Proposed Bridge and Tunnel Tolls

Total Page:16

File Type:pdf, Size:1020Kb

Proposed Bridge and Tunnel Tolls Proposed Bridge and Tunnel Tolls Note: E-ZPass rates apply only to tags issued by New York E-ZPass Customer Service Center (This includes: MTA Bridges and Tunnels, Port Authority of New York and New Jersey, New York State Thruway Authority and New York State Bridge Authority). Other E-ZPass customers will record the cash and Tolls by Mail rate to cross MTA facilities. Anyone, regardless of residency, can apply for a New York Customer Service Center-issued E-ZPass. Visit www.ezpassny.com for more information. Cars Current Proposed Verrazano–Narrows Bridge (One–Way Tolling) Cash / Tolls by Mail $16.00 $17.00 E–ZPass $11.08 $11.52 Staten Island Resident Token / E-Token $8.86 $9.22 Staten Island Resident E–ZPass (3 or more trips per month) $6.24 $6.48 Staten Island Resident E-ZPass (up to 2 trips per month) $6.60 $6.84 Staten Island Resident Carpool $3.08 $3.20 Major Crossings: Robert F. Kennedy Bridge – Bronx-Whitestone Bridge – Throgs Neck Bridge – Hugh L. Carey Tunnel – Queens Midtown Tunnel Cash / Tolls by Mail $8.00 $8.50 E-ZPass $5.54 $5.76 Henry Hudson Bridge Tolls by Mail $5.50 $6.00 E-ZPass $2.54 $2.64 Minor Crossings: Marine Parkway-Gil Hodges Memorial Bridge – Cross Bay Veterans Memorial Bridge Cash / Tolls by Mail $4.00 $4.25 Minor Token / E-Token $2.67 $2.83 E-ZPass $2.08 $2.16 Rockaway Resident Token / E-Token $1.86 $1.93 Rockaway Resident E-ZPass $1.36 $1.41 Cars: Each Additional Axle (Cash, Tolls by Mail, and E-ZPass) Current Proposed Verrazano-Narrows Bridge (One-Way Tolling) $6.50 $7.00 Major Crossings: Robert F. Kennedy Bridge – Bronx- Whitestone Bridge – Throgs Neck Bridge – Hugh L. Carey Tunnel $3.25 $3.50 – Queens Midtown Tunnel Henry Hudson Bridge $2.50 $2.75 Minor Crossings: Marine Parkway-Gil Hodges Memorial Bridge – Cross Bay Veterans Memorial Bridge $2.50 $2.75 Motorcycles Current Proposed Verrazano-Narrows Bridge (One-Way Tolling) Cash / Tolls by Mail $6.50 $7.00 E-ZPass $4.82 $5.02 Major Crossings: Robert F. Kennedy Bridge – Bronx- Whitestone Bridge – Throgs Neck Bridge – Hugh L. Carey Tunnel – Queens Midtown Tunnel Cash / Tolls by Mail $3.25 $3.50 E-ZPass $2.41 $2.51 Henry Hudson Bridge Tolls by Mail $3.25 $3.50 E-ZPass $1.73 $1.80 Minor Crossings: Marine Parkway-Gil Hodges Memorial Bridge – Cross Bay Veterans Memorial Bridge Cash / Tolls by Mail $3.25 $3.50 E-ZPass $1.73 $1.80 Trucks (More than 7,000 lbs. MGW (maximum gross weight) Verrazano-Narrows Bridge (One-Way Tolling) Cash / Cash / E-ZPass E-ZPass Tolls by Tolls by Current Proposed Mail Mail Current Proposed 2 Axle $32.00 $34.00 $20.00 $20.80 3 Axle $52.00 $56.00 $32.78 $34.10 4 Axle $66.00 $70.00 $41.90 $43.58 5 Axle $86.00 $92.00 $54.62 $56.80 6 Axle $100.00 $106.00 $63.74 $66.28 7 Axle $124.00 $132.00 $76.46 $79.52 Each Additional Axle Above 7 $18.00 $20.00 $12.78 $13.28 Major Crossings: Robert F. Kennedy Bridge – Bronx- Whitestone Bridge – Throgs Neck Bridge – Hugh L. Carey Tunnel – Queens Midtown Tunnel 2 Axle $16.00 $17.00 $10.00 $10.40 3 Axle $26.00 $28.00 $16.39 $17.05 4 Axle $33.00 $35.00 $20.95 $21.79 5 Axle $43.00 $46.00 $27.31 $28.40 6 Axle $50.00 $53.00 $31.87 $33.14 7 Axle $62.00 $66.00 $38.23 $39.76 Each Additional Axle Above 7 $9.00 $10.00 $6.39 $6.64 Minor Crossings: Marine Parkway-Gil Hodges Memorial Bridge – Cross Bay Veterans Memorial Bridge 2 Axle $8.00 $8.50 $5.00 $5.20 3 Axle $13.00 $14.00 $8.20 $8.53 4 Axle $16.50 $17.50 $10.48 $10.90 5 Axle $21.50 $23.00 $13.66 $14.20 6 Axle $25.00 $26.50 $15.94 $16.57 7 Axle $31.00 $33.00 $19.12 $19.88 Each Additional Axle Above 7 $4.50 $5.00 $3.20 $3.32 Franchise Buses – E-ZPass Current Proposed Verrazano-Narrows Bridge (One-Way Tolling) 2 Axle $8.02 $8.34 3 Axle $9.52 $9.90 Major Crossings: Robert F. Kennedy Bridge – Bronx-Whitestone Bridge – Throgs Neck Bridge – Hugh L. Carey Tunnel – Queens Midtown Tunnel 2 Axle $4.01 $4.17 3 Axle $4.76 $4.95 Minor Crossings - Marine Parkway-Gil Hodges Memorial Bridge – Cross Bay Veterans Memorial Bridge 2 Axle $2.00 $2.08 3 Axle $2.51 $2.61 .
Recommended publications
  • For the Fiscal Year Ended June 30, 2008 with Comparisons to Prior Fiscal Years Ended June 30, 2007 and June 30, 2006
