Think Richmond Industrial Centre. International Vancouver Airport

Total Page:16

File Type:pdf, Size:1020Kb

Think Richmond Industrial Centre. International Vancouver Airport Vancouver Vancouver International Highway 91 Airport Westminster Highway Think Big. Highway 99 Think Richmond Industrial Centre. Blundell Road Richmond Industrial Centre is the largest business park campus in the history of Metro Vancouver, providing over 2.8 million square feet of leasable space in a new 170-acre industrial estate. Richmond Industrial Centre offers a wide range of capacity and design options suitable for various sizes of business. The current phase of development is Building 4, totaling 300,000 square feet, with anticipated delivery Q1 2021. Port ofRichmond Vancouver’s Logistics Hub 170 Acres SF Facts & Figures2.8 M Total Area: 12 Buildings: SF 300,000 Building 4 40 Acres Green Space: Jobs 4,800 Employment Generation: Richmond Industrial Centre campus buildings offer state-of-the-art features including: • 32’ clear ceiling heights • 185’ loading courts • 9’ x 10’ dock doors equipped with 40,000 lb • LED lighting hydraulic levelers, seals and bumpers Market-leading design focused on efficiency • ESFR sprinkler systems More – Richmond Industrial Centre incorporates • 55’ x 35’ standard column grid sustainable and innovative design features • 2,000A, 347/600V, 3-phase electrical service to cost-effectively deliver optimum building • 60’ staging bays (additional capacity available) Efficient specifications. • 50’ reinforced concrete loading aprons • High volume destratification fans • 16’ x 16’ drive-in loading doors • Offices built-to-suit • Warehouse floors designed for 750 lbs per • Designed to the latest ASHRAE standards square foot live load Built-To-Suit Key Plan BLUNDELL ROAD BUILDING By Montrose BUILDING 3 8 BUILDING 1 100% • Site preparation has been progressing rapidly with the recent completion of the LEASED Blundell Road extension. Richmond Industrial Centre can now accommodate space requirements from 200,000 square feet to over 300,000 square feet. ZYLMANS WAY PIERSON ROAD Design NO. 7 ROAD CANAL BUILDING BUILDING BUILDING 4 9 2 Each building at Richmond Industrial Centre will be built-to-suit its lead tenant’s needs and can be 300,000 SF customized to accommodate a wide variety of features, such as: BUILDING 6 BUILDING 10 BUILDING 7 Refrigeration and floor Conveyors, carousels and Cranes and floor pads for drains for food processing sorters for distribution manufacturing and processing FRANCIS ROAD Zoning PORT OF VANCOUVER Richmond Industrial Centre is currently zoned Industrial (I) and permits a wide range of general and BUILDING 11 FUTURE DEVELOPMENT heavy industrial uses. This allows the flexibility to accommodate manufacturing, sales and service of heavy machinery, warehousing, and yard areas for the storage of materials, equipment, as well as container stacking. Projected Delivery Dates* SAVAGE ROAD SAVAGE BUILDING 12 B u i l d i n g 3 200,000 SF 100% LEASED Delivery July 2020 Preload Delivery B u i l d i n g 4 300,000 SF completion as early as December 2019 January 2021 Buildings 1, 2, 6- 13 FUTURE DEVELOPMENT BUILDING 13 *Please note the projected delivery dates above are based on Q2 2019 lease execution FRASER N RIVER 99 West Vancouver CN Rail Over 6.5 million square feet of import and export distribution 99 1 centres are located directly to the east of Richmond Industrial Trans-Canada Hwy North Vancouver Centre. Importers can capitalize on reduced transportation Lions Gate Bridge and container evacuation costs afforded by a neighbouring full service, 27-acre container yard. Ironworkers Memorial Bridge CP Rail Location, Centerm Vanterm CP Rail Port Moody Burrard Street Hastings