mayor, City of St. Louis Dr. Sam Page projects listed in the weekly Missouri State Federal Assistance Clearinghouse Tables. County Executive St. Louis County The Missouri State Clearinghouse Table contains information about grant applications Kurt Prenzler for federal assistance, announcements, and public notices.
    [Show full text]
  • Existing Conditions EXISTING CONDITIONS
    COLLINSVILLE 2025 - COMPREHENSIVE PLAN Chapter 1: Existing Conditions EXISTING CONDITIONS Section 1.01 SUMMARY The Existing Conditions section includes an executive summary of the comprehensive planning process, the resulting plan, and an analysis of Collinsville’s socio-economic conditions and description of existing zoning and land uses. It also includes a baseline report on the existing services available to residents of Collinsville, the condition of these services, recommendations for improving these services and implementation strategies to provide ongoing services. Section 1.02 STUDY AREA The study area includes all areas within the City’s current boundaries, located mainly in Madison County and partially in St. Clair County, and extending outwards by 1½ miles into unincorporated County areas within the City’s jurisdiction as authorized by the Illinois Municipal Code (65 ILCS 5/11- 12-6) and any areas proposed for future annexation. The City of Collinsville is centered at 38° 40′ 28″ North, 89° 59′ 43″ West (38.674444, -89.995278). The map below (Figure 1.1) is of the study area shown in red. Figure 1.1: Study Area Map (Source: City of Collinsville)) 4 COLLINSVILLE 2025 - COMPREHENSIVE PLAN Chapter 1: Existing Conditions SECTION 1.03 HISTORY OF COLLINSVILLE Collinsville is a “Home Rule Unit” City with a Council-Manager form of government. The elected, policy-making body of the City consists of a Mayor and four-member Council. The Mayor and all council members are elected at-large. Municipal elections are held on the first Tuesday of April every other year. The City Manager is appointed by, and responsible to, the Mayor and City Council, and is the chief administrative officer of the City supervising all departments and the day-to-day operations of the City.
    [Show full text]
  • 2022 Priority Freight Projects, St. Louis Regional Freightway
    2022 PRIORITY FREIGHT PROJECTS ST LOUIS REGIONAL FREIGHTWAY The St. Louis Regional Freightway’s 2022 Priority Business and industry leaders work directly Projects List represents the infrastructure needs of with local and state officials and departments of the manufacturing and logistics industries in the transportation to set infrastructure priorities by Eastern Missouri and Southwestern Illinois area. helping them to understand how infrastructure and The list includes 21 projects representing a total efficiency impacts on-time delivery and costs. investment of more than $2.75 billion, with more than $1.1 billion covering infrastructure projects The updated 2022 Priority Projects List has that are already funded and under construction, identified the I-70 improvements from Route 141 expected to start in 2021/2022, or programmed to to I-170 in Missouri near the St. Louis Lambert begin within the next few years. The list indicates International Airport as a new high priority project. tremendous progress on a range of projects Other regionally significant projects have made that will strengthen critical roads, bridges, rail significant construction progress or continue to infrastructure, and port and airport facilities across advance towards construction. This includes the the bi-state St. Louis region, supporting multimodal highest priority project, the Merchants Bridge connectivity and providing global access to shippers Replacement (MO-IL) scheduled for completion in and carriers throughout the world. late 2023. Among the projects advancing towards construction are the I-255/Davis St. Ferry Rd The Priority Projects List is a valuable tool used Interchange (IL), I-64 Improvements from Green by the St. Louis Regional Freightway to align and Mount Rd to Illinois Route 158 (Air Mobility Drive) amplify advocacy for support and funding for (IL), segments of I-70 in Missouri and of I-270 critical infrastructure improvements.