    Peninsula Corridor Joint Powers Board San Carlos, California A Joint Exercise of Powers Agreement among: City and County of San Francisco San Mateo County Transit District Santa Clara Valley Transportation Authority Comprehensive Annual Financial Report Fiscal Year Ended June 30, 2008 PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Year Ended June 30, 2008 Prepared by the Finance Division This page intentionally left blank. Table of Contents Page I. INTRODUCTORY SECTION Letter of Transmittal.....................................................................................................................i Government Finance Officers Association (GFOA) Certificate of Achievement......................xi Board of Directors .................................................................................................................... xii Executive Management ........................................................................................................... xiii Organization Chart...................................................................................................................xiv Map............................................................................................................................................xv Table of Credits ........................................................................................................................xvi II. FINANCIAL SECTION INDEPENDENT AUDITOR’S REPORT ...............................................................................1
    [Show full text]
  • For the Fiscal Year Ended June 30, 2017 with Comparisons to Prior Fiscal Years Ended June 30, 2015 and June 30, 2016
    This Page Left Intentionally Blank PENINSULA CORRIDOR JOINT POWERS BOARD San Carlos, California Comprehensive Annual Financial Report Fiscal Years Ended June 30, 2017 and 2016 Prepared by the Finance Division This Page Left Intentionally Blank Table of Contents Page I. INTRODUCTORY SECTION Letter of Transmittal ............................................................................................................................................ i Government Finance Officers Association (GFOA) Certificate of Achievement ............................................. ix Board of Directors ............................................................................................................................................... x Executive Management ...................................................................................................................................... xi Organization Chart ........................................................................................................................................... xii Map ................................................................................................................................................................. xiii Table of Credits ................................................................................................................................................ xiv II. FINANCIAL SECTION INDEPENDENT AUDITOR’S REPORT ...................................................................................................... 1 MANAGEMENT'S
    [Show full text]
  • A Guide to the MTBTA Verrazano-Narrows Bridge Construction Photograph Collection
    A Guide to the MTBTA Verrazano-Narrows Bridge Construction Photograph Collection TABLE OF CONTENTS Overview of the Collection Administrative Information Restrictions Administrative History Scope & Content Note Index Terms Series Description & Container Listing Archives & Special Collections College of Staten Island Library, CUNY 2800 Victory Blvd., 1L-216 Staten Island, NY 10314 © 2005 The College of Staten Island, CUNY Overview of the Collection Collection #: IC 1 Title: MTBTA Verrazano-Narrows Bridge Construction Photograph Collection Creator: Metropolitan Triborough Bridge and Tunnel Association Dates: 1960-1964 Extent: Abstract: This collection contains eleven photographs of the construction of the Verrazano- Narrows bridge. Administrative Information Preferred Citation MTBTA Verrazano-Narrows Bridge Construction Photograph Collection, Archives & Special Collections, Department of the Library, College of Staten Island, CUNY, Staten Island, New York. Acquisition These photographs were donated to the CSI Archives & Special Collections on October 26th, 2004 following their use in an exhibition at the college. Processing Information Restrictions Access Access to this record group is unrestricted. Copyright Notice The researcher assumes full responsibility for compliance with laws of copyright. The images are still the property of their creators, and requests for or use in publications should be directed to the Administrator of the MTA Special Archive, Laura Rosen. Laura Rosen Administrator, Special Archive MTBTA 2 Broadway, 22nd Floor New York, NY 646-252-7418 Administrative History The Verrazano-Narrows bridge was constructed in the late 1950’s and early 1960’s, and was completed in November of 1964. It was built to permit the movement of vehicular traffic between Staten Island and Brooklyn and link parts of the Interstate Highway System.