St Bridge 7A St. Johns St Granville Street Cambie Street Port Coquitlam Bridge Bridge Clark Dr Burnaby Location, Broadway 7 7 Coquitlam Pitt River Bridge & Mary Hill Interchange Canada Way CN Rail Lougheed Hwy Kingsway 7 Vancouver 99 CN Rail 7B Location 1 CP Rail 7 CP Intermodal Pitt Meadows New Westminster Douglas McBride Blvd 203 St Maple Ridge CN Rail Port Mann Island PITT MEADOWS Knight St Bridge Richmond Industrial Centre is ideally located for cost-effective, Granville St REGIONAL Patullo raser Perim Tenth Ave South F eter Rd Bridge CN Rail AIRPORT timely and efficient transportation. Highway 91, which provides CP Rail Knight Street Boundary Rd Arthur Laing M 17 Bridge Oak Street Bridge arine CN Intermodal quick connections to Highways 99 and 17, is accessed by both the W Bridge a Golden Ears CN Rail y Queensborough 1 Barnston Nelson Road and Westminster Highway interchanges. Richmond Bridge Island Bridge VANCOUVER Fraser 7 Surrey CP Rail INTERNATIONAL 91A CN Rail Industrial Centre is centrally located relative to Metro Vancouver’s AIRPORT Docks East-West Connector 96 Ave McMillan major ports and Vancouver International Airport. 91 Island Annacis Trans-Canada Hwy Westminster Hwy Island 17 CN Rail Alex Fraser Fraser Hwy 15 CN Rail CN Bridge Southern Railway of BC Drive Times 99 BNSF Rail d R CN Rail King George Blvd r e Richmond aser et Distance th Fr Perim Surrey ou Destination S Minutes KM 91 200 St 10 Highway 91 4 3.0 Langley Southern Railway of BC George Township Highway 17 - South Fraser Perimeter Road 12 11.0 Massey 17 Tunnel Delta 10 1 10 LANGLEY Highway 1 - Trans-Canada Highway 28 26.0 AIRPORT 17A Westham Ladner Trunk Rd 99 Vancouver International Airport 16 17.8 Island BC RailCN Rail Fraser Surrey Docks 22 21.4 BOUNDARY Langley BAY 13 Trans-Canada Hwy Deltaport Wy AIRPORT Fraser Hwy Vanterm/Centerm Terminals 26 18.9 King George Blvd 15 27B Ave 17 Deltaport 29 29.3 d R BNSF Rail er FSNB 99 et rim CN Intermodal Terminal 27 32.8 e White Rock 176 St P er as Fr h CP Intermodal Terminal 32 32.1 ut So DeltaportDeltaport 8 Ave Canada - U.S. Border 27 35.2 BC Rail Port Subdivision BC FERRIES TERMINAL Date of analysis: April 9, 2019. Drive times represent estimates. The Team Montrose Property Holdings Ltd., along with their highly-experienced team of professional consultants, handle the entire process, from design and permitting to site preparation and construction. The dedicated Richmond Industrial Centre team uses their unparalleled knowledge of the Metro Vancouver industrial market to formulate and execute solutions that align companies’ real estate strategies with their business goals and deliver exceptional results. The team is committed to using their expertise to position you and your business for continued success. Leasing and Marketing: Colliers International Development Manager: Omicron Canada Inc. Design and Construction: Omicron is one of the largest integrated Omicron Architecture Engineering Construction Ltd. Montrose Property Holdings Ltd. is the parent company of Ecowaste Industries Ltd., a long development services, design and construction Civil Engineering: standing leader in the solid waste management firms in Western Canada, providing solutions Associated Engineering Ltd. field. to clients in the industrial, institutional, building Geotechnical Engineering: renewal, commercial, retail, and residential GeoPacific Engineering Ltd. Montrose/Ecowaste have applied the highest sectors. standards, employing an innovative approach Environmental Engineer: to land reclamation, and are pleased to provide Omicron was established in 1998 by people Pottinger Gaherty Environmental Consultants Ltd. this unique opportunity for a large-scale who believed real estate