    [Show full text]
  • The Great River Road in Illinois National Scenic Byway
    THE GREAT RIVER ROAD IN ILLINOIS NATIONAL SCENIC BYWAY Driving Directions – South to North Alexander County Enter Illinois on U.S. Highway 60/62 and continue to the intersection with Highway 51, near Fort Defiance Park At the intersection, continue onto Highway 51 N/Illinois Route 3 The route continues on Illinois Route 3 N through the remainder of Alexander County Union, Jackson & Randolph Counties The route continues on Illinois Route 3 N through Union, Jackson & Randolph Counties Monroe County The route continues on Illinois Route 3 N through Columbia Past Columbia, veer right onto I-255 N/Illinois Route 3 N/U.S. Highway 50 E St. Claire & Madison Counties Continue on I-255 N/Illinois Route 3 N /U.S. Highway 50 E Take Exit 10 (Illinois Route 3 to Cahokia - East St. Louis) Continue on Illinois Route 3 N to the intersection with I-70 E/I-64 E/I55 N Take I-55 N/Illinois Route 3 N (Chicago - Indianapolis) in Fairmont City Continue on I-55 N to Illinois Route 111 N (Exit 6 Wood River - Washington Park) Turn Left onto Illinois Route 111 N Get on I-270 W in Pontoon Beach Take Exit 3 North (Illinois Route 3 to Alton). Keep right toward Alton. Continue on Illinois Route 3 N to Illinois Route 143 W/Great River Road North (to Alton Riverfront) Stay on Illinois Route 143 W until it becomes U.S. Highway 67 N Continue on U.S. Highway 67 N until you reach Illinois Route 100 N in Alton Turn Left onto Illinois Route 100 N and continue until you reach Jersey County Jersey & Greene Counties Continue on Illinois Route 100 N through Jersey
    [Show full text]
  • Monroe County Manufacturing & Logistics Overview
    MONROE COUNTY MANUFACTURING AND LOGISTICS INDUSTRY OVERVIEW COUNTY OVERVIEW Monroe County, Illinois, sits in the southern portion of the St. Louis region -- a vital transportation hub and home to all four major modes of transportation including road, rail, water and air. The county lies just east of the Mississippi River and south of the St. Louis metropolitan area, among lush rolling hills dotted with numerous picturesque communities that are home to growing populations and thriving businesses. These communities include the towns of Columbia, Waterloo (county seat), Valmeyer and Hecker, as well as other smaller villages such as Maeystown and Fults. Featuring the safest municipalities in the state, it has been one of the fastest growing counties in the bi-state area, seeing its population increase nearly 20% between 2000 and 2010, before posting a more modest increase of another 4% (32,431 to 33,739) between 2010 and 2017 (U.S. Census). Monroe County also is home to approximately 3,000 businesses of many different types, from manufacturing and light industrial, to technology, professional services, warehouse and distribution, retail, and corporate headquarters. Since 2016, economic development in the county has been guided by the Monroe County IL Economic Development Corporation (MCILEDC), which aligns the efforts of public and private leaders to move the economy forward in the county and other opportunity areas in adjacent Randolph and St. Clair Counties. Its governing Board is made up of 30 business and government leaders dedicated to continuing to grow a more diversified local economy, a broader tax base and an enhanced quality of life for the region.
    [Show full text]
  • Route 66 Association of Missouri Winter 1996 "Invaluable" "A Delight ...A Must" St
    St. Louis County SHOWME ROUTE 66 Quarterly Magazine of The Route 66 Association of Missouri Winter 1996 "Invaluable" "A Delight ...A Must" St. Louis Post Dispatch Ollt West Magazine TOlJR\\OOK C. u,\SKl'P) C\TR.TIS A History of Route 66 in Missouri Over 350 Vintage Postcards & Photographs with Detailed Driving Instructions This 272-page volume will take you on a nostalgic trip on old 2-lane Route 66 across Missouri, both educating and entertaining you, whether you're "touring" in your home or experiencing the "Show Me State" on the open road. To the Springfield News-Leader, " •••the book's real attraction for Route 66 fans and nostalgia lovers is its photographs," The St. Louis Post-Dispatch said the book "••.otTers a glimpse of what the Golden Age held for motorists." $20 (Plus $3 for shipping & handling) Send check or money order to: Curtis Enterprises 2302A Gascony Drive Lake st. Louis, MO 63367 . 314-625-8267 This photo shows the first cloverleaf interchange west of the Mississippi River nearing completion. Finished in 1932 at a cost of $37,000, the red granite-faced bridge is at Highway 66 (Watson Road) and Lindbergh Boulevard, south of Kirkwood, Missouri. The February 1932 issue of Missouri Motor News explained how it works, "Traffic desiring to turn from one road on to the other uses a paved circle or ramp constructed at each corner of the intersection. All left turns are prohibited, and neither is traffic allowed to cross either road. The necessity for left turns is eliminated by constructing the drives so that traffic makes two right turns.
    [Show full text]
  • Area Roads, Bridges Addressed in State's New Six-Year Plan
    Page 8 Subscribe online now! www.ibjonline.com Illinois Business Journal August 2020 Area roads, bridges addressed in state’s new six-year plan Gov. JB Pritzker joined the Illinois Major highway projects of interest that Dupo to Illinois Route 15 in St. Clair and of $1.6 million. Department of Transportation in mid-July are tentatively scheduled during the Monroe counties, including the Jefferson • Interstate 270 at the Illinois 111 in Collinsville to announce the release of a FY2021-2026 timeframe include: Barracks Bridges. Resurfacing on 22.3 interchange in Madison County. Interchange $21.3 billion plan to improve Illinois roads • Interstate 55/Interstate 64 at Poplar Street miles (including ramp repair), a bridge reconstruction and construction engineering and bridges over the next six years. Collector-Distributor eastbound from Poplar deck overlay, bridge repair, superstructure are programmed in FY 2021 at a cost of The investment, which effects Street Bridge to Trendley Avenue in St. Clair rehabilitation, bridge joint replace/repair, $19 million. Provides for efficient freight communities throughout the state, is part of County. Bridge substructure rehabilitation, bridge deck repairs, bridge deck sealing and movement. the governor’s Rebuild Illinois capital plan, a new bridge deck, bridge painting, a bridge bridge painting are programmed during FY • U.S. 67 at Delhi Bypass in Jersey County. the first in nearly a decade. deck overlay, bridge joint replace/repair and 2021-2026 at a cost of $123.6 million. Of New construction of 3.2 miles of a four-lane The multi-year plan provides funding to bridge repair are programmed in FY 2021 at this total, engineering for contract plans and expressway for the bypass around Delhi reconstruct more than 3,300 miles of roads a cost of $35.4 million.
    [Show full text]