    [Show full text]
  • San Francisco-Oakland Bay Bridge Project: Peer Review
    U.S. Department of Transportation Federal Highway Administration SAN FRANCISCO–OAKLAND BAY BRIDGE PROJECT PEER REVIEW DECEMBER 2004 PEER REVIEW TEAM San Francisco–Oakland Bay Bridge Project: Peer Review DECEMBER 2004 Executive Summary After the 1989 Loma Prieta and 1994 Northridge earthquakes, the State of Cali- fornia enacted the State Toll Bridge Seismic Retrofit Program in 1997 to improve the safety and reliability of critical transportation infrastructure assets in Califor- nia. One of the critical elements to successfully finishing the program is comple- tion of the San Francisco–Oakland Bay Bridge (SFOBB) project. This project consists of 16 separate contracts, including the proposed self-anchored suspension (SAS) bridge contract. Caltrans advertised the SAS contract in February 2003 and opened bids in May 2004. The single bid received (in the amount of $1.4 billion using foreign steel) exceeded the $740 million of funding available for the SAS portion of the SFOBB. The California Legislature was unable to develop a funding package to address the additional cost and the contractor’s bid was allowed to expire. In September 2004, the California Secretary of Business, Transportation and Housing asked the Federal Highway Administration (FHWA) for assistance in moving the SFOBB project forward. FHWA assembled the Peer Review Team (PRT), which convened November 1–5, 2004. The team examined project alterna- tives identified by Caltrans and assessed the risk that each might not achieve its key objectives. It is important to note that the PRT did not perform any independ- ent analysis of technical issues (seismic performance), environmental documenta- tion, cost estimation, or constructability, but relied exclusively on data presented by Caltrans, the Independent Review Team (IRT), the project design team (T.Y.
    [Show full text]
  • Bridges and Tunnels Committee Meeting
    Bridges and Tunnels Committee Meeting May 2020 Committee Members L. Lacewell, Chair D. Mack, Vice Chair N. Brown R. Glucksman K. Law J. Samuelsen L. Schwartz V. Tessitore N. Zuckerman Bridges & Tunnels Committee Meeting 2 Broadway 20th Floor Board Room New York, NY 10004 Wednesday, 5/20/2020 10:00 AM - 5:00 PM ET 1. Summary of Actions - None 2. Public Comments 3. B&T Minutes of Committee Meetings and Board Meeting - April 2020 B&T Minutes of Committees and Board Meeting - April 2020 - Page 3 4. Committee Work Plan B&T Committee Work Plan - Page 23 5. Report on Operations - March 2020 B&T Report on Operations - March 2020 - Page 30 6. Safety Report - March 2020 B&T Safety Report - March 2020 - Page 45 7. Final Review of 2019 Year-End Operating Results B&T Final Review of 2019 Year-End Operating Results - Page 50 8. Capital Program Project Status Report - April 2020 B&T Capital Program Project Status Report - April 2020 - Page 74 9. Procurements - None 10. Diversity Report - First Quarter 2020 B&T Diversity Report - First Quarter 2020 - Page 80 Minutes of Committees and Board Meeting – April 2020 ________________________________________________________________________________ Master Page # 3 of 95 - Bridges & Tunnels Committee Meeting 5/20/2020 Joint Committee and Board Meeting of the Metropolitan Transportation Authority, the New York City Transit Authority, the Manhattan and Bronx Surface Transit Operating Authority, the Staten Island Rapid Transit Operating Authority, the Metropolitan Suburban Bus Authority, the Triborough Bridge and Tunnel Authority, the Long Island Rail Road Company, the Metro-North Commuter Railroad Company, MTA Construction & Development, the MTA Bus Company and the First Mutual Transportation Assurance Company Minutes 2 Broadway New York, NY 10004 Wednesday, April 22, 2020 10:00 a.m.