strategists, architects, Habitat Consultant: industrial property development. Our approach interior designers, engineers and builders could Keystone Environmental Ltd. to business is based on product quality and work together to deliver a better experience long-term ownership, incorporating the best throughout each step of a building project. Over Landscape Architect: technologies and innovation in our operations the years, we have realized that it is more than Connect Landscape Architecture and facilities, driving operational efficiency and our integration, it is the way we work together Legal: environmental sustainability. that delivers that better experience. We work Koffman Kalef LLP to build trust and pride, to get involved, to be leaders and to find efficiencies, every day. Property Manager: SDM Realty Advisors Ltd. Marketed by: STUART MORRISON Personal Real Estate Corporation Executive Vice President | Vancouver Phone: +1 604 662 2676 Email: [email protected] JOHN BOER Personal Real Estate Corporation Executive Vice President | Vancouver Phone: +1 604 662 2659 Email: [email protected] ROY PAT (白松恩) Personal Real Estate Corporation Associate Vice President | Vancouver Phone: +1 604 694 7204 Email: [email protected] COLLIERS INTERNATIONAL 200 Granville Street, 19th Floor Vancouver, BC V6C 2R6 +1 604 681 4111 www.collierscanada.com Development renderings shown are for general illustration purposes and should not be relied upon to accurately represent the building when completed. The developer reserves the right to make modifications before or after an Information Statement is filed. E.&O.E. This document/email has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of colliers international and /or its licensor(s). © 2019. All rights reserved. this communication is not intended to cause or induce breach of an existing listing agreement. Colliers Macaulay Nicolls Inc. PO11977a www.RICIndustrial.com.
Recommended publications
  • Vulnerability Assessment of Arizona's Critical Infrastructure
    Leadership in Sustainable Infrastructure Leadership en Infrastructures Durables Vancouver, Canada May 31 – June 3, 2017/ Mai 31 – Juin 3, 2017 SCOUR IN COMPLEX BRIDGE PIERS: FRASER AND PADMA RIVERS Jose A. Vasquez1,2, Kara I. Hurtig1, Matt S. Gellis1, Andre Zimmerman1, Bruce W. Walsh1. 1 Northwest Hydraulic Consultants Ltd. (NHC), North Vancouver, British Columbia, Canada 2 [email protected] ABSTRACT The construction of complex bridge piers in large sand-bed rivers has become increasingly common. These piers are made by driving or boring a group of piles deep into the riverbed and then connecting them by a pile cap on top, over which the stem of the pier supporting the deck is located. In contrast with conventional footings, the pile cap is located high above the riverbed and close to the water surface, functioning also as protection against ship collision. The combination of several piles, pile cap and stem above the riverbed gives the pier a complex geometry, which does not easily fit with the simple geometry commonly assumed by most scour prediction equations; hence the need for mobile-bed physical modelling in order to determine scour depths for design purposes. We report the results of several complex piers scour experiments carried out at Northwest Hydraulic Consultants’ laboratory including the Golden Ears Bridge, Port Mann Bridge and Pattullo Bridge in the Fraser River, British Columbia and the Padma River Bridge in Bangladesh. These pier tests encompass a wide range of conditions such as vertical and inclined piles (diameters from 1.8 to 3.0 m), rectangular, octagonal and dumbbell-shaped pile caps (pile cap lengths between 18 and 60 m), and flow discharges ranging from 2-year to 100-year floods.
    [Show full text]
  • Fall 2011 Baseline Truck Traffic in Metro Vancouver
    Fall 2011 Baseline Truck Traffic in Metro Vancouver Watercrossings, Border Crossings and Top 10 Truck Volume Locations (Weekday, 6AM-10PM) Transportation Committee Map of the Month March 12, 2014 Legend Screenline Volumes Total Vehicles Counted (fall weekday in 2011) Light and Heavy Commercial Trucks Lions Gate Bridge Passenger Vehicles, Motorcycles, 61,000 Vehicles Second Narrows Bridge Transit Vehicles, Bicycles 1% Trucks 120,000 Vehicles Daily Average from Auto Counts (no truck data) 5% Trucks Regional Land Use Designations Burrard Bridge Industrial and Mixed Employment 53,000 Vehicles Cambie Bridge General Urban 2% Trucks 46,000 Vehicles Agricultural, Conservation & Recreation, Rural 2% Trucks Highway 1 - West of Granville Bridge North Road Brunette Ave. - Pitt River Bridge 51,000 Vehicles 103,000 Vehicles South of Highway 1 70,000 Vehicles 1% Trucks 8% Trucks 53,000 Vehicles 6% Trucks 13% Trucks Port Mann Bridge Arthur Laing Bridge 96,000 Vehicles Knight St Bridge 72,000 Vehicles, 2% Trucks 7% Trucks 89,000 Vehicles Golden Ears Bridge Airport Connector Bridge- 19,000 Vehicles, 5% Trucks 8% Trucks Pattullo Bridge 27,000 Vehicles 8% Trucks Moray Bridge- 17,000 Vehicles, 5% Trucks 63,000 Vehicles Oak St Bridge 7% Trucks Dinsmore Bridge- 21,000 Vehicles, 2% Trucks 78,000 Vehicles Queensborough Bridge 3% Trucks 79,000 Vehicles No. 2 Road Bridge- 30,000 Vehicles, 1% Trucks Highway 1 - West of Highway 91 - West of 9% Trucks 176th Street No. 8 Road Alex Fraser Bridge 70,000 Vehicles 82,000 Vehicles 102,000 Vehicles 12% Trucks 10% Trucks 8% Trucks George Massey Tunnel 77,000 Vehicles 7% Trucks Highway 1 - East of 264th Street 59,000 Vehicles 12% Trucks Point Roberts Border Crossing Highway 13 Border Crossing 5,500 Daily Average Highway 99 Border Crossing Highway 15 Border Crossing 4,400 Daily Average No truck data 13,000 Vehicles 13,000 Vehicles No truck data 1% Trucks 14% Trucks A Note About the Border Crossings Highway 99 Border Crossing prohibits all commercial vehicles, but a small number of commercial trucks were observed on the survey day.
    [Show full text]
  • Dodam Bridge
    A GLOBAL BRIDGE World’s Longest Sea Bridge NETWORK SYSTRA has been a world leader in the World’s Longest Floating Bridge fi eld of transportation infrastructure for 60 years. Bridges are a major product SHEIKH JABER AL-AHMAD AL-SABAH CAUSEWAY line and a cornerstone of our technical Kuwait MONTREAL excellence in providing safe, effi cient, PARIS SEOUL and economical solutions. SAN DIEGO EVERGREEN POINT FLOATING BRIDGE World’s Longest Span International Bridge Technologies joined Seattle, Washington Railway Cable-Stayed Bridge NEW DELHI SYSTRA in 2017. The two companies DUBAI have combined their complementary World’s Longest technical expertise to offer specialized Concrete Span engineering services in all facets of bridge TIANXINGZHOU BRIDGE design, construction, and maintenance. China World’s Fastest Design & SYSTRA’s Global Bridge Network consists Construction Supervision on any Metro Project of over 350 bridge specialists deployed 3rd PANAMA CANAL CROSSING worldwide, with Bridge Design Centers Colón, Panama World’s Longest located in San Diego, Montreal, São Paolo, Double Suspension Bridge SÃO PAOLO Paris, Dubai, New Delhi, and Seoul. MECCA (MMMP) METRO Saudi Arabia CHACAO BRIDGE BRIDGE DESIGN CENTERS Chacao, Chile • SERVICES • Tender Preparation • BIM / BrIM • Conceptual Design • Complex Drafting & Specialized Detailing • Pre-Bid Engineering • Realistic Graphics • Proposal Preparation - 3D Renderings - Visual Animation • Specifications Preparation - Construction Sequence Animation • Bids Analysis • Technical Assistance During Construction
    [Show full text]
  • Land for LEASE