    [Show full text]
  • Manhattan River Crossings 2001
    Manhattan River Crossings 2001 PT 2219913 and PT 2220914 Contract D00642 Task CDOT-02-01 and CDOT-02-02 The preparation of this report was financed in part with funds from the U.S. Department of Transportation, Federal Highway Administration, under the Federal Highway Act of 1956, as amended, and the Urban Mass Transportation Act of 1964, as amended. This document is disseminated by the New York City Department of Transportation in the interest of information exchange. It reflects the views of the New York City Department of Transportation (NYCDOT), which is responsible for the facts and the accuracy of the data presented herein. The report does not necessarily reflect any official views or policies of the Federal Transit Administration, the Federal Highway Administration, or the State of New York. The report does not constitute a standard, specification, or regulation. NYCDOT is grateful to the Port Authority of New York and New Jersey (PANYNJ) and the Metropolitan Transportation Authority (MTA) for providing data used to develop this report. Following is the introduction and summary of the report. The complete report is available from the Division of Traffic Operations of the Department of Transportation. Prepared by: New York City Department of Transportation Iris Weinshall Commissioner Judy Bergtraum First Deputy Commissioner David Woloch Deputy Commissioner/Senior Policy Advisor Michael Primeggia Deputy Commissioner Ann Marie Sledge-Doherty Director, Research, Implementation, and Safety Richard P. Roan Research, Implementation, and Safety INTRODUCTION Since 1948, the City of New York has been monitoring traffic flow over the 20 bridges and tunnels serving Manhattan. The Manhattan River Crossings report, published annually by the New York City Department of Transportation (NYCDOT) since 1972, presents vehicular volumes, classification, and trends for all bridge and tunnel facilities serving Manhattan.
    [Show full text]
  • Specifications for the National Tunnel Inventory (SNTI)
    Specifications for the National Tunnel Inventory July 2015 Publication No. FHWA-HIF-15-006 FOREWORD This document was developed in coordination with the National Tunnel Inspection Standards (NTIS) regulation 23 CFR 650 Subpart E and the Tunnel Operations, Maintenance, Inspection and Evaluation (TOMIE) Manual. It is intended to supplement the NTIS and provide the specifications for coding data required to be submitted to the National Tunnel Inventory (NTI). Data in the NTI will be used to meet legislative reporting requirements and provide tunnel owners, the Federal Highway Administration (FHWA) and the general public with information on the number and condition of the Nation’s tunnels. I would like to acknowledge the initial work done on tunnel inspection through a joint project between the FHWA and the Federal Transit Authority which developed the Highway and Rail Transit Tunnel Inspection Manual in 2003, and the subsequent update in 2005. This document laid the foundation for highway tunnel inspection using a general condition rating methodology. In this coding document, we move from general condition ratings to element condition states to be consistent with the inspection methodology used for National Highway System (NHS) bridges. By moving to element condition states, tunnel owners should be able to more easily integrate tunnel inventory data into an asset management program and determine the need for maintenance and/or repair of their highway tunnels. Finally, I would like to acknowledge some of those who were involved in the development of this specification; AASHTO Technical Committee T-20 on Tunnels and the FHWA Review Team. Joseph L Hartmann, Ph.D., P.E.