    Partnership. Performance. Image Source: Google River Road 1611 Patrick Street 0.912 acres (39,727 SF) Patrick Street Savage Road 1600 Savage Road 1.305 acres (56,846 SF) LAND FOR LEASE Opportunity 1600 SAVAGE ROAD & To lease two properties totalling 1611 PatrICK STREET approximately 2.22 acres of fenced RICHMonD, BC yard area in North Richmond Ryan Kerr*, Principal Angus Thiele, Associate 604.647.5094 604.646.8386 [email protected] [email protected] *Ryan Kerr Personal Real Estate Corporation 1600 SAVAGE ROAD & 1611 PatrICK StrEET RICHMonD, BC Location Property Details The subject properties provide the opportunity to lease up to 2.22 acres of fenced and secured yard space conveniently located off of River Road between Available Land Area Savage Road and Patrick Street, east of No. 6 Road, in north Richmond, BC. This site boasts a central location, with convenient access to Vancouver and the rest 1600 Savage Road 1.305 acres (56,846 SF) of the Lower Mainland via major arterials such as Knight Street, SW Marine Drive, 1611 Patrick Street 0.912 acres (39,727 SF) Highway 91, and Highway 99. Total 2.22 acres (96,573 SF)* Zoning *Approximately I-L (Light Impact Industrial Zone) is intended to accommodate and regulate Lease Rate the development of light impact industry, transportation industry, warehouses, $2.25 PSF Net distribution centres and limited office and service uses. Access Each property has one (1) point of access & Property Features egress • 1600 Savage Road is fenced and paved Available Immediately • 1611 Patrick Street is fenced and compacted gravel • Rare opportunity to lease yard of this size in Richmond Ryan Kerr*, Principal 604.647.5094 DriveD riveTime MapTimes Map [email protected] To Snug Cove To Langdale *Ryan Kerr Personal Real Estate Corporation Cypress Provincial Park ture Bay) par Horseshoe o (De Bay aim Nan To Whytecli HORSESHOE BAY Park Ferry Terminal Whytecli Lynn Headwaters MARINE DR.
    [Show full text]
  • Think Big. Vancouver Think Richmond Industrial Centre
    Think Big. Vancouver Think Richmond Industrial Centre. International Vancouver Airport Richmond Industrial Centre is the largest business park campus in the history of Metro Vancouver, providing over 2.8 million square feet of leasable space in a new 170-acre industrial estate. Highway 91 Richmond Industrial Centre offers a wide range of capacity Westminster Highway and design options suitable for various sizes of business. Highway 99 The current phase of development is 8011 Zylmans Way totaling 500,000 square feet, with anticipated delivery Q2 2021. Blundell Road Facts & Figures Total Area: 2.8 M SF 170 Acres Buildings: 12 Green Space: 40 Acres Employment Jobs Generation: 4,800 Port of Vancouver’s Richmond Logistics Hub Richmond Industrial Centre campus buildings offer state-of-the-art features including: • 36’ clear ceiling heights • 185’ loading courts • 9’ x 10’ dock doors equipped with 40,000 lb • LED lighting hydraulic levelers, seals and bumpers Market-leading design focused on efficiency • ESFR sprinkler systems More – Richmond Industrial Centre incorporates • 55’ x 35’ standard column grid sustainable and innovative design features • 2,000A, 347/600V, 3-phase electrical service to cost-effectively deliver optimum building • 60’ staging bays (additional capacity available) Efficient specifications. • 50’ reinforced concrete loading aprons • High volume destratification fans • 16’ x 16’ drive-in loading doors • Offices built-to-suit • Warehouse floors designed for 750 lbs per • Designed to the latest ASHRAE standards square foot live load Built-To-Suit Key Plan BLUNDELL ROAD 8020 8015 Zylmans By Montrose Pierson Way 8011 Zylmans Way Road 500,000 SF 100% • Site preparation has been progressing rapidly with the recent completion of the LEASED Blundell Road extension.
    [Show full text]
  • Bridging the Infrastructure Gap
    Bridging the Infrastructure Gap A Comparison of Bridge Infrastructure Crossing the Fraser River to Bridge Infrastructure in Four Major Western Canadian Cities By Get Moving BC September 2008 Table of Contents Table of Contents page 2 Executive Summary Page 3 Introduction page 7 Bridges in Western Canadian Cities: An Overview page 9 New Bridge Infrastructure is Being Added page 12 Bridge Traffic Volumes page 15 Traffic Congestion: An Overview page 19 The Cost of Traffic Congestion page 24 Conclusion and Recommendations page 26 Appendix A: Notes on the population and bridges of Edmonton page 30 Appendix B: Notes on the population and bridges of Calgary page 32 Appendix C: Notes on the population and bridges of Winnipeg page 35 Appendix D: Notes on the population and bridges of Saskatoon page 38 Appendix E: Notes on the population and bridges of Portland page 40 Appendix F: Notes on the population and bridges of the Lower Mainland page 44 2 – Bridging the Infrastructure Gap Executive Summary – Bridging the Infrastructure Gap By Get Moving BC – September 2008 Last October, Get Moving BC released a revealing study comparing bridges in the Portland area to bridges in the Lower Mainland. Despite having a significantly smaller metropolitan population than the Vancouver area, the Portland area was found to have significantly more bridges (60% more) and significantly more bridge lanes (75% more) crossing the Willamette River than the Vancouver area has crossing the Fraser River. Now, with our current study, “Bridging the Infrastructure Gap,” we have examined bridge infrastructure in four major western Canadian cities (Calgary, Edmonton, Winnipeg and Saskatoon) to see how well served these cities are compared to the Vancouver area.
    [Show full text]
  • Port Mann/Highway 1 Pre-Design Concepts
    FEEDBACK FORM ON BACK www.gatewayprogram.bc.ca PORT MANN/HIGHWAY 1 PRE-DESIGN CONCEPTS Pre-Design Community Consultation Discussion Guide • February – April 2006 PRE-DESIGN COMMUNITY CONSULTATION : Port Mann/Highway 1 The Ministry of Transportation will conduct community consultation at three design stages: Pre-design Consultation Open House Schedule February – April 2006 Langley: February 18, 2006 Walnut Grove Community Centre The purpose of the pre-design consultation on the Port Mann and 10:00 am – 1:00 pm 8889 Walnut Grove Drive Highway 1 Project is to obtain community and stakeholder feedback on pre-design concepts for improvements to the Port Mann/Highway 1 New Westminster: February 25, 2006 Centennial Community Centre corridor between Vancouver and Langley. The consultation seeks 10:00 am – 1:00 pm 65 East 6th Avenue feedback on goals for interchange upgrades, and draft options for congestion reduction measures such as high occupancy vehicle lanes, Burnaby: March 4, 2006 Burnaby Eight Rinks HOV and transit priority on-ramps, commercial vehicle priority access to 10:00 am – 1:00 pm 6501 Sprott Street on-ramps, potential tolling, and improvements to the cycling network. Burnaby: March 8, 2006 Bonsor Recreation Centre 6:00 pm – 9:00 pm 6550 Bonsor Avenue Preliminary Design Consultation Vancouver: March 25, 2006 Hastings Community Centre 2007 10:00 am – 1:00 pm 3096 East Hastings Street With basic pre-design components determined, consultation on Auditorium preliminary design discusses refi nements to interchanges and accesses, lane use, congestion reduction measures and other key features. Vancouver: March 29, 2006 Roundhouse Community Centre 6:00 pm – 9:00 pm 181 Roundhouse Mews, Great Hall Surrey: April 8, 2006 Guildford Recreation Centre 10:00 am – 1:00 pm 15105 105th Avenue Detailed Design Consultation 2008 Surrey: April 11, 2006 North Surrey Arena Detailed design consultation generally focuses on fewer but more detailed 6:00 pm – 9:00 pm 10275 – 135th Street treatments, such as specifi c interchange and access features, lighting and landscaping.