    [Show full text]
  • 2016 New York City Bridge Traffic Volumes
    2016 New York City Bridge Traffic Volumes TM NEW YORK CITY Bill de Blasio Polly Trottenberg Mayor Commissioner A member of the New York Metropolitan Transportation Council 2016 New York City Bridge Traffic Volumes Contract C033467 2014-2015: PTDT14D00.E01 2015-2016: PTDT15D00.E01 2016-2017: PTDT16D00.E02 2017-2018: PTDT17D00.E02 The preparation of this report has been financed through the U.S. Department of Transportation’s Federal Transit Administration and Federal Highway Administration. This document is disseminated under the sponsorship of the New York Metropolitan Transportation Council in the interest of information exchange. The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Federal Transit Administration, Federal Highway Administration or the State of New York. This report does not constitute a standard, specification or regulation. NYCDOT is grateful to the Metropolitan Transportation Authority Bridges and Tunnels (MTABT), the Port Authority of New York and New Jersey (PANYNJ), and the New York Metropolitan Transportation Council (NYMTC) for providing data used to develop this report. This 2016 New York City Bridge Traffic Volumes Report was funded through the New York Metropolitan Transportation Council SFY 2017 Unified Planning Work Program project, Data Management PTDT17D00.E02, which was funded through matching grants from the Federal Transit Administration and from the Federal Highway Administration. Title VI Statement The New York Metropolitan Transportation Council is committed to compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and all related rules and statutes.
    [Show full text]
  • Recommendations for Bridge and Tunnel Security
    Recommendations for Bridge and Tunnel Security Requested by: The American Association of State Highway and Transportation Officials (AASHTO) Transportation Security Task Force Prepared by: The Blue Ribbon Panel on Bridge and Tunnel Security SEPTEMBER 2003 Recommendations for Bridge and Tunnel Security Requested by: The American Association of State Highway and Transportation Officials (AASHTO) Transportation Security Task Force Prepared by: The Blue Ribbon Panel on Bridge and Tunnel Security SEPTEMBER 2003 Acknowledgments This report was requested by the American Association of State Highway and Transportation Officials (AASHTO) Transportation Security Task Force and the Federal Highway Administration (FHWA).The work was authored by the Blue Ribbon Panel on Bridge and Tunnel Security, which included James E. Roberts, P.E.(Chair), Dr. John M. Kulicki, P.E. (Vice Chair), Dwight A. Beranek, Joseph M. Englot, Dr. John W. Fisher, P.E.,Henry Hungerbeeler, Dr. Jeremy Isenberg, Dr. Frieder Seible, Kenneth Stinson, Dr. Man Chung Tang, and Kary Witt. Sponsor liaisons included James D. Cooper, P.E.,and Steven L. Ernst, P.E., representing FHWA, and Dr.Anthony R. Kane, Paul V. Liles, Jr., P.E.,and Mary Lou Ralls, P.E., representing AASHTO. Science Applications International Corporation provided technical support to the Blue Ribbon Panel on Bridge and Tunnel Security under a contract with the National Cooperative Highway Research Program (NCHRP). Foreword A note from the American Association of State Highway and Transportation Officials and the Federal Highway Administration: The Blue Ribbon Panel on Bridge and Tunnel Security was formed from renowned engi- neering experts who generously contributed their time, without compensation, to guide government leaders, infrastructure owners, and the engineering community on how to improve the security of bridges and tunnels.
    [Show full text]
  • Analysis and Findings
    The 2005 Transit Strike : Transportation Impacts and Analysis Analysis and Findings During the course of the Transit Strike, the Department of Transportation (NYCDOT) implemented a comprehensive data collection and monitoring program. NYCDOT synthesized this data to understand the regional travel patterns by various modes of travel during the course of the strike. These findings are summarized in the following section. This program focused on providing the following components: • Traffic Patterns in the Manhattan Central Business District (CBD) • Vehicle entries and exits into and out of the CBD • Vehicle volumes on key arterials and limited access highways • Vehicle occupancy and classification • Vehicle Travel Times and Speeds • Traffic Patterns in the Boroughs • Vehicle volumes on limited access roadways • Vehicle speeds • Pedestrian and Bicycle Travel Trends • Functioning Transit Service • Waterborne Transportation • Private Bus Lines • Commuter Rail/PATH Service • Taxicab Usage 34 © 2006 Adam Fields, http://www.adamfields.com All Rights Reserved The 2005 Transit Strike : Transportation Impacts and Analysis Traffic Patterns in the Manhattan Central Business District (CBD) One of the primary goals of the 2005 Strike Contingency Plan was to limit vehicle entries into Manhattan and maximize vehicle occupancy. The Manhattan Central Business District (CBD) represents one of the primary trip generators in the city with the high rate of employment, land use density and number of trips into and out of the area. The Department frequently tracks traffic patterns in the CBD, so there was a good foundation for existing or before numbers. Vehicle Entries into the Manhattan CBD The implementation and enforcement of the HOV-4 restriction during the 5-11 AM period had a dramatic effect on controlling vehicle entries into the Manhattan CBD.
    [Show full text]
  • Big Dig” in the Age of Privatization Michael R
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by ScholarsArchive at Johnson & Wales University Johnson & Wales University ScholarsArchive@JWU Humanities Department Faculty Publications & College of Arts & Sciences Research 12-5-2011 Tunnel Vision: “Invisible” Highways and Boston’s “Big Dig” in the Age of Privatization Michael R. Fein Johnson & Wales University - Providence, [email protected] Follow this and additional works at: https://scholarsarchive.jwu.edu/humanities_fac Part of the Cultural History Commons, History of Science, Technology, and Medicine Commons, Other History Commons, Political History Commons, Social History Commons, and the United States History Commons Repository Citation Fein, Michael R., "Tunnel Vision: “Invisible” Highways and Boston’s “Big Dig” in the Age of Privatization" (2011). Humanities Department Faculty Publications & Research. 33. https://scholarsarchive.jwu.edu/humanities_fac/33 This Article is brought to you for free and open access by the College of Arts & Sciences at ScholarsArchive@JWU. It has been accepted for inclusion in Humanities Department Faculty Publications & Research by an authorized administrator of ScholarsArchive@JWU. For more information, please contact [email protected]. Journal of Planning History 000(00) 1-23 ª 2011 The Author(s) Tunnel Vision: ‘‘Invisible’’ Reprints and permission: sagepub.com/journalsPermissions.nav Highways and Boston’s DOI: 10.1177/1538513211425209 http://jph.sagepub.com ‘‘Big Dig’’ in the Age of Privatization Michael R. Fein1 Abstract While most analyses of late-twentieth-century highway policy suggest a shift toward open system design, bottom-up federalism, and the devolution of transportation governance, the history of Boston’s Central Artery/Tunnel project, informally known as the ‘‘Big Dig,’’ runs counter to this trend.
    [Show full text]
  • Coyotes Go “Bridge and Tunnel”
    Cities and the Environment (CATE) Volume 8 Issue 1 Urban Wildlife Research in Support of Article 5 Conservation Management 4-22-2015 Coyotes Go “Bridge and Tunnel”: A Narrow Opportunity to Study the Socio-ecological Impacts of Coyote Range Expansion on Long Island, NY Pre- and Post-Arrival Mark Weckel American Museum of Natural History, [email protected] Daniel A. Bogan Siena College, [email protected] Russel L. Burke Hofstra University, [email protected] Christopher Nagy Mianus River Gorge, [email protected] William F. Siemer Cornell University, [email protected] Timothy Green Brookhaven National Laboratory, [email protected] Recommended Citation Weckel, Mark; Bogan, Daniel A.; Burke, Russel L.; Nagy, Christopher; Siemer, William F.; Green, Timothy; and Mitchell, Numi (2015) "Coyotes Go “Bridge and Tunnel”: A Narrow Opportunity to Study the Socio-ecological Impacts of Coyote Range Expansion on Long Island, NY Pre- and Post-Arrival," Cities and the Environment (CATE): Vol. 8: Iss. 1, Article 5. Available at: http://digitalcommons.lmu.edu/cate/vol8/iss1/5 This Special Topic Article: Urban Wildlife is brought to you for free and open access by the Biology at Digital Commons @ Loyola Marymount University and Loyola Law School. It has been accepted for inclusion in Cities and the Environment (CATE) by an authorized administrator of Digital Commons at Loyola Marymount University and Loyola Law School. For more information, please contact [email protected]. Numi Mitchell The Conservation Agency, [email protected] Coyotes Go “Bridge and Tunnel”: A Narrow Opportunity to Study the Socio-ecological Impacts of Coyote Range Expansion on Long Island, NY Pre- and Post-Arrival Currently, Long Island, NY is without a breeding population of northeastern coyote (Canis latras var.), yet recent evidence of dispersing individuals on the island, coupled with the “dogged” momentum of coyote range expansion across North America, suggests a Long Island coyote population is close at hand.
    [Show full text]