    [Show full text]
  • Pitt River Regional Greenway CONCEPT PLAN
    Concept Plan A Partnership Project between: GVRD • District of Pitt Meadows • District of Maple Ridge Pitt River Regional Greenway CONCEPT PLAN Table of Contents Summary 4 1.0 Introduction 1.1 What are Greenways? 5 1.2 Plan Purpose 6 1.3 Implementing the Greenway 6 • Planning Process 6 • Land Acquisitions 7 • Implementation Timeline 9 1.4 Regional Significance and Context for the Pitt River Greenway 9 1.5 Pitt River Greenway Objectives 12 • Recreation • Education • Partnerships • Ecosystem Management • Cultural Heritage 2.0 Pitt River Greenway Phase I 2.1 Overview • Context 13 • Existing Use and Conditions 13 • Phase I Issues and Actions 14 2.2 Development Sites • Sawyer’s Landing and River Front Park 15 • Pitt Meadows Airport 15 • Ford Road Staging Area 16 • Ferry Slip Road Staging Area 16 • Connection to Golden Ears Bridge 17 2.3 Ecological Sites 18 3.0 Pitt River Greenway Phase II 3.1 Overview • Context 19 • Existing Use and Conditions 19 • Phase II Issues and Actions 20 3.2 Development Sites • Pitt River Bridge 21 • Alouette River Greenway 21 • Quarry Connection 21 3.3 Ecological Sites 21 4.0 Pitt River Greenway Phase III 4.1 Overview • Context 22 • Existing Use and Conditions 22 • Phase III Issues and Actions 23 4.2 Development Sites • Sturgeon Slough 23 • Grant Narrows Regional Park 23 4.3 Ecological Sites • Pitt Addington Wildlife Management Area 24 5.0 Operations and Management of the Pitt River Greenway 24 References 25 Appendices: Comprehensive Inventory Appendix 1 Regional and Local Setting • Regional setting map • Pitt Meadows
    [Show full text]
  • 8.0 Effects Assessment Methods
    PORT METRO VANCOUVER | Roberts Bank Terminal 2 8.0 EFFECTS ASSESSMENT METHODS This section describes the methods used to assess potential Project-related effects, including cumulative effects. These methods have been developed to meet the requirements specified in the EIS Guidelines and are consistent with existing guidance documents, including the Operational Policy Statement Assessing Cumulative Environmental Effects Under the Canadian Environmental Assessment Act, 2012 (CEA Agency 2013) and Determining Whether a Project is Likely to Cause Significant Adverse Environmental Effects (CEA Agency 1994), the Cumulative Effects Assessment Practitioners’ Guide (Hegmann et al. 1999), and the Guideline for the Selection of Valued Components and Assessment of Potential Effects (EAO 2013), among others. The methods used, including the selection of VCs, allow the full consideration of the factors listed in subsection 19(1) and 19(2) of CEAA 2012, and section 79 of the Species at Risk Act. 8.1 ENVIRONMENTAL ASSESSMENT METHODS The EIS Guidelines, part 1, section 3.1, describe the scope of the proposed Roberts Bank Terminal 2 Project as including the construction, operation, and, where relevant, decommissioning of the Project components and activities listed in the EIS Guidelines, part 2, sections 7.1 and 7.2. A detailed description of Project components (i.e., marine terminal, widened causeway, expanded tug basin) and physical activities to be carried out during Project construction, decommissioning of temporary construction-related facilities, and
    [Show full text]
  • Bridge Crossing Loops – Fraser and Pitt Rivers
    Bridge Crossing Loops – Fraser and Pitt Rivers These Loops include Port Mann Bridge, Golden Ears Bridge, Pitt River Bridge, Alex Fraser Bridge, and Queensborough Bridge. The route follows as many greenways, regional parks and local parks as possible. The spectacular views from the bridge decks are the main focus of these rides. Four of these magnificent bridges are cable-stayed. For maps go to: Composite Google Map Google Earth kml GPX file Loop Mode Dist Brief Notes Suggested parking and access Port Mann – Golden Cycle 43.4 Takes in Colony Farm Regional Park and There is easy parking Ears – Pitt River Loop km Tynehead Regional Park as well as the Pitt at a number of River Greenway, the South PoCo Trail, and locations – upload the the Golden Ears Greenway. There is also Google Map or Google an option to take in the Surrey Bend Earth kml map. Regional Park. Using North PoCo Add The North PoCo Trail option Takes in trails Trail Option 10 along Hoy Creek and the Coquitlam River. km Port Mann – Alex Cycle 50 Takes in Colony Farm Regional Park, Humes Fraser – km Park, New Westminster Quay, Cross Surrey Queensborough Greenway, Green Timbers Forest, Tynehead Loop Regional Park. There is an option to go along the Fraser at the Brunette Fraser Regional Greenway. Complete Loop: Pitt Cycle 74.3 All of the above. The main route is the River – Golden Ears – km orange track that skips the Port Mann Alex Fraser - Bridge. Queensborough To do the 5 bridges in one trip without shuttling adds 17.5 km to the route by going over the Port Mann Bridge twice for a total of 92 km.
    [Show full text]
  • Bchn 1997-98 Winter.Pdf
    MEMBER SOCIETIES Member Societies and their Secretaries are responsible for seeing that the correct address for their society is up to date. Please send any change to both the Treasurer and the Editor at the addresses inside the back cover. The Annual Return as at October 31 should include telephone numbers for contact. MEMBERS’ DUES for the current year were paid by the following Societies: Alberni District Historical Society Box 284, Port Alberni, B.C. V9Y 7M7 Alder Grove Heritage Society 3190 - 271 St. Aldergrove, B.C. V4W 3H7 Arrow Lakes Historical Society Box 584, Nakusp, B.C. VOG 1 RO Atlin Historical Society Box 111, Atlin, B.C. VOW 1 AC Boundary Historical Society Box 580, Grand Forks, B.C. VOH 1 HO Bowen Island Historians Box 97, Bowen Island, B.C. VON 1 GO Burnaby Historical Society 6501 Deer Lake Avenue, Burnaby, B.C. V5G 3T6 Chemainus Valley Historical Society Box 172, Chemainus, B.C. VOR 1KO Cowichan Historical Society RO. Box 1014, Duncan, B.C. V9L 3Y2 District 69 Historical Society Box 1452, Parksville, B.C. V9P 2H4 East Kootenay Historical Association RO. Box 74, Cranbrook, B.C. Vi C 4H6 Gulf Islands Branch, BCHF do A. Loveridge, S.22, C.1 1, RR#1, Galiano. VON 1 P0 Hedley Heritage Society Box 218, Hedley, B.C. VOX 1 KO Kamloops Museum Association 207 Seymour Street, Kamloops, B.C. V2C 2E7 Koksilah School Historical Society 5203 Trans Canada Highway, Koksilah, B.C. VOR 2CC Kootenay Museum & Historical Society 402 Anderson Street, Nelson, B.C. Vi L 3Y3 Lantzville Historical Society do Box 274, Lantzville, B.C.
    [Show full text]
  • ASPIRE™ Spring 2009
    THE CONCRETE BRIDGE MAGAZINE Spring 2010 www.aspirebridge.org Otay River Bridge San Diego County, California hoover dam bypass Boulder City, Nevada angeles crest bridge 1 Los Angeles County, California elwha river bridge Clallam County, Washington sh58 ramp a flyover Golden, Colorado pacific street bridge Oceanside, California auction road bridge Lancaster County, Pennsylvania ASPIRE, Spring 2010 | 3 CONTENTS Social, Economic, and Ecological Benefits of Sustainable Concrete Bridges Features international bridge technologies 8 Focus on new concepts being used around the world keeps IBT 8 growing in its 10th year. hoover dam bypass 16 The Mike O’Callaghan–Pat Tillman Memorial Bridge at Hoover Dam set to open Fall 2010. angeles crest bridge 1 20 Searching for a practical solution. elwha river bridge 24 Battling the Terrain. sh58 ramp a flyover bridge 28 Colorado is using curved precast concrete U-girders to create cost-effective, long-span bridges where aesthetics and urban issues are key factors. Photo: International Bridge Technologies. pacific street bridge 34 Gracefully curved cast-in-place concrete bridge brings peace 12 of mind to community. auction road bridge replacement 40 Recreating an Historic Treasure. Departments editorial 2 reader response 4 concrete calendar 6 Preliminary rendering: Kiewit, HNTB, and FIGG. perspective—sustainable bridges 12 aesthetics commentary 31, 36 16 concrete connections 44 FHWA—ultra-high-performance concrete 46 STATE—concrete bridges in oregon 48 safety and serviceability 52 county—the bridge replacement program of grant county, washington 53 AASHTO lrfd specifications 56 Technologies. Bridge International Photo: Rendering: Central Federal Lands Highway Division, Federal Highway Administration. Advertisers Index Bridgescape . 27 Flatiron.
    [Show